2016YEAR IN REVIEW

Page 2: Q4 Flywheel Special Edition

FROM GEORGE2016 is essentially complete. Amazing! To you “old timers” doesn’t it seem that Y2K was not too long ago and here we are 17 years later? It’s one of the paradox’s in life. The older you get, the faster time “seems” to travel.

I write to you sitting here in Guantanamo Bay, Cuba where we have repeated a pattern that has become common at RQ. It first happened at our home base, Camp Pendleton/San Diego. Then at Camp Lejeune, NC. It has now repeated itself at GTMO and the pacific North West. What is that pattern and what does it signify?

The pattern goes back to our Mission Statement. We exist to provide the best built environment to our customers while being the first choice of all stakeholders. One of the cornerstones of RQ has been our intense desire to be considered the best outstanding contractor they work with and thus their first choice for their next project. I believe we are pretty close to that in the greater San Diego region. But then, as we expanded to Virginia/N. Carolina, that same result came about because we would not compromise our standards to the marketplace. The same result has come about in the Pacific NW where our customers are quite emphatic that we stand out. And Gitmo is no different, and in fact stands out even more because most of our tough competition has no desire to work here.

Team members, I am so proud that we are succeeding and growing doing things the RQ way. That pride is in all of you that make things happen, every single one of you. 2016 has been a good year. I can not wait for 2017’s challenges and opportunities. The flywheel is turning and accelerating. I thank you. And, if I can speak for all the other stakeholders in what we do, I think I can represent them and say a big “Thank You!”

George H. Rogers, III, CEORQ Construction, LLC

Flywheelthe

2016 Q4 SPECIAL EDITION OF

A LOOK BACK AT 2016

Page 3: Q4 Flywheel Special Edition

PROJECT MILESTONES IN ADDITION TO THE FOLLOWING PHOTO MEMORIES THAT WERE CAPTURED OVER THE YEAR, THE BELOW PROJECT ACHIEVEMENTS WERE NOTED IN 2016:

–– FAVORABLE– CPARS– EVALUATION– FOR– RENOVATE– BACHELOR– QUARTERS– B-320,–B-321,–B-323,–NAVAL–AMPHIBIOUS–BASE–CORONADO,–CALIFORNIA

– DBIA-WPR AWARD OF MERIT IN DESIGN FOR P705 FITNESS CENTER, NBC CORONADO, CA

–– FAVORABLE–CPARS–EVALUATION–FOR–REPAIR–FIRE–DAMAGED–UTILITIES–PROJECT–AT–MCB–CAMP–PENDLETON–/–NWS–FALLBROOK–ANNEX,–CA

– ENR BEST PROJECT/MID-ATLANTIC REGION IN LANDSCAPE/HARDSCAPE FOR FLIGHT 93 NATIONAL MEMORIAL VISITOR CENTER, SOMERSET COUNTY, PA

– ABC - EAGLE AWARD IN DESIGN FOR THE BACHELOR ENLISTED QUARTERS COMPLEX, WALLACE CREEK NORTH, NC

– DBIA NATIONAL AWARD OF EXCELLENCE IN DESIGN FOR THE BACHELOR ENLISTED QUARTERS COMPLEX, WALLACE CREEK NORTH, NC

OTHER MILESTONES–

RQ–CELEBRATES–THE–RETIREMENT–OF––TINA–BOOKOUT–•–THANK–YOU–FOR–17–DEDICATED–YEARS

RQ–CELEBRATES–THE–TENURE–OF–THESE–DEDICATED–EMPLOYEES:–

15 YEARS JOHN–KUCHINSKY

10 YEARS––CAROLYN–HARPER–•–STEVE–NOEL–•–DAVID–YOUNGDALE–•–BRETT–BASARICH

5 YEARS––TROY–BRANDT•–MILO–MIDDLETON–•–MICHAEL–HAYDEN–•–GARY–TANKUS–•–KATY–VENTRE–•–DONELLA–CHAINUS–•–TRAVIS–NICHOLS–•–JOHN–HOGLEN–

RICHARD–ELLINGER–•–BILL–DUNNING–•–CHAD–HOLMES–•–JESSE–GONSALVES–•–CHRIS–GOWAN–•–RICHARD–OLAIZ–•–JOHN–JONSSON–•–CARL–DAVIS–•–BEN–LAW

