![Page 1: Public Transport Network Design and Appraisal - a case study of Porto Álvaro Costa, Pedro Abrantes and Oana Grozavu Santos Faculty of Engineering, University.](https://reader035.fdocuments.us/reader035/viewer/2022062515/56649d0a5503460f949dd8d3/html5/thumbnails/1.jpg)
Public Transport Network Design and Appraisal
- a case study of Porto
Álvaro Costa, Pedro Abrantes and Oana Grozavu SantosFaculty of Engineering, University of Porto
19th Annual International EMME/2 Users’ ConferenceSeattle, 19-21 of September, 2005
![Page 2: Public Transport Network Design and Appraisal - a case study of Porto Álvaro Costa, Pedro Abrantes and Oana Grozavu Santos Faculty of Engineering, University.](https://reader035.fdocuments.us/reader035/viewer/2022062515/56649d0a5503460f949dd8d3/html5/thumbnails/2.jpg)
Contents
1. Introduction2. Re-designing bus network3. Network Appraisal Methodology4. Impact of LRT Network5. Impact of Strategic Bus Network6. Local vs. Global Accessibility7. Global Efficiency Indicators8. Complementarities between EMME/2,Enif and
ArcView9. Conclusions10. Further Research
![Page 3: Public Transport Network Design and Appraisal - a case study of Porto Álvaro Costa, Pedro Abrantes and Oana Grozavu Santos Faculty of Engineering, University.](https://reader035.fdocuments.us/reader035/viewer/2022062515/56649d0a5503460f949dd8d3/html5/thumbnails/3.jpg)
Introduction
• Porto Metropolitan Area pop.: 1.2 mi
• New Light Rail (Metro do Porto)
• New integrated ticketing system (Andante)
• Need to re-design the bus network to improve integration and efficiency
• New network design based on “professional judgment” (heuristic method?)
• FEUP was commissioned to:• evaluate its public
acceptability and efficiency
• suggest improvements
![Page 4: Public Transport Network Design and Appraisal - a case study of Porto Álvaro Costa, Pedro Abrantes and Oana Grozavu Santos Faculty of Engineering, University.](https://reader035.fdocuments.us/reader035/viewer/2022062515/56649d0a5503460f949dd8d3/html5/thumbnails/4.jpg)
Introduction
• Starting point: existing STCP bus network (red): 81 bus lines (to be cut down to 50)
• Driving force: introduction of the new light metro network (blue)
• Problem: Guaranteeing public acceptability and increase efficiency (heavily constrained problem, but poorly defined constraints)
• Solution: Iterative, piece meal, client-driven approach (“trial & error”) to ensure feasibility of solution = optimization in the real world
• Strong emphasis on GIS analysis of results.
![Page 5: Public Transport Network Design and Appraisal - a case study of Porto Álvaro Costa, Pedro Abrantes and Oana Grozavu Santos Faculty of Engineering, University.](https://reader035.fdocuments.us/reader035/viewer/2022062515/56649d0a5503460f949dd8d3/html5/thumbnails/5.jpg)
Change in bus service frequency
(blue = increase)
Re-designing bus network
• Design criteria:– Short lines– Modal integration– Homogeneous
frequencies (10min)– 20% veh-km
reduction
• Result:– Decrease in radial
services– Increase in orbital
services
![Page 6: Public Transport Network Design and Appraisal - a case study of Porto Álvaro Costa, Pedro Abrantes and Oana Grozavu Santos Faculty of Engineering, University.](https://reader035.fdocuments.us/reader035/viewer/2022062515/56649d0a5503460f949dd8d3/html5/thumbnails/6.jpg)
PT Modeling Approach
• Public Transport Assignment Model (EMME/2)
• Detailed zoning system: 350 zones covering an area with aprox. 1 million inhabitants (City of Porto: 105 zones and 350 000 inhabitans)
• Household travel survey from year 2000. Fixed demand
• The match between the two zoning systems was done applying a gravity-type model
![Page 7: Public Transport Network Design and Appraisal - a case study of Porto Álvaro Costa, Pedro Abrantes and Oana Grozavu Santos Faculty of Engineering, University.](https://reader035.fdocuments.us/reader035/viewer/2022062515/56649d0a5503460f949dd8d3/html5/thumbnails/7.jpg)
