By the Numbers: Making the Case for Reuse Based on Facts with Joan Lasselle and Amber Swope
Public Meeting and Open House - KCATA · Public Meeting and Open House. ... Sample Project:...
Transcript of Public Meeting and Open House - KCATA · Public Meeting and Open House. ... Sample Project:...
![Page 1: Public Meeting and Open House - KCATA · Public Meeting and Open House. ... Sample Project: Neighborhood Connectivity ... Swope Connectivity Project Kickoff Author: Shoup, Lilly](https://reader036.fdocuments.us/reader036/viewer/2022070609/5ad589427f8b9a0d2d8dcbab/html5/thumbnails/1.jpg)
Presented by Lilly Shoup
February 2018
Public Meeting and Open House
![Page 2: Public Meeting and Open House - KCATA · Public Meeting and Open House. ... Sample Project: Neighborhood Connectivity ... Swope Connectivity Project Kickoff Author: Shoup, Lilly](https://reader036.fdocuments.us/reader036/viewer/2022070609/5ad589427f8b9a0d2d8dcbab/html5/thumbnails/2.jpg)
Background
![Page 3: Public Meeting and Open House - KCATA · Public Meeting and Open House. ... Sample Project: Neighborhood Connectivity ... Swope Connectivity Project Kickoff Author: Shoup, Lilly](https://reader036.fdocuments.us/reader036/viewer/2022070609/5ad589427f8b9a0d2d8dcbab/html5/thumbnails/3.jpg)
Connecting Swope Study Nelson\Nygaard Consulting Associates, Inc.
“While we cannot change the past, we can ensure that current and future transportation projects connect and strengthen communities, including areas that have, in the past, been on the wrong side of transportation decisions.”- Former Secretary of Transportation Anthony Foxx
![Page 4: Public Meeting and Open House - KCATA · Public Meeting and Open House. ... Sample Project: Neighborhood Connectivity ... Swope Connectivity Project Kickoff Author: Shoup, Lilly](https://reader036.fdocuments.us/reader036/viewer/2022070609/5ad589427f8b9a0d2d8dcbab/html5/thumbnails/4.jpg)
Goals
1. Identify barriers and gaps (for pedestrians, transit riders, and bicyclists)
2. Ensure access to Prospect MAX stations; and 3. Improve safety, comfort, and ease of crossing U.S. 71
Nelson\Nygaard Consulting Associates, Inc. 4
Hwy 71 and E 69th St
![Page 5: Public Meeting and Open House - KCATA · Public Meeting and Open House. ... Sample Project: Neighborhood Connectivity ... Swope Connectivity Project Kickoff Author: Shoup, Lilly](https://reader036.fdocuments.us/reader036/viewer/2022070609/5ad589427f8b9a0d2d8dcbab/html5/thumbnails/5.jpg)
Approach
DISCOVERY DESIRE
DECISIONS DELIVERABLES
Nelson\Nygaard Consulting Associates, Inc.
![Page 6: Public Meeting and Open House - KCATA · Public Meeting and Open House. ... Sample Project: Neighborhood Connectivity ... Swope Connectivity Project Kickoff Author: Shoup, Lilly](https://reader036.fdocuments.us/reader036/viewer/2022070609/5ad589427f8b9a0d2d8dcbab/html5/thumbnails/6.jpg)
Discovery
![Page 7: Public Meeting and Open House - KCATA · Public Meeting and Open House. ... Sample Project: Neighborhood Connectivity ... Swope Connectivity Project Kickoff Author: Shoup, Lilly](https://reader036.fdocuments.us/reader036/viewer/2022070609/5ad589427f8b9a0d2d8dcbab/html5/thumbnails/7.jpg)
Planning and Policy Framework
Create an interconnected, multimodaltransportation system in the Swope area that integrates with land use patterns, connects neighborhoods and businesses, and increases transportation choice.
- Swope Area Plan, 2014
Nelson\Nygaard Consulting Associates, Inc.
![Page 8: Public Meeting and Open House - KCATA · Public Meeting and Open House. ... Sample Project: Neighborhood Connectivity ... Swope Connectivity Project Kickoff Author: Shoup, Lilly](https://reader036.fdocuments.us/reader036/viewer/2022070609/5ad589427f8b9a0d2d8dcbab/html5/thumbnails/8.jpg)
Best Practices
■ Successful safety and connectivity projects in other cities ■ Economic development around BRT lines in similar areas■ Policy tools that support transit access and context
sensitive development
Nelson\Nygaard Consulting Associates, Inc.
