QP Dialogue 2018/02abci.gov.bn/ABCi Documents/FOR TAKLIMAT/QP Dialogue 2018... · 2018-05-23 ·...
Transcript of QP Dialogue 2018/02abci.gov.bn/ABCi Documents/FOR TAKLIMAT/QP Dialogue 2018... · 2018-05-23 ·...
![Page 1: QP Dialogue 2018/02abci.gov.bn/ABCi Documents/FOR TAKLIMAT/QP Dialogue 2018... · 2018-05-23 · verified by the QP is to be submitted. The inspection checklist will be emailed to](https://reader034.fdocuments.us/reader034/viewer/2022042116/5e931e77540bb048002a8072/html5/thumbnails/1.jpg)
QPDialogue2018/027th March20189:00AMDewanInderaPahlawan,MODTC
2018/02
![Page 2: QP Dialogue 2018/02abci.gov.bn/ABCi Documents/FOR TAKLIMAT/QP Dialogue 2018... · 2018-05-23 · verified by the QP is to be submitted. The inspection checklist will be emailed to](https://reader034.fdocuments.us/reader034/viewer/2022042116/5e931e77540bb048002a8072/html5/thumbnails/2.jpg)
AGENDA
• GeneralHousekeeping&Reminders• Process&FormUpdates• InspectionChecklistRequirement• QPScaleofFees• Q+A
2018/02
![Page 3: QP Dialogue 2018/02abci.gov.bn/ABCi Documents/FOR TAKLIMAT/QP Dialogue 2018... · 2018-05-23 · verified by the QP is to be submitted. The inspection checklist will be emailed to](https://reader034.fdocuments.us/reader034/viewer/2022042116/5e931e77540bb048002a8072/html5/thumbnails/3.jpg)
GeneralHousekeeping
ALL attachments uploaded on OneBiz are official submissionsand will be electronically stamped upon approval.
• File Naming (i.e LOT XXXX – BORANG A)• Correct and required documentation (i.eArchitectural Drawings for Borang C submission notrequired)• All Bomba fees are to be paid during OP stage
Reminders
2018/02
![Page 4: QP Dialogue 2018/02abci.gov.bn/ABCi Documents/FOR TAKLIMAT/QP Dialogue 2018... · 2018-05-23 · verified by the QP is to be submitted. The inspection checklist will be emailed to](https://reader034.fdocuments.us/reader034/viewer/2022042116/5e931e77540bb048002a8072/html5/thumbnails/4.jpg)
GeneralHousekeeping
QPs are to submit the names of 2 representativesto ABCi as requested on 18 January 2018• Copy of IC• Passport size photographs
Reminders
2018/02
![Page 5: QP Dialogue 2018/02abci.gov.bn/ABCi Documents/FOR TAKLIMAT/QP Dialogue 2018... · 2018-05-23 · verified by the QP is to be submitted. The inspection checklist will be emailed to](https://reader034.fdocuments.us/reader034/viewer/2022042116/5e931e77540bb048002a8072/html5/thumbnails/5.jpg)
Process&FormUpdatesGeneral- Borang A/C /E
2018/02
PleasenotethatwhenfillingouttheQPparticularsweareaskingforthePracticingCertificateNo. notBAPEQSRegistrationNo.:
00XXXAr
2018BAPEQS/XXXX✔
✘
![Page 6: QP Dialogue 2018/02abci.gov.bn/ABCi Documents/FOR TAKLIMAT/QP Dialogue 2018... · 2018-05-23 · verified by the QP is to be submitted. The inspection checklist will be emailed to](https://reader034.fdocuments.us/reader034/viewer/2022042116/5e931e77540bb048002a8072/html5/thumbnails/6.jpg)
Process&FormUpdatesBuildingApproval(Borang A)- Changes
QPsarerequiredtodeclarewhetheranOPforearthworkshasbeenapproved/obtained(ifapplicable)Additionally,QPswillberequiredtodeclarewhetherapprovalfromHousingDevelopmentDepartmenthasbeenobtainedforRPN/STKRJapplications(ifapplicable)
2018/02
![Page 7: QP Dialogue 2018/02abci.gov.bn/ABCi Documents/FOR TAKLIMAT/QP Dialogue 2018... · 2018-05-23 · verified by the QP is to be submitted. The inspection checklist will be emailed to](https://reader034.fdocuments.us/reader034/viewer/2022042116/5e931e77540bb048002a8072/html5/thumbnails/7.jpg)
Process&FormUpdatesBuildingApproval(Borang A)- Reminders
PleaseberemindedthatthesubmittingQPforBorang Aisdeclaringthefollowing:
2018/02
