c Go n Grow Business Consulting Inc. © Eureka! Business Management Ltd 1
Quality in Projects
A Customer-focused Approach
c Go n Grow Business Consulting Inc. 2
Agenda
Quality Planning Exercise 1Exercise 2
Quality Assurance
Quality Control
c Go n Grow Business Consulting Inc. 3
Why Quality
Fundamental to staying in business Protect the Brand Retain customers Maintain internal morale Increase unit profitability Promotes versatility
c Go n Grow Business Consulting Inc. 4
Continuous Improvement
Out of the Crisis by W. Edwards Deming ,1986.
c Go n Grow Business Consulting Inc. 5
Constancy of Purpose
Long term vision Beyond current customer view Build for the future
c Go n Grow Business Consulting Inc. 6
Adopt a New Philosophy
Quality ahead of financial returns Starts in the boardroom Clear definition Clear organisation Design a work process, test it then refine it
c Go n Grow Business Consulting Inc. 7
Cease Mass Inspection
Too expensive to make, inspect, correct and release
Management has the responsibility to Learn the process Adjust it to eliminate defectsReduce inspectors
Move to statistical sampling
c Go n Grow Business Consulting Inc. 8
Differentiate Products
Stop the price tag alone approach Minimise total cost by
Building long term relationships withHigh quality suppliers Build value – a joint effort
c Go n Grow Business Consulting Inc. 9
Improve Continuously
Don’t manage the defects or outcomes Manage the system that produced the
defect
c Go n Grow Business Consulting Inc. 10
Train and Retrain
Skills to perform the job Why it is important How it fits into the system Understand upstream and downstream
user needs You are your supplier’s customer
c Go n Grow Business Consulting Inc. 11
Improve Leadership
Help people do a better job Help them be consistent Be a Visionary Ensure your managers know the system
c Go n Grow Business Consulting Inc. 12
Safe-fail Environments
Provide a sense of security Learn from failure Embrace change Acknowledge uncertainty Stress community
c Go n Grow Business Consulting Inc. 13
Eliminate Inter-Departmental Friction Interdependent NOT independent View the business as a whole Competition is overall improvement in
place of divisional ‘wins’
c Go n Grow Business Consulting Inc. 14
Eliminate Slogans
Ask people to what they can do Provide support to do a better job Design the system to eliminate problems Exhortations will frustrate where the
system is not designed for quality
c Go n Grow Business Consulting Inc. 15
Performance Appraisals
Eliminate numerical quotas Focus on well rather than many Reduce competition Substitute cooperation Design organisational rewards
c Go n Grow Business Consulting Inc. 16
Create Pride
Celebrate success – customer feedback Show how contribution is significant Most valuable asset is people
Their skills Teir ability to work together
c Go n Grow Business Consulting Inc. 17
Self-improvement
Vigorous programs Knowledge and skills in any area
Steve Jobs: Connecting the dots, humility & death
Job focused Personal development
By learning more, do better
c Go n Grow Business Consulting Inc. 18
Do It
Top management initiate actionsThrough seminars By teaching Showing by example
Put everyone to work to accomplish the transformation
c Go n Grow Business Consulting Inc. 19
What is “Quality”
The customer defines your quality standard Expectation = Fitness for Purpose A strategy to consistently meet requirements or
expectations A series of steps and activities that convert
inputs into outputs and deliver “value” Value = effectively satisfying customer needs Effectiveness = efficiency + flexibility
c Go n Grow Business Consulting Inc. 20
The Customer’s View
Customers feel variation not averages
Six Sigma is all about:
reducing variation in product or service quality
from the customer perspective
c Go n Grow Business Consulting Inc. 21
Quality Responsibility
Management owns the responsibility: As executives of the organisation As directors of delivery and supporting
processes Errors = 94% Management and processes,
6% worker fault Management have the authority and tools
to align resources to the customer needs
c Go n Grow Business Consulting Inc. 22
Quality Flows
From identification of the project purpose Integral to scope and deliverable definition Impact on risk and mitigation strategies Execution (assurance) and control
(control) phases Project close – lessons learned folded
back into continuous improvement process
c Go n Grow Business Consulting Inc. 23
Quality is When?
