ISO-9001 Certified ISO-17025 Certified ISO-14000 Certified ADVANTECH CO., LTD. QA Test Report IPC-610-H ( Product Reliability Test ) Report No : 03S005A0 Report Date : May 8 2003 _______________________ _____________________ ___________________ Issue Stamp Chi-Horng Liao Manager of QA Department Charles Chang Approval Knight Hu Test Engineer

Transcript of QA Test Report - Elmarksupport.elmark.com.pl/advantech/download/ipc-610/1-DP3JL.pdf2 IPC-610-H Test...

Page 1: QA Test Report - Elmarksupport.elmark.com.pl/advantech/download/ipc-610/1-DP3JL.pdf2 IPC-610-H Test Item List Report No.03S005A0 QA Lab Reliability test Num. Test item Result Remark

ISO-9001 Certified ISO-17025 Certified ISO-14000 Certified

ADVANTECH CO., LTD.

QA Test Report

IPC-610-H

( Product Reliability Test )

Report No : 03S005A0

Report Date : May 8 2003 _______________________ _____________________ ___________________

Issue Stamp

Chi-Horng Liao Manager of QA Department

Charles Chang Approval

Knight Hu Test Engineer

Page 2: QA Test Report - Elmarksupport.elmark.com.pl/advantech/download/ipc-610/1-DP3JL.pdf2 IPC-610-H Test Item List Report No.03S005A0 QA Lab Reliability test Num. Test item Result Remark

1

IPC-610-H Table of Contents Report No.03S005A0

QA Lab Reliability test

1. Test item list …………………………………………………… 2 2. High temperature operation test ……………………………… 3 3. Low temperature operation test ………………………………. 6 4. Humidity operation test ………………………………………. 9 5. Temperature cycle test ………………………………………… 12 6. High temperature and humidity storage test ………………… 15 7. Low temperature storage test …………………………………. 18 8. Cold start test ………………………………………………….. 21 9. Random vibration operation test ……………………………... 24

10. Sine vibration non-operation test……………………………... 27 11. Package vibration……………………………………………… 30 12. Package Drop test ……………………………………………... 33

Page 3: QA Test Report - Elmarksupport.elmark.com.pl/advantech/download/ipc-610/1-DP3JL.pdf2 IPC-610-H Test Item List Report No.03S005A0 QA Lab Reliability test Num. Test item Result Remark

2

IPC-610-H Test Item List Report No.03S005A0

QA Lab Reliability test

Num. Test item Result Remark1 High temperature operation test Passed 2 Low temperature operation test Passed 3 Humidity operation test Passed 4 Temperature cycle test Passed 5 High temperature and humidity storage test Passed 6 Low temperature storage test Passed 7 Cold start test Passed 8 Random vibration operation test Passed 9 Sine vibration non-operation test Passed

10 Package vibration test Passed 11 Package Drop test Passed

Page 4: QA Test Report - Elmarksupport.elmark.com.pl/advantech/download/ipc-610/1-DP3JL.pdf2 IPC-610-H Test Item List Report No.03S005A0 QA Lab Reliability test Num. Test item Result Remark

3

IPC-610-H High temperature operation test Report No.03S005A0

QA Lab Reliability test Test Date : November 8, 2002 ~ November 9, 2002 Test Site : Advantech QA Environment Lab Performed By : Knight Hu Purpose : The NPDP test. Test Standard : Reference IEC68-2-2 Testing procedures

Test Bb : Dry Heat Test Test Condition :

1. Test Temperature : 55℃ 2. Test Times : 24Hrs 3. Test Software : Win2000 MPEG test program 4. Test Environment Curve :

Temp.℃ 55℃ 25℃ Time Hrs

0:0 1:00 25:00 26:00

Page 5: QA Test Report - Elmarksupport.elmark.com.pl/advantech/download/ipc-610/1-DP3JL.pdf2 IPC-610-H Test Item List Report No.03S005A0 QA Lab Reliability test Num. Test item Result Remark

4

IPC-610-H High temperature operation test Report No.03S005A0

QA Lab Reliability test Test Equipment : Programmable Temperature & Humidity Chamber

K.SON. CO. LTD. Model : THS-DL4+/-100 Date of Calibration : 5/21/2002

Sample Configuration & Quantity Under Test :

Using one IPC-610-H Industrial PC with the following options installed: 1. CPU board. : PCA-6180B W

