SEQUENCE OF OPERATION( AUTOMATIC PROCEDURE )
BUILDING LOAD
NORMAL OPERATION
1. ATS are in normal position connected to utility source
2. All generator set paralleling circuit breaker open
BUILDING LOAD
LOSS OF NORMAL POWER
1. Upon reciept of start signal from any ATS all generators automatically and independently start.ATS
2. Any genset at normal operating condition will closed each GCB at deadbus condition
3. Succeeding genset will synchronize to the emergency bus
BUILDING LOAD
ATS TRANSFER TO EMERGENCY POWER
1. After the preset time delay expire ATS will transfer to emergency power.
ATS
LOAD MANAGEMENT ( LOAD DEMAND CONTROL )
BUILDING LOAD
TOTAL LOAD IS 80%
1. All synchronized generators will share the load equally
ATS
BUILDING LOAD
1. If the total load is reduced to 20% of the total capacity while the 2 generators are running
ATS
2. The system will shut off the GCB # 2
3. Priority Genset # 1 will received the reduced load
BUILDING LOAD
1. Single generator is running and reached 70% of its rated capacity
ATS
2. The system will start genset # 2 synchronized to online generator and share load equally
NORMAL POWER RETURNS
www.intellisyspower.com
www.intellisyspower.com
BUILDING LOAD
1. When normal power return, ATS will transfer power from emergency into normal power after a preset time delay
ATS
NORMAL POWER RETURNS
START SIGNAL
2. System start from ATS will be remove and the genset will turn off after cool down timer expires
MANUAL PARALLELING USING DEIF AGC - 4
www.intellisyspower.com
1. Before any attempt to start and parallel the generators, check that all generator paralleling circuit breaker are all in OFF position. Generator controller auto mode must be switch on. 2. Press MODE push button (SELECT SEMI-AUTO MODE) located on the front face of DEIF controller (G1 and G2) and then press START button the generator will start and ramp to rated voltage and frequency.
www.intellisyspower.com
Mode Button
Start Button
3. Check if run and generator voltage LED illuminates , it means the generator is protected and ready.4. Select the generator (G1 and G2) to be online first, then press CB CLOSE/OPEN button on the DEIF controller. The controller will automatically detects if it is a paralleling mode or a single mode
www.intellisyspower.com
CB Close/Open Button
Run LED
5. To synchronize the second generator, press CB CLOSE/OPEN button on DEIF controller , the digital synchroscope will automatically display during synchronization time and then it will disappear after generator breaker closed. Available loads on the bus will automatically load share to the units online. Typically the load share percentage factor is 50 %.
www.intellisyspower.com
CB Close/Open Button
www.intellisyspower.com
6. To stop the G1 and G2 press STOP button on DEIF controller to perform engine cooling down. When the preset cool down timer elapse the engine will automatically shutdown.
Stop Button
BASIC TROUBLESHOOTING GUIDE
www.intellisyspower.com
GCB Fail to CloseProbable Cause
• Circuit Breaker control CB tripped off• GCB Closing relay defective (3XG)• Circuit Breaker Spring Discharged
• Defective closing coil , de –energized• Controller relay output defective• GCB control transformer defective or no output
Corrective Action
• Check GCB control circuit, reset control CB• Replace defective closing relay• Manually charged circuit breaker using manual handle• Replace defective closing coil• Replace or check defective under voltage trip coil• Check controller input / output status
www.intellisyspower.com
GCB Fail to OpenProbable Cause
• GCB opening relay defective (3YG)• Controller relay output defecting• Control supply loose• Defective tripping coil
Corrective Action
• Manually open circuit breaker using manual button on circuit breaker• Check CB opening control circuit (Refer to Wiring Diagram)• Check controller input / output status
www.intellisyspower.com
Fail to Synchronize
Probable Cause
• Analog output from controller has too low output range • Toho Electronic governor controller cannot regulate the voltage and frequency of incoming generator • Speed Bias control not responding• Voltage Bias control not responding
Corrective Action
• Check controller analog output maximum settings• Check and Calibrate speed bias control• Check and calibrate voltage bias control
www.intellisyspower.com
`
Generator fail to startProbable Cause
• Fault and Alarm is active• Defective generator run relay (4x)• MGS controller not in auto• Low Battery voltage
Corrective Action
• Check and reset fault and alarm active• Replace defective run relay• Switch MGS controller to auto mode• Check and replace battery• Check automatic battery charger if operational or defective
www.intellisyspower.com
Probable Cause
• Analog output from controller has too low output range• Generator fuel lines and filter is clogged • Generator governor control unable to accept speed bias signal• Defective controller speed governor output • Faulty control cable connection
Corrective Action
• Check and calibrate speed bias control• Replace clogged fuel filter• Check and calibrate generator governor control system• Check control cable connection
Generator not able to take load at 100 %
www.intellisyspower.com
Probable Cause
• Loose governor control sensing• Loose control cable connection from Toho Electronic governor control • Generator fuel filter clogged
Corrective Action
• Check all control cable connection for possible loose ( Refer to Wiring Diagram )• Replace clogged fuel filter• Check and calibrate governor control systems
Generator speed unstable or hunting
www.intellisyspower.com
www.intellisyspower.com
LED FUNCTIONS
AGC (DG)
AlarmFlashing: Unacknowledged alarms present,Fixed: Acknowledged alarms present,No alarm: no LED light up
Power: indicates auxiliary supply ONSelf check OK: Indicates self check OK
Alarm inh: Indicates alarm inhibit active LED is ON,After engine running LED is OFF.
