    Quality

    What is Quality

    Product or service meeting requirement specified and

    intended both

    Shall be In Built

    Meeting Code, Standards, DEP, Procedure requirements

    What Is NCR ?

    Deviation from the required

    Below standards

    Not fit for purpose

    Why NCR occur ? >>>>

  • 7/27/2019 Quality and NCRs.pptx

    2/5

    Quality

    poor work man-ship at manufacturing / Construction

    as well as during installations stage Poor supervision / lack of supervision

    lack of Team work (within Contractor group itself andwith PMC and OWNER)

    Stakeholder unnecessary pressurize for job completionon urgent basis

    Procedure and Systems are not in place / not approved

    Poor design / Inexperienced in field work and O&M

    Root cause in many cases is just lack of clear andconcise communication from the Project Manager tothe Superintendent to the Foremen to the front linerswho actually carry out the work

    Poor Project management or leadership

  • 7/27/2019 Quality and NCRs.pptx

    3/5

    Quality

    Construction methods & site conditions / preparation

    in some cases creating difficult situations thatcompromises qualityOther Reasons for NCRs

    Resources

    Skill shortage / Lack of training / Inadequate training

    Inexperienced site QC personnel / Incompetentpersonnel

    Human factor

    laziness, carelessness complacency, incompetence,unauthorized changes

    Lack of awareness about the procedures, methodology

    Not adhering to approved inspection and test plans .

  • 7/27/2019 Quality and NCRs.pptx

    4/5

    Quality

    Issues with Vendor

    Failure to monitor vendors

    Equipment arrives on site and does not

    comply with project specified requirements Dispatching the equipment's at project sites

    in-spite several open FAT comments

    Material arrives late or requires significantprogress chasing and is found to be

    nonconforming

  • 7/27/2019 Quality and NCRs.pptx

    5/5

    Quality

    Project Surveillance and Audit

    Please remember, audit is not mean to punish a contractor, it is a tool tohelp the contractor identify deficiencies, with the ability to act on them

    before a NCR is issued

    Audits on the other hand are a QA function and very much different from

    Quality Control using check-list and surveillance visits.

    Ongoing project surveillance with both PMC and Contractor QualityPersonnel, in addition to frequent Compliance audits will ensure that the

    project is kept on track in most cases without the need for an NCR

    These surveillance checks need not be lengthy, choose one particular item

    and check the documentation / system followed to ensure its

    completeness.

    After repetitive issues (NCRs) follow up audit (additional Audit) is expected

    in addition to planned audit program. Then audit criteria would be

    assigned and an audit trail established into why the problem keeps

    occurring