CPU: Intel Pentium III 1GHz SDRAM: NEC 256MB PC-100

2.Chassis : IPC-610-H 3.Back plane : PCA-6114P4-C 4. Power supply : Delta DPS-300GB 300W 5.CD-ROM : TEAC CD-540E 6.FDD : TEAC 235FD 7.HDD : Quantum Fireball 5.1AT LB05A011 Rev01-A 8.Front I/O board : ACP_USB/KB Left A 101-1 9.Fan : ADDA AD1212HB-A73GL

Performance Criteria : Electronic function check:

1. All system function must have properly test program to test and passed this test.

2. Running OS for Win 2000 the system cannot have degradation of the performance.

Mechanical function check:

1. The switch button ,covers ,slot can work properly without any interference. 2. All screws are tighten up appropriately

Page 6: QA Test Report - Elmarksupport.elmark.com.pl/advantech/download/ipc-610/1-DP3JL.pdf2 IPC-610-H Test Item List Report No.03S005A0 QA Lab Reliability test Num. Test item Result Remark

5

IPC-610-H High temperature operation test Report No.03S005A0

QA Lab Reliability test Test Result :

Test is no electronic and mechanical function damage or degradation have found, and without any incurably physical damage degradation the performance.

Conclusion :

Passed. The IPC-610-H Industrial PC meets the high temperature operation test.

Page 7: QA Test Report - Elmarksupport.elmark.com.pl/advantech/download/ipc-610/1-DP3JL.pdf2 IPC-610-H Test Item List Report No.03S005A0 QA Lab Reliability test Num. Test item Result Remark

6

IPC-610-H Low temperature operation test Report No.03S005A0

QA Lab Reliability test Test Date : November 10, 2002 ~ November 11, 2002 Test Site : Advantech QA Environment Lab Performed By : Knight Hu Purpose : The NPDP test. Test Standard : Reference IEC68-2-1 Testing procedures

Test Ab : Cold Test Test Condition :

1. Test Temperature : -5℃ 2. Test Times : 24Hrs 3. Test Software : Win2000 MPEG test program 4. Test Environment Curve :

Temp.℃ 25℃ -5℃ Time Hrs

0:0 1:30 25:30 27:00

Page 8: QA Test Report - Elmarksupport.elmark.com.pl/advantech/download/ipc-610/1-DP3JL.pdf2 IPC-610-H Test Item List Report No.03S005A0 QA Lab Reliability test Num. Test item Result Remark

7

IPC-610-H Low temperature operation test Report No.03S005A0

QA Lab Reliability test Test Equipment : Programmable Temperature & Humidity Chamber

K.SON. CO. LTD. Model : THS-DL4+/-100 Date of Calibration : 5/21/2002

Sample Configuration & Quantity Under Test :

Using one IPC-610-H Industrial PC with the following options installed: 1. CPU board. : PCA-6180B W

CPU: Intel Pentium III 1GHz SDRAM: NEC 256MB PC-100

2.Chassis : IPC-610-H 3.Back plane : PCA-6114P4-C 4. Power supply : Delta DPS-300GB 300W 5.CD-ROM : TEAC CD-540E 6.FDD : TEAC 235FD 7.HDD : Quantum Fireball 5.1AT LB05A011 Rev01-A 8.Front I/O board : ACP_USB/KB Left A 101-1 9.Fan : ADDA AD1212HB-A73GL

Performance Criteria : Electronic function check:

1. All system function must have properly test program to test and passed this test.

2. Running OS for Win 2000 the system cannot have degradation of the performance.

Mechanical function check:

1. The switch button ,covers ,slot can work properly without any interference. 2. All screws are tighten up appropriately

Page 9: QA Test Report - Elmarksupport.elmark.com.pl/advantech/download/ipc-610/1-DP3JL.pdf2 IPC-610-H Test Item List Report No.03S005A0 QA Lab Reliability test Num. Test item Result Remark

8

IPC-610-H Low temperature operation test Report No.03S005A0

QA Lab Reliability test Test Result :

Test is no electronic and mechanical function damage or degradation have found, and without any incurably physical damage degradation the performance.

Conclusion :

Passed. The IPC-610-H Industrial PC meets the low temperature operation test.

