Public Open House Yonge Street and Bernard Avenue (Bernard KDA) Planning Study Update Town of Richmond Hill March 30, 2017

Transcript of Public Open House - City of Richmond Hill · Public Open House. Yonge Street and Bernard Avenue...

Page 1: Public Open House - City of Richmond Hill · Public Open House. Yonge Street and Bernard Avenue (Bernard KDA) Planning Study Update Town of Richmond Hill March 30, 2017. Open House

Public Open House Yonge Street and Bernard Avenue

(Bernard KDA) Planning Study Update

Town of Richmond Hill

March 30, 2017

Page 2: Public Open House - City of Richmond Hill · Public Open House. Yonge Street and Bernard Avenue (Bernard KDA) Planning Study Update Town of Richmond Hill March 30, 2017. Open House

Open House

• Review of Project Purpose and Process• Policy Refresher • Highlights of Background Stage of Work• Opportunities and Constraints• What We Heard • Options Framework • Draft Options Review • Next Steps

Page 3: Public Open House - City of Richmond Hill · Public Open House. Yonge Street and Bernard Avenue (Bernard KDA) Planning Study Update Town of Richmond Hill March 30, 2017. Open House

The Project and Our Team

Our TaskTo create a more detailed, site-specific plan for the Bernard and Yonge area to implement the Official Plan

Our Team

Planning and Urban Design

Transportation Servicing and Stormwater

Groundwater Natural Heritage

Page 4: Public Open House - City of Richmond Hill · Public Open House. Yonge Street and Bernard Avenue (Bernard KDA) Planning Study Update Town of Richmond Hill March 30, 2017. Open House

The Project Process

We are here

Page 5: Public Open House - City of Richmond Hill · Public Open House. Yonge Street and Bernard Avenue (Bernard KDA) Planning Study Update Town of Richmond Hill March 30, 2017. Open House

Why Bernard and Yonge?

“where public rapid transit services intersect with major nodes of retail and commercial…where opportunities exist for redevelopment of…new public streets, parks and urban open space connections”

Section 4.4, Town of Richmond Hill Official Plan

Page 6: Public Open House - City of Richmond Hill · Public Open House. Yonge Street and Bernard Avenue (Bernard KDA) Planning Study Update Town of Richmond Hill March 30, 2017. Open House

Policy Refresher

• 2.5- 3.0 times FSI (density) per “development block”

• Minimum height 3 storeys • Base building max 6 storeys• Tower height max 15 storeys • Tallest buildings directed to Yonge

and Bernard • Neighbourhood and Mixed Use

Regional Corridor within context

OP Schedule 2A Land Use, Excerpt

Page 7: Public Open House - City of Richmond Hill · Public Open House. Yonge Street and Bernard Avenue (Bernard KDA) Planning Study Update Town of Richmond Hill March 30, 2017. Open House

Background Stage – Summary of Work

What did we do?

• Stakeholder interviews with landowners and key public agencies• Planning Policy Review • Preliminary Transportation Analysis • Preliminary Servicing and Storm Water Capacity Analysis • Natural Heritage Desktop Study • Geotechnical + Hydrogeological Desktop Study• Public Workshop

Page 8: Public Open House - City of Richmond Hill · Public Open House. Yonge Street and Bernard Avenue (Bernard KDA) Planning Study Update Town of Richmond Hill March 30, 2017. Open House

Existing Conditions: Site Opportunities and Constraints

Existing Neighbourhoods

Existing NeighbourhoodsLarge Blocks

Height and Density Policies

Limited Street Network

Natural Heritage

Natural Heritage

Commercial Uses

Placemaking

Groundwater

Bus Terminal

Page 9: Public Open House - City of Richmond Hill · Public Open House. Yonge Street and Bernard Avenue (Bernard KDA) Planning Study Update Town of Richmond Hill March 30, 2017. Open House

Public Workshop – March 1st, 2017

Approximately 35-40 attendees

Page 10: Public Open House - City of Richmond Hill · Public Open House. Yonge Street and Bernard Avenue (Bernard KDA) Planning Study Update Town of Richmond Hill March 30, 2017. Open House

Public Workshop Feedback – Key Takeaways

• A common desire to reduce traffic and improve the pedestrian network• Concern with high density development – village-feel important and con-

cern that new development will not integrate or transition to existing context

• Importance of commercial character – current retail environment well-supported

• Desire to define a sense of place and create a destination

• Improve connections to open space and greenway systems

Page 11: Public Open House - City of Richmond Hill · Public Open House. Yonge Street and Bernard Avenue (Bernard KDA) Planning Study Update Town of Richmond Hill March 30, 2017. Open House

Draft Options Framework

What are the Elements Driving the Options

Development?

