QAQC cv

download QAQC cv

of 4

Transcript of QAQC cv

  • 8/12/2019 QAQC cv

    1/4

    CURRICULUM VITAERama Rao Rachakonda E mail:[email protected]

    Skype ID: r.ramarao1 Mobile No: +919848634421___________________________________________________________________________________________________________

    Knowledge Preview:

    o ShellApproved QC Welding Inspectoro Successfully completed More Then 18Shut downs in Shell GTL and Petro Rabigho More Than 10 Years Experience In Oil and Gas, Heavy Manufacturing and Inspection Serviceso Coordination with project department to install new equipment and site erection and commissioningo Reviewing Construction Drawings such as P&ID, Piping Isometric, Equipment, Structural, GAD.o Preparation of WPS, PQRand WPQas per ASME Sec IXo Familiar with CS,AS,SS and Inconel metals and GTAW,SMAW,SAW,GMAW,FCAWand Stud Weldingo Involved in Internal Audit and Document preparation as per ISO 9001-2008.o Worked As a Qc inspector in OFF Shore Helix Energy Solution KG-D6 Basin Reliance Projecto Familiar with code ASME SecI,IIA,IIC,V,VIII,IX,B16.25,B16.5,B31.1,B31.3,API-510,570,653, AWS

    D1.1,EN,DEP and IBR

    Career Objective:

    Seeking a quality environment where my knowledge and experience will be shared looking for the opportunity wheremy quality and responsible position that will impact company development and enrich professional skills .

    Educational Qualification:

    Diploma in Metallurgical Engg, From J.N.Govt Polytechnic Ramanthapur, Hyderabad, India

    S.S.C from R.B.V.R.Reddy.High School

    Professional Qualification:

    TWIU.KCSWIP 3.1 Welding Inspector (Cert. No. 58144) Expiry date01.08.2016 American Society for Nondestructive Test LevelII in Radiography Test

    Ultrasonic TestMagnetic Particle Test

    Penetrant Test

    Visual Test and

    Radiography Test Film Interpretation

    Safety Training Attended:

    H2S Safety Course -Petro Rabigh, Shell GTL QatarBreathing Apparatus course -Shell GTLPride in Production course attended -Shell GTLBasic Fire fighting, Work at Height, Confined Space, Heat Stress, Poor Light, LOTO,SPSP and Isolation attend inShell GTL

    Computer Knowledge:

    Windows 7 & XP, MS office, MS Outlook, SAP Basics Navigation and AIM-EDMS

    Membership Affiliation:

    Member IIM ST0240706 (Indian Institute of Metals)

    Members ISNTLM-8397-HD (Indian Society for Non Destructive Testing)

    Member BARC (Baba Atomic Research Centre)

    mailto:[email protected]:[email protected]:[email protected]
  • 8/12/2019 QAQC cv

    2/4

    Personal Profile:

    Father : R.Narsinga Rao

    Date of birth : 14.Sep.1984

    Nationality : INDIAN

    Passport No : G2860541 (Valid Until 19.April.2017)

    Address in India : Plot No.8, H. No. 4-121,

    Himagirinagar, Gandhamguda Village,

    Rajendranagar Mandal, R.R.Dist,Hyderabad500008, A.P, India

    Industrial Training:

    Worked in Metallurgical Lab as aTrainee in HMTBearings (Moulali) HYD, from 20.05.2002 to19.11.2002

    Worked as aQC Fabrication DivTrainee in B.H.E.L. (R.C.Puram) HYD, from 04.01.2003.to 02.06.2003

    Professional Experience:

    1) ORGANIZATION : Qatar Shell GTL (World Largest Gas to Liquid Production Plant)

    (Secondment through Inter serve& Madina Group W.L.L)DURATION : From May 2012 to Mar 2014

    DESIGNATION : QA/QC Welding Inspector (Maintenance)

    Company Profile: M/s Madina Group W.L.L. As an ISO 9001: 2008 Certified company and ASME U S A,PP, R& NB

    Authorized Stamp Holder for Manufacturing, repair& Alterations of Boilers &Pressure vessels and Piping