PT Modeling Approach
Network Characteristics:
– 350 centroids– 3266 regular nodes– 8051 links– 7 modes– 9400 transit line segments– 140 lines: 81 present bus lines, 50 future bus
lines, 4 metro lines, 4 train lines, 1 elevator
![Page 8: Public Transport Network Design and Appraisal - a case study of Porto Álvaro Costa, Pedro Abrantes and Oana Grozavu Santos Faculty of Engineering, University.](https://reader035.fdocuments.us/reader035/viewer/2022062515/56649d0a5503460f949dd8d3/html5/thumbnails/8.jpg)
PT Modeling Approach
• Network Scenarios:– 10 (Reference case): Current STCP Network +
Suburban Railways– 20: Reference Case + LRT– 30: STCP Strategic Network + Suburban Railways +
LRT– 3x: Modifications of STCP Strategic Network +
Suburban Railways + LRT
• Accessibility analysis and efficiency analysis– Impact of LRT network (Scenario 20 vs. 10)
– Impact of STCP Strategic Network (Scenario 30 vs. 20)
– Impact of the new transport system (Scenario 30 vs. 10)
– Impact of the modifications on the Strategic Network
![Page 9: Public Transport Network Design and Appraisal - a case study of Porto Álvaro Costa, Pedro Abrantes and Oana Grozavu Santos Faculty of Engineering, University.](https://reader035.fdocuments.us/reader035/viewer/2022062515/56649d0a5503460f949dd8d3/html5/thumbnails/9.jpg)
Network Appraisal Methology
• Accessibility indicator (GIS plots) : Average generalized travel time by destination zone
• Efficiency indicators:Fleet size, Veh-kms, Total trips (operator)Pax-kms, travel time, walk time, number of interchanges (users)
iiD
iiDiD
DT
TGTTGTT
)(
ijijijijij InVehTTransferTWaitTWalkTGTT
![Page 10: Public Transport Network Design and Appraisal - a case study of Porto Álvaro Costa, Pedro Abrantes and Oana Grozavu Santos Faculty of Engineering, University.](https://reader035.fdocuments.us/reader035/viewer/2022062515/56649d0a5503460f949dd8d3/html5/thumbnails/10.jpg)
Impact of the LRT Network
Change in accessibility between scenarios 10 and 20
• As expected, LRT brings about significant travel time reductions (up to 12 min)
• Greatest benefits along LRT
• Large gains up to a significant distance from LRT, because of bus-LRT difference in speed(25km/h vs 13km/h)
dTT20-10-30 - -16-16 - -8-8 - -4-4 - -2-2 - -1-1 - -0.5-0.5 - 0.5-0.5 - 11 - 22 - 44 - 88 - 1616 - 30
Linhas metro_a.shpAmp_conc.shp
dTT média global - cenário 20 vs cenário 10
Mapa nº 3
![Page 11: Public Transport Network Design and Appraisal - a case study of Porto Álvaro Costa, Pedro Abrantes and Oana Grozavu Santos Faculty of Engineering, University.](https://reader035.fdocuments.us/reader035/viewer/2022062515/56649d0a5503460f949dd8d3/html5/thumbnails/11.jpg)
Impact of the LRT Network
Change in bus passenger flows between scenarios 10 and 20
• General reduction in bus pax flows
• Small increases in certain suburban/orbital routes
• Potential complementary role of bus in new network
![Page 12: Public Transport Network Design and Appraisal - a case study of Porto Álvaro Costa, Pedro Abrantes and Oana Grozavu Santos Faculty of Engineering, University.](https://reader035.fdocuments.us/reader035/viewer/2022062515/56649d0a5503460f949dd8d3/html5/thumbnails/12.jpg)
Impact of the Strategic Bus Network
Change in accessibility between scenarios 30 and 20
• Significant travel time increases (8 min): poorer coverage or service transfer to private sector
• Significant gains in some suburban zones (10 min): improved LRT access, successful integration ☺
• Gains from metro outweigh losses from new bus network in nearly all zones (special zones treated later)
• Policy implication Metro + SN must be introduced at same time
dTT média global - cenário 30 vs cenário 20
dTT30-20-30 - -16-16 - -8-8 - -4-4 - -2-2 - -1-1 - -0.5-0.5 - 0.5-0.5 - 11 - 22 - 44 - 88 - 1616 - 30