Page 12: Public Open House - City of Richmond Hill · Public Open House. Yonge Street and Bernard Avenue (Bernard KDA) Planning Study Update Town of Richmond Hill March 30, 2017. Open House

The Big Ideas Open Space Connectivity

Page 13: Public Open House - City of Richmond Hill · Public Open House. Yonge Street and Bernard Avenue (Bernard KDA) Planning Study Update Town of Richmond Hill March 30, 2017. Open House

The Big Ideas Reinforcing Yonge St

Page 14: Public Open House - City of Richmond Hill · Public Open House. Yonge Street and Bernard Avenue (Bernard KDA) Planning Study Update Town of Richmond Hill March 30, 2017. Open House

The Big Ideas Integrated Bus Transit

Page 15: Public Open House - City of Richmond Hill · Public Open House. Yonge Street and Bernard Avenue (Bernard KDA) Planning Study Update Town of Richmond Hill March 30, 2017. Open House

The Big Ideas Integrated Commercial Uses

Page 16: Public Open House - City of Richmond Hill · Public Open House. Yonge Street and Bernard Avenue (Bernard KDA) Planning Study Update Town of Richmond Hill March 30, 2017. Open House

The Big Ideas Interconnected Street Network

Page 17: Public Open House - City of Richmond Hill · Public Open House. Yonge Street and Bernard Avenue (Bernard KDA) Planning Study Update Town of Richmond Hill March 30, 2017. Open House

Draft Options

1. Two scenarios that can reach the minimum and maximum density prescribed • A focus on the Yonge Street Corridor • Creation of a node at Yonge and

Bernard

2. Street Network Options 3. Open Space Structure

Page 18: Public Open House - City of Richmond Hill · Public Open House. Yonge Street and Bernard Avenue (Bernard KDA) Planning Study Update Town of Richmond Hill March 30, 2017. Open House

Yonge Street Corridor

FSIDENSITY DISTRIBUTION

Max Min4 3.5

2 1.75

2.9 2.5Total

Page 19: Public Open House - City of Richmond Hill · Public Open House. Yonge Street and Bernard Avenue (Bernard KDA) Planning Study Update Town of Richmond Hill March 30, 2017. Open House

Yonge Street Corridor

10 storey min 15 storey

max

4 storey

min 10

storeymax. 3

storeymax

4 storeymin

10 storeymax

FSIDENSITY DISTRIBUTION

Max Min4 3.5

2 1.75

2.9 2.5Total

Page 20: Public Open House - City of Richmond Hill · Public Open House. Yonge Street and Bernard Avenue (Bernard KDA) Planning Study Update Town of Richmond Hill March 30, 2017. Open House

Looking North

Page 21: Public Open House - City of Richmond Hill · Public Open House. Yonge Street and Bernard Avenue (Bernard KDA) Planning Study Update Town of Richmond Hill March 30, 2017. Open House

Looking South

Page 22: Public Open House - City of Richmond Hill · Public Open House. Yonge Street and Bernard Avenue (Bernard KDA) Planning Study Update Town of Richmond Hill March 30, 2017. Open House

Yonge and Bernard NodeDENSITY DISTRIBUTION

Max Min4 3.5

3.5 2.5

2.5 2

2 1.5

2.9 2.5

FSI

Total

Page 23: Public Open House - City of Richmond Hill · Public Open House. Yonge Street and Bernard Avenue (Bernard KDA) Planning Study Update Town of Richmond Hill March 30, 2017. Open House

Yonge and Bernard Node

10 storey min 15 storey max

3 storeymax

4 storeymin

10 storeymax

3 storey min 6 storey

max

Max Min4 3.5

3.5 2.5

2.5 2

2 1.5

2.9 2.5

FSI

Total

DENSITY DISTRIBUTION

4 storeymin

10 storeymax

Page 24: Public Open House - City of Richmond Hill · Public Open House. Yonge Street and Bernard Avenue (Bernard KDA) Planning Study Update Town of Richmond Hill March 30, 2017. Open House

Looking North

Page 25: Public Open House - City of Richmond Hill · Public Open House. Yonge Street and Bernard Avenue (Bernard KDA) Planning Study Update Town of Richmond Hill March 30, 2017. Open House

Looking South

Page 26: Public Open House - City of Richmond Hill · Public Open House. Yonge Street and Bernard Avenue (Bernard KDA) Planning Study Update Town of Richmond Hill March 30, 2017. Open House

Draft Options Framework

How the Bus Loop and Long Term Commercial

Uses have been Considered

Page 27: Public Open House - City of Richmond Hill · Public Open House. Yonge Street and Bernard Avenue (Bernard KDA) Planning Study Update Town of Richmond Hill March 30, 2017. Open House

