Purple Line Extension, Section...
Transcript of Purple Line Extension, Section...
![Page 1: Purple Line Extension, Section 2media.metro.net/projects_studies/westside/images/presentation_pur… · Century City/ Constellation Westwood/UCLA Westwood/VA Hospital Pre-Construction](https://reader036.fdocuments.us/reader036/viewer/2022071213/603e1e8851ea8d16dc563202/html5/thumbnails/1.jpg)
Purple Line Extension, Section 2 Pre-Construction Community Meeting February 2, 2017
![Page 2: Purple Line Extension, Section 2media.metro.net/projects_studies/westside/images/presentation_pur… · Century City/ Constellation Westwood/UCLA Westwood/VA Hospital Pre-Construction](https://reader036.fdocuments.us/reader036/viewer/2022071213/603e1e8851ea8d16dc563202/html5/thumbnails/2.jpg)
Agenda
• Project Overview & Schedule
• Advance Utility Relocation
• Constellation Ave
• Wilshire/Rodeo
• Eat Shop Play Wilshire
Questions & Answers
2
![Page 3: Purple Line Extension, Section 2media.metro.net/projects_studies/westside/images/presentation_pur… · Century City/ Constellation Westwood/UCLA Westwood/VA Hospital Pre-Construction](https://reader036.fdocuments.us/reader036/viewer/2022071213/603e1e8851ea8d16dc563202/html5/thumbnails/3.jpg)
Purple Line Extension Project Alignment
![Page 4: Purple Line Extension, Section 2media.metro.net/projects_studies/westside/images/presentation_pur… · Century City/ Constellation Westwood/UCLA Westwood/VA Hospital Pre-Construction](https://reader036.fdocuments.us/reader036/viewer/2022071213/603e1e8851ea8d16dc563202/html5/thumbnails/4.jpg)
Section 2 Project Description
4
Tunneling
Station
Testing
*This environmentally approved alignment is subject to further analysis in the Supplemental Environmental Impact Statement currently underway.
![Page 5: Purple Line Extension, Section 2media.metro.net/projects_studies/westside/images/presentation_pur… · Century City/ Constellation Westwood/UCLA Westwood/VA Hospital Pre-Construction](https://reader036.fdocuments.us/reader036/viewer/2022071213/603e1e8851ea8d16dc563202/html5/thumbnails/5.jpg)
Status of Sections 2 and 3
5
Under Construction Forecasted Schedule
Section 1 Section 2 Section 3
Length 3.92 Miles 2.59 Miles 2.59 Miles
New Stations Wilshire/La Brea
Wilshire/Fairfax
Wilshire/La Cienega
Wilshire/Rodeo
Century City/
Constellation
Westwood/UCLA
Westwood/VA
Hospital
Pre-Construction Activities Current - 2016 2016 - 2018 2025 – 2027*
Construction 2015 - 2023 2018 – 2026* 2027 – 2035*
Operations 2024 2026* 2035*
3
*Subject to change. The PLE project team is working to deliver the project consistent with Measure M
![Page 6: Purple Line Extension, Section 2media.metro.net/projects_studies/westside/images/presentation_pur… · Century City/ Constellation Westwood/UCLA Westwood/VA Hospital Pre-Construction](https://reader036.fdocuments.us/reader036/viewer/2022071213/603e1e8851ea8d16dc563202/html5/thumbnails/6.jpg)
Section 2 Project Description
6
Tunneling
Station
Testing
• Twin-bored tunnels and 2 new subway stations
– Wilshire/Rodeo
– Century City/ Constellation
• Approved Federal Funding
– Federal New Starts $1.187 billion
– TIFIA Loan $307 million
– CMAQ $169 million
• Pre-Construction
– Current through 2018
• Construction
– 2018-2026
• Revenue Service Date:
– Forecast: August 2025
– FFGA: No later than December 2026
• Supplemental Environmental Impact Statement
![Page 7: Purple Line Extension, Section 2media.metro.net/projects_studies/westside/images/presentation_pur… · Century City/ Constellation Westwood/UCLA Westwood/VA Hospital Pre-Construction](https://reader036.fdocuments.us/reader036/viewer/2022071213/603e1e8851ea8d16dc563202/html5/thumbnails/7.jpg)
Station Overview
7
![Page 8: Purple Line Extension, Section 2media.metro.net/projects_studies/westside/images/presentation_pur… · Century City/ Constellation Westwood/UCLA Westwood/VA Hospital Pre-Construction](https://reader036.fdocuments.us/reader036/viewer/2022071213/603e1e8851ea8d16dc563202/html5/thumbnails/8.jpg)