Page 10: QA Test Report - Elmarksupport.elmark.com.pl/advantech/download/ipc-610/1-DP3JL.pdf2 IPC-610-H Test Item List Report No.03S005A0 QA Lab Reliability test Num. Test item Result Remark

9

IPC-610-H Humidity Test Report No.03S005A0

QA Lab Reliability test Test Date : December 1, 2002 ~ December 3, 2002 Test Site : Advantech QA Environment Lab Performed By : Knight Hu Purpose : The NPDP test. Test Standard : Reference IEC68-2-3 Testing procedures Test Cb : Damp Heat steady state Test Test Condition :

1. Test Temperature : 40℃ 2. Test Humidity : 95% 3. Test Times : 48Hrs 4. Test Software : Win2000 MPEG test program 5. Test Environment Curve :

Humidity %

Temp℃

95%

40℃

25℃

50%

Time Hrs 0:00 0:45 48:45 49:30

Page 11: QA Test Report - Elmarksupport.elmark.com.pl/advantech/download/ipc-610/1-DP3JL.pdf2 IPC-610-H Test Item List Report No.03S005A0 QA Lab Reliability test Num. Test item Result Remark

10

IPC-610-H Humidity Test Report No.03S005A0

QA Lab Reliability test

Test Equipment : Programmable Temperature & Humidity Chamber K.SON. INS. TECH CORP. Model : THS-DL4 +-100 Date of Calibration : 5/21/2002 Sample Configuration & Quantity Under Test :

Using one IPC-610-H Industrial PC with the following options installed: 1. CPU board. : PCA-6180B W

CPU: Intel Pentium III 1GHz SDRAM: NEC 256MB PC-100

2.Chassis : IPC-610-H 3.Back plane : PCA-6114P4-C 4. Power supply : Delta DPS-300GB 300W 5.CD-ROM : TEAC CD-540E 6.FDD : TEAC 235FD 7.HDD : Quantum Fireball 5.1AT LB05A011 Rev01-A 8.Front I/O board : ACP_USB/KB Left A 101-1 9.Fan : ADDA AD1212HB-A73GL

Performance Criteria : Electronic function check:

1. All system function must have properly test program to test and passed this test.

2. Running OS for Win 2000 the system cannot have degradation of the performance.

Mechanical function check:

1. The switch button ,covers ,slot can work properly without any interference. 2. All screws are tighten up appropriately

Page 12: QA Test Report - Elmarksupport.elmark.com.pl/advantech/download/ipc-610/1-DP3JL.pdf2 IPC-610-H Test Item List Report No.03S005A0 QA Lab Reliability test Num. Test item Result Remark

11

IPC-610-H Humidity Test Report No.03S005A0

QA Lab Reliability test Test Result :

There is no damage in electronic and mechanical functions. Degradation has not been found. Performance is maintained with no incurable physical damage or degradation.

Conclusion : Passed.

The IPC-610-H Industrial PC meets humidity operation test.

Page 13: QA Test Report - Elmarksupport.elmark.com.pl/advantech/download/ipc-610/1-DP3JL.pdf2 IPC-610-H Test Item List Report No.03S005A0 QA Lab Reliability test Num. Test item Result Remark

12

IPC-610-H Temperature cycle test Report No.03S005A0

QA Lab Reliability test Test Date : November 26, 2002 ~ November 29, 2002 Test Site : Advantech QA Environment Lab Performed By : Knight Hu

Purpose : The NPDP test. Test Standard : Reference IEC68-2-14 Testing procedures

Test N: Change of temperature Test

Test Condition :

1. Test High Temperature: 50℃ 2. Test Low Temperature: -5℃ 3. Test dwell time: 4Hrs 4. Temperature slope: 20℃/hr 5. Test cycle: 5 cycles 6.Test Software : Win 2000 MPEG test program 7. Test Environment Curve:

Total 5 Cycle …….. 0 1:00 5:00 7:30 11:30 13:00 65:00

Temp. 50℃ Temp.25℃ Temp. -5℃ Time Hrs

Page 14: QA Test Report - Elmarksupport.elmark.com.pl/advantech/download/ipc-610/1-DP3JL.pdf2 IPC-610-H Test Item List Report No.03S005A0 QA Lab Reliability test Num. Test item Result Remark

13

IPC-610-H Temperature cycle test Report No.03S005A0

QA Lab Reliability test Test Equipment : Programmable Temperature & Humidity Chamber

K.SON. CO. LTD. Model : THS-DL4+/-100 Date of Calibration : 5/21/2002

Sample Configuration & Quantity Under Test :

Using one IPC-610-H Industrial PC with the following options installed: 1. CPU board. : PCA-6180B W

CPU: Intel Pentium III 1GHz SDRAM: NEC 256MB PC-100

2.Chassis : IPC-610-H 3.Back plane : PCA-6114P4-C 4. Power supply : Delta DPS-300GB 300W 5.CD-ROM : TEAC CD-540E 6.FDD : TEAC 235FD 7.HDD : Quantum Fireball 5.1AT LB05A011 Rev01-A 8.Front I/O board : ACP_USB/KB Left A 101-1 9.Fan : ADDA AD1212HB-A73GL

