Team Members: Mr. Rajakumaran Kandasamy- Dy Manager Process Mr. Anwar Ajaj- Manager Mechanical JK Cement Muddapur QCFI

Transcript of QCFI JK Cement Muddapurqcfihyderabad.com/cementconclave2018/wp-content/uploads/2018/10/JK... ·...

Page 1: QCFI JK Cement Muddapurqcfihyderabad.com/cementconclave2018/wp-content/uploads/2018/10/JK... · Make-FLS 1000 TPH LS Reclaimer Make FLS 700 TPH Raw Mill VRM- FLS ATOX- 52.5 540 TPH

Team Members: Mr. Rajakumaran Kandasamy- Dy Manager

Process Mr. Anwar Ajaj- Manager Mechanical

JK Cement Muddapur

QCFI

Page 2: QCFI JK Cement Muddapurqcfihyderabad.com/cementconclave2018/wp-content/uploads/2018/10/JK... · Make-FLS 1000 TPH LS Reclaimer Make FLS 700 TPH Raw Mill VRM- FLS ATOX- 52.5 540 TPH

2

J.K. Cement Ltd. is part of the conglomerate of JK Organization the Companyis promoted by Mr. Yadupati Singhania and (Late) Dr. Gaur Hari Singhania. Thegroup entered the cement manufacturing business in 1975.

One of the largest white cement manufacturer in the World with 1.20MTPA capacity including 0.60 MTPA White Cement Plant at Fujairahcommissioned in Mar. 2014. Also 2nd largest producer of wall putty inIndia with installed capacity of 0.50 MTPA.

Highly reputed brand with extensive nation-wide distribution,expanded domestic grey cement capacity to 10.50 MTPA

JK Cement Muddapur is one of the integrated Grey Cement plant of JKGroup. Plant is situated at Karnataka state in India, having Capacity of2.20 MTPA Clinkerisation & 3.50 MTPA Finished Cement Grinding.

J K Cement Muddapur is certified with ISO 14001, ISO 9001 OHSAS 18001 &ISO 50001:2011

Brief introduction

Page 3: QCFI JK Cement Muddapurqcfihyderabad.com/cementconclave2018/wp-content/uploads/2018/10/JK... · Make-FLS 1000 TPH LS Reclaimer Make FLS 700 TPH Raw Mill VRM- FLS ATOX- 52.5 540 TPH

Process Flow & Major Equipment Specification

Mining & Crushing

Raw Mill & Coal Mill

Kiln & Cooler

Cement Mill

Packing Plant

MinesMuddapur161.87HectareHalki124.24HectareCrusherMake- L&T 900 TPHLS StackerMake-FLS1000 TPH LS ReclaimerMake FLS700 TPH

Raw MillVRM- FLSATOX- 52.5540 TPHCoal MillVRM- FLSATOX- 25.050 TPH SA CoalCoal Stacker Make- FLS130 TPHCoal ReclaimerMake FLS100 TPH

KilnFLSmidthILC- 4.75ǾX745500 TPDCalcinerLow NOxILC- 8.5ǾX52 Mtr.Cooler- FLSCross bar 4X6138.8 M2AFRSchenck Process20 TPH

Mill-01FLSmidthBall Mill 4.6 Ǿ140 TPH OPCMill-02FLSmidthBall Mill 4.6 Ǿ140 TPH OPCMill-03Gebr. PfeifferVRM- MPS 5600160 TPH Slag

PKR 1-4EEL India Ltd.12 Spout Double Discharge180 TPH

3

Page 4: QCFI JK Cement Muddapurqcfihyderabad.com/cementconclave2018/wp-content/uploads/2018/10/JK... · Make-FLS 1000 TPH LS Reclaimer Make FLS 700 TPH Raw Mill VRM- FLS ATOX- 52.5 540 TPH

708 705 693 682

47.92 52.89 45.11 44.90

77.38 84.74 72.53 72.32

2 0 1 5 - 1 6 2 0 1 6 - 1 7 2 0 1 7 - 1 8 2 0 1 8 - 1 9

Specific Heat (kCal/kg Clinker) Clinkerization (Kwh/T.clinker)

Total power (Kwh/T.cement)