At each project stage Metrics defined at project planning Where cost of failure is greater than
Cost of appraisal and control and Cost of prevention
As a compulsory project process Integral to the regular status report
c Go n Grow Business Consulting Inc. 24
Quality is Maintained
Inspection steps throughout the planning, execution and close project phases
Determine special or common causes Problem solving teams – Ishikawa diagram:
People, Methods, Management, Technology, Measurements & Environment.
Change control Continuous improvement
c Go n Grow Business Consulting Inc. 25
Quality Planning
Define Product Quality Attributes Functionality Usability Reliability Performance Measurements
Plan Quality Processes Change Management Configuration Management Standards Procedures Testing Methods Tools
c Go n Grow Business Consulting Inc. 26
Define Attributes
Who is the Customer? Common agreement of outcome
What the product will accomplish for the usersClearly defined components What each component does How each component links the other
c Go n Grow Business Consulting Inc. 27
Who is the Customer?
Owner or user Owner puts the money up User has significant influence on the
specification Use is daily operational mode Cost-effective Team buy-in
Tripartite negotiations with PM facilitating
c Go n Grow Business Consulting Inc. 28
Acceptable Quality Level - AQL
Acceptable Quality Level. Also referred to as Assured Quality Level. The largest quantity of defectives in a certain sample size that can make the lot definitely acceptable; Customer will definitely prefer the zero defect products or services and will ultimately establish the acceptable level of quality. Competition however, will 'educate' the customer and establish the customer's values. There is only one ideal acceptable quality level - zero defects - all others are compromises based upon acceptable business, financial and safety levels.
c Go n Grow Business Consulting Inc. 29
Stakeholder Analysis Chart
Key Stakeholder
Strongly Against Having It Happen
Moderately Against Havening It Happen
Lets It Happen
Helps It Happen
Makes It Happen
Robyn o x
Rick o x
Joanna o x
Ruben o x
c Go n Grow Business Consulting Inc. 30
Influence Chart
Key Stakeholder Type of Resistance Underlying Issue Strategy
Robyn
Rick
Joanna
Ruben
Technical
Political
Organisational
Individual
Feelings of inadequacy with new technology
Loss of perceived power
Control
Emotional paralysis
Educate, involve in learning and inform
Stress what is gained through successful solutions
Give control over processes or give credit for successes
Support and consult without asking for decisions
c Go n Grow Business Consulting Inc. 31
Define Functionality
Cost of Quality Specification Duty cycle
Fitness for purpose Conforming to the customer requirement
c Go n Grow Business Consulting Inc. 32
Define Usability
Use in whose view Multiple perspectives Different outcomes for each perspective Back to the scope Negotiate a compromise Check on ‘fit-for-purpose’ and ‘cost of
quality’
c Go n Grow Business Consulting Inc. 33
Define Reliability
Availability Expected duty cycle
Expectation of errors Tolerance for errors Impact of errors
Maintainability Difficult, complex Lagging maintenance reduces reliability and, in turn,
availability
c Go n Grow Business Consulting Inc. 34
Define Performance
Standard a product is expected to deliver Link back into:
Fit for purpose Reliability Cost of quality Scope – Common agreement of outcome
c Go n Grow Business Consulting Inc. 35
Performance Is..