![Page 9: Public Meeting and Open House - KCATA · Public Meeting and Open House. ... Sample Project: Neighborhood Connectivity ... Swope Connectivity Project Kickoff Author: Shoup, Lilly](https://reader036.fdocuments.us/reader036/viewer/2022070609/5ad589427f8b9a0d2d8dcbab/html5/thumbnails/9.jpg)
Existing Conditions
The pedestrian network is better connected to the west of Hwy 71 and less well connected on the east.
Informal crossings of Hwy 71 exist at: ■ 53rd St■ 57th St■ 69th St
Nelson\Nygaard Consulting Associates, Inc.
![Page 10: Public Meeting and Open House - KCATA · Public Meeting and Open House. ... Sample Project: Neighborhood Connectivity ... Swope Connectivity Project Kickoff Author: Shoup, Lilly](https://reader036.fdocuments.us/reader036/viewer/2022070609/5ad589427f8b9a0d2d8dcbab/html5/thumbnails/10.jpg)
Existing Conditions
There are no bicycle facilities in the area, though there are signed bicycle routes.
A buffered bicycle facility is just outside the area on Gregory Blvd along with a proposed bike trail.
Nelson\Nygaard Consulting Associates, Inc.
![Page 11: Public Meeting and Open House - KCATA · Public Meeting and Open House. ... Sample Project: Neighborhood Connectivity ... Swope Connectivity Project Kickoff Author: Shoup, Lilly](https://reader036.fdocuments.us/reader036/viewer/2022070609/5ad589427f8b9a0d2d8dcbab/html5/thumbnails/11.jpg)
Existing Conditions
There are 12 transit routes in the area with significant transfers at:■ Prospect & Swope
Pkwy■ Prospect & 63rd
■ Prospect & 75th
Nelson\Nygaard Consulting Associates, Inc.
![Page 12: Public Meeting and Open House - KCATA · Public Meeting and Open House. ... Sample Project: Neighborhood Connectivity ... Swope Connectivity Project Kickoff Author: Shoup, Lilly](https://reader036.fdocuments.us/reader036/viewer/2022070609/5ad589427f8b9a0d2d8dcbab/html5/thumbnails/12.jpg)
Safety
■ Between 2012-2016, there were 61 crashes involving pedestrians, and 25 involving bicyclists.
■ There were 5 crashes on Hwy 71 that killed a pedestrian or a bicyclist.
Nelson\Nygaard Consulting Associates, Inc.
![Page 13: Public Meeting and Open House - KCATA · Public Meeting and Open House. ... Sample Project: Neighborhood Connectivity ... Swope Connectivity Project Kickoff Author: Shoup, Lilly](https://reader036.fdocuments.us/reader036/viewer/2022070609/5ad589427f8b9a0d2d8dcbab/html5/thumbnails/13.jpg)
Desire
![Page 14: Public Meeting and Open House - KCATA · Public Meeting and Open House. ... Sample Project: Neighborhood Connectivity ... Swope Connectivity Project Kickoff Author: Shoup, Lilly](https://reader036.fdocuments.us/reader036/viewer/2022070609/5ad589427f8b9a0d2d8dcbab/html5/thumbnails/14.jpg)
Public Survey Results
■ Of the nearly 100 survey respondents, the majority drive alone to get around– But more than 30% walk, bike, or take transit regularly
■ People walk for exercise, to run errands, & visit friends– But safety (from traffic and crime) and the lack of
pedestrian facilities are a barrier
■ More people than the City overall own a bicycle– Residents preferred buffered and protected bicycle
facilities to standard bike lanes
■ While most residents own a smartphone, most have never used ride-hailing services such as Uber or Lyft.
Nelson\Nygaard Consulting Associates, Inc.
