Over 85-year experience in engineering and design of hydropower facilities in Ukraine
and overseas
History
1927 – incorporation of UKRHYDROPROJECT.
1994 - reorganization of UKRHYDROPROJECT into an open joint stock company
2009 – reorganization of UKRHYDROPROJECT into a public joint stock company
2010 – creation of a DESIGN ENGINEERING COMPLEX “GRANT” comprising UKRHYDROPROJECT PJSC, HYDROTECHPROJECT LTD., INTERDEPARTMENTAL CENTRE OF ENGINEERING RESEARCHES LTD., and UKRATOMENERGOPROJECT LTD. in the framework of structural reorganization of UKRHYDROPROJECT.
Major Projects
Over the years, UKRHYDROPROJECT has become a largest engineering company in hydropowerand water management construction in Ukraine.
Since its establishment, the company has designed large and medium hydropower plants (withcapacities up to 900 MW), small hydropower plants (with capacities from 0.4 MW), pumpedstorage plants (with capacities between 235 and 3,600 MW), Canals for navigation, irrigation, andwater supply for cities and regions, as well as hydrotechnical structures at ore and miningcomplexes, in Ukraine, Russia, Belarus, Moldova, and Georgia.
UKRHYDROPROJECT has also performed design works for hydro facilities in Vietnam, China,Laos, Mexico, Venezuela, Iraq, Ethiopia, Afghanistan, and other countries.
Awards and Memberships in International Organizations
UKRHYDROPROJECT is a member of the followingorganizations:
• International Hydropower Association (IHA)• Council on Large Electric Systems (CIGRE)• Ukrainian Commission on Large Dams• Ukrainian Association of Quality• Non-commercial partnership Association of
organizations engaged in the preparation of design documentation for energy facilities, grids and substations “Energoproject”
Quality Management System
High-quality products are a key objective of the company.Quality of the company’s work is confirmed by qualitycertificates in conformity with the international standardISO 9001:2008
Areas of expertise
Engineering surveys
Design works (new construction, rehabilitation, and overhaul)
Design of bearing and filler structures
Design of internal and external engineering networks, systems, and structures
Engineering works, including design services
Development of special design parts (EIA/SIA, labor safety, etc.)
Technical assistance; engineering, consulting and information services
Development of regulations to operate facilities and fire protection measures
Development of bid documentation, customer specifications, and maintenance of bidding processes
Designer’s and engineering supervision over construction
Appraisal of designs and development of measures to provide safety of hydrotechnical structures
Designs of HPPs in Ukraine: Cascade on the Dnieper River
1. Kyiv HPP (361 MW). Commissioned in 1968
2. Kaniv HPP (444 MW). Commissioned in 1975
3. Dniprodzerzhinsk HPP (352 MW). Commissioned in 1964
4. Kremenchuk HPP (625 MW). Commissioned in 1960
5. Dnieper HPP-1 (585 MW). Commissioned in 1932, restored in 1947
6. Dnieper HPP-2 (876,8 MW). Commissioned in 1981
7. Kahovka HPP (300 MW). Commissioned in 1956
Designs of HPPs in Ukraine and Moldova: Cascade on the Dniester River
1. Dniester HPP-1 (702 MW). Commissioned in 1983
2. Dniester HPP-2 (40.8 MW). Commissioned in 1999-2002
3. Dubossary HPP (48 MW). Commissioned in 1954
Dniester HPP-1, Ukraine
Dniester HPP-2, Ukraine
Dubossary HPP, Moldova
1. Kyiv PSP (t.m.: 235 MW/p.m.: 139 MW) on the Dnieper River. Commissioned in 1972
2. Dniester PSP (t.m.: 2,268 MW/p.m.: 2,949 MW) on the Dniester River. Unit No. 1 commissioned in 2009
3. Tashlyk PSP (t.m.: 906 MW/p.m.: 1,382 MW) on the South Bug River. Units No. 1 and No. 2 commissioned in 2006-2007
4. Kaniv PSP (t.m.: 1,000 MW/p.m.: 1,120 MW) on the Dnieper River. Design (1987-2012)
Designs of PSP in UkraineKyiv PSP
Kaniv PSP
Tashlyk PSP
Dniester PSP
Designs of small HPPs in Ukraine
1. Tereblyia-Rikskaya HPP (27 MW). Commissioned in 1956
2. Oleksandrivska HPP (10.9 MW). Commissioned in 1999
3. Cascade HPP on the Teresva River (20.52 MW). Feasibility study and first phase of detailed design (2008-2009)
Tereblyia-Rikskaya HPP
Oleksandrivska HPP
HPP-4 on the Teresva River
Rehabilitation of HPPs operated by Ukrhydroenergo
1996-2002 – first phase of rehabilitation of the hydropower plants in the Dnieper Cascade, including:
• Rehabilitation of 16 units at the Kyiv, Kahovka, andDnieper HPP-1
• Replacement of electrical equipment • Replacement of excitation, speed control, and control
systems at unit, block, and plant levels, electrical protections
• Partial rehabilitation of auxiliary AC/DC system and cabling
2006-2017 – second phase of rehabilitation of the hydropower plants in the Dnieper Cascade, including:
• Rehabilitation of 64 turbines at the Kyiv HPP and PSP, Kaniv, Dniprodzerzhinsk, Kremenchuk, Kahovka, andDnieper HPP-1 and HPP-2;
• Replacement of excitation system, speed control system, control system, electrical protections, and electrical equipment
• Rehabilitation of auxiliary, fire extinguishing, air-conditioning, and service water supply systems, DC control boards, batteries, etc.