Linhas metro_a.shpAmp_conc.shp
Mapa nº 4
![Page 13: Public Transport Network Design and Appraisal - a case study of Porto Álvaro Costa, Pedro Abrantes and Oana Grozavu Santos Faculty of Engineering, University.](https://reader035.fdocuments.us/reader035/viewer/2022062515/56649d0a5503460f949dd8d3/html5/thumbnails/13.jpg)
Impact of the Strategic Bus Network
Change in bus passenger flows between scenarios 30 and 20
• Reduction in radial flows, esp. around city centre, due to reduced frequency
• Significant increases in orbital flows, esp. towards main metro interfaces
• Explains gains away from LRT route bus services play an important role as feeders to LRT
![Page 14: Public Transport Network Design and Appraisal - a case study of Porto Álvaro Costa, Pedro Abrantes and Oana Grozavu Santos Faculty of Engineering, University.](https://reader035.fdocuments.us/reader035/viewer/2022062515/56649d0a5503460f949dd8d3/html5/thumbnails/14.jpg)
Impact on the pattern of trip interchanges
Change in transfer boardings between scenarios 10 and 30 (red=increase)
• Concentration of interchanges around key metro stations
• Bus increasingly becomes a feeder mode to LRT. Bus-bus transfers decrease significantly
• Policy implications:– Improve interchange facilities
to take full advantage of new mode
– Minimize distance between bus and metro stops
![Page 15: Public Transport Network Design and Appraisal - a case study of Porto Álvaro Costa, Pedro Abrantes and Oana Grozavu Santos Faculty of Engineering, University.](https://reader035.fdocuments.us/reader035/viewer/2022062515/56649d0a5503460f949dd8d3/html5/thumbnails/15.jpg)
Local vs. Global Accessibility
• Problem: Some zones lose accessibility from sce. 10 to 30
• Further investigation showed inconsistencies in network design:– Zones furthest away from
metro miss out the most with the new bus network
– Those zones also happen to be important centers for surrounding neighborhoods
Subseccoes ine.shp
z190_53.shp-24 - -12-12 - -6-6 - -3-3 - -1-1 - 11 - 33 - 66 - 1212 - 24
Linhas metro.shp
#Y#
190
Análise da Acessibilidade a Partir da Zona 190 (5-3)
Análise da Acessibilidade a Partir da Zona 190 (7-3)
Subseccoes ine.shp
z189_73.shp-24 - -12-12 - -6-6 - -3-3 - -1-1 - 11 - 33 - 66 - 1212 - 24
Linha_39d_i.shpLinha_39d_v.shpLinhas metro.shp
#
190
#Y
![Page 16: Public Transport Network Design and Appraisal - a case study of Porto Álvaro Costa, Pedro Abrantes and Oana Grozavu Santos Faculty of Engineering, University.](https://reader035.fdocuments.us/reader035/viewer/2022062515/56649d0a5503460f949dd8d3/html5/thumbnails/16.jpg)
Diagrams attempt to illustrate the problem
• The new bus network improves access to metro stations, which in turn greatly improve access to distant parts of the city
• Yet, reduced network coverage decreases local accessibility
• As we started by looking at the whole metropolitan area, this problem went nearly unnoticed
• Policy outcome: strengthen local bus services
Local vs. Global Accessibility
![Page 17: Public Transport Network Design and Appraisal - a case study of Porto Álvaro Costa, Pedro Abrantes and Oana Grozavu Santos Faculty of Engineering, University.](https://reader035.fdocuments.us/reader035/viewer/2022062515/56649d0a5503460f949dd8d3/html5/thumbnails/17.jpg)
Global efficiency indicators – User perspective
• 3% mean travel time decrease from sc. 10 to 20
• Constant travel time from 20 to 30
• 1.5% mean travel distance decrease from sc. 10 to 20
• 1.5% mean travel distance decrease from sc. 20 to 30
• Notice significant pax-kms transfer to metro due to new bus network (+10%)
36.16
34.98
34.95
34 34.5 35 35.5 36 36.5
10
20
30
Sce
nar
io
Average generalized travel time (min)
198,951
162,949
154,650
33,347
36,352
0 50,000 100,000 150,000 200,000 250,000
10
20
30Sce
nar
ios
Pax-kms
bus
metro