PEOPLE

SAFETY

ETHICS

TEAMWORK

INNOVATION

DISCIPLINE

Page 4: Q4 Flywheel Special Edition

3

HVAC BLDG 1 REPAIRS NMC SAN DIEGO, CALIFORNIA

SOF 3D MSOB COMPANY/TEAM & SOF SERE TRAINING FACILITIES MCB CAMP LEJEUNE, NC

SPECIAL OPERATIONS BATTALION OPERATIONS COMPLEX, JOINT BASE LEWIS MCCHORD, WA

BACHELOR QUARTERS RENOVATIONS NAVAL AIR STATION OCEANA, VIRGINIA BEACH, VA

REPLACE FUEL PIER & TRUCK LOAD FACILITY, NS GUANTANAMO BAY, CUBA

RENOVATIONS FOR BUILDINGS KL, KM, AND KQ, NS NORFOLK, VA

TOC MTOC, P8A, NAS WHIDBEY ISLAND, WA

SEAWATER RO TREATMENT PLANT, NAS GUANTANAMO BAY, CUBA

P1445/P1447/P1448 STEAM DECENTRALIZATION, MCB CAMP LEJEUNE, NC

SOF INDOOR DYNAMIC SHOOTING FACILITY, NAB CORONADO, CA

P1391 SOF SUSTAINMENT TRAINING COMPLEX, MCB CAMP LEJEUNE, NC

REPLACE WASTE DRAIN PIPE, BLD. 1, NAVAL MEDICAL CENTER, CA

STERILE PROCESSING NMC BLDG 1 RENOVATION, NAVAL MEDICAL CENTER, CA

DESIGN AND RENOVATE BLDG 630 BARRACKS, PRESIDIO OF MONTEREY, CA

SEISMIC REHABILITATION (PHASE 1), BLD 1, NAVAL MEDICAL CENTER, CA

P159 CAMP WILSON INFRASTRUCTURE UPGRADES, MCAGCC TWENTYNINE PALMS, CA

SOF SUPPORT ACTIVITY OPS FACILITIES ONE & TWO Q797 & Q893 SSTC, NAS CORONADO, CA

DINING FACILITY, NAS GUANTANAMO BAY, CUBA

MEDICAL FACILITY COMPLEX, NAS GUANTANAMO BAY, CUBA

RENOVATION OF BUILDING R61, NS NORFOLK, VA

15

16

17

18

19

20

14

7ACTIVE PROJECTS

1

2

34

5

6

78

9

10

11

12

13

14 115

121029

2317

16

1331

2

2021 22

25

4

14

PRIME: DPR HARDIN CONSTRUCTION-WGI JV

P157 SOF HUMAN PERFORMANCE CENTER, NAS OCEANA, VIRGINIA BEACH, VA

PRIME: DPR HARDIN CONSTRUCTION-WGI JV

D/B P-334 LOGSU TWO OPERATIONS FACILITY,

JOINT EXPEDITIONARY BASE LITTLE CREEK - FORT STORY, VA

PRIME: RQ CONSTRUCTION

SEISMIC REHABILITATION (PHASE2), BUILDING 1, NAVY MEDICAL CENTER, CA

PRIME: RQ-URS JV

FACILITY 1678 CHILLER REPLACEMENT, NB GUANTANAMO BAY, CUBA PRIME: RQ-URS JV

INSTALL BACKUP GENERATOR BLDG 1442, NB GUANTANAMO BAY, CUBA

PRIME: RQ-URS JV

REPLACE FUEL STORAGE TANKS, NS GUANTANAMO BAY, CUBA

PRIME: RQ-URS JV

SEAWATER REVERSE OSMOSIS TREATMENT REPLICAPITALIZATION (TRAINS C&D)