Upto July’18

Energy ReductionΩ 2015-2017 Clinkerization

o 5.86% reduction

Total Plant Powero 6.26%

reduction Specific Heat

o 2.11% reduction

Specific Energy Consumption in last 3 years

Page 5: QCFI JK Cement Muddapurqcfihyderabad.com/cementconclave2018/wp-content/uploads/2018/10/JK... · Make-FLS 1000 TPH LS Reclaimer Make FLS 700 TPH Raw Mill VRM- FLS ATOX- 52.5 540 TPH

5

33.60

38.36

34.34

35.46

33.00

34.00

35.00

36.00

37.00

38.00

39.00

2015-16 2016-17 2017-18 2018-19

Cement grinding (Kwh/T.cem) Reasons for variation;Ω 2016-17: CM-3 G.box break down Mill load restricted to run

below 65% for 05 MonthΩ 2017-18: PSC grinding increased

from 17 % ( 3.08 Lac. MT) to 24 % ( 3.95 Lac. MT)

During monthly Kiln stoppage PSC grinding in Ball Mill.

Cement Grinding Performance

Page 6: QCFI JK Cement Muddapurqcfihyderabad.com/cementconclave2018/wp-content/uploads/2018/10/JK... · Make-FLS 1000 TPH LS Reclaimer Make FLS 700 TPH Raw Mill VRM- FLS ATOX- 52.5 540 TPH

6

Encon Last 3 yrs Projects Summary (FY’2015-2018)

Particular Units

Investment Category

Without Investment

Marginal**Investment

Medium Investment

Total

No of Project Implemented

Nos. 34.00 40.00 35.00 109.00

Electrical Energy saved

Million kWh

1.53 1.27 8.71 11.51

Thermal Energy saved

MillionKcal

3069.00 4324.00 8274.00 15667.00

*FY’(2015-2016-2017) ** Marginal investment ≤ 1.00 Lacs

Page 7: QCFI JK Cement Muddapurqcfihyderabad.com/cementconclave2018/wp-content/uploads/2018/10/JK... · Make-FLS 1000 TPH LS Reclaimer Make FLS 700 TPH Raw Mill VRM- FLS ATOX- 52.5 540 TPH

7

Saving Projects Without investment (FY’2015-2018)

*FY’(2015-2016-2017) ** Marginal investment ≤ 1.00 Lacs

Title of projectElectrical

Million KwhThermal MKcal

Saving (Million Rs.)

CM-1&2 transport bag filter stopped during Slag/ Pond ash feeding.

0.04 - 0.24

CM1&2 Mill vent fan damper removed & resulted reduction in pressure drop.

0.02 - 0.08

CM3, modification done in water injection nozzle and achieved reduction in Mill vibration stoppage as well as improvement in Mill stability.

0.02-

0.08

CM2, compressor air pressure optimizedfrom 6.5 to 5.5 bar.

0.05-

0.25

CM3, MD GRR cooling blowers run time reduced for energy conservation.

0.001 - 0.01

Page 8: QCFI JK Cement Muddapurqcfihyderabad.com/cementconclave2018/wp-content/uploads/2018/10/JK... · Make-FLS 1000 TPH LS Reclaimer Make FLS 700 TPH Raw Mill VRM- FLS ATOX- 52.5 540 TPH

8

Title of projectElectrical

Million KwhThermal MKcal

Saving (Million Rs.)

Optimization done in RABH hopper heater operation.

0.03 - 0.17

Coal mill return dust transport chain conveyor & rotary air lock continuous running changed in cyclic timer mode.

0.02 - 0.07

Coal Mill booster fan pressure drop across reduced by adjusting fan damper angle.

0.02 - 0.01

Coal mill hot air cyclone dip tube reduced by 200 mm for pressure drop reduction. 0.01 - 0.07

Raw mill production increased from 540 tph to 600 tph by process optimization. 0.28 - 1.40

Continue….

Saving Projects Without investment (FY’2015-2018)

Page 9: QCFI JK Cement Muddapurqcfihyderabad.com/cementconclave2018/wp-content/uploads/2018/10/JK... · Make-FLS 1000 TPH LS Reclaimer Make FLS 700 TPH Raw Mill VRM- FLS ATOX- 52.5 540 TPH

9

Title of projectElectrical

Million KwhThermal MKcal

Saving (Million Rs.)

RABH fan Auto PID operation to control PH fan outlet pressure.

0.22 - 1.19

RABH reverse air fan operation optimization.

