6 th Annual LNG Transport, Handling & Storage Forum Bali, 14 September 2016 PUSHING FORWARD WITH LNG SUPPLY AND INFRASTRUCTURE TO SUPPORT INDONESIA’S POWER SECTOR

Transcript of PUSHING FORWARD WITH LNG SUPPLY AND INFRASTRUCTURE … Rachmatullah - PLN.… · Confidential and...

Page 1: PUSHING FORWARD WITH LNG SUPPLY AND INFRASTRUCTURE … Rachmatullah - PLN.… · Confidential and Proprietary. Any use of this material without specific permission of PLN is strictly

6th AnnualLNGTransport,Handling&StorageForum

Bali,14 September 2016

PUSHINGFORWARDWITHLNGSUPPLYANDINFRASTRUCTURETOSUPPORTINDONESIA’SPOWERSECTOR

Page 2: PUSHING FORWARD WITH LNG SUPPLY AND INFRASTRUCTURE … Rachmatullah - PLN.… · Confidential and Proprietary. Any use of this material without specific permission of PLN is strictly

ConfidentialandProprietary.AnyuseofthismaterialwithoutspecificpermissionofPLNisstrictlyprohibited.

FuelMix2016(Prognosis)

Comparedtotherealizationin2015withprognosisin2016,theportionofcoalwillrise2%-3%inthefuelmix,whilefueloildecreased2%-3%.

PLN+IPP2015à2016

COAL:56%à 58%FUELOIL:9%à 7%HYDRO:6%à 6%GEO+RE:4% à 4%GAS:25%à 25%

PLN2015à2016

COAL:52%à 55%FUELOIL:11%à 8%HYDRO:6%à 6%GEO+RE:2% à 2%GAS:29%à 29%

Coal55%

FuelOil8%

Hydro6%

Geothermal+RE2%

Gas29%

PLN

Coal58%

FuelOil7%

Hydro6%

Geothermal+RE4%

Gas25%

PLN+IPP

PLN PLN+IPPCoal 106.844,98 149.210,65FuelOil 16.279,28 16.954,01Hydro 12.061,80 16.509,41Geothermal+RE 4.231,01 11.559,96Gas 57.032,31 65.347,20

196.449,38 259.581,23

FuelType

TOTAL

0

50,000

100,000

150,000

200,000

250,000

300,000

PLN PLN+IPP

ENER

GYGWH

Coal FuelOil Hydro Geothermal+RE Gas

6

Page 3: PUSHING FORWARD WITH LNG SUPPLY AND INFRASTRUCTURE … Rachmatullah - PLN.… · Confidential and Proprietary. Any use of this material without specific permission of PLN is strictly

ConfidentialandProprietary.AnyuseofthismaterialwithoutspecificpermissionofPLNisstrictlyprohibited.

ElectricityProductionCostinIndonesia

3

PotentialefficiencyofthefuelisverysignificanttoreduceoperatingexpensesinPLN.

2015*)BasedonPLN'sFinancialReport(Final&Published)

-PurchaseElectricity 51,69Rp T -Maintenance 17,59Rp T-Lease 7,56Rp T -Personnel 20,32Rp T

-Depreciation 21,42Rp T Others 7,09Rp T

T

-Coal 32,46Rp T 26,9%-Gas 48,35Rp T 40,1%-Oil 35,99Rp T 29,8%

-Geothermal 3,26Rp T 2,7%-Hydro 0,24Rp T 0,2%

-Lubricants 0,29Rp T 0,2%TotalFuels&Lubricants 120,59Rp T

OVERVIEWOFOPERATINGEXPENSESPTPLN(PERSERO)IN

FuelExpensesBreakdown

49%

TotalOperatingExpenses246,26Rp

Fuels &Lubricants Power Plants HighVoltageTransmissions

TransmissionSubstations

MediumV.Transmissions

DistributionSubstations

DistributionLines

HighVoltageConsumers

MediumV.Consumers

Residential&SmallIndustriesConsumers

ElectricityEnergy

Purchase Electricity,Lease,Depreciation

Maintenance,Personnel,Others

of TotalFuels&Lubes

ofTotalOperatingExpenses

USD19BILLION

USD1= Rp13000

USD3,7BILLION

USD1= Rp13000

Page 4: PUSHING FORWARD WITH LNG SUPPLY AND INFRASTRUCTURE … Rachmatullah - PLN.… · Confidential and Proprietary. Any use of this material without specific permission of PLN is strictly

ConfidentialandProprietary.AnyuseofthismaterialwithoutspecificpermissionofPLNisstrictlyprohibited.