    Job Responsible:

    o Preparation ITP as per Approved Drawing Through SAP and AIMS EDMS and get signature from cliento Involved in QA/QC and Welding Inspection Activities and prepare Final Dossier for Client Approvalo Responsible to Inspect plant process equipment, maintenance (Corrective & Progressive Maintenance)o Raw materials Inspection Through warehouse when required, to ensure compliance with codes,

    Standards and Shell DEPspecifications.o To supervise all UP& Down-stream and shutdown inspection activities for statics and Rotating Equipmento To comply with all company Health, Safety and Environment as well as Work Permit, policies and procedures and follow

    the Life Savings Rules

    2) ORGANIZATION : Sohar Refinery Orpic(SHUT DOWN)

    (Secondment through SOHAR FOUNDRY AND MARINE ENGINEERING LLC)

    DURATION : From 2011 Nov to May 2012

    DESIGNATION : Sr.QC Welding Inspector

    Job Responsible:o Successfully completed PI STOP shut down without LTIo Co-ordinate with client Integrity Department and Engineering Departmento Structural Drawing Like Grating Pipe Support ladles and client issued drawing reviewing and stage wise inspection and

    offer to cliento To comply with all company Health, Safety and Environment as well as Work Permit, policies and procedures

    Company Profile:M/s Sohar foundry and Marine Engineering L.L.C. Sohar. Sultanate of Oman as an ISO 9001: 2008 Certifiedcompany and ASMEU S R & NB Authorized Stamp Holder forManufacturing, repair& Alterations ofBoilers &Pressure vessels.Fabrication of Anode stems,Crucibles, Anode pallet, Skip Bath, Storage Tanks and othstructural Fabrication

  • 8/12/2019 QAQC cv

    3/4

    3) ORGANIZATION : Petro Rabigh Refinery and Petro chemical (Saudi Aramco SHUT DOWN)(Secondment through Gulf Quality Control Company Limited)

    DURATION : From 16 April 2011 to 18 June 2011

    DESIGNATION : QC Inspector (Shut Down)

    4) ORGANIZATION : THERMAL SYSTEMS (HYD) Pvt LTD

    DURATION : From Feb 2007 to Mar 2011

    DESIGNATION : QC ENGINEERCompany Profile: M/s. Thermal Systems (Hyd) Pvt Ltd. is an ISO 9001-2008 Certified Company engaged In house Design,

    Procurement, Manufacturing, erection and commissioning on a Turnkey of the equipments (since last 25 Years)Waste Heat Recovery Systems as Waste boilers, Economizers, Super heaters , Evaporators, dearators, Feed wattanks, Air preheaters, Heat Exchangers and Pressure Vessels. Clients include Alstom Power Energy SystemsSHG Ltd. U.K. and Germany, Lurgi, IOCL, Indo Gulf Corp.Ltd, Outokumpu Gmbh, HZL, JSW and etc.M/s. TSPL is also accredited with ASME stamps-"U","S","PP" and "R" stamp from NBBIC

    5) ORGANIZATION : FLAW TECH INSPECTION SERVICES.(A Division of Curie Institute of Quality and NDT Technology)

    DURATION : From Jan 2004 to Jan 2007

    DESIGNATION : QC/NDT INSPECTOR

    Company Profile :NDT Services & ASNT Level I & II (RT, UT, MT, PT, LT&VT) Training & Certification& Level III (company

    written exam)API(510,653,570)Preparatory Training Programs /With Company Certification,

    Welding inspector ,Fabrication inspector, Quality Control, Internal Auditors Training Courses &

    Painting/ Coating Inspectors Program,ISO/ASME Auditing.