0.04 - 0.21

Optimization of Raw Mill residue on 90 micron as well 212 micron.

0.02 - 0.13

Reduction of Raw Mill cyclone dip tube height by 200 mm.

0.05 - 0.29

Preheater False air reduction. 0.12 1530.00 2.50

Kiln optimization, Maintaining Oxygen % Max 3.0 % at PH outlet.

1.50 3069.00 4.19

Continue….

Saving Projects Without investment (FY’2015-2018)

Page 10: QCFI JK Cement Muddapurqcfihyderabad.com/cementconclave2018/wp-content/uploads/2018/10/JK... · Make-FLS 1000 TPH LS Reclaimer Make FLS 700 TPH Raw Mill VRM- FLS ATOX- 52.5 540 TPH

10

Title of projectElectrical

Million KwhThermal MKcal

Saving (Million Rs.)

Coal Mill outlet temperature control PID with booster fan as well as with Recirculation damper in complete auto mode.

0.01 - 0.07

RABH Rotary Air lock continuousrunning changed to cyclic timer mode for last 04 hoppers.

0.01 - 0.04

Pre-Heater Fan outlet junction point draft rectification.

0.41 - 2.26

Kiln Firing blower Motor derated from 110 kW to 90 kW.

0.03 - 0.17

Calciner coal firing motor derated from 160 kW to 110 kW.

0.05 - 0.28

Saving Projects Without investment (FY’2015-2018)

Page 11: QCFI JK Cement Muddapurqcfihyderabad.com/cementconclave2018/wp-content/uploads/2018/10/JK... · Make-FLS 1000 TPH LS Reclaimer Make FLS 700 TPH Raw Mill VRM- FLS ATOX- 52.5 540 TPH

11

Title of projectElectrical

Million KwhThermal MKcal

Saving(Million

Rs)

Investment (Million Rs.)

In CM-3, provision provided for direct diverting of OPC material to Silo-01 Elevator

0.02- 0.11 0.03

In CM3 water injection capacity upgraded from 10kl to 12kl, which resulted into minimized stoppage by vibration.

0.26 - 1.43 0.02

CM-3 Optimization without HAG for PPC & OPC grinding during monthly shutdown

0.16 4024.00 3.42 0.09

CM-3 Mill feed belt motor derated from 90 kW to 45 kW.

0.02 - 0.11 0.10

Saving Project with Marginal investment(FY’2015-2018)

Continue….

Page 12: QCFI JK Cement Muddapurqcfihyderabad.com/cementconclave2018/wp-content/uploads/2018/10/JK... · Make-FLS 1000 TPH LS Reclaimer Make FLS 700 TPH Raw Mill VRM- FLS ATOX- 52.5 540 TPH

12

Title of projectElectrical

Million KwhThermal MKcal

Saving(Million

Rs)

Investment (Million Rs.)

Modification in pulley diameter of calciner & Kiln firing blower for flow reduction.

0.02 300.00 0.42 0.03

Replacement of Raw Mill hopper building reversible belt motor of 11 kW with 7.5 kW

0.00 - 0.01 0.03

During Kiln shutdown , 30 kW small capacity water pump installed @ran instead of main pump of capacity 67kW.

0.07 - 0.38 0.05

Limestone stacker belt motor derated from 200 kW to 160 kW.

0.02 - 0.11 0.03

Continue….

Saving Project with Marginal investment(FY’2015-2018)

Page 13: QCFI JK Cement Muddapurqcfihyderabad.com/cementconclave2018/wp-content/uploads/2018/10/JK... · Make-FLS 1000 TPH LS Reclaimer Make FLS 700 TPH Raw Mill VRM- FLS ATOX- 52.5 540 TPH

13

Title of projectElectrical

Million KwhThermal MKcal

Saving(Million

Rs)

Investment (Million Rs.)

Raw Mill & Coal Mill False airreduction 0.03 0.16 0.08

Kiln feed Circuit Bag filter Optimization, suction line interconnected ( 01 Bag filter completely stopped)

0.02 0.08 0.02

Transport circuit Bag filter ( 535FN642) Motor replaced with low RPM motor.