GasUtilizationin35GWPowerProgram

35.000MW

CoalFired:19.813MW

Geothermal:725MW

Others:210MW

Hydro:1.971MW

Gas:12.908MW

Additional 35GW by2019isrequiredbasedonfollowingassumptions :- Economicgrowth6,6%perannum- Powerdemandgrowth8,3%perannum- Electrificationratioincreasedto97%

TypeofPowerPlant IPP PLN Total PortionCoalFired 17.598 2.215 19.813 55,6%Hydro-electric 582 1.389 1.971 5,5%GasFired 6.123 6.785 12.908 36,2%Geothermal 555 170 725 2,0%Wind 180 - 180 0,5%Biomass 30 - 30 0,1%Total 25.068 10.559 35.627 100,0%Source:RUPTL2016-2025

39/06/2016

Page 5: PUSHING FORWARD WITH LNG SUPPLY AND INFRASTRUCTURE … Rachmatullah - PLN.… · Confidential and Proprietary. Any use of this material without specific permission of PLN is strictly

ConfidentialandProprietary.AnyuseofthismaterialwithoutspecificpermissionofPLNisstrictlyprohibited.

NewGasFiredPowerPlantsinIndonesia(2016-2025)

5

INDONESIAGasQuantity Capacity

2.189BBTUD 22.117MW

KALIMANTAN(KAL)GasQuantity Capacity

150 BBTUD 1.631MW

SULAWESINUSATENGGARA(SNT)

GasQuantity Capacity

223 BBTUD 2.740MW

MALUKU PAPUA(MP)GasQuantity Capacity

117 BBTUD 1.070MW

RUPTL2016-2025

JAWABALI(JB)GasQuantity Capacity1.335BBTUD 13.206MW

SUMATERA(SUM)GasQuantity Capacity364BBTUD 3.470MW

Page 6: PUSHING FORWARD WITH LNG SUPPLY AND INFRASTRUCTURE … Rachmatullah - PLN.… · Confidential and Proprietary. Any use of this material without specific permission of PLN is strictly

ConfidentialandProprietary.AnyuseofthismaterialwithoutspecificpermissionofPLNisstrictlyprohibited.

ElectricityGasBalance(PLN+IPP)

6

In the period 2016-2025, the gas demand for electricity grows significantly approx 3.500 BBTUD in 2025.

Untill 2025,additionalgassupplyneededisapprox2000BBTUD.

-

500

1,000

1,500

2,000

2,500

3,000

3,500

4,000

2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025

BBTU

D

SupplyContractvsDemand

RMP

SNT

KAL

JBTB

JBT

JBB

SUMSUPPLYCONTRACT

Page 7: PUSHING FORWARD WITH LNG SUPPLY AND INFRASTRUCTURE … Rachmatullah - PLN.… · Confidential and Proprietary. Any use of this material without specific permission of PLN is strictly

ConfidentialandProprietary.AnyuseofthismaterialwithoutspecificpermissionofPLNisstrictlyprohibited.

