Page 1: PUBLIC PARTICIATION NOTICE BOARD POSTER · GENERIC POSTER USED FOR NOTICE BOARDS “Balancing Growth with Resilience” Proposed Developments: 1) Construction of Potable Water Reservoir

PUBLIC PARTICIATION – NOTICE BOARD POSTER

Page 2: PUBLIC PARTICIATION NOTICE BOARD POSTER · GENERIC POSTER USED FOR NOTICE BOARDS “Balancing Growth with Resilience” Proposed Developments: 1) Construction of Potable Water Reservoir

PUBLIC PARTICIATION – NOTICE BOARD POSTER

Page 3: PUBLIC PARTICIATION NOTICE BOARD POSTER · GENERIC POSTER USED FOR NOTICE BOARDS “Balancing Growth with Resilience” Proposed Developments: 1) Construction of Potable Water Reservoir

PUBLIC PARTICIPATION – SITE NOTICE

Page 4: PUBLIC PARTICIATION NOTICE BOARD POSTER · GENERIC POSTER USED FOR NOTICE BOARDS “Balancing Growth with Resilience” Proposed Developments: 1) Construction of Potable Water Reservoir

GENERIC POSTER USED FOR NOTICE BOARDS

“Balancing Growth with Resilience”

Proposed Developments: 1) Construction of Potable Water Reservoir (to be constructed on a 30m x 30 m area at the Swakopmund

Smallholdings area) 2) Creation Of A Public Road (Portions 180 and 181 of Remainder of Portion B of Swakopmund Town and

Townlands No.41 into 12 portions and Remainder) Proponent: Swakopmund Municipality, Erongo Region Environmental Assessment Practitioner: Erongo Consulting Group Competent Authority: Ministry of Environment & Tourism

Erongo Consulting Group has been duly apointed by the Swakopmund Municipality, to professionally underatke and complete an Environmental & Social Impact Assessment (ESIA) and the Environmental Monitoring and Management Plan (EMMP) in order to obtain Environnmental Clearance Certificates (ECCs), as per the legal requirements of the Environmental Management Act (Act No. 7 of 2007), and Environmrntal Impact Assessment Regulations (GN 30 in Government Gazette 4878 of February 6th 2012). The proposed two (2) developments – Construction of a Potatable Water Reservoir & Creation of Public Road / Street, may not be undertaken without Environmental Clearance Certificates (ECCs) as enshrined in the Environmental Management Act (Act 7 of 2007) and its Regulations. The EIA Process and the purpose of these two EIA studies is to identify the direct and indirect impacts that the developments will have on the natural resources, eco-system, and the socio-economic dimensions of the neighbouring communities and populations. Interested and Affected Parties (IAPs) are hereby invited to register and participate in the public consultation process - to give input, comments, and opinions in writing not later than 31 July 2020. COMMENTING PERIOD: 17 – 31 July 2020, 1700 Hours +264-81-277-2797 or +264-85-277-2797 Stakeholders Engagement: Due to the prevailing COVID19 Lockdown in Erongo Region, and as a precautionary measure, no physical interface will take. Please submit your comments in writing not later than 31 July 2020. Email: [email protected] / [email protected]

Commissioning & Operations | Project Delivery | Energy | Research | Environmental Sciences | Sustainability & Resilience | DRR | Planning & Consulting | Trainings | SHEQ | Waste

Management | Advisory Services | Management Consulting

ENVIRONMENTAL CLEARANCE NOTICE

Public Participation Notice in terms of Regulation No. 29, Section 21

under the Environmental Management Act (Act No. 7 of 2007)

Page 5: PUBLIC PARTICIATION NOTICE BOARD POSTER · GENERIC POSTER USED FOR NOTICE BOARDS “Balancing Growth with Resilience” Proposed Developments: 1) Construction of Potable Water Reservoir

NEWSPAPER ADVERT – NEW ERA, FRIDAY 10 JULY 2020

Page 6: PUBLIC PARTICIATION NOTICE BOARD POSTER · GENERIC POSTER USED FOR NOTICE BOARDS “Balancing Growth with Resilience” Proposed Developments: 1) Construction of Potable Water Reservoir

NEWSPAPER ADVERT – NAMIB TIMES, FRIDAY 17 JULY 2020

Page 7: PUBLIC PARTICIATION NOTICE BOARD POSTER · GENERIC POSTER USED FOR NOTICE BOARDS “Balancing Growth with Resilience” Proposed Developments: 1) Construction of Potable Water Reservoir

PUBLIC PARTICIPATION – FACEBOOK POST

Page 8: PUBLIC PARTICIATION NOTICE BOARD POSTER · GENERIC POSTER USED FOR NOTICE BOARDS “Balancing Growth with Resilience” Proposed Developments: 1) Construction of Potable Water Reservoir

LIST OF CONSULTED STAKEHOLDERS / I&APS

Name Organization Contacts Paulina Engelbrecht - Environmental Officer

Swakopmund Municipality +264 64 410 4438

Johanna Angolo, Town Planner Swakopmund Municipality +264 64 410 4433

Trophimus Haiduwa, GIS Coordinator Swakopmund Municipality +264 64 410 4433

Dinina Hamupembe, Technician: Projects Swakopmund Municipality +264 64 410 4423

Chief Regional Officer Erongo Regional Council [email protected]

Anet Kotting, Chairperson Hospitality Association of Namibia [email protected]

Glory Madzura SAIPA Swakopmund [email protected]

Clara Matatari Environmental Defense 0812402654

Geoffrey Kapembe Stakeholder [email protected]

Josephine Twatuka Stakeholder 0852401261

Ingplan Civil Engineers Project Managers +264 61 245 539