![Page 15: Public Meeting and Open House - KCATA · Public Meeting and Open House. ... Sample Project: Neighborhood Connectivity ... Swope Connectivity Project Kickoff Author: Shoup, Lilly](https://reader036.fdocuments.us/reader036/viewer/2022070609/5ad589427f8b9a0d2d8dcbab/html5/thumbnails/15.jpg)
Community Concerns
■ Common concerns are:– Crossing 71 Hwy is dangerous for pedestrians– Sidewalks are missing and badly maintained with debris– Cleanliness of 71 Hwy medians, frontage roads, and
sidewalks
■ People want to see:– Sidewalk improvements– Economic development– Covered shelters, benches, pads at Ride KC stops– Time increased for pedestrians crossing on traffic lights– Pedestrian bridges over 71 Hwy
Nelson\Nygaard Consulting Associates, Inc. 15
![Page 16: Public Meeting and Open House - KCATA · Public Meeting and Open House. ... Sample Project: Neighborhood Connectivity ... Swope Connectivity Project Kickoff Author: Shoup, Lilly](https://reader036.fdocuments.us/reader036/viewer/2022070609/5ad589427f8b9a0d2d8dcbab/html5/thumbnails/16.jpg)
Projects
![Page 17: Public Meeting and Open House - KCATA · Public Meeting and Open House. ... Sample Project: Neighborhood Connectivity ... Swope Connectivity Project Kickoff Author: Shoup, Lilly](https://reader036.fdocuments.us/reader036/viewer/2022070609/5ad589427f8b9a0d2d8dcbab/html5/thumbnails/17.jpg)
Initial Project Screening
Nelson\Nygaard Consulting Associates, Inc. 17
Project Type Cost Reach Effectiveness
New at-grade street crossing
Infrastructure
◕ ◔ ●
■ Cost: General cost estimate, implementation difficulty, and level of effort
■ Reach: Economic development, quality of life, who is impacted/benefits, and access to jobs
■ Effectiveness: Supportiveness of safety & connectivity
An example:
![Page 18: Public Meeting and Open House - KCATA · Public Meeting and Open House. ... Sample Project: Neighborhood Connectivity ... Swope Connectivity Project Kickoff Author: Shoup, Lilly](https://reader036.fdocuments.us/reader036/viewer/2022070609/5ad589427f8b9a0d2d8dcbab/html5/thumbnails/18.jpg)
Project Types
Infrastructure Operations Technology Education
Physical changes to the street and new streets or pedestrian crossings
Improving traffic flow and safety through signal timing, transit frequency, and maintenance
Information, shared mobility services, and ride-hailing
Safety campaigns, youth programs, or open streets festivals
Nelson\Nygaard Consulting Associates, Inc.
![Page 19: Public Meeting and Open House - KCATA · Public Meeting and Open House. ... Sample Project: Neighborhood Connectivity ... Swope Connectivity Project Kickoff Author: Shoup, Lilly](https://reader036.fdocuments.us/reader036/viewer/2022070609/5ad589427f8b9a0d2d8dcbab/html5/thumbnails/19.jpg)
Sample Project: New Street Crossing
■ New at-grade street crossing and pedestrian improvements with a traffic signal on 71 Hwy
Nelson\Nygaard Consulting Associates, Inc. 19
![Page 20: Public Meeting and Open House - KCATA · Public Meeting and Open House. ... Sample Project: Neighborhood Connectivity ... Swope Connectivity Project Kickoff Author: Shoup, Lilly](https://reader036.fdocuments.us/reader036/viewer/2022070609/5ad589427f8b9a0d2d8dcbab/html5/thumbnails/20.jpg)
Sample Project: Street Overpass
■ Moving 71 travel lanes inward with new street overpasses at new locations and current at-grade crossings
Nelson\Nygaard Consulting Associates, Inc. 20
![Page 21: Public Meeting and Open House - KCATA · Public Meeting and Open House. ... Sample Project: Neighborhood Connectivity ... Swope Connectivity Project Kickoff Author: Shoup, Lilly](https://reader036.fdocuments.us/reader036/viewer/2022070609/5ad589427f8b9a0d2d8dcbab/html5/thumbnails/21.jpg)
Sample Project: Bike/Ped Only Overpass
■ New pedestrian/bicycle overpass with an accessible ramp to access from frontage streets
Nelson\Nygaard Consulting Associates, Inc. 21