![Page 18: Public Transport Network Design and Appraisal - a case study of Porto Álvaro Costa, Pedro Abrantes and Oana Grozavu Santos Faculty of Engineering, University.](https://reader035.fdocuments.us/reader035/viewer/2022062515/56649d0a5503460f949dd8d3/html5/thumbnails/18.jpg)
Global efficiency indicators – User perspective
• Metro does not produce an increase in av. interchanges
• New bus network actually reduces interchanges
• But at the cost of greater walk access time
• Still, no increase in travel time
1.45
1.44
1.41
1.39 1.4 1.41 1.42 1.43 1.44 1.45 1.46
10
20
30
Sce
nar
io
Average number of boardings per trip
7.45
7.17
7.91
6.60 6.80 7.00 7.20 7.40 7.60 7.80 8.00
10
20
30Sce
nar
io
walk time (min)
![Page 19: Public Transport Network Design and Appraisal - a case study of Porto Álvaro Costa, Pedro Abrantes and Oana Grozavu Santos Faculty of Engineering, University.](https://reader035.fdocuments.us/reader035/viewer/2022062515/56649d0a5503460f949dd8d3/html5/thumbnails/19.jpg)
Global efficiency indicators – Operator perspective
• 6% decrease in fleet size requirements
• 4.2% decrease in morning peak hour veh-kms traveled
• Conclusion: Significant savings achieved, while maintaining or improving accessibility by applying simple network design rules
• “Operator happy, passengers happy”
Fleet size Veh-kms
(AM peak hr)
Bus_0 517 7676
Bus_1 485 7350
delta -6.0% -4.2%
![Page 20: Public Transport Network Design and Appraisal - a case study of Porto Álvaro Costa, Pedro Abrantes and Oana Grozavu Santos Faculty of Engineering, University.](https://reader035.fdocuments.us/reader035/viewer/2022062515/56649d0a5503460f949dd8d3/html5/thumbnails/20.jpg)
EMME/2 - Enif - ArcView
• ArcView is a great help in the construction of EMME/2 network files
• ArcView is a good tool for “translating” in a friendly image the results of the assignments (especially OD pairs related data)
• In both cases, Access is a priceless help
• Enif is a useful tool for analyzing data regarding interfaces, boardings, alightings, flows on links
![Page 21: Public Transport Network Design and Appraisal - a case study of Porto Álvaro Costa, Pedro Abrantes and Oana Grozavu Santos Faculty of Engineering, University.](https://reader035.fdocuments.us/reader035/viewer/2022062515/56649d0a5503460f949dd8d3/html5/thumbnails/21.jpg)
Conclusions
• The methodology is understandable to decision makers
• Benefits from LRT line are significant, and spread beyond the route
• Scale of benefits depends on bus service design bus plays an important feeder role in the LRT network
• It is possible to achieve significant gains in accessibility and productivity by re-designing the bus network for better integration with LRT network
• Nevertheless there is a trade-off between local and global accessibility in some areas, which is not visible when analyzing accessibility across the whole area
![Page 22: Public Transport Network Design and Appraisal - a case study of Porto Álvaro Costa, Pedro Abrantes and Oana Grozavu Santos Faculty of Engineering, University.](https://reader035.fdocuments.us/reader035/viewer/2022062515/56649d0a5503460f949dd8d3/html5/thumbnails/22.jpg)
Future research
• Schedule the implementation
• Incorporate elastic demand model
• Introduce outstanding operators and differentiated fare system
• Develop optimization algorithms to find the “optimum network”
• Test the impact of other policy measures, e.g. bus priority
![Page 23: Public Transport Network Design and Appraisal - a case study of Porto Álvaro Costa, Pedro Abrantes and Oana Grozavu Santos Faculty of Engineering, University.](https://reader035.fdocuments.us/reader035/viewer/2022062515/56649d0a5503460f949dd8d3/html5/thumbnails/23.jpg)
Questions & comments
Álvaro Costa < [email protected]>Faculdade de Engenharia da Universidade do Porto
Oana Grozavu Santos <[email protected]>Faculdade de Engenharia da Universidade do Porto