NS GUANTANAMO BAY, CUBA PRIME: RQ CONSTRUCTION

IDIQ MACC FOR COMMERCIAL & INSTITUTIONAL PROJECTS,

NAVFAC SOUTHWEST AOR

PRIME: RQ CONSTRUCTION

LITTORAL COMBAT SHIP SUPPORT FACILITY, NAVAL BASE SAN DIEGO, CA

PRIME: RQ CONSTRUCTION

SPECIAL OPERATIONS FORCES LOGSU ONE OPS FACILITY TWO,

NAVAL BASE CORONADO, CA

PRIME: RQ-URS JV

MOP TOWER REPAIR AND REPLACEMENT, NB GUANTANAMO BAY, CUBA

PRIME: RQ-URS JV

NAVY COMMUNICATION FACILITY, AV30 & AV79, NB GUANTANAMO BAY, CUBA

PRIME: RQ-URS JV

REPAIRS TO WINDMILL BEACH, RADIO RANGE, & KITTERY CAFE ROADS,

NB GUANTANAMO BAY, CUBA

PRIME: RQ-URS JV

WHARF BRAVO STRUCTURAL REPAIRS, NB GUANTANAMO BAY, CUBA

NEW AWARDSA BRIGHT FY2017 WITH MANY OPPORTUNITIES TO LIVE OUT OUR VALUES

21

22

23

30

9

2819

6

26

25

26

27

28

29

30

31

32

33

34

35

5 8

30 3432

35332718

Page 5: Q4 Flywheel Special Edition

progress: D/B Q797 & Q893 SOF SUPPORT ACTIVITY OPS FACILIES ONE & TWO SSTC-S IMPERIAL BEACH, CA

progress: SOF INDOOR DYNAMIC SHOOTING FACILITY NB CORONADO, SAN DIEGO, CA

Page 6: Q4 Flywheel Special Edition

progress: SPECIAL OPERATIONS BATTALION OPPERATIONS COMPLEX JOINT BASE LEWIS MCCHORD, WA

Page 7: Q4 Flywheel Special Edition

progress: RENOVATION OF BUILDING R61 NORFOLK, VA

progress: P1391 SOF SUSTAINMENT TRAINING COMPLEX MCB CAMP LEJEUNE, NC

Page 8: Q4 Flywheel Special Edition

progress: STERILE PROCESSING DEPARTMENT, BUILDING 1 RENOVATION REPLACE WASTE DRAIN PIPE, BUILDING 1 SEISMIC REHABILITATION (PHASE 1), BUILDING 1 HVAC & DUCTWORK REPAIRS

Page 9: Q4 Flywheel Special Edition

progress: SEAWATER REVERSE OSMOSIS TREATMENT, NAVAL STATION GUANTANAMO BAY, CUBA P1203 REPLACE FUEL PIER AND P13S3 REPLACE TRUCK LOAD FACILITY

Page 10: Q4 Flywheel Special Edition

progress: DESIGN OF BACHELOR QUARTERS NAS OCEANA, VIRGINIA BEACH, VA

A

OF

1909 CYPRESS AVENUEVIRGINIA BEACH, VA 23451

(757) 417 - 0140

SUBMITTAL

SHEET

B

C

1 2 3 4 5

D

NAVFAC DRAWING NO.

CONSTR. CONTR. NO.

EPROJECT NO.:

SCALE:

1 2 3 4 5

<<XX>>

CHIEF ENG/ARCH

BRANCH MANAGER

<<PM/DM>> NJCLSDCRJC???

DES DRW CHK

SATISFACTORY TO DATE

DES

APPROVED

FOR COMMANDER NAVFAC

xxxxx

SYM

DATE

APPR

DESC

RIPT

ION

AS NOTED

N40085-15-R-0017

SEAL

A/E INFO

DEPA

RTME

NT O

F TH

E NA

VYNA

VAL F

ACILI

TIES

ENG

INEE

RING

COM

MAND

VIRG

INIA

BEA

CH, V

APW

D OC

EANA

- FEA

DNA

VAL F

ACILI

TIES E

NGIN

EERI

NG C

OMMA

ND ~

MID-

ATLA

NTIC

VIRG

INIA

BEA

CH, V

ANA

S OC

EANA

- DAM

NEC

K AN

NEX

A

B

C

D

C:\20

15 R

evit P

rojec

ts\14

27_P

-157

HPC

- Arch

_joet@

hbao

nline

.com.