Current/PotentialDomesticGasSources

7

SUMATERA

Jambi Merang,Grissik,Lematang,Natuna,

ENIKrueng Mane

KALIMANTAN

LNGBontang,Simenggaris,Bangkanai,Bunyu,ENIMuara

Bakau, IDD

JAWABALI

ONWJ,CNOOC,WMO,Kepodang,Cepu,Gundih,Kangean,HCML,Santos,

LNGNR(ex.Tangguh/Bontang)

SULAWESI

Donggi Senoro,Matindok,

Sengkang/WasamboMALUKU&PAPUA

Salawati, Tangguh,Masela

Page 8: PUSHING FORWARD WITH LNG SUPPLY AND INFRASTRUCTURE … Rachmatullah - PLN.… · Confidential and Proprietary. Any use of this material without specific permission of PLN is strictly

ConfidentialandProprietary.AnyuseofthismaterialwithoutspecificpermissionofPLNisstrictlyprohibited.

ShallWeImport?

8

Can exploration of domestic gas resources wait until its commercial

production met the growing capacity to pay of domestic off

takers ?

Page 9: PUSHING FORWARD WITH LNG SUPPLY AND INFRASTRUCTURE … Rachmatullah - PLN.… · Confidential and Proprietary. Any use of this material without specific permission of PLN is strictly

ConfidentialandProprietary.AnyuseofthismaterialwithoutspecificpermissionofPLNisstrictlyprohibited.

GasSupplyAlternatives

9

LNGTerminal

LNGTerminal

VirtualPipeline

Import

Domestic

LNGStorageRegasification

LNGStorageRegasification

PowerPlantLocation1

PowerPlantLocation 2

Scheme:1. IPP+GasValueChain2. EPC(PLN)+GasSupply(ThirdParty)3. EPC(PLN)+GasSupply(PLN)4. IPP+GasSupply(PLN)

LNGStorageRegasification

PowerPlantLocationn

Page 10: PUSHING FORWARD WITH LNG SUPPLY AND INFRASTRUCTURE … Rachmatullah - PLN.… · Confidential and Proprietary. Any use of this material without specific permission of PLN is strictly

ConfidentialandProprietary.AnyuseofthismaterialwithoutspecificpermissionofPLNisstrictlyprohibited.

AdditionalGasFiredPowerPlants2016- 2025

9/05/2016 10

Page 11: PUSHING FORWARD WITH LNG SUPPLY AND INFRASTRUCTURE … Rachmatullah - PLN.… · Confidential and Proprietary. Any use of this material without specific permission of PLN is strictly

ConfidentialandProprietary.AnyuseofthismaterialwithoutspecificpermissionofPLNisstrictlyprohibited.

RequirementofLNGReceivingTerminal

11

CCPPJAWA1

COD 2020

StorageCap 170.000m3

Regas Cap. 200MMSCFD(1,56MTPA)

CCPPJAWA3

COD 2020

StorageCap 2x50.000m3

Regas Cap. 157MMSCFD(1,23MTPA)

LNGTERMINALARUN

InOperation

StorageCap 6x127.000m3

Regas Cap. 400MMSCFD(3,12MTPA)

CCPPSUMBAGUT1,3,4

COD 2020

StorageCap 120.000m3

Regas Cap. 200MMSCFD(1,56MTPA)

FSRUNUSANTARA REGAS

InOperation

StorageCap 125.000m3

Regas Cap. 500MMSCFD(3,91MTPA)

FSRU LAMPUNG

InOperation

StorageCap 150.000m3

Regas Cap. 500MMSCFD(3,91MTPA)

LNGTERMINALBOJONEGARA

COD 2020

StorageCap 2x150.000m3

Regas Cap. 500MMSCFD(3,91MTPA)

Page 12: PUSHING FORWARD WITH LNG SUPPLY AND INFRASTRUCTURE … Rachmatullah - PLN.… · Confidential and Proprietary. Any use of this material without specific permission of PLN is strictly

ConfidentialandProprietary.AnyuseofthismaterialwithoutspecificpermissionofPLNisstrictlyprohibited.12

SmallScaleLNGDistribution

LNG Terminal & Unloading

LNG Mini Tanker

LNG Hub

LNG Mini Tanker LNG Trucking on LCT

Gas Pipeline

LNG Storage & Regas near PLTMG

Gas Fired Power Plants

LNG ISO Tank & Trucking

Most gassupplytonewgasfiredpowerplants(excludeJawa Bali) willusesmallscaleLNG

distribution system.

