Quality Control Pertemuan 12 Mata kuliah: J0444 - Manajemen Operasional Tahun: 2010.

36
Quality Control Pertemuan 12 Mata kuliah : J0444 - Manajemen Operasional Tahun : 2010

Transcript of Quality Control Pertemuan 12 Mata kuliah: J0444 - Manajemen Operasional Tahun: 2010.

Page 1: Quality Control Pertemuan 12 Mata kuliah: J0444 - Manajemen Operasional Tahun: 2010.

Quality Control Pertemuan 12

Mata kuliah : J0444 - Manajemen OperasionalTahun : 2010

Page 2: Quality Control Pertemuan 12 Mata kuliah: J0444 - Manajemen Operasional Tahun: 2010.

Learning Objectives

• List and briefly explain the elements of the control process.

• Explain how control charts are used to monitor a process, and the concepts that underlie their use.

• Use and interpret control charts. • Use run tests to check for nonrandomness in

process output. • Assess process capability.

Page 3: Quality Control Pertemuan 12 Mata kuliah: J0444 - Manajemen Operasional Tahun: 2010.

Phases of Quality Assurance

Acceptancesampling

Processcontrol

Continuousimprovement

Inspection of lotsbefore/afterproduction

Inspection andcorrective

action duringproduction

Quality builtinto theprocess

The leastprogressive

The mostprogressive

Page 4: Quality Control Pertemuan 12 Mata kuliah: J0444 - Manajemen Operasional Tahun: 2010.

Inspection

• How Much/How Often• Where/When • Centralized vs. On-site

Inputs Transformation Outputs

Acceptancesampling

Processcontrol

Acceptancesampling

Page 5: Quality Control Pertemuan 12 Mata kuliah: J0444 - Manajemen Operasional Tahun: 2010.

Where to Inspect in the Process

• Raw materials and purchased parts

• Finished products

• Before a costly operation

• Before an irreversible process

• Before a covering process

Page 6: Quality Control Pertemuan 12 Mata kuliah: J0444 - Manajemen Operasional Tahun: 2010.

Examples of Inspection Points

Type ofbusiness

Inspectionpoints

Characteristics

Fast Food CashierCounter areaEating areaBuildingKitchen

AccuracyAppearance, productivityCleanlinessAppearanceHealth regulations

Hotel/motel Parking lotAccountingBuildingMain desk

Safe, well lightedAccuracy, timelinessAppearance, safetyWaiting times

Supermarket CashiersDeliveries

Accuracy, courtesyQuality, quantity

Page 7: Quality Control Pertemuan 12 Mata kuliah: J0444 - Manajemen Operasional Tahun: 2010.

•Statistical Process Control: Statistical evaluation of the output of a process during production

•Quality of Conformance:A product or service conforms to specifications

Statistical Control

Page 8: Quality Control Pertemuan 12 Mata kuliah: J0444 - Manajemen Operasional Tahun: 2010.

Control Chart

• Control Chart– Purpose: to monitor process output to see

if it is random

– A time ordered plot representative sample statistics obtained from an on going process (e.g. sample means)

– Upper and lower control limits define the range of acceptable variation

Page 9: Quality Control Pertemuan 12 Mata kuliah: J0444 - Manajemen Operasional Tahun: 2010.

Control Chart

0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15

UCL

LCL

Sample number

Mean

Out ofcontrol

Normal variationdue to chance

Abnormal variationdue to assignable sources

Abnormal variationdue to assignable sources

Page 10: Quality Control Pertemuan 12 Mata kuliah: J0444 - Manajemen Operasional Tahun: 2010.

Statistical Process Control

• The essence of statistical process control is to assure that the output of a process is random so that future output will be random.

Page 11: Quality Control Pertemuan 12 Mata kuliah: J0444 - Manajemen Operasional Tahun: 2010.

Produce GoodProvide Service

Stop Process

Yes

NoAssign.

Causes?Take Sample

Inspect Sample

Find Out WhyCreate

Control Chart

Start

Statistical Process Control Steps

Page 12: Quality Control Pertemuan 12 Mata kuliah: J0444 - Manajemen Operasional Tahun: 2010.

Statistical Process Control

• Variations and Control– Random variation: Natural variations in the

output of a process, created by countless minor factors

– Assignable variation: A variation whose source can be identified

Page 13: Quality Control Pertemuan 12 Mata kuliah: J0444 - Manajemen Operasional Tahun: 2010.

Sampling Distribution

Samplingdistribution

Processdistribution

Mean

Page 14: Quality Control Pertemuan 12 Mata kuliah: J0444 - Manajemen Operasional Tahun: 2010.

Normal Distribution

Mean

95.44%

99.74%

Standard deviation

Page 15: Quality Control Pertemuan 12 Mata kuliah: J0444 - Manajemen Operasional Tahun: 2010.

Control Limits

Samplingdistribution

Processdistribution

Mean

Lowercontrol

limit

Uppercontrol

limit

Page 16: Quality Control Pertemuan 12 Mata kuliah: J0444 - Manajemen Operasional Tahun: 2010.

SPC Errors

• Type I error– Concluding a process is not in control

when it actually is.

• Type II error– Concluding a process is in control when it

is not.

Page 17: Quality Control Pertemuan 12 Mata kuliah: J0444 - Manajemen Operasional Tahun: 2010.

10-17

Type I and Type II Errors

In control Out of control

In control No Error Type I error

(producers risk)

Out of control

Type II Error

(consumers risk)

No error

Page 18: Quality Control Pertemuan 12 Mata kuliah: J0444 - Manajemen Operasional Tahun: 2010.