![Page 8: QP Dialogue 2018/02abci.gov.bn/ABCi Documents/FOR TAKLIMAT/QP Dialogue 2018... · 2018-05-23 · verified by the QP is to be submitted. The inspection checklist will be emailed to](https://reader034.fdocuments.us/reader034/viewer/2022042116/5e931e77540bb048002a8072/html5/thumbnails/8.jpg)
Process&FormUpdatesPermittoCarryoutBuildingWorks(Borang C)- Changes
QPsarerequiredtodeclarewhetheranOPforearthworkshasbeenapproved/obtained(ifapplicable)
2018/02
![Page 9: QP Dialogue 2018/02abci.gov.bn/ABCi Documents/FOR TAKLIMAT/QP Dialogue 2018... · 2018-05-23 · verified by the QP is to be submitted. The inspection checklist will be emailed to](https://reader034.fdocuments.us/reader034/viewer/2022042116/5e931e77540bb048002a8072/html5/thumbnails/9.jpg)
Process&FormUpdatesPermittoCarryoutBuildingWorks(Borang C)- Changes
QPswillneedtofilloutthesefieldsbydeclaringiftheyaretobesupervisingduringconstruction,orifanAccreditedCheckerhasbeenengaged(ifapplicable)
2018/02
![Page 10: QP Dialogue 2018/02abci.gov.bn/ABCi Documents/FOR TAKLIMAT/QP Dialogue 2018... · 2018-05-23 · verified by the QP is to be submitted. The inspection checklist will be emailed to](https://reader034.fdocuments.us/reader034/viewer/2022042116/5e931e77540bb048002a8072/html5/thumbnails/10.jpg)
Process&FormUpdatesPermittoCarryoutBuildingWorks(Borang C)- Reminders
2018/02
PleaseberemindedthatthesubmittingQPforBorang Cisdeclaringthefollowing:
![Page 11: QP Dialogue 2018/02abci.gov.bn/ABCi Documents/FOR TAKLIMAT/QP Dialogue 2018... · 2018-05-23 · verified by the QP is to be submitted. The inspection checklist will be emailed to](https://reader034.fdocuments.us/reader034/viewer/2022042116/5e931e77540bb048002a8072/html5/thumbnails/11.jpg)
InspectionChecklist
InadditiontosubmittingtheBuilder’sCertificateofCompletion(viaemail)whenbookinganinspection,anInspectionChecklistsignedbytheContractorandverifiedbytheQPistobesubmitted.
TheinspectionchecklistwillbeemailedtoallQPsandalsoavailabletodownloadfromtheMODwebsite.
General
2018/02
![Page 12: QP Dialogue 2018/02abci.gov.bn/ABCi Documents/FOR TAKLIMAT/QP Dialogue 2018... · 2018-05-23 · verified by the QP is to be submitted. The inspection checklist will be emailed to](https://reader034.fdocuments.us/reader034/viewer/2022042116/5e931e77540bb048002a8072/html5/thumbnails/12.jpg)
InspectionEtiquette
• Checklistmustbecompletelyfilledoutandincompliance.• QPrepresentativeandContractorrepresentativemustbepresentforALL inspections
General
2018/02
![Page 13: QP Dialogue 2018/02abci.gov.bn/ABCi Documents/FOR TAKLIMAT/QP Dialogue 2018... · 2018-05-23 · verified by the QP is to be submitted. The inspection checklist will be emailed to](https://reader034.fdocuments.us/reader034/viewer/2022042116/5e931e77540bb048002a8072/html5/thumbnails/13.jpg)
2018/02
![Page 14: QP Dialogue 2018/02abci.gov.bn/ABCi Documents/FOR TAKLIMAT/QP Dialogue 2018... · 2018-05-23 · verified by the QP is to be submitted. The inspection checklist will be emailed to](https://reader034.fdocuments.us/reader034/viewer/2022042116/5e931e77540bb048002a8072/html5/thumbnails/14.jpg)
2018/02
QPSCALEOFFEES
![Page 15: QP Dialogue 2018/02abci.gov.bn/ABCi Documents/FOR TAKLIMAT/QP Dialogue 2018... · 2018-05-23 · verified by the QP is to be submitted. The inspection checklist will be emailed to](https://reader034.fdocuments.us/reader034/viewer/2022042116/5e931e77540bb048002a8072/html5/thumbnails/15.jpg)
2018/02
Q+A
![Page 16: QP Dialogue 2018/02abci.gov.bn/ABCi Documents/FOR TAKLIMAT/QP Dialogue 2018... · 2018-05-23 · verified by the QP is to be submitted. The inspection checklist will be emailed to](https://reader034.fdocuments.us/reader034/viewer/2022042116/5e931e77540bb048002a8072/html5/thumbnails/16.jpg)
THANKYOU
2018/02