Page 13: PUSHING FORWARD WITH LNG SUPPLY AND INFRASTRUCTURE … Rachmatullah - PLN.… · Confidential and Proprietary. Any use of this material without specific permission of PLN is strictly

ConfidentialandProprietary.AnyuseofthismaterialwithoutspecificpermissionofPLNisstrictlyprohibited.

13

• TotalDemand forMaluku Papuareaching 960MW,± 105bbtud.• LNGVesselrequired:70,000m3(Ternate,Ambon,Sorong,Manokwari,Jayapura )and14,000m3(Ambon,Langgur-Merauke)• Total14daysroundtrip

FOB11%REP

10,000m3

25,000m3

10,000m310,000m3

8,000m3

11,400m3

643NM

323NM336NM

198NM

425NM

293NM

2,500m3

Alternative forLNG Distribution inEasternRegion

Page 14: PUSHING FORWARD WITH LNG SUPPLY AND INFRASTRUCTURE … Rachmatullah - PLN.… · Confidential and Proprietary. Any use of this material without specific permission of PLN is strictly

ConfidentialandProprietary.AnyuseofthismaterialwithoutspecificpermissionofPLNisstrictlyprohibited.

14

OptionforNorth Maluku

MPPTobelo 10MW(2017)PLTMGTobelo 20MW(2020)

3.6bbtud ~150m3/d

MPPMalifut 5MW(2017)0.6bbtud~25m3/d

MPPMaba 10MW(2023)1.2bbtud ~50m3/d

PLTMGBacan 20MW(2018)2.4bbtud~100m3/d

PLTMGMinahasa Peaker 150MW(2018)

PLTGGorontaloPeaker 100MW(2016)

MPPTernate30MW(2017)PLTMGTernate40MW(2018)PLTMGTidore 20MW(2020)*MPPSofifi 10MW(2017)*12bbtud ~499.2m3/d

TotalDemand165MW,19.8bbtudVessel4,000m3,roundtrip:10days,buffer3days

125NM

221NM

115NM

179NM

179NM

HUB10,000m3

ShortdistanceofTernateTidore ± 16km,Tidore-Sofifi ± 12km,moreeconomictouse SubmarineCable

Page 15: PUSHING FORWARD WITH LNG SUPPLY AND INFRASTRUCTURE … Rachmatullah - PLN.… · Confidential and Proprietary. Any use of this material without specific permission of PLN is strictly

ConfidentialandProprietary.AnyuseofthismaterialwithoutspecificpermissionofPLNisstrictlyprohibited.

LogisticCosttoEachHub

15

Margin MarginMarginMarginMargin

$/mmbtu

FOBBontang : 11% ICP,assumingICP @35$/bblfor12%ICPwhenICP@47USD/bblà 5,6USD/mmbtuvsHSDat12USD/mmbtu

Page 16: PUSHING FORWARD WITH LNG SUPPLY AND INFRASTRUCTURE … Rachmatullah - PLN.… · Confidential and Proprietary. Any use of this material without specific permission of PLN is strictly

ConfidentialandProprietary.AnyuseofthismaterialwithoutspecificpermissionofPLNisstrictlyprohibited.16

GasInfrastructureProjectsinPLN

LNGPesanggaranStatus:Operation

LNGCentralIndonesiaStatus:RFPAddendum

GasPipelinesPK-52Bontang toTanjung BatuStatus:Biddoc Released

LNGGorontalo PeakerStatus:FID

ClustersinSumateraandKalimantanStatus:Pra FS&FEED

ClustersinMalukuStatus:Pra FS&FEED

ClustersinPapuaStatus:Pra FS&FEED

LNGSupplyforJAWA1Status:DomesticAllocation

1

2

3

4

5

6

7

8

Page 17: PUSHING FORWARD WITH LNG SUPPLY AND INFRASTRUCTURE … Rachmatullah - PLN.… · Confidential and Proprietary. Any use of this material without specific permission of PLN is strictly

Thank youemail : [email protected]

17