0.02 0.09 0.04

Installed 67 kW water pump in place of 02 pump ( 55 kW & 33.5 kW)

0.16 0.88 0.10

Saving Project with Marginal investment(FY’2015-2018)

Page 14: QCFI JK Cement Muddapurqcfihyderabad.com/cementconclave2018/wp-content/uploads/2018/10/JK... · Make-FLS 1000 TPH LS Reclaimer Make FLS 700 TPH Raw Mill VRM- FLS ATOX- 52.5 540 TPH

14

Title of projectElectrical

Million KwhThermal MKcal

Saving(Million

Rs)

Investment (Million Rs.)

VFD Installation• Crusher Bag filter• Raw Mill feed belt bag filter• Cement Mill-1 Vent fan• Cement Mill-2 Vent fan• Cement Mill-3 De-dusting Fan• Packing Plant-1 Bag filter• Packing Plant-2 Bag filter• Raw Mill Water Spray pump• Coal Mill water spray pump• Cooler water spray• DPC water spray pump

0.73 4.02 4.01

Projects with Medium/Major investment (FY’2015-2018) Continue….

Page 15: QCFI JK Cement Muddapurqcfihyderabad.com/cementconclave2018/wp-content/uploads/2018/10/JK... · Make-FLS 1000 TPH LS Reclaimer Make FLS 700 TPH Raw Mill VRM- FLS ATOX- 52.5 540 TPH

15

Title of projectElectrical

Million KwhThermal MKcal

Saving(Million

Rs)

Investment (Million Rs.)

VFD Installation• CM-3 Feed Belt water Spray pump• Kiln Inlet seal Air Fan• Cement Silo-04 top Elevator• Cement Silo-01 Elevator• Dry Flyash Elevator

18.45 53.09 101.47 2.05

Application of Shell cooling fan at Kiln smoke chamber during shutdown instead of RABH fan

0.33 - 1.81 0.12

Coal Mill booster fan motor derated 0.02 - 0.11 0.22

Cooler Inlet CIS upgraded to ABC inlet

4.44 8274.00 32.63 20.00

Projects with Medium/Major investment (FY’2015-2018)

Page 16: QCFI JK Cement Muddapurqcfihyderabad.com/cementconclave2018/wp-content/uploads/2018/10/JK... · Make-FLS 1000 TPH LS Reclaimer Make FLS 700 TPH Raw Mill VRM- FLS ATOX- 52.5 540 TPH

16

Observation:• It has been observed that we were unable to run CM-3 on full output

exclusively in Silo 01-OPC Product

Problem:• CM-3 output got reduced up to 30% while filling exclusively in silo 01.• OPC grinding power consumption high

Root cause analysis:• Silo-1 elevator designed for Max. 200 tph • Silo-1 transport circuit design for CM-1 capacity

Modification:• Elevator motor replaced with high capacity.• VFD installation in Elevator.• As a second path, a duct also installed from CM-3 product elevator discharge to

Silo 01 feed elevator inlet.

Innovative Project-1

VRM Grinding Silo-1 Transport Circuit Optimization

Continue….

Page 17: QCFI JK Cement Muddapurqcfihyderabad.com/cementconclave2018/wp-content/uploads/2018/10/JK... · Make-FLS 1000 TPH LS Reclaimer Make FLS 700 TPH Raw Mill VRM- FLS ATOX- 52.5 540 TPH

Silo Model

OPC 2500 MT

OPC/ Composite 3750 MT

PSC3500 MT

PPC2500 MT

CM-1 CM-2 CM-3

Silo-1 Silo-2 Silo-3 Silo-4

Continue….

24

Innovative Project-1

Splitter

Page 18: QCFI JK Cement Muddapurqcfihyderabad.com/cementconclave2018/wp-content/uploads/2018/10/JK... · Make-FLS 1000 TPH LS Reclaimer Make FLS 700 TPH Raw Mill VRM- FLS ATOX- 52.5 540 TPH

18

Original silo storage combination was OPC = Silo 1&2; PPC = Silo 3; PSC = Silo 4.

In earlier days maximum OPC requirement was fulfilled by CM-3 due to its lower

specific power(30-31 kWh/MT CMT) and high throughput(220-230 tph in Silo-02).

Due to load restriction in silo-1 feed elevator we used to spilt path of CM-3 OPC

product in 50-50 ratio to fill both silo 1 & silo 2.

During Silo inspection we found higher vibration level on the Silo-04 top, filling

stopped planned for its strengthening work.

Again silo filling scenario changed to OPC = Silo-1; PPC = Silo-2; PSC = Silo-3. as

despatch requirement is only 5000 MT/day.