rvt4/2

1/201

6 4:17

:30 P

M

A-302

P-15

7 SOF

HUM

AN P

ERFO

RMAN

CE C

ENTE

RFI

NAL C

ONCE

PT - I

NTER

IOR

REND

ERIN

G

DI JT DR

1298158

22 APRIL 2016

CDW

66

22 APRIL 2016

progress: P157 SOF HUMAN PERFORMANCE CENTER NAS OCEANA, VIRGINIA BEACH, VA

Page 11: Q4 Flywheel Special Edition

progress: P159 CAMP WILSON INRASTRUCTURE UPGRADES, MCAGCC TWENTYNINE PALMS, CA

Page 12: Q4 Flywheel Special Edition

delivered: DESIGN/RENOVATE BARRACKS REPAIR BLD 630 PRESIDIO OF MONTEREY, CA

Page 13: Q4 Flywheel Special Edition

SAFETY RECOGNITION

NATIONAL SAFETY COUNCIL - MILLION WORK HOURS AWARD FOR OPERATING 3,000,464 EMPLOYEE HOURS WITHOUT INCIDENT

NATIONAL SAFETY COUNCIL -2016 RECIPIENT OF THE OCCUPATIONAL EXCELLENCE ACHIEVEMENT AWARD

MILESTONE AWARD - RQ-DPR JV MSOB, CAMP LEJEUNE FOR OPERATING 475,000 EMPLOYEE HOURS WITHOUT INCIDENT

MILESTONE AWARD - RQ FUEL PIER AND TRUCK LOAD, GTMO FOR OPERATING 176,545 (33 MONTHS) EMPLOYEE HOURS WITHOUT INCIDENT

MILESTONE AWARD - RQ BLDG 630, MONTEREY FOR OPERATING 145,532 EMPLOYEE HOURS WITHOUT INCIDENT

MILESTONE AWARD - RQ SEAWATER RO, GTMO FOR OPERATING 30,400 EMPLOYEE HOURS WITHOUT INCIDENT

MILESTONE AWARD - RQ SOF BATTALION OPS, JBLM FOR OPERATING 109,000 EMPLOYEE HOURS WITHOUT INCIDENT

MILESTONE AWARD - RQ TOC-MTOC, WHIDBEY ISLAND FOR OPERATING 85,000 EMPLOYEE HOURS WITHOUT INCIDENT

[FY2016 RQ CONSTRUCTION COMPANY AWARDS]

progress: P1445/P1447/P1448 STEAM DECENTRALIZATION MCB CAMP LEJEUNE, NC

Page 14: Q4 Flywheel Special Edition

HOME AND HOMERWe have talked about flywheels and 20-mile marching in the past in relation to our business, but I’d like to meditate on actual flywheels a bit more in thinking about our future. Flywheels are wheels that start off moving slow and pick up speed once they get going. They get going faster and faster. But faster for what? The real purpose of flywheels is positive energy and positive energy transfer. They serve as, or like, engines or motors.

So if RQ’s flywheel is really an engine producing greater power as it spins faster, where is that engine taking us and why does it need to be continuously juiced up?

Being in the Christmas season, I can’t help but think about home and the nature of home. Growing up I moved several times, sometimes with my parents and several more times since going off to college and then life beyond. What I recognized when my folks moved is that their new home always felt like home. The square footage and architecture of the house itself were always different, but it was filled with all the same family pictures, furniture and knick-knacks that made them all feel like home…not to mention family members were the same. I felt the same way when I visited my brother’s dorm room for the first time. It felt like Bryan. And when my sister got married, her house felt like Kelly. The saying goes, “Home is where you hang your hat.” I would say that’s right if you mean “your hat” being your distinct personality or that of your family.

RQ has incredibly spread out the past several years. But in every new location, it feels like RQ. There are green diamonds, sign-in templates, and the same spreadsheets and software applications open on computers in Washington, North Carolina and GTMO. Jobsite banners, swag, and binders on shelves look a lot the same in Virginia and California. But more than that, our own people identify that it is the similar, exceptional quality of our people and their character that is the most striking similarity of each of our locations. And our Client seems to recognize the same, meaning our reputation has spread as expressed in glowing evals, ribbon-cutting ceremony compliments, and passerby comments that make you proud.

As we look to the future and where our 20-mile marching is taking us, it is easy to get caught up in the excitement of destinations. But what we should appreciate is that our future destinations, like our past achievements, will always feel like home because it is us going there. Whether we hang pictures on the wall including projects in new states or a part of new markets, they are going to be filled with RQ faces wearing RQ hard hats that made them happen. If we achieve greater and greater volume of the DoD’s build needs, it’ll be completed by folks that had to answer questions about high school years before getting hired on and share the same motivation traits as those that came before us and are running with us right now.

I love home. As an English major, I appreciate the fact that “home” is a significant literary theme since forever, Homer himself attesting to that. Thank you all for making RQ such a great home to be a part of from sea to shining sea. I look forward to all that the future holds for us, and I look forward to it entirely because it involves “us.” Have a Merry Christmas and we’ll all have a busy New Year! Having raced through this one, I already can’t wait to see next year’s book of the 2017 dragons we slayed and lands we conquered - together.

Eric TaylorVP Of Operations

“Some people spend all day indoors. This is MY office,

and it’s a beautiful thing.”

Don Rogers, CHSTS.V.P., CHIEF SAFETY OFFICER

Page 15: Q4 Flywheel Special Edition