AUTO: Only LED ON at Auto mode
RUN: LED ON at Generator running.
LED ON: Generator Frequency and Voltage OK
LED ON: Generator Breaker ONLED OFF: Generator Breaker OFF
PUSHBUTTON GUIDE
AGC (DG)
INFO: Shifts the display three lower lines to show the alarm list.
BACK: jumps one step back ward in the menu
JUMP: Enter a specific menu number selection
START: Start of gen-setat Semi-auto/Manual
STOP: Stop of gen-setat Semi-auto/Manual
Only at SEMI-AUTO: Opens the GB, if it is closed.Closes (Sync:) the GB, if it is opened.
LOG: Shifts the display three lowerLines to show the event and alarm list.
VIEW: Shift the first line displaying in the setup Menus. Push 2 sec to switch to master display incase more than 1 display is connected.
MODE: Changes the display menu line (line four) to mode Selection.
AGC (DG)
Increases the value of set point (in the setup menu).In the daily use display, this button function is used for scrolling the second line displayingOf generator values.
Moves the cursor left formanoeuvring in the menu
SEL: Selects the underscored entry in the fourth line of the display, enter/selectbutton for parameter setup and Acknowledgethe alarm.
Moves the cursor right formanoeuvring in the menu
Decreases the value of set point (in the setup menu).In the daily use display, this button function is used for scrolling the second line displayingOf generator values.
MANUAL OPERATION OF AIR
CIRCUIT BREAKER
www.intellisyspower.com
AIR CIRCUIT BREAKER
LEVER
LOCK BUTTON
CHARGING SPRING STATUS
TRIP UNIT
RACKING HANDLEBREAKER
POSITIONING STATUS
INDICATOR
ON AND OFF BUTTON
CRADLE
BREAKER STATUS
INDICATOR
www.intellisyspower.com
Step : 1
Manual charging of ACB by cranking the lever at least “6 times”.
DISCHARGEOFF
www.intellisyspower.com
OFF CHARGE OK
CLICK
Step : 2
After cranking the chargerLever, The charging springMechanism is in charge position state.
www.intellisyspower.com
. CHARGE OKOFFStep : 3
The Breaker is ready toclose. Close the ACB bypressing the black pushbutton ( on button )
www.intellisyspower.com
ON DISCHARGE
The ACB is in close position.Charging spring Indicatorwill switch from Charge toDischarge state.
www.intellisyspower.com
ON DISCHARGE Step : 4
The Breaker is in closePosition. To off the Breaker,Press the red pushbutton
www.intellisyspower.com
OFF DISCHARGE
The ACB is in Open position.
www.intellisyspower.com
WITHDRAWING IN AND OUT OF AIR CIRCUIT BREAKER
www.intellisyspower.com
DRAW-OUT ACB STATUS INDICATOR
RACKING HANDLE
LOCK PUSH BUTTON FOR WITHDRAWING
THE ACB
BREAKER POSITION INDICATOR
www.intellisyspower.com
LOCK BUTTON
PUSH THE LOCK BUTTONOF THE ACB BEFORE DRAW-IN/DRAW-OUT.
Note:
www.intellisyspower.com
DRAW-IN/DRAW-OUT CYCLE OF
ACB
Pull-out the racking handle
GREEN ARROW RACKING-IN THE
ACB
RED ARROW RACKING-OUT THE ACBwww.intellisyspower.com
DRAW OUT BREAKER POSITION INDICATOR
CONNECTED POSITION
WITHDRAWN POSITION
TEST POSITION
www.intellisyspower.com
Note:
Push the Draw-in/out lock mechanism before drawing in and out the breaker.
www.intellisyspower.com
Pull-out the ACB
PULLING IN AND OUT OF
ACBPull-IN the ACB
GREEN ARROW DRAW-OUT
THE ACB
RED ARROW DRAW-IN THE ACB
www.intellisyspower.com
MICROLOGIC TRIP UNIT 2.0A
INDICATING LED’s
LCD SCREEN
KEYSLONG TIME
DELAY
LONG TIME
SHORT TIME
RESET BUTTON
www.intellisyspower.com