Brainstorming done to overcome the situation. Finally we got the solution and we

implemented successfully

Found solution to increase throughput by increasing the motor capacity & RPM

through VFD

Summary:Continue….

Innovative Project-1

Page 19: QCFI JK Cement Muddapurqcfihyderabad.com/cementconclave2018/wp-content/uploads/2018/10/JK... · Make-FLS 1000 TPH LS Reclaimer Make FLS 700 TPH Raw Mill VRM- FLS ATOX- 52.5 540 TPH

To increase throughput we have upgraded Elevator motor and installed VFD to

increase RPM by 13 %.

Saving calculation

◼ Mill Output restriction eliminated. Mill feed increased by 30-40 tph.

◼ Mill Power consumption reduction by 6-7 kWh/MT CMT.

◼ Cost saving= 39483.00 X 0.80 X 12.00 X 6.50X 7.00 = Rs. 17.20 Millions

Elevator Parameter OLD Motor New Motor

Load 45.00 55.00

RPM 1500.00 1500.00

VFD - 1700 (RPM Increased)

G. Box Elecon KCH280, 45:1

Saving Calculation

26

Innovative Project-1

Page 20: QCFI JK Cement Muddapurqcfihyderabad.com/cementconclave2018/wp-content/uploads/2018/10/JK... · Make-FLS 1000 TPH LS Reclaimer Make FLS 700 TPH Raw Mill VRM- FLS ATOX- 52.5 540 TPH

Cement Mill-3, VRM Operation Optimization without HAG/Shutdown for Production of OPC & PPC

Observation:• During grinding of OPC/ PPC product without HAG we have faced the

problem of Mill tripping by High load or High vibration.• Grinding of OPC/PPC in CM-1/CM-2 Ball Mill is not economical as compare

to CM-3.• During process stoppages of Mill required HAG firing for startup.• Some times smell observed in Cement sample.• Due to operational issue Mill Stopped & Product grinding start in Ball Mill.

Continue….

Innovative Project-2

Root cause Analysis:• Low Nozzle Ring Velocity.

o Nozzle ring area measurement taken and calculated the velocity. Thevelocity found <38.05 M/Sec.

27

Page 21: QCFI JK Cement Muddapurqcfihyderabad.com/cementconclave2018/wp-content/uploads/2018/10/JK... · Make-FLS 1000 TPH LS Reclaimer Make FLS 700 TPH Raw Mill VRM- FLS ATOX- 52.5 540 TPH

• High Damring Height.o Dam ring Height was maintain higher

side ~5.5 %• Water Spray Nozzle

o The installed nozzle was less effectiveto spray over the radial position oftrack.

• Dry Flyash Bin levelo Flushing effect of dry Flyash, whenever

bin filling start.• False Air

o Area identified source of false aircreated Mill temperature drop

• Slag Iron particle escape wayo No escape found on table for removal

of iron particle.

Continue….

Innovative Project-2

28

Page 22: QCFI JK Cement Muddapurqcfihyderabad.com/cementconclave2018/wp-content/uploads/2018/10/JK... · Make-FLS 1000 TPH LS Reclaimer Make FLS 700 TPH Raw Mill VRM- FLS ATOX- 52.5 540 TPH

Modification:• Nozzle ring area reduced to get velocity ~43.2 M/Sec.• Dam ring height reduced to ~4.8 %• New water spray nozzle installed and spray patternimproved• Dry flyash bin level ON/OFF filling optimize to getminimum surging effect.• False air minimized by change of sealing, patchingwork etc.• Accumulation of Slag iron particle on table due tohigh density. Several slots were cut at the bottom ofdam ring to escape iron particle.• Auto action logic prepared to control vibrationtripping -H1 alarm login- Reduction of grinding pressurefor 10 sec. with change of pressure setpoint & parallelseparator speed reduction by 10%. Same operation willresume with auto step command for separator.