Performance Criteria : Electronic function check:

1. All system function must have properly test program to test and passed this test.

2. Running OS for Win 2000 the system cannot have degradation of the performance.

Mechanical function check:

1. The switch button ,covers ,slot can work properly without any interference. 2. All screws are tighten up appropriately

Page 15: QA Test Report - Elmarksupport.elmark.com.pl/advantech/download/ipc-610/1-DP3JL.pdf2 IPC-610-H Test Item List Report No.03S005A0 QA Lab Reliability test Num. Test item Result Remark

14

IPC-610-H Temperature cycle test Report No.03S005A0

QA Lab Reliability test Test Result :

Test is no electronic and mechanical function damage or degradation have found, and without any incurably physical damage degradation the performance.

Conclusion :

Passed. The IPC-610-H Industrial PC meets the temperature cycle test.

Page 16: QA Test Report - Elmarksupport.elmark.com.pl/advantech/download/ipc-610/1-DP3JL.pdf2 IPC-610-H Test Item List Report No.03S005A0 QA Lab Reliability test Num. Test item Result Remark

15

IPC-610-H High temp./humi. Storage test Report No.03S005A0

QA Lab Reliability test Test Date : November 22, 2002 ~ November 24,, 2002 Test Site : Advantech QA Environment Lab Performed By : Knight Hu Purpose : The NPDP test. Test Standard : Reference IEC68-2-3 Testing procedures

Test Ca : Damp heat steady state test Test Condition :

1. Test Temperature : 60℃ 2. Test Humidity : 95% 3. Test Times : 48Hrs 4.Test Software : Win 2000 MPEG test program 5. Test Environment Curve :

Humidity %

Temp℃

95%

60℃

25℃

50%

Time Hrs 0:00 0:52 48:52 49:45

Page 17: QA Test Report - Elmarksupport.elmark.com.pl/advantech/download/ipc-610/1-DP3JL.pdf2 IPC-610-H Test Item List Report No.03S005A0 QA Lab Reliability test Num. Test item Result Remark

16

IPC-610-H High temp./humi. Storage test Report No.03S005A0

QA Lab Reliability test Test Equipment : Programmable Temperature & Humidity Chamber

K.SON. CO. LTD. Model : THS-DL4+/-100 Date of Calibration : 5/21/2002

Sample Configuration & Quantity Under Test :

Using one IPC-610-H Industrial PC with the following options installed: 1. CPU board. : PCA-6180B W

CPU: Intel Pentium III 1GHz SDRAM: NEC 256MB PC-100

2.Chassis : IPC-610-H 3.Back plane : PCA-6114P4-C 4. Power supply : Delta DPS-300GB 300W 5.CD-ROM : TEAC CD-540E 6.FDD : TEAC 235FD 7.HDD : Quantum Fireball 5.1AT LB05A011 Rev01-A 8.Front I/O board : ACP_USB/KB Left A 101-1 9.Fan : ADDA AD1212HB-A73GL

Performance Criteria : Electronic function check:

1. All system function must have properly test program to test and passed this test.

2. Running OS for Win 2000 the system cannot have degradation of the performance.

Mechanical function check: 1.The switch button ,covers ,slot can work properly without any interference. 2.All screws are tighten up appropriately. 3.All gaps on the surface are appropriately. 4.Assembling/disassembling the system enclosure or mechanical parts must be

smooth ,and no deformed parts found.

Page 18: QA Test Report - Elmarksupport.elmark.com.pl/advantech/download/ipc-610/1-DP3JL.pdf2 IPC-610-H Test Item List Report No.03S005A0 QA Lab Reliability test Num. Test item Result Remark

17

IPC-610-H High temp./humi. Storage test Report No.03S005A0

QA Lab Reliability test Test Result :

Test is no electronic and mechanical function damage or degradation have found, and without any incurably physical damage degradation the performance.

Conclusion :

Passed. The IPC-610-H Industrial PC meets the high temperature and humidity storage test.