    Duties & Job Responsibilities:

    o Inspection of Raw Materials along with MTC Plates, Pipes, Forgings, Fittings etc.with respect to Purchase Technical / cspecification and approved drawings, applicable code/ standards and maintaining record of materials used for construction

    o Reviewing The Piping Isometric Drawings,P&ID,Boilers ,pressure vessels and structuralo Preparation of Inspection test plan for customer/client approval for their Hold, witness or Surveillance check points,

    Preparation of assembly wise checklist for better tracking of the job progress.

    o Inspection of waste heat boilers , Pressure vessels, Heat Exchangers , Tanks and general pipe work assembly at bothshop &site in Liaison with various third party/Client inspection

    o Preparation of KPI Reporto Preparation of WPS, PQR and WPQ for ferrous, Non-ferrous metals and Alloy welding. As per ASME Sec IX and ENo Arranging of Calibration of welding equipments, HT recorders, Thermocouples, electrode and flux baking ovenso Welding consumables inspection as per ASME section- II Co Review of drawings and preparing the weld plans for production.o Weld Visual Examination, Dimensional Accuracy, Identifying defects and acceptability with respect to specification.o Preparing the Heat Treatment procedure based on the requirement given in Engineering drawings and codes.o Reviewing and approving the HT chart, submit to the A .I or third party inspector for his review and acceptanceo Raising Non-Conformity report and resolving the same.o Maintain Welders Continuity Record, Welders ID cards, Welding equipment calibrations and consumables recordso Witness of Ultrasonic test, Penetrant test and Magnetic Partical testo Review of Radiographs and Review of Ferrite Numbers Reportso Witness of Hydro Test and Pressure Relief Valve. Along with P&ID Drawing or Test Location Drawings.

  • 8/12/2019 QAQC cv

    4/4

    o Preparation Final Dossier through ERP.o Painting Inspection WFT and DFT Measurement and Surface Preparation (Sand Blasting)o Hand Experience in RT,UT,MT,PT,VT,RTFI,PMI,Thermo Graphy,Metallography and Mechanical Testing Like UTM,

    Hardness Test(HRC,HRB,HB,VHN),Impact Test, Bend test

    o Conducting The Training for the welders,Riggers,and production Supervisors with presentationo Provide leadership role in the department to meet the requirements of the quality systemso Coordination with project department to install new equipment and site erection and commissioningo

    Preparation of (Line Walk Down) Punch List after Site Installation and Preparation of Flaw Less CheckList, Surveillance of Tensioning and Torqing Test for Rotating and Statics Equipment (Spade/Despading, NRV Replaceme

    RV Replacement)

    o Co-ordinate with Third Party(GL,BVQI,MODI International)/ Clint Integrity(Shell)

    Completed Projects:

    Qatar Shell GTL:

    Fabrication and Installation of Mounting Bracket for Noise Hood and Filter Support Fabrication Fabrication and installation New Warm up Line for HTF Pump with Supports and Oil Flush Temporary spool Fabrication Fabrication and installation 6 Pipe Linefor Ammonia Injection Line Fabrication and installation of Steam Manifold and Steam Sparger SMR Unit Fabrication and installation of N2 Purge Manifold Header Fabrication and installation of Water Inlet & Outlet Engine Line For Bourbon Gulf Vessel Fabrication and Installation of Offshore Man way Cover, Aluminium Hand Rail, Gratings and other structurals for Shell

    OFFSHORE Pearl 1 and Pearl 2 and more other ProjectsSohar Aluminum.

    Repair Activity POT shell for Aluminum Smelting FurnacePetro Rabigh Refinery and Petro Chemical.

    Involved in Shutdown Activity Like Pressure Vessels, Heat Exchangers,Columns,Rotating Equipments and PipingsThermal Systems Hyderabad Pvt Ltd.

    Involved in Fabrication Jobs Pressure Vessels,Boilers,Heat Exchanger, Feed Water Tank, Super Heater,Economiser,Evaparator, Deaerator, Furnace and Piping as per ASME S,U and PP Stamp

    S.No Equipments Client Third Party

    1 Pressure Vessel,Boiler,Super Heaters,Economiser,Piping and ,FWT,

    Deaerator and Structural Jobs

    TIFFERT TECHNIP

    2 Pressure Vessel, Heat Exchanger, Power Boiler,Economisers HZL,IOCL,Vizag

    Steel,RIL,TATA

    IBR

    3 Pressure Vessel, Heat Exchanger, Power Boiler,Economisers JSW,Vandanta,Birla IBR

    4 Pressure Vessel, Heat Exchanger, Power Boiler,Economisers Lurgi, Simon carves,

    Alstom

    Lloyds Register