Wilshire/Rodeo Drive Station Box
6
![Page 9: Purple Line Extension, Section 2media.metro.net/projects_studies/westside/images/presentation_pur… · Century City/ Constellation Westwood/UCLA Westwood/VA Hospital Pre-Construction](https://reader036.fdocuments.us/reader036/viewer/2022071213/603e1e8851ea8d16dc563202/html5/thumbnails/9.jpg)
Century City/ Constellation Station Box
7
![Page 10: Purple Line Extension, Section 2media.metro.net/projects_studies/westside/images/presentation_pur… · Century City/ Constellation Westwood/UCLA Westwood/VA Hospital Pre-Construction](https://reader036.fdocuments.us/reader036/viewer/2022071213/603e1e8851ea8d16dc563202/html5/thumbnails/10.jpg)
Station Construction Overview
11
![Page 11: Purple Line Extension, Section 2media.metro.net/projects_studies/westside/images/presentation_pur… · Century City/ Constellation Westwood/UCLA Westwood/VA Hospital Pre-Construction](https://reader036.fdocuments.us/reader036/viewer/2022071213/603e1e8851ea8d16dc563202/html5/thumbnails/11.jpg)
10 Rendering of AUR work
• Utility relocations: – Clear the way for station construction – Telecom, gas, water, power, sewer – Ensure continued utility service
• Typical process: – Day and night-time hours approved per city
jurisdiction. – Maintain at least 2 lanes of traffic in each
direction – Truck/crew leave and lanes reopen at the end of
each work period – Noisiest activities include saw-cutting and jack-
hammering
• Traffic Plans – Traffic plans will be approved by the cities of Los
Angeles and Beverly Hills
Pre-Construction Advanced Utility Relocation (AUR)
![Page 12: Purple Line Extension, Section 2media.metro.net/projects_studies/westside/images/presentation_pur… · Century City/ Constellation Westwood/UCLA Westwood/VA Hospital Pre-Construction](https://reader036.fdocuments.us/reader036/viewer/2022071213/603e1e8851ea8d16dc563202/html5/thumbnails/12.jpg)
Advance Utility Relocation Century City/Constellation Station
Now through Spring 2017
• Relocating telecommunication lines
• Includes installation of traffic control devices, excavation and shoring, placement of temporary trench plates, utility construction, and surface restoration
• Intermittent street closures on Constellation Bl between Avenue of the Stars and Century Park West
– Coordinating with Westfield Mall and Century Plaza Hotel construction activities and events in the area
Work Hours
• Sunday through Thursday night
• 8pm to 6am
12 Telecommunication line work
![Page 13: Purple Line Extension, Section 2media.metro.net/projects_studies/westside/images/presentation_pur… · Century City/ Constellation Westwood/UCLA Westwood/VA Hospital Pre-Construction](https://reader036.fdocuments.us/reader036/viewer/2022071213/603e1e8851ea8d16dc563202/html5/thumbnails/13.jpg)
Upcoming Work Century City/Constellation Station
March 2017*
• Utility relocation of gas, water, power, AT&T lines
• Includes installation of traffic control devices, excavation and shoring, placement of temporary trench plates, utility construction, and surface restoration
• Intermittent street closures on Constellation Blvd between Avenue of the Stars and Century Park West
– Coordination with Westfield Mall and Century Plaza Hotel construction activities and events in the area
Work Hours and Traffic plans pending approval
13
Examples of AUR work set up at night
*Dates subject to change.
![Page 14: Purple Line Extension, Section 2media.metro.net/projects_studies/westside/images/presentation_pur… · Century City/ Constellation Westwood/UCLA Westwood/VA Hospital Pre-Construction](https://reader036.fdocuments.us/reader036/viewer/2022071213/603e1e8851ea8d16dc563202/html5/thumbnails/14.jpg)
Advance Utility Relocation Wilshire/Rodeo Drive Station
Anticipated Work Activities • Relocation of Southern California
Edison lines
• Work hours, traffic plans, and start date pending City of Beverly Hills approval
• Construction Community Meeting in advance of starting utility work.
