Pump Storage:A System Operations Perspective
2
Pump Storage: A System Operations Perspective Sam Holeman
Power System Engineer 25 years at Duke Energy 7 yrs - Energy Management System Development
Generation Resource Commitment logic Generation Economic Dispatch logic Power Flow logic
18 yrs – Bulk Electric System Operations NERC Certified System Operator-Reliability 0 yrs – Pump Storage Asset Operations 0 yrs – Pump Storage Asset Main
3
In Light of This….The New Title is……
Pump Storage: The Duct Tape of System Operations
4
Duke Energy Carolinas Generation Mix These are approximations Total Generation Capability – 21,000 MWs
Nuclear – 7000 MWs Fossil (Coal) – 7600 MWs Combustion Turbines – 3100 MWs Conventional Hydro – 1100 MWs Pump Storage Hydro – 2000 MWs
Pump Storage Hydro (MWs) – approx. 9.5% of capacity Pump Storage Generation (MWhrs) – approx. 2.5% of energy generated
5
From the view of System Operations……
Bad Creek Pumped-Storage Generating StationCapacity: 1,065 megawatts Location: Oconee County, South Carolina Commercial Date: 1991
Jocassee Pumped-Storage Generating StationCapacity: 610 megawatts Location: Pickens County, South Carolina Commercial Date: 1973
Numbers don’t tell the story of the value of Pump Storage!
6
The Pump Storage System Operations Story
NERC Interconnected Operations Services Operating Reserves Regulating Reserves/Load Following Contingency Reserves Reactive Power Supply Frequency Response
From the eyes of System Operations Dependable Flexible Fast/ Nimble Our Duct Tape
0:00 0:48 1:35 2:24 3:12 3:59 4:48 5:36 6:23 7:12 8:00 8:48 9:36 10:2411:1212:0012:4813:3514:2415:1215:5916:4817:3618:2319:1220:0020:4821:3622:2423:12
-1500
-1000
-500
0
500
1000
1500
2000
0
2000
4000
6000
8000
10000
12000
14000
16000
18000
20000
Bad Creek Jocassee Load
Meg
awat
ts
Meg
awat
ts
Operating Reserves/Load Following/Regulating Reserves
11:45
11:46
11:47
11:47
11:49
11:50
11:51
11:52
11:53
11:54
11:55
11:56
11:57
11:58
11:59
12:00
12:01
12:02
12:03
12:04
12:05
12:06
12:07
12:08
12:09
12:10
12:11
12:12
12:13
12:14
12:15
12:16
12:17
12:18
12:19
12:20
12:21
12:22
12:23
12:24
12:25
12:26
12:27
12:28
12:29
12:30
-600
-400
-200
0
200
400
600
800
Bad Creek Jocassee ACEEmergency Energy Request - 500 MW
Meg
awat
ts
Contingency Reserves/Emergency Response
8:00
8:02
8:04
8:06
8:08
8:10
8:12
8:14
8:16
8:18
8:20
8:22
8:24
8:26
8:28
8:30
8:32
8:34
8:36
8:38
8:39
8:42
8:44
-1400
-1200
-1000
-800
-600
-400
-200
0
200
400
600
800
1000
1200
59.94
59.96
59.98
60
60.02
60.04
60.06
Bad Creek Jocassee ACE Freq
Meg
awat
ts
Freq
uenc
y
The Real Time Whole Ball of Wax – Pump Storage At Its Best