Input
Suppliers Effectiveness
Process
Your Efficiency
Output
Your Effectiveness
Develop key quality measures
Cycle time
How well you are meeting customer requirements
Cost Structure
Value Added
Labour Applied
c Go n Grow Business Consulting Inc. 36
Define Measurements
Measure performance Not too many parameters (Analysis paralysis)The ones that show up as a variance in the
customers eyes The ones that increase cost Those that have a significant impact where
performance fails or is sub standard
c Go n Grow Business Consulting Inc. 37
Measurement Tollgates
Create a Data Collection plan of: What to measure
Input = Supplier Effectiveness (1 to 2) Process = Your Efficiency (1 or 2) Output = Your Effectiveness (2 to 3)
Type of measure: Not too much; not too little Type of data
Discrete = on/off, good/bad Continuous = days, height, weight, length
Operational definitions = common language: no ambiguity Target/Specifications: Target = finite; Specifications = limits up or down Data collection forms that define
What a defect is Categories of defect Time frame to collect data Grid of data collection
c Go n Grow Business Consulting Inc. 38
Definition Reality
Time
Broadened Scope
Increased Quality to Match New Scope
Original Scope
Original Quality
Larger Team Increased
Cost
People Cost
c Go n Grow Business Consulting Inc. 39
Threat / Opportunity Matrix
Threats
Long Term Changes require a new skill-set
Lay-off’s through not meeting business goals
Customers regognise and reward organisation for exceptional work
Short Term
Increased negative publicity over internal actions
Profitability targets met
Short Term Long Term
Opportunities
c Go n Grow Business Consulting Inc. 40
Solution Payoff Matrix
Ease to Implement
Hard Install SAP as the ‘Best Practice’ information system
Install new fab lines without disrupting existing production
Easy
Change web site to provide ‘click-through’ to order entry
Eliminate 60% of non-value add activities in the set-up process
Low High
Business Impact
c Go n Grow Business Consulting Inc. 41
Solution Vision StatementSolution Action Result Behaviour
Modify patient registration form
Next Solution
Reduce lines to 5 from 14
Actions
Less time registering
Results
Greater personal attention to the customer More discretionary time to manage the process
More flexible behaviour
c Go n Grow Business Consulting Inc. 42
Plan Change Management Processes You don’t get it right first time As you build, you learn of greater possibilities Involve people in setting the priority changes –
what’s changed Assess the benefits against the cost Compromise on rigidity vs. fluidity Publish the change process widely and often
c Go n Grow Business Consulting Inc. 43
Plan Configuration Management Processes Identify errors as early as possible in the
lifecycle Costs of change are highly geared the further
you are in the process Spend time at the front doing lots of ‘what-if’
scenarios Start the Quality Control Walkthroughs right at
the beginning of the project lifecycle
c Go n Grow Business Consulting Inc. 44
Impact on the User - Historical
Traditional Project Transition
Transition Point
Degree of Change
Time
Learning CurveTurns Positive
T1 T3
Project Team Rolls OffOperations Takes Over
T2
The Valley of Despair
c Go n Grow Business Consulting Inc. 45
Current View
Early Project Transition
Transition Starts
Degree of Change
Time
Learning CurveTurns Positive
T1 T2
Transition Point
Project Team Rolls OffOperations Takes Over
Joint Team EffortTransition Gradient
T3
Project Team
Operations Team
a
b
c
c Go n Grow Business Consulting Inc. 46
Cause & Effect Diagram
Why are there so many'waits' in this process
Machine Methods
People Materials
Measurement
Mother Nature
Numbers inplace ofminutes
Traffic conflict
Tempramental
Thermometers
Pushproduction
Electrical'brown-outs'
Inferiormaterials
Costpressures
Layout
Training
Staff turnover
Power linesdown
c Go n Grow Business Consulting Inc. 47
Plan Procedures
Design or apply processes to Monitor quality Trigger changes
Align project processes to internal processes Bring your internal customers into the team as
experts Publish procedures widely and show respect for
the process – walk the talk.