• Construction notices will provide work hours and details
• City of Beverly Hills Community Meeting, February 9th
14
Past AUR work at Wilshire/La Cienega
![Page 15: Purple Line Extension, Section 2media.metro.net/projects_studies/westside/images/presentation_pur… · Century City/ Constellation Westwood/UCLA Westwood/VA Hospital Pre-Construction](https://reader036.fdocuments.us/reader036/viewer/2022071213/603e1e8851ea8d16dc563202/html5/thumbnails/15.jpg)
Pre-Construction Advanced Utility Relocation (AUR)
7
Examples of AUR work
![Page 16: Purple Line Extension, Section 2media.metro.net/projects_studies/westside/images/presentation_pur… · Century City/ Constellation Westwood/UCLA Westwood/VA Hospital Pre-Construction](https://reader036.fdocuments.us/reader036/viewer/2022071213/603e1e8851ea8d16dc563202/html5/thumbnails/16.jpg)
Wilshire/Rodeo Drive Station Former Ace Gallery
16
Former Ace Gallery and future location of Wilshire/ Rodeo station
• Former Ace Gallery is the future location of Wilshire/Rodeo station at Wilshire Bl/Reeves Dr
• Future staging yard for project construction
• Metro currently owns the property
• Maintenance and security inside and outside of yard
• Building demolition to be determined pending City of Beverly Hills approval
Current Wilshire/Rodeo Station Rendering
![Page 17: Purple Line Extension, Section 2media.metro.net/projects_studies/westside/images/presentation_pur… · Century City/ Constellation Westwood/UCLA Westwood/VA Hospital Pre-Construction](https://reader036.fdocuments.us/reader036/viewer/2022071213/603e1e8851ea8d16dc563202/html5/thumbnails/17.jpg)
Project Coordination
17
Century Plaza Hotel Westfield Mall Construction
Santa Monica Street Restoration, Beverly Hills
![Page 18: Purple Line Extension, Section 2media.metro.net/projects_studies/westside/images/presentation_pur… · Century City/ Constellation Westwood/UCLA Westwood/VA Hospital Pre-Construction](https://reader036.fdocuments.us/reader036/viewer/2022071213/603e1e8851ea8d16dc563202/html5/thumbnails/18.jpg)
Noise Mitigation
5 Step Noise Control Plan 1. Training
2. Scheduling of Noisy Activities
3. Noise Control Measures
4. Monitoring
5. Response
18
![Page 19: Purple Line Extension, Section 2media.metro.net/projects_studies/westside/images/presentation_pur… · Century City/ Constellation Westwood/UCLA Westwood/VA Hospital Pre-Construction](https://reader036.fdocuments.us/reader036/viewer/2022071213/603e1e8851ea8d16dc563202/html5/thumbnails/19.jpg)
Noise Mitigation Training
19
• Employees must take noise awareness training
• Provided monthly
• Emphasizes the importance of noise control
• Discusses methods of limiting noise on the construction site: – No yelling
– No idling of equipment
– Avoid staging equipment in front of residences
– Install low impact back-up alarms
– Use noise control measures such as noise blankets, quiet equipment, placing materials instead of dropping, etc.
![Page 20: Purple Line Extension, Section 2media.metro.net/projects_studies/westside/images/presentation_pur… · Century City/ Constellation Westwood/UCLA Westwood/VA Hospital Pre-Construction](https://reader036.fdocuments.us/reader036/viewer/2022071213/603e1e8851ea8d16dc563202/html5/thumbnails/20.jpg)
Noise Mitigation Scheduling
20
• Schedule noisiest activities during the day or early evening hours when possible. Examples:
– Saw-cutting
– Jack-hammering
• Traffic restrictions may require that some of this work occurs at night
![Page 21: Purple Line Extension, Section 2media.metro.net/projects_studies/westside/images/presentation_pur… · Century City/ Constellation Westwood/UCLA Westwood/VA Hospital Pre-Construction](https://reader036.fdocuments.us/reader036/viewer/2022071213/603e1e8851ea8d16dc563202/html5/thumbnails/21.jpg)
Noise Mitigation Noise Control Measures
21
Solar-powered generators and light stands (not engine powered)
Sound Blankets used to reduce noise at worksite.