Type I Error

Mean

LCL UCL

/2 /2

Probabilityof Type I error

Page 19: Quality Control Pertemuan 12 Mata kuliah: J0444 - Manajemen Operasional Tahun: 2010.

Observations from Sample Distribution

Sample number

UCL

LCL

1 2 3 4

Page 20: Quality Control Pertemuan 12 Mata kuliah: J0444 - Manajemen Operasional Tahun: 2010.

Control Charts for Variables

• Mean control charts

– Used to monitor the central tendency of a process.

– X bar charts

• Range control charts

– Used to monitor the process dispersion

– R charts

Variables generate data that are Variables generate data that are measuredmeasured..

Page 21: Quality Control Pertemuan 12 Mata kuliah: J0444 - Manajemen Operasional Tahun: 2010.

Mean and Range Charts

UCL

LCL

UCL

LCL

R-chart

x-Chart Detects shift

Does notdetect shift

(process mean is shifting upward)

SamplingDistribution

Page 22: Quality Control Pertemuan 12 Mata kuliah: J0444 - Manajemen Operasional Tahun: 2010.

x-Chart

UCL

Does notreveal increase

Mean and Range Charts

UCL

LCL

LCL

R-chart Reveals increase

(process variability is increasing)

SamplingDistribution

Page 23: Quality Control Pertemuan 12 Mata kuliah: J0444 - Manajemen Operasional Tahun: 2010.

Control Chart for Attributes

• p-Chart - Control chart used to monitor the proportion of defectives in a process

• c-Chart - Control chart used to monitor the number of defects per unit

Attributes generate data that are Attributes generate data that are countedcounted..

Page 24: Quality Control Pertemuan 12 Mata kuliah: J0444 - Manajemen Operasional Tahun: 2010.

Use of p-Charts

• When observations can be placed into two categories.– Good or bad– Pass or fail– Operate or don’t operate

• When the data consists of multiple samples of several observations each

Page 25: Quality Control Pertemuan 12 Mata kuliah: J0444 - Manajemen Operasional Tahun: 2010.

Use of c-Charts

• Use only when the number of occurrences per unit of measure can be counted; non-occurrences cannot be counted.– Scratches, chips, dents, or errors per item– Cracks or faults per unit of distance– Breaks or Tears per unit of area– Bacteria or pollutants per unit of volume– Calls, complaints, failures per unit of time

Page 26: Quality Control Pertemuan 12 Mata kuliah: J0444 - Manajemen Operasional Tahun: 2010.

Use of Control Charts

• At what point in the process to use control charts

• What size samples to take

• What type of control chart to use

– Variables

– Attributes

Page 27: Quality Control Pertemuan 12 Mata kuliah: J0444 - Manajemen Operasional Tahun: 2010.

Run Tests

• Run test – a test for randomness

• Any sort of pattern in the data would suggest a non-random process

• All points are within the control limits - the process may not be random

Page 28: Quality Control Pertemuan 12 Mata kuliah: J0444 - Manajemen Operasional Tahun: 2010.

Nonrandom Patterns in Control charts

• Trend• Cycles• Bias• Mean shift• Too much dispersion

Page 29: Quality Control Pertemuan 12 Mata kuliah: J0444 - Manajemen Operasional Tahun: 2010.

Counting Above/Below Median Runs (7 runs)

Counting Up/Down Runs (8 runs)

U U D U D U D U U D

B A A B A B B B A A B

Counting RunsCounting Runs

Page 30: Quality Control Pertemuan 12 Mata kuliah: J0444 - Manajemen Operasional Tahun: 2010.

NonRandom Variation

• Managers should have response plans to investigate cause

• May be false alarm (Type I error)• May be assignable variation

Page 31: Quality Control Pertemuan 12 Mata kuliah: J0444 - Manajemen Operasional Tahun: 2010.

• Tolerances or specifications

– Range of acceptable values established by engineering design or customer requirements

• Process variability

– Natural variability in a process

• Process capability

– Process variability relative to specification

Process Capability

Page 32: Quality Control Pertemuan 12 Mata kuliah: J0444 - Manajemen Operasional Tahun: 2010.

Process Capability

LowerSpecification

UpperSpecification

A. Process variability matches specifications

LowerSpecification

UpperSpecification

B. Process variability well within specifications

LowerSpecification

UpperSpecification

C. Process variability exceeds specifications

Page 33: Quality Control Pertemuan 12 Mata kuliah: J0444 - Manajemen Operasional Tahun: 2010.

Process Capability Ratio

Process capability ratio, Cp = specification widthprocess width

Upper specification – lower specification6

Cp =

3

X-UTLor

3

LTLXmin=C pk

If the process is centered use Cp

If the process is not centered use Cpk

Page 34: Quality Control Pertemuan 12 Mata kuliah: J0444 - Manajemen Operasional Tahun: 2010.

Limitations of Capability Indexes

1. Process may not be stable

2. Process output may not be normally distributed

3. Process not centered but Cp is used

Page 35: Quality Control Pertemuan 12 Mata kuliah: J0444 - Manajemen Operasional Tahun: 2010.

10-35

Example

MachineStandard Deviation

Machine Capability Cp

A 0.13 0.78 0.80/0.78 = 1.03

B 0.08 0.48 0.80/0.48 = 1.67

C 0.16 0.96 0.80/0.96 = 0.83

Cp > 1.33 is desirableCp = 1.00 process is barely capableCp < 1.00 process is not capable

Page 36: Quality Control Pertemuan 12 Mata kuliah: J0444 - Manajemen Operasional Tahun: 2010.

The End