PUCT Electric Service Rate Comparison
Loads in SCED v. 2October 27, 2014
![Page 2: PUCT Electric Service Rate Comparison Loads in SCED v. 2 October 27, 2014.](https://reader036.fdocuments.us/reader036/viewer/2022082710/56649db65503460f94aa86a6/html5/thumbnails/2.jpg)
Calculation of G Using PUC Data
• At last Loads in SCED meeting, we discussed using PUC retail rate information to determine G
• Participants at last meeting wanted more information to evaluate options
• Spoke to Grace Godines, who prepares PUC rate information for website
• www.puc.texas.gov/industry/electric/rates/RESbill.aspx
![Page 3: PUCT Electric Service Rate Comparison Loads in SCED v. 2 October 27, 2014.](https://reader036.fdocuments.us/reader036/viewer/2022082710/56649db65503460f94aa86a6/html5/thumbnails/3.jpg)
Oncor Electric DeliveryAMBIT ENERGY
Certified Green One-Year$66.08 $109.99 $163.89 $217.79Certified Green Variable$71.08 $134.98 $198.88 $262.78
AMIGO ENERGY100% Renewable$59.64 $97.19 $144.69 $192.19Online Offer, Twelve-Month Commitment$58.14 $94.19 $140.19 $186.19
![Page 4: PUCT Electric Service Rate Comparison Loads in SCED v. 2 October 27, 2014.](https://reader036.fdocuments.us/reader036/viewer/2022082710/56649db65503460f94aa86a6/html5/thumbnails/4.jpg)
What Information is Available• Cost information for a small number of rate
plans, by TDU service area and REP• Plans identified by name, which may give some
indication of type of plan• All-in rate, includes delivery charges• Plans appear to be selected to provide cost
comparisons over long periods• Separate table on PUC website provides
unbundled delivery rates• Lag in posting of information
![Page 5: PUCT Electric Service Rate Comparison Loads in SCED v. 2 October 27, 2014.](https://reader036.fdocuments.us/reader036/viewer/2022082710/56649db65503460f94aa86a6/html5/thumbnails/5.jpg)
Using PUC Rate Information to Calculate G
• May need broader set of rate plans• Need to refer to other sources for key
plan details (EFL or Terms and Conditions)
• Need to subtract delivery rates calculated from different web page
• Is lag in posting information a concern?
![Page 6: PUCT Electric Service Rate Comparison Loads in SCED v. 2 October 27, 2014.](https://reader036.fdocuments.us/reader036/viewer/2022082710/56649db65503460f94aa86a6/html5/thumbnails/6.jpg)
Discussion