Page 19: QA Test Report - Elmarksupport.elmark.com.pl/advantech/download/ipc-610/1-DP3JL.pdf2 IPC-610-H Test Item List Report No.03S005A0 QA Lab Reliability test Num. Test item Result Remark

18

IPC-610-H Low temperature storage test Report No.03S005A0

QA Lab Reliability test Test Date : November 19, 2002 ~ November 21, 2002 Test Site : Advantech QA Environment Lab Performed By : Knight Hu Purpose : The NPDP test. Test Standard : Reference IEC68-2-1 Testing procedures

Test Ab : Cold Test Test Condition :

1. Test Temperature : -40℃ 2. Test Times : 48Hrs 3. Test Environment Curve :

Temp.℃ 25℃ -40℃ Time Hrs

0:0 1:30 49:30 51:00

Page 20: QA Test Report - Elmarksupport.elmark.com.pl/advantech/download/ipc-610/1-DP3JL.pdf2 IPC-610-H Test Item List Report No.03S005A0 QA Lab Reliability test Num. Test item Result Remark

19

IPC-610-H Low temperature storage test Report No.03S005A0

QA Lab Reliability test Test Equipment : Programmable Temperature & Humidity Chamber

K.SON. CO. LTD. Model : THS-DL4+/-100 Date of Calibration : 5/21/2002

Sample Configuration & Quantity Under Test :

Using one IPC-610-H Industrial PC with the following options installed: 1. CPU board. : PCA-6180B W

CPU: Intel Pentium III 1GHz SDRAM: NEC 256MB PC-100

2.Chassis : IPC-610-H 3.Back plane : PCA-6114P4-C 4. Power supply : Delta DPS-300GB 300W 5.CD-ROM : TEAC CD-540E 6.FDD : TEAC 235FD 7.HDD : Quantum Fireball 5.1AT LB05A011 Rev01-A 8.Front I/O board : ACP_USB/KB Left A 101-1 9.Fan : ADDA AD1212HB-A73GL

Performance Criteria : Electronic function check:

1. All system function must have properly test program to test and passed this test.

2. Running OS for Win 2000 the system cannot have degradation of the performance.

Mechanical function check: 1.The switch button ,covers ,slot can work properly without any interference. 2.All screws are tighten up appropriately. 3.All gaps on the surface are appropriately. 4.Assembling/disassembling the system enclosure or mechanical parts must be

smooth ,and no deformed parts found.

Page 21: QA Test Report - Elmarksupport.elmark.com.pl/advantech/download/ipc-610/1-DP3JL.pdf2 IPC-610-H Test Item List Report No.03S005A0 QA Lab Reliability test Num. Test item Result Remark

20

IPC-610-H Low temperature storage test Report No.03S005A0

QA Lab Reliability test Test Result :

Test is no electronic and mechanical function damage or degradation have found, and without any incurably physical damage degradation the performance.

Conclusion :

Passed. The IPC-610H Industrial PC meets the low temperature storage test.

Page 22: QA Test Report - Elmarksupport.elmark.com.pl/advantech/download/ipc-610/1-DP3JL.pdf2 IPC-610-H Test Item List Report No.03S005A0 QA Lab Reliability test Num. Test item Result Remark

21

IPC-610-H Cold Start Test Report No.03S005A0

QA Lab Reliability test Test Date : November 26, 2002 Test Site : Advantech QA Environment Lab Performed By : Knight Hu Purpose : The NPDP test. Test Standard : Reference IEC68-2-1 Testing procedures Test Ab : Cold Test Test Condition : 1. Test Temperature : -10℃ 2. Test Times : 8Hrs Step: A. System power off 4 hours. B. System power on , then 2 minutes later, system power off. C. After 10 minutes, system power on again. D. Two minutes later, system power off again. E. Recycle step C& D for 20 times. 3. Number of test : 20 times 4. Test Software : MS-DOS

5. Test Environment Curve : 1 2 18 19 20 Times iiii 0:0 1:45 5:45 10min 9:45 10:00 11:45

Temp℃

25℃

Power ON

-10℃

Power OFF

Time Hrs

Page 23: QA Test Report - Elmarksupport.elmark.com.pl/advantech/download/ipc-610/1-DP3JL.pdf2 IPC-610-H Test Item List Report No.03S005A0 QA Lab Reliability test Num. Test item Result Remark

22

IPC-610-H Cold Start Test Report No.03S005A0

QA Lab Reliability test Test Equipment : Programmable Temperature & Humidity Chamber K.SON. INS. TECH CORP. Model : THS-DL4 +-100 Date of Calibration : 10/06/2000 Sample Configuration & Quantity Under Test :

Using one IPC-610-H Industrial PC with the following options installed: 1. CPU board. : PCA-6180B W

CPU: Intel Pentium III 1GHz SDRAM: NEC 256MB PC-100

2.Chassis : IPC-610-H 3.Back plane : PCA-6114P4-C 4. Power supply : Delta DPS-300GB 300W 5.CD-ROM : TEAC CD-540E 6.FDD : TEAC 235FD 7.HDD : Quantum Fireball 5.1AT LB05A011 Rev01-A 8.Front I/O board : ACP_USB/KB Left A 101-1 9.Fan : ADDA AD1212HB-A73GL