![Page 22: Purple Line Extension, Section 2media.metro.net/projects_studies/westside/images/presentation_pur… · Century City/ Constellation Westwood/UCLA Westwood/VA Hospital Pre-Construction](https://reader036.fdocuments.us/reader036/viewer/2022071213/603e1e8851ea8d16dc563202/html5/thumbnails/22.jpg)
Noise Mitigation Noise Control Measures
22
• Construction noise at night must be limited to no more than 5dB above the current ambient noise level
![Page 23: Purple Line Extension, Section 2media.metro.net/projects_studies/westside/images/presentation_pur… · Century City/ Constellation Westwood/UCLA Westwood/VA Hospital Pre-Construction](https://reader036.fdocuments.us/reader036/viewer/2022071213/603e1e8851ea8d16dc563202/html5/thumbnails/23.jpg)
Noise Mitigation Response
23
• 24-hour hotline • Email • Contact information is
provided to the community via:
– All project materials – Website – Social media channels – E-mail
• Hotline monitored: – Urgent issues receive
immediate response, otherwise call is returned within 24 hours
![Page 24: Purple Line Extension, Section 2media.metro.net/projects_studies/westside/images/presentation_pur… · Century City/ Constellation Westwood/UCLA Westwood/VA Hospital Pre-Construction](https://reader036.fdocuments.us/reader036/viewer/2022071213/603e1e8851ea8d16dc563202/html5/thumbnails/24.jpg)
Pre-Construction Survey Overview and Benefits
• Pre-construction survey is a process for recording the pre-existing conditions of a property prior to construction starting
• Standard practice for Metro construction projects
• Documents conditions before construction begins for buildings that:
– Front tunnel alignment
– Are immediately adjacent to construction staging sites
• Includes written report and photos
Benefits
• Copy provided to property owner
• No cost to property owner for survey or report
• Documents existing interior and exterior building conditions
• Used by all parties in the event of a damage claim
24
![Page 25: Purple Line Extension, Section 2media.metro.net/projects_studies/westside/images/presentation_pur… · Century City/ Constellation Westwood/UCLA Westwood/VA Hospital Pre-Construction](https://reader036.fdocuments.us/reader036/viewer/2022071213/603e1e8851ea8d16dc563202/html5/thumbnails/25.jpg)
Property Acquisition
• Required for staging, construction and operations
• Governed by State and Federal law for all public agencies
• Various methods of acquisition
– Permanent property need
– Temporary construction staging
– Subsurface (below ground) easements
• Fact Sheet available
• List of potential properties in Final EIS/EIR online
25
![Page 26: Purple Line Extension, Section 2media.metro.net/projects_studies/westside/images/presentation_pur… · Century City/ Constellation Westwood/UCLA Westwood/VA Hospital Pre-Construction](https://reader036.fdocuments.us/reader036/viewer/2022071213/603e1e8851ea8d16dc563202/html5/thumbnails/26.jpg)
Eat Shop Play • Metro marketing and community engagement campaign to bring focused
attention to businesses impacted by construction. • Goal: make it easy for consumers to eat at local restaurants, shop at local stores
and play at local destination. • Online tools, traditional media and promotional materials available. • Participation is free for businesses along the alignment.
![Page 27: Purple Line Extension, Section 2media.metro.net/projects_studies/westside/images/presentation_pur… · Century City/ Constellation Westwood/UCLA Westwood/VA Hospital Pre-Construction](https://reader036.fdocuments.us/reader036/viewer/2022071213/603e1e8851ea8d16dc563202/html5/thumbnails/27.jpg)
Measure M Update
• Passed with over 71% support from county voters
– ½ Cent sales tax goes into effect in July 2017
• Metro staff is currently looking to fill both the Taxpayer’s Oversight Committee and Measure M Advisory Council
• We’re working on a new Long Range Transportation Plan
• On the Westside, work is underway on three Measure M Projects
• Purple Line Section 3 is getting shovel ready
• Scoping has started on the Sepulveda Pass and Crenshaw North
27
![Page 28: Purple Line Extension, Section 2media.metro.net/projects_studies/westside/images/presentation_pur… · Century City/ Constellation Westwood/UCLA Westwood/VA Hospital Pre-Construction](https://reader036.fdocuments.us/reader036/viewer/2022071213/603e1e8851ea8d16dc563202/html5/thumbnails/28.jpg)
Stay in Touch
28