Continue….Innovative Project-2

29

Page 23: QCFI JK Cement Muddapurqcfihyderabad.com/cementconclave2018/wp-content/uploads/2018/10/JK... · Make-FLS 1000 TPH LS Reclaimer Make FLS 700 TPH Raw Mill VRM- FLS ATOX- 52.5 540 TPH

Reduction in Shutdown grinding power consumption

Improvement in productivity as compare to Ball Mill( CM-1/CM-2)

HSD saving

Grinding performance during Kiln shutdown for 13 days

CM-1/2

OPC Grinding

PPC Grinding

Total Monthly Saving

Yearly saving

MT MT MT Million Millions

Before Modification 13200.00 16000.00 29200.00

0.10 1.26After Modification 11280.00 11293.00 22573.00

Difference 1920.00 4707.00 6627.00

Unit Saving, kWh 8832.00 10355.00 19187.00

Savings

Innovative Project-2

30

Page 24: QCFI JK Cement Muddapurqcfihyderabad.com/cementconclave2018/wp-content/uploads/2018/10/JK... · Make-FLS 1000 TPH LS Reclaimer Make FLS 700 TPH Raw Mill VRM- FLS ATOX- 52.5 540 TPH

39

o In earlier days we used to operateCM-3(VRM) through HAG system forOPC, PPC & PSC grinding during Kilnrunning as well during Kiln shutdown.

o Necessary modifications done in VRM.To run Mill in OPC & PPC without hotgases & PSC grinding in Ball Mill

o Mill heat up done through HAG dieselfiring system only at initial stage of millstart, later even if mill get trips in midtimes, can be started with clinkertemperature only.

115596

60600

50000

100000

150000

Fuel Consumption (LTR)

Fuel Consumption (LTR)

Before Project After Project

Monthly Fuel saved

YearlyFuel saved

C02 Emission saved

Liters Liters MT

109536.00 1314432.00 402.00

* Approx.. 40 Million saving

2.760.24

0.00

5.00

LTR/MT Cem

Before Project After Project

Continue….

** 03 months avg. figure

**

Innovative Project-2

Page 25: QCFI JK Cement Muddapurqcfihyderabad.com/cementconclave2018/wp-content/uploads/2018/10/JK... · Make-FLS 1000 TPH LS Reclaimer Make FLS 700 TPH Raw Mill VRM- FLS ATOX- 52.5 540 TPH

25

Observation:• It is been observed continuous formation of snowman at Cooler fixed inlet &

High Clinker temperature.

Problem:• Stoppages of kiln due to snowman formation.• Kiln output restricted to 5500 TPD, where potential of 6500TPD.• Low heat recovery which is leading to cooler in-efficiency.• High Clinker temperature• Red river formation

Root cause analysis/Study:• High alkali and sulphur in Raw mix. & Petcoke respectively• High liquid, Mgo & low LSF in Raw mix.• Low heat recovery due to snowman formation.

Cooler Optimization with Help of Technology upgradation-Installation of ABC Inlet by FLSmidth

Continue….

Innovative Project-3

Page 26: QCFI JK Cement Muddapurqcfihyderabad.com/cementconclave2018/wp-content/uploads/2018/10/JK... · Make-FLS 1000 TPH LS Reclaimer Make FLS 700 TPH Raw Mill VRM- FLS ATOX- 52.5 540 TPH

Modification• Cooler inlet change from CIS inlet to

ABC inlet

• Partitions done at 2nd compartment &

installed new fan

• Existing cooler MFR pattern modified

• Other small modification

Continue….

Innovative Project-3

32

Page 27: QCFI JK Cement Muddapurqcfihyderabad.com/cementconclave2018/wp-content/uploads/2018/10/JK... · Make-FLS 1000 TPH LS Reclaimer Make FLS 700 TPH Raw Mill VRM- FLS ATOX- 52.5 540 TPH

27

Continue….

Comparison before and after cooler modification

Parameter UnitBefore cooler modification

After cooler modification

Production tpd 6538.00 6539.00Snowman formation # Frequent NilCooler fan power consumption Kwh/T of Clk 5.98 4.81Clinker temperature (DBC) Deg C 169.00 143.00Sec. air temp Deg C 1086.00 1106.00Ter. Air temp Deg C 936.00 1011.00Cooler vent loss Kcal/Kg Ck 105.00 91.40Cooler efficiency % 67.50 73.10Cooler vent temperature Deg C 376.00 360.02Cooler vent mass flow kg/kg Clk 1.11 1.02P.H exit temp Deg C 288.00 280.00P.H fan-1 power Kwh 985.00 851.00P.H fan-1 power Kwh 990.00 853.00Sp. Power consumption of P.H fan Kwh/T of Clk 7.25 6.26