Evolution of Form Over time

Development can go forward while long term uses stay in place

Looking Northwest Existing Loblaws and commercial uses

Existing Bus Loop and Terminal

Page 28: Public Open House - City of Richmond Hill · Public Open House. Yonge Street and Bernard Avenue (Bernard KDA) Planning Study Update Town of Richmond Hill March 30, 2017. Open House

Evolution of Form Over time

Looking Northwest

Large format retail integrated into mixed use building on Yonge

Long term redevelopment potential of Loblaws site

Bus interface evolves away from existing loop can take various forms in future

Page 29: Public Open House - City of Richmond Hill · Public Open House. Yonge Street and Bernard Avenue (Bernard KDA) Planning Study Update Town of Richmond Hill March 30, 2017. Open House

Draft Options –Street Network

Three Variations on how a future street network

could function

Page 30: Public Open House - City of Richmond Hill · Public Open House. Yonge Street and Bernard Avenue (Bernard KDA) Planning Study Update Town of Richmond Hill March 30, 2017. Open House

Street Network A

1. Leyburn Collector 2. Internal Private Streets 3. North South Public Street 4. Mid Block Connection 5. Connection to Yonge Street 6. Connection to Brookside7. Integrate the Community

KEY DIFFERENCES A. New Intersection at Yonge B. Naughton Land Swap

Page 31: Public Open House - City of Richmond Hill · Public Open House. Yonge Street and Bernard Avenue (Bernard KDA) Planning Study Update Town of Richmond Hill March 30, 2017. Open House

Street Network B

1. Leyburn Collector 2. Internal Private Streets 3. North South Public Street 4. Mid Block Connection 5. Connection to Yonge Street 6. Connection to Brookside7. Integrate the Community

KEY DIFFERENCES B. Naughton Land Swap C. Connectivity to Yonge Street

Page 32: Public Open House - City of Richmond Hill · Public Open House. Yonge Street and Bernard Avenue (Bernard KDA) Planning Study Update Town of Richmond Hill March 30, 2017. Open House

Street Network C

1. Leyburn Collector 2. Internal Private Streets 3. North South Public Street 4. Mid Block Connection 5. Connection to Yonge Street 6. Connection to Brookside7. Integrate the Community

KEY DIFFERENCES D. Connect Naughton out to Yonge Street

Page 33: Public Open House - City of Richmond Hill · Public Open House. Yonge Street and Bernard Avenue (Bernard KDA) Planning Study Update Town of Richmond Hill March 30, 2017. Open House

Draft Options – Open Space

An Open Space Structure Supporting All

The Options

Page 34: Public Open House - City of Richmond Hill · Public Open House. Yonge Street and Bernard Avenue (Bernard KDA) Planning Study Update Town of Richmond Hill March 30, 2017. Open House

Street Network and Open Space - A new crossing of Yonge Street

1

2

2

3

45

1. Linear Park Loop

Page 35: Public Open House - City of Richmond Hill · Public Open House. Yonge Street and Bernard Avenue (Bernard KDA) Planning Study Update Town of Richmond Hill March 30, 2017. Open House

Street Network and Open Space - A new crossing of Yonge Street

1

2

2

3

45

2. Connections to Open Space3. Urban Squares

4. Enhance the Watercourse

5. Connection across Yonge Street

Page 36: Public Open House - City of Richmond Hill · Public Open House. Yonge Street and Bernard Avenue (Bernard KDA) Planning Study Update Town of Richmond Hill March 30, 2017. Open House

What Feedback are We Looking For?

Our next step is refining these option into a preferred option –

• Height + Density - Which height and density option best supports transit and a mix of uses across the Bernard KDA over the long term?

• Parks and Open Space – Please tell us how this parks system improves upon and enhances access to new and existing parks, linkages and urban open spaces over the long term?

• Street Network – Please tell us which Option do you think provides the best access and connectivity for vehicles and pedestrians across the KDA over the long term and why?

Page 37: Public Open House - City of Richmond Hill · Public Open House. Yonge Street and Bernard Avenue (Bernard KDA) Planning Study Update Town of Richmond Hill March 30, 2017. Open House

What is Next for the Study

• Review Feedback • Prepare a Preferred Option and

Policy Direction Report for early May • Public and Stakeholder Comment on

the Preferred Option • Targeting a Final Recommendation

Report to Council in July

Page 38: Public Open House - City of Richmond Hill · Public Open House. Yonge Street and Bernard Avenue (Bernard KDA) Planning Study Update Town of Richmond Hill March 30, 2017. Open House

Public Open House Yonge Street and Bernard Avenue

(Bernard KDA) Planning Study Update

Town of Richmond Hill

March 30, 2017