Performance Criteria : Electronic function check:

1. All system function must have properly test program to test and passed this test.

2. Running OS for Win 2000 the system cannot have degradation of the performance.

Mechanical function check:

1. The switch button ,covers ,slot can work properly without any interference. 2. All screws are tighten up appropriately

Page 24: QA Test Report - Elmarksupport.elmark.com.pl/advantech/download/ipc-610/1-DP3JL.pdf2 IPC-610-H Test Item List Report No.03S005A0 QA Lab Reliability test Num. Test item Result Remark

23

IPC-610-H Cold Start Test Report No.03S005A0

QA Lab Reliability test Test Result :

There is no damage in electronic and mechanical functions. Degradation has not been found. Performance is maintained with no incurable physical damage or degradation.

Conclusion : Passed.

The IPC-610-H Industrial PC meets cold start test.

Page 25: QA Test Report - Elmarksupport.elmark.com.pl/advantech/download/ipc-610/1-DP3JL.pdf2 IPC-610-H Test Item List Report No.03S005A0 QA Lab Reliability test Num. Test item Result Remark

24

IPC-610-H Random vibration operation test Report No.03S005A0

QA Lab Reliability test Test Date : December 16, 2002 Test Site : Advantech QA Environment Lab Performed By : Knigtht Hu Purpose : The NPDP test Test Standard : Reference IEC68-2-64 Testing procedures Test Fh : Vibration Board Band Random Test Test Condition :

1. Test PSD : 0.002G²/Hz (1Grms) 2. Test Frequency :5-500Hz 3. Test Axis : Z-axis 4. Test Time : 1Hr pre axis 5. Test Software : Win2000 MPEG test program 6. Test Vibration Curve :

Acceleration 1Grms

PSD

0.002g²/Hz

5Hz 500Hz

Page 26: QA Test Report - Elmarksupport.elmark.com.pl/advantech/download/ipc-610/1-DP3JL.pdf2 IPC-610-H Test Item List Report No.03S005A0 QA Lab Reliability test Num. Test item Result Remark

25

IPC-610-H Random vibration operation test Report No.03S005A0

QA Lab Reliability test Test Equipment : Vibration Simulator System

KING DESIGN Co. LTD. Model : 9363EM-20030-25N80 S / N : MC104053285 Date of Calibration : 05/16/2002

Sample Configuration & Quantity Under Test :

Using one IPC-610-H Industrial PC with the following options installed: 1. CPU board. : PCA-6180B W

CPU: Intel Pentium III 1GHz SDRAM: NEC 256MB PC-100

2.Chassis : IPC-610-H 3.Back plane : PCA-6114P4-C 4. Power supply : Delta DPS-300GB 300W 5.CD-ROM : TEAC CD-540E 6.FDD : TEAC 235FD 7.HDD : Quantum Fireball 5.1AT LB05A011 Rev01-A 8.Front I/O board : ACP_USB/KB Left A 101-1 9.Fan : ADDA AD1212HB-A73GL

Performance Criteria : Electronic function check:

1. All system function must have properly test program to test and passed this test.

2. Running OS for Win 2000 the system cannot have degradation of the performance.

Page 27: QA Test Report - Elmarksupport.elmark.com.pl/advantech/download/ipc-610/1-DP3JL.pdf2 IPC-610-H Test Item List Report No.03S005A0 QA Lab Reliability test Num. Test item Result Remark

26

IPC-610-H Random vibration operation test Report No.03S005A0

QA Lab Reliability test

Mechanical function check: 1. The switch button ,covers ,slot can work properly without any interference. 2. All screws are tighten up appropriately. 3. All gaps on the surface are appropriately. 4. Assembling/disassembling the system enclosure or mechanical parts must be

smooths ,and no deformed parts found. Test Result :

Test is no electronic and mechanical function damage or degradation have found, and without any incurably physical damage degradation the performance.

Conclusion :

Passed. The IPC-610-H Industrial PC meets random vibration operation test.