Innovative Project-3

Page 28: QCFI JK Cement Muddapurqcfihyderabad.com/cementconclave2018/wp-content/uploads/2018/10/JK... · Make-FLS 1000 TPH LS Reclaimer Make FLS 700 TPH Raw Mill VRM- FLS ATOX- 52.5 540 TPH

Particular Unit Before After Difference

Specific Energy Pyro kWh/ MT CLk 50.10 46.52 3.90

Specific heat Kcal/ Kg CLk 712.00 700.00 12.00

Plant production TPD 6500.00 6800.00 300.00

Yearly Unit saving Million Kwh

Saving based on Clinker production FY’16-17

i.e. 1237498 MT

4.82

Heat saved Million Kwh 8449.00

Coal Saved MT 1054.00

Money saved Million Rs. 32.63

After modification we are benefited by elimination of Snowman problem &improvement in specific heat consumption by Approx. 12 Kcal/Kg Clk.Further efforts enhanced the Plant production gradually to 7000 TPD.

Savings

Innovative Project-3

34

Page 29: QCFI JK Cement Muddapurqcfihyderabad.com/cementconclave2018/wp-content/uploads/2018/10/JK... · Make-FLS 1000 TPH LS Reclaimer Make FLS 700 TPH Raw Mill VRM- FLS ATOX- 52.5 540 TPH

29

Utilization of waste for replacing the Conventional Fuel (FY’2015-2018)

2015-162016-17

2017-182018-19 (Upto July'18)

0

1000

2000

3000

4000

5000

6000

7000

8000

9000

10000

Mt % TSR

1,967.5

0.7

727.0

0.3

3,995.1

1.8

9,596.2

8.0

AFR Consumption

1497

1819

2662

0

500

1000

1500

2000

2500

3000

2015-16 2016-17 2017-18

Coal saved

MT

Page 30: QCFI JK Cement Muddapurqcfihyderabad.com/cementconclave2018/wp-content/uploads/2018/10/JK... · Make-FLS 1000 TPH LS Reclaimer Make FLS 700 TPH Raw Mill VRM- FLS ATOX- 52.5 540 TPH

Utilisation of renewable energy sources

2505.6 2509.63081

0

1000

2000

3000

4000

FY'2015-2016 FY'2016-2017 FY'2017-2018

Renewable Energy Used, kWh

Renewable Energy

UOM FY’17-18 FY’18-19July

RPO Non Solar Million Rs. 55.70 58.70

RPO Solar Million Rs. 3.70 7.60

New Installation Million Rs. 0.18 1.43

35

Page 31: QCFI JK Cement Muddapurqcfihyderabad.com/cementconclave2018/wp-content/uploads/2018/10/JK... · Make-FLS 1000 TPH LS Reclaimer Make FLS 700 TPH Raw Mill VRM- FLS ATOX- 52.5 540 TPH

31

Higher Electrical Energy:o Due to every month shutdown (only 15-17

days kiln running in a month).o Unavailability of CF Silo.o During shutdown PSC grinding done from

Ball Mill.o Due to high % Grinding of OPC product.

Cement Grinding ratio OPC/PPC/PSC –45/32/23 for FY’17-18

72.32 64.00 57.04

0

20

40

60

80

Kwh/Mt.Cem

Best Achieve figure National Best International Best

684 676651

600

650

700

kCal/kg clinker

Best Achieve figure National Best International Best

682

Energy Benchmarking

* Data source: Energy benchmarking cement Industry in CII Awards

* FY’18-19 Year Plant Power

*

*

Higher Thermal Energy:o Due to Monthly stoppage in account

of Clinker tank full.o Due 100 % petcoke consumption.o AFR Consumptiono NOx reduction process through

primary abetment

Page 32: QCFI JK Cement Muddapurqcfihyderabad.com/cementconclave2018/wp-content/uploads/2018/10/JK... · Make-FLS 1000 TPH LS Reclaimer Make FLS 700 TPH Raw Mill VRM- FLS ATOX- 52.5 540 TPH

Road Map to achieve benchmark-National/Global (FY’2018-2020)

Internal Benchmark

• Goal set by Management

• KPI

Kaizen

• Tool for Improvement

• Employee Motivation

Innovative Projects

• For cost reduction

• MTBF improvement

Brainstorming

• Involvement of Employee

• Development of ideas

Process Audit

• Third party audits

• Internal Audit

Technology Upgradation

• For plant improvement

• Sustainability

Continue….