c Go n Grow Business Consulting Inc. 48
Procedures - Actions
Communication Build awareness of demand for quality & opportunity for improvement Set goals for improvement Report progress Celebrate success and learning from failure
Organise Make the process acceptable to the people Take advice: use cross-functional teams
Train & retrain Don’t apply yesterday’s tools to today’s problems
Keep score Compare actual outcome to baseline
c Go n Grow Business Consulting Inc. 49
Plan Quality Management Tools
Tools include Critical to quality trees Process mapsCause and effect analysis Pareto diagrams and histogramsAffinity diagrams Run and control charts
c Go n Grow Business Consulting Inc. 50
10 Technical Tools
1. Critical to Quality Tree 2. Process Map 3. Histogram 4. Pareto Chart 5. Process Summary Worksheet6. Cause-Effect Diagram 7. Scatter Diagram8. Affinity Diagram 9. Run Chart 10. Control Chart
c Go n Grow Business Consulting Inc. 51
10 Soft Tools
Stakeholder Analysis Chart Planning for Influence Table Threat / Opportunity Matrix Pay-off Matrix Solution Vision Statement Team Meeting Agenda Ground Rules Parking Lot Plus / Delta Meeting Review Activity Reports
c Go n Grow Business Consulting Inc. 52
Balance People with Tools
Six Sigma is tool-heavy Statistics Processes Solutions
Six Sigma requires changed behaviours Managers Supervisors Line workers
Successful Six Sigma projects require: Intense strategic
communication Bringing people along as
part of the change process Training and retraining Providing safe-fail
environments Celebrating failures and
successes
c Go n Grow Business Consulting Inc. 53
Critical to Quality Tree
Registration
Courtesy
Timeliness
Accuracy
General Need Behaviour Required
Type of Room
Hospital Ward
c Go n Grow Business Consulting Inc. 54
The Critical To Quality Tree
Start with the Customer needs State the need as a noun with no adjective Move left to right until ‘how to measure’ is
described – not the unit of measure Once started, a branch should define
greater detail – not a new requirement
c Go n Grow Business Consulting Inc. 55
Your Turn, Now
For the next 45 minutes: Get into your teams and take a whiteboard Start defining and planning your quality
approach to your Archer solution At the end of 30 minutes, report out the full
class on your key activities
c Go n Grow Business Consulting Inc. 56
A Little Bit of Six Sigma
The Six Sigma HistoryMotorola under Bob Galvin
Acted on processes producing most variance
Allied Signal under Larry Bossidy Understood customer measures of effectiveness
General Electric under Jack Welch Pursued with passion
c Go n Grow Business Consulting Inc. 57
Philosophy of Six Sigma
Management responsible for work gets done
Customers see business as a series of processes
Strategic business objectives are: Revenue less Costs = Profit Margin Growth: continued customer satisfaction Sustainability via employee satisfaction
c Go n Grow Business Consulting Inc. 58
Standard Deviation
c Go n Grow Business Consulting Inc. 59
Partial Process Sigma Table
Long Term Yield Process Sigma Defects per 1,000,000
99.99966 6 3.4
99.98 5 233
99.4 4 6,210
93.3 3 66,807
84.1 2.5 158,655
69.1 2 308,538
50.0 1.5 500,000
c Go n Grow Business Consulting Inc. 60
Σ Calculation
Unit = food order Defects = too early or too late (1), inaccurate (1), not
fresh (1) Opportunities = 3 Examine 50 orders: result = early or late (13), inaccurate
(3), not fresh (0) Calculate: defects (16)/(units (50)x opportunities (3))x
1,000,000 [16/(50x3)x1,000,000 = 106,667] Σ between 2.7 and 2.8
c Go n Grow Business Consulting Inc. 61
Process Frequency Distribution
X
X
X X
X X X x
X X X X X X
x x x x X x x
Previous Day
12:00 to 2:00
2:01 to 4:00
4:01 to 6:00 6:01 to 8:00
8:01 to 10:00
Later Day
c Go n Grow Business Consulting Inc. 62
High-level DMAIC MethodologyDefine
Measure
AnalyseImprove
Control
• Charter • Customer needs, requirements• High-level process map
•Data collection plan•Data collection implementation plans
•Data analysis•Process analysis •Root cause analysis
•Solution generation•Solution selection•Solution implementation
•Control methods •The response plan
c Go n Grow Business Consulting Inc. 63
The Process Map
Map the representative process – not the best or worst
Capture steps as the actually occur – both easily seen and invisible (waits or moves)
Verify the map: Talk to people in the process Follow the process from beginning to end
Use verbs or adjectives to describe steps Use nouns to describe output and input Now, do a ‘to be’ process map of what should be
happening.