Page 28: QA Test Report - Elmarksupport.elmark.com.pl/advantech/download/ipc-610/1-DP3JL.pdf2 IPC-610-H Test Item List Report No.03S005A0 QA Lab Reliability test Num. Test item Result Remark

27

IPC-610-H Sine vibration non-operation test Report No.03S005A0

QA Lab Reliability test Test Date : December 12, 2002 Test Site : Advantech QA Environment Lab Performed By : Knight Hu Purpose : The NPDP test Test Standard : Reference IEC68-2-6 Testing procedures Test Fc : Vibration sinusoidal Test Test Condition :

1. Test Acceleration : 2G 2. Test Frequency :5-500Hz 3. Test Axis : X,Y,Z three axis 4. Test Time : 1Hr pre axis 5. Test Vibration Curve :

Acceleration 2G Displacement 2.5mm

5Hz 20Hz 500Hz

Page 29: QA Test Report - Elmarksupport.elmark.com.pl/advantech/download/ipc-610/1-DP3JL.pdf2 IPC-610-H Test Item List Report No.03S005A0 QA Lab Reliability test Num. Test item Result Remark

28

IPC-610-H Sine vibration non-operation test Report No.03S005A0

QA Lab Reliability test Test Equipment : Vibration Simulator System

KING DESIGN Co. LTD. Model : 9363EM-20030-25N80 S / N : MC104053285 Date of Calibration : 05/16/2002

Sample Configuration & Quantity Under Test :

Using one IPC-610-H Industrial PC with the following options installed: 1. CPU board. : PCA-6180B W

CPU: Intel Pentium III 1GHz SDRAM: NEC 256MB PC-100

2.Chassis : IPC-610-H 3.Back plane : PCA-6114P4-C 4. Power supply : Delta DPS-300GB 300W 5.CD-ROM : TEAC CD-540E 6.FDD : TEAC 235FD 7.HDD : Quantum Fireball 5.1AT LB05A011 Rev01-A 8.Front I/O board : ACP_USB/KB Left A 101-1 9.Fan : ADDA AD1212HB-A73GL

Performance Criteria : Electronic function check:

1. All system function must have properly test program to test and passed this test.

2. Running OS for Win 2000 the system cannot have degradation of the performance.

Mechanical function check: 1.The switch button ,covers ,slot can work properly without any interference. 2.All screws are tighten up appropriately. 3.All gaps on the surface are appropriately. 4.Assembling/disassembling the system enclosure or mechanical parts must be

smooth ,and no deformed parts found.

Page 30: QA Test Report - Elmarksupport.elmark.com.pl/advantech/download/ipc-610/1-DP3JL.pdf2 IPC-610-H Test Item List Report No.03S005A0 QA Lab Reliability test Num. Test item Result Remark

29

IPC-610-H Sine vibration non-operation test Report No.03S005A0

QA Lab Reliability test

Test Result : Test is no electronic and mechanical function damage or degradation have found, and without any incurably physical damage degradation the performance.

Conclusion :

Passed. The IPC-610-H Industrial PC meets sine vibration non-operation test.

Page 31: QA Test Report - Elmarksupport.elmark.com.pl/advantech/download/ipc-610/1-DP3JL.pdf2 IPC-610-H Test Item List Report No.03S005A0 QA Lab Reliability test Num. Test item Result Remark

30

IPC-610-H Package Vibration Test Report No.03S005A0

QA Lab Reliability test Test Date : December 23, 2002 Test Site : Advantech QA Environment Lab Performed By : Knight Hu Purpose : The NPDP test. Test Standard : Reference IEC68-2-64 Testing procedures Test Fh : Vibration Board Band Random Test Test Condition :

1. Test PSD : 0.016G²/Hz (2.16Grms) 2. Test Frequency : 5-500Hz 3. Test Axis : X,Y,Z three axis 4. Test Time : 1Hr pre axis 5. Test Vibration Curve :

Acceleration 2.16Grms -6db/oct

PSD 0.016g²/Hz

0.0016g²/Hz

5Hz 200Hz 500Hz

Page 32: QA Test Report - Elmarksupport.elmark.com.pl/advantech/download/ipc-610/1-DP3JL.pdf2 IPC-610-H Test Item List Report No.03S005A0 QA Lab Reliability test Num. Test item Result Remark

31

IPC-610-H Package Vibration Test Report No.03S005A0

QA Lab Reliability test Test Equipment : Vibration Simulator System

KING DESIGN Co. LTD. Model : 9363EM-20030-25N80 S / N : MC104053285 Date of Calibration : 05/16/2002

Sample Configuration & Quantity Under Test :

Using one IPC-610-H Industrial PC with the following options installed: 1. CPU board. : PCA-6180B W