![Page 22: Public Meeting and Open House - KCATA · Public Meeting and Open House. ... Sample Project: Neighborhood Connectivity ... Swope Connectivity Project Kickoff Author: Shoup, Lilly](https://reader036.fdocuments.us/reader036/viewer/2022070609/5ad589427f8b9a0d2d8dcbab/html5/thumbnails/22.jpg)
Bike/Ped Overpass Concepts
Nelson\Nygaard Consulting Associates, Inc. 22
![Page 23: Public Meeting and Open House - KCATA · Public Meeting and Open House. ... Sample Project: Neighborhood Connectivity ... Swope Connectivity Project Kickoff Author: Shoup, Lilly](https://reader036.fdocuments.us/reader036/viewer/2022070609/5ad589427f8b9a0d2d8dcbab/html5/thumbnails/23.jpg)
Sample Project: Bike/Ped Only Underpass
■ A new well-lighted pedestrian and bicycle tunnel underneath 71 Hwy or overpass over 71Hwy
Nelson\Nygaard Consulting Associates, Inc. 23
![Page 24: Public Meeting and Open House - KCATA · Public Meeting and Open House. ... Sample Project: Neighborhood Connectivity ... Swope Connectivity Project Kickoff Author: Shoup, Lilly](https://reader036.fdocuments.us/reader036/viewer/2022070609/5ad589427f8b9a0d2d8dcbab/html5/thumbnails/24.jpg)
Bike/Ped Underpass Concepts
Nelson\Nygaard Consulting Associates, Inc. 24
![Page 25: Public Meeting and Open House - KCATA · Public Meeting and Open House. ... Sample Project: Neighborhood Connectivity ... Swope Connectivity Project Kickoff Author: Shoup, Lilly](https://reader036.fdocuments.us/reader036/viewer/2022070609/5ad589427f8b9a0d2d8dcbab/html5/thumbnails/25.jpg)
Sample Project: Neighborhood Connectivity
■ Expand bikeshare along with bicycle facilities, pedestrian improvements, and green infrastructure
Nelson\Nygaard Consulting Associates, Inc. 25
![Page 26: Public Meeting and Open House - KCATA · Public Meeting and Open House. ... Sample Project: Neighborhood Connectivity ... Swope Connectivity Project Kickoff Author: Shoup, Lilly](https://reader036.fdocuments.us/reader036/viewer/2022070609/5ad589427f8b9a0d2d8dcbab/html5/thumbnails/26.jpg)
Nelson\Nygaard Consulting Associates, Inc. 26
Neighborhood Connectivity Concepts
![Page 27: Public Meeting and Open House - KCATA · Public Meeting and Open House. ... Sample Project: Neighborhood Connectivity ... Swope Connectivity Project Kickoff Author: Shoup, Lilly](https://reader036.fdocuments.us/reader036/viewer/2022070609/5ad589427f8b9a0d2d8dcbab/html5/thumbnails/27.jpg)
Sample Technology Projects
■ Mobility hubs with travel time and transit arrival information, carsharing, and rideshare subsidies
Nelson\Nygaard Consulting Associates, Inc. 27
![Page 28: Public Meeting and Open House - KCATA · Public Meeting and Open House. ... Sample Project: Neighborhood Connectivity ... Swope Connectivity Project Kickoff Author: Shoup, Lilly](https://reader036.fdocuments.us/reader036/viewer/2022070609/5ad589427f8b9a0d2d8dcbab/html5/thumbnails/28.jpg)
■ Wayfinding signage and school safety education programs
■ Open streets events
Nelson\Nygaard Consulting Associates, Inc. 28
Sample Education Projects and Programs
![Page 29: Public Meeting and Open House - KCATA · Public Meeting and Open House. ... Sample Project: Neighborhood Connectivity ... Swope Connectivity Project Kickoff Author: Shoup, Lilly](https://reader036.fdocuments.us/reader036/viewer/2022070609/5ad589427f8b9a0d2d8dcbab/html5/thumbnails/29.jpg)
Our Task Today
We Want to Hear From You!
■ Where are improvements needed?
■ What types of projects to improve safety and connectivity would you like to see?
Nelson\Nygaard Consulting Associates, Inc. 29
![Page 30: Public Meeting and Open House - KCATA · Public Meeting and Open House. ... Sample Project: Neighborhood Connectivity ... Swope Connectivity Project Kickoff Author: Shoup, Lilly](https://reader036.fdocuments.us/reader036/viewer/2022070609/5ad589427f8b9a0d2d8dcbab/html5/thumbnails/30.jpg)
Next Steps
The project team will:
1. Use community feedback to prioritize projects,
2. Develop cost estimates, identify locations, and funding sources,
3. Develop implementation plan for short- and longer-term improvements, and
4. Present recommendations to you in Spring 2018!