c Go n Grow Business Consulting Inc. 64
Process Map – Five Categories
DMAIC Step Define Analyse Improve
Identity of suppliers to the process
High level
Start the process of measurement
Greater detail
Understand the detail and validate the measurements
Should be maps
Map the solution and validate with experiments
Inputs provided
Function of the process
Out from the process
Customers of the process
c Go n Grow Business Consulting Inc. 65
Process Summary Worksheet
Process Step 1 2 3 4 5 6 Total Minutes
Percent
Time ( in minutes) 1 20 15 45 10 15 106 100.0
Value added x x 16 15.1
Non-value added x x x x 90 84.9
Moves 0 0
Delays x 45 42.5
Set-up 0 0
Internal failures x x 25 23.5
External failures x 20 18.9
Control / Inspection 0 0
Value-enabling 0 0
c Go n Grow Business Consulting Inc. 66
Plan Testing Methods
Statistical sampling User engagement via test scripts Component testing Unit testing Batch testing System testing Consolidated testing Final user acceptance testing
c Go n Grow Business Consulting Inc. 67
Run Chart – The Foundation
Weight by Week
55
60
65
70
75
80
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
Weeks
Kilo
's
Kilo's
c Go n Grow Business Consulting Inc. 68
Your Turn, Again
Get to your whiteboard space and: Brainstorm some processes that fit your
Archer project approach Develop a stakeholder map and strategies to
move the stakeholders to a positive point Brainstorm and justify your testing methods
Take 45 minutes – no more! Report out to the full group
c Go n Grow Business Consulting Inc. 69
Quality Assurance
Audit Processes
Verify Quality of the System
c Go n Grow Business Consulting Inc. 70
Quality Assurance
A planned and systematic set of activities to ensure that variances in processes are clearly identified, assessed and improving defined processes for fullfilling the requirements of customers and product or service makers.
A planned and systematic pattern of all actions necessary to provide adequate confidence that the product optimally fulfils customer's expectations.
A planned and systematic set of activities to ensure that requirements are clearly established and the defined process complies to these requirements.
"Work done to ensure that Quality is built into work products, rather than Defects." This is by (a) identifying what "quality" means in context; (b) specifying methods by which its presence can be ensured; and (c) specifying ways in which it can be measured to ensure conformance (see *Quality Control*, also *Quality*).
c Go n Grow Business Consulting Inc. 71
Quality Control – Assess Quality
Verify and Validate ProductsWalkthrough reviewsTechnical reviewsPhase reviews
Perform Acceptance TestingSolution Acceptance
Review Quality Standards
c Go n Grow Business Consulting Inc. 72
To Assess Quality
Clear specifications: don’t change the agreed definitions – modified by change processes
Use defined standards from an agreed baseline Historical experience Qualified resources Impartial design reviews
c Go n Grow Business Consulting Inc. 73
Quality Control
Also called statistical quality control. The managerial process during which actual process performance is evaluated and actions are taken on unusual performance.It is a process to ensure whether a product meets predefined standards and requisite action taken if the standards are not met.
------------
Quality Control measures both products and processes for conformance to quality requirements (including both the specific requirements prescribed by the product specification, and the more general requirements prescribed by *Quality Assurance*); identifies acceptable limits for significant *Quality Attributes*; identifies whether products and processes fall within those limits (conform to requirements) or fall outside them (exhibit defects); and reports accordingly. Correction of product failures generally lies outside the ambit of Quality Control; correction of process failures may or may not be included.
c Go n Grow Business Consulting Inc. 74
Run Chart – With Control Limits
Weight by Week
55
60
65
70
75
80
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
Weeks
Kilo
's
Kilo's
Upper Control Limit
Lower Control Limit
Trend
c Go n Grow Business Consulting Inc. 75
Run Chart: Expected Revised Control Limits
Weight by Week
55
60
65
70
75
80
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
Weeks
Kilo
's
Kilo's
Revised Upper Control Limit
Revised Lower Control Limit
c Go n Grow Business Consulting Inc. 76
Thank You for Your Participation