7

Road Map

Page 33: QCFI JK Cement Muddapurqcfihyderabad.com/cementconclave2018/wp-content/uploads/2018/10/JK... · Make-FLS 1000 TPH LS Reclaimer Make FLS 700 TPH Raw Mill VRM- FLS ATOX- 52.5 540 TPH

Future Projects (FY’2018-2020)

Future Project

Preheater water spray Nozzle upgradation ( Investment - 1.00, Sav- 5.40 )

Preheater down comer CFD Analysis Opportunity for pressure reduction to save the power by modification in the top cyclone (Inv-1.50, Sav-2.10)

PH 6th cyclone expansion joint replacement (Inv-0.80, Sav-1.70)

CF Silo erection (Inv-150.00, Sav-20.20)

False air reduction in pyro by dedicated team formation (Inv-0.30, Sav-1.90)

Cooler ESP fan Efficiency improvement by Fan impeller modification (Inv-2.5, Sav-0.8)

Efficiency improvement of coal mill fan by Impeller Modification (Inv-3.00, Sav-1.00)

Coal Mill Feeding screw conveyor up gradation to Rotary air lock for false air reduction & MTBF improvement (Inv-4.80, Sav-1.30)

Coal Mill Main Drive conversion to VFD (Inv-15.00, Sav-3.00)

• Inv = Investment in Million

• Sav = Savings in Million

Continue….

9

Page 34: QCFI JK Cement Muddapurqcfihyderabad.com/cementconclave2018/wp-content/uploads/2018/10/JK... · Make-FLS 1000 TPH LS Reclaimer Make FLS 700 TPH Raw Mill VRM- FLS ATOX- 52.5 540 TPH

Future Project

Coal Mill Baghouse bag upgradation ( Bag house DP reduction, Feed rate Improvement, Energy saving) (Inv-2.00, Sav-1.20)

Raw mill RAL up gradation-Heated RAL will minimized the stoppage due to coating formation inside the sluice during rainy season (Inv-8.00, Sav-12.70)

Laterite feeding capacity enlargement-Feeding system capacity improvement will help in consistency of recipe making (Inv-4.00, Sav-1.30)

Raw Mill Fan flow optimization through online flow sensor (Inv-0.50, Sav-0.30)

Shredder installation to Improve in AFR consumption by 5 tph (Inv-38.00, Sav-27.00)

Installation of new liquid firing AFR system in calciner (Inv-5.00, Sav-5.20)

Standby belt feeding system for AFR with belt-weigher (Inv-0.20, Sav-0.20)

Installation of 01 MW Wind Energy plant(Inv-50.00, Sav-32.76)

Installation of 05 MW Solar Power Plant (Inv-400.00, Sav-68.2)

Continue….

• Inv = Investment in Million

• Sav = Savings in Million10

Future Projects (FY’2018-2020)

Page 35: QCFI JK Cement Muddapurqcfihyderabad.com/cementconclave2018/wp-content/uploads/2018/10/JK... · Make-FLS 1000 TPH LS Reclaimer Make FLS 700 TPH Raw Mill VRM- FLS ATOX- 52.5 540 TPH

Future Project

Pre-grinder/ Crusher installation for Ball Mill productivity improvement & power reduction. (Inv-20.00, Sav-10.00)

CM-1 & CM-2( ball Mills), CFD analysis for separator circuit in account of pressure drop & dust circulation reduction. (Inv-1.20, Sav-0.90)

Installation of 4th hopper in CM-3 for addition Pond-ash/Slag for improving the clinker factor & consistency of Mill operation. (Inv-16.50, Sav-9.50)

CM-3( VRM) Hot air booster fan efficiency improvement (Inv-4.00, Sav-2.20)

Cement Silo-01 Elevator capacity upgradation (Inv-3.50, Sav-4.20)

Coal based HAG installation (Inv-60.00, Sav-20.50)

Procuring of bobcat machine for cleaning /de-breaking. (Inv-2.50, Sav-2.20)

Roof top solar power installation in Plant & Colony (Inv-1.00, Sav-2.80)

Approx. Total Investment Rs = 800.70 Million, Saving Rs= 300.40 Million

• Inv = Investment in Million

• Sav = Savings in Million11

Future Projects (FY’2018-2020)