7/27/2019 Quality and NCRs.pptx
1/5
Quality
What is Quality
Product or service meeting requirement specified and
intended both
Shall be In Built
Meeting Code, Standards, DEP, Procedure requirements
What Is NCR ?
Deviation from the required
Below standards
Not fit for purpose
Why NCR occur ? >>>>
-
7/27/2019 Quality and NCRs.pptx
2/5
Quality
poor work man-ship at manufacturing / Construction
as well as during installations stage Poor supervision / lack of supervision
lack of Team work (within Contractor group itself andwith PMC and OWNER)
Stakeholder unnecessary pressurize for job completionon urgent basis
Procedure and Systems are not in place / not approved
Poor design / Inexperienced in field work and O&M
Root cause in many cases is just lack of clear andconcise communication from the Project Manager tothe Superintendent to the Foremen to the front linerswho actually carry out the work
Poor Project management or leadership
-
7/27/2019 Quality and NCRs.pptx
3/5
Quality
Construction methods & site conditions / preparation
in some cases creating difficult situations thatcompromises qualityOther Reasons for NCRs
Resources
Skill shortage / Lack of training / Inadequate training
Inexperienced site QC personnel / Incompetentpersonnel
Human factor
laziness, carelessness complacency, incompetence,unauthorized changes
Lack of awareness about the procedures, methodology
Not adhering to approved inspection and test plans .
-
7/27/2019 Quality and NCRs.pptx
4/5
Quality
Issues with Vendor
Failure to monitor vendors
Equipment arrives on site and does not
comply with project specified requirements Dispatching the equipment's at project sites
in-spite several open FAT comments
Material arrives late or requires significantprogress chasing and is found to be
nonconforming
-
7/27/2019 Quality and NCRs.pptx
5/5
Quality
Project Surveillance and Audit
Please remember, audit is not mean to punish a contractor, it is a tool tohelp the contractor identify deficiencies, with the ability to act on them
before a NCR is issued
Audits on the other hand are a QA function and very much different from
Quality Control using check-list and surveillance visits.
Ongoing project surveillance with both PMC and Contractor QualityPersonnel, in addition to frequent Compliance audits will ensure that the
project is kept on track in most cases without the need for an NCR
These surveillance checks need not be lengthy, choose one particular item
and check the documentation / system followed to ensure its
completeness.
After repetitive issues (NCRs) follow up audit (additional Audit) is expected
in addition to planned audit program. Then audit criteria would be
assigned and an audit trail established into why the problem keeps
occurring