CPU: Intel Pentium III 1GHz SDRAM: NEC 256MB PC-100

2.Chassis : IPC-610-H 3.Back plane : PCA-6114P4-C 4. Power supply : Delta DPS-300GB 300W 5.CD-ROM : TEAC CD-540E 6.FDD : TEAC 235FD 7.HDD : Quantum Fireball 5.1AT LB05A011 Rev01-A 8.Front I/O board : ACP_USB/KB Left A 101-1 9.Fan : ADDA AD1212HB-A73GL

Performance Criteria : Electronic function check:

1. All system function must have properly test program to test and passed this test.

2. Running OS for Win 2000 the system cannot have degradation of the performance.

Page 33: QA Test Report - Elmarksupport.elmark.com.pl/advantech/download/ipc-610/1-DP3JL.pdf2 IPC-610-H Test Item List Report No.03S005A0 QA Lab Reliability test Num. Test item Result Remark

32

IPC-610-H Package Vibration Test Report No.03S005A0

QA Lab Reliability test

Mechanical function check: 1. The switch button covers, slot can work properly without any interference. 2. All screws are tighten up appropriately. 3. All gaps on the surface are appropriately. 4. Assembling/disassembling the system enclosure or mechanical parts must be

smooths, and no deformed parts found. Test Result :

Test is no electronic and mechanical function damage or degradation have found, and without any incurably physical damage degradation the performance.

Conclusion :

Passed. The IPC-610-H Industrial PC meets the package vibration test.

Page 34: QA Test Report - Elmarksupport.elmark.com.pl/advantech/download/ipc-610/1-DP3JL.pdf2 IPC-610-H Test Item List Report No.03S005A0 QA Lab Reliability test Num. Test item Result Remark

33

IPC-610-H Package drop Test Report No.03S005A0

QA Lab Reliability test Test Date : March 13, 2003 Test Site : Advantech QA Environment Lab Performed By : Knight Hu Purpose : The NDPD test. Test Standard : Reference Federal Standard 101 Method 5007 Testing procedure B

Test Ea : Drop Test Test Condition :

1. Test Phase : One corner Three edges Six face

2. Test High : 76cm 3. Package Weight : 18.4Kg 4. Package Dimension : 62.0cm×57.0cm×36.0cm 5. Test Drawing :

Topside Rear Side Left Side Right Side Bottom Side Mid Edge Front Side Short Edge Long Edge Damage Corner

Page 35: QA Test Report - Elmarksupport.elmark.com.pl/advantech/download/ipc-610/1-DP3JL.pdf2 IPC-610-H Test Item List Report No.03S005A0 QA Lab Reliability test Num. Test item Result Remark

34

IPC-610-H Package drop Test Report No.03S005A0

QA Lab Reliability test Test Equipment : Drop Tester Machine TOSHIDA SEIKI Co. LTD. Model : DT-100B Sample Configuration & Quantity Under Test :

Using one IPC-610-H Industrial PC with the following options installed: 1. CPU board. : PCA-6180B W

CPU: Intel Pentium III 1GHz SDRAM: NEC 256MB PC-100

2.Chassis : IPC-610-H 3.Back plane : PCA-6114P4-C 4. Power supply : Delta DPS-300GB 300W 5.CD-ROM : TEAC CD-540E 6.FDD : TEAC 235FD 7.HDD : Quantum Fireball 5.1AT LB05A011 Rev01-A 8.Front I/O board : ACP_USB/KB Left A 101-1 9.Fan : ADDA AD1212HB-A73GL

Performance Criteria : Electronic function check:

1. All system function must have properly test program to test and passed this test.

2. Running OS for Win 2000 the system cannot have degradation of the performance.

Mechanical function check:

1. The switch button ,covers ,slot can work properly without any interference. 2. All screws are tighten up appropriately. 3. All gaps on the surface are appropriately. 4. Assembling/disassembling the system enclosure or mechanical parts must be

smooths ,and no deformed parts found. 5. The package material (carton and sponge) can work properly without any

interference to protection function.

Page 36: QA Test Report - Elmarksupport.elmark.com.pl/advantech/download/ipc-610/1-DP3JL.pdf2 IPC-610-H Test Item List Report No.03S005A0 QA Lab Reliability test Num. Test item Result Remark

35

IPC-610-H Package drop Test Report No.03S005A0

QA Lab Reliability test Test data :

Drop Face Acceleration (G) Remark Front Side 41.3 Rear Side 41.1 Left side 47.6

Right side 35.8 Top side 36.3

Bottom side 50.4 Test Result :

1.Test is no electronic and mechanical function damage or degradation have found, and without any incurably physical damage degradation the performance.

Conclusion :

Passed. The IPC-610-H Industrial PC meets package drop test