Legend:
n – number of units
Nd – capacity at design head (50% probability)
E – average annual output
nNp,
MW
E,
million
kWh
nNd,
MW
E,
million
kWh
nNd,
MW
E,
million
kWh
Kyiv PSP 6 235 112 235 112 235 112 3 239 128
Kyiv HPP 20 361 663 9 401 672 3 412 675 8 440 683
Kaniv HPP 24 444 812 444 812 2 451 816 22 528 858
Kremenchuk HPP 12 625 1400 625 1400 625 1400 12 683 1449
Dniprodzerzhinsk HPP 8 352 1100 352 1100 2 361 1114 6 387 1154
Dnieper HPP-1 9 585 1448 6 627 1527 627 1527 3 648 1567
Dnieper HPP-2 8 877 2168 877 2168 877 2168 8 886 2204
Kahovka HPP 6 300 1230 1 306 1237 3 324 1258 2 336 1272
TOTAL for the Dnieper
Cascade93 3779 8933 16 3867 9028 10 3912 9070 64 4147 9315
Dniester HPP-1 6 702 865 702 865 702 865 702 865
TOTAL 99 4481 9798 16 4569 9893 10 4614 9935 64 4849 10180
HPP n
Before
rehabilitationAfter rehabilitation
Nd,
MW
E,
million
kWh
1st Phase Transitional Phase 2nd Phase
Improvement of parameters at HPPs operated byUkrhydroenergo at different phases of rehabilitation
Hydrotechnical Structures and Canals in Ukraine
Siversky Donets-Donbas Canal
Dnieper-Donbas Canal
1. Dnieper-Donbas Canal: 1 phase – commissioned in1984, 2 phase – under construction
2. Siversky Donets-Donbas Canal. Commissioned in1974
3. Nikitovka-Krasny Luch Canal. Design
4. Danube-Dnieper Canal. Feasibility study
5. Black Sea-Baltic Sea Waterway (Ukraine, Belarus, Poland). Feasibility report.
Designs of Wind power plants in Ukraine
1. Ai-Petri WPP (0,81 MW). Commissioned in 1992;
2. Adzhigolsk WPP (1,2 MW). Commissioned in1992;
3. Novoushytsk WPP (0,22 MW). Design;
4. Zborovsk WPP (0,22 MW). Design;
5. Donuzlavska WPP, Sudak section: stages 5and 6 (5 MW; 6,3 MW). Commissioned in 2002-2003;
6. Aulska WPP (0,2 MW). Design;
7. Vyshgorod WPP (5 MW). Feasibility study, Design.
Adzhigolsk WPP
Donuzlavska WPP, Sudak section
Designs of substations and transmission lines in Ukraine
1. 10; 35; 110 kV HV transmission lines 8 pumping plantsof Dnieper-Donbass Canal. Commissioned in 1980-1995;
2. 6; 35/10; 330 kV outdoor switchyard and 6; 10; 35; 330 kV HV transmission lines of South Ukrainian power complex. Commissioned in 1983-2003;
3. 35/6 kV Substation of pumping plant in Kozlovvillage. Commissioned in 1990;
4. 330/110; 110/35 kV outdoor switchyard and 354 110; 330 kV HV transmission lines of Cascades on the Dnieper and Dniester rivers. Commissioned in 1991, 1993-1998;
5. 35/10/6 kV district substation and 10 kV HV transmission lines of the HPP in Snyatin. Commissioned in 1995-1996;
6. 110/6 к kV outdoor switchyard «Kharverst». Commissioned in 2005;
7. 330 kV HV overpass «Novoodesskaya-Artsyz». Feasibility study 2007;
8. Rehabilitation of 330 kV outdoor switchyard of 750 kV substation «Pivnichnoukrainska». Detailed design 2012.
Substation «Pivnichnoukrainska»
HV-overpass «Novoodesskaya-Artsyz»
Design and survey works for hydrotechnicalstructures at ore and mining complexes (OMC):
• Southern OMC, Ukraine. Design of a tail storage
• Lebedin OMC, Russian Federation. Design of tail storage rehabilitation
• Stoylensky OMC, Russian Federation. Technical regulation for extension of the 2nd-step pump plant for the tail storage and water bypass structure
Lebedin OMC, Russian Federation
Stoylensky OMC, Russian Federation
Southern OMC, Ukraine
Ore and Mining Complexes in Ukraine and the Russian Federation
Designs of HPPs in countries of the former USSR
• Grodno HPP (22 MW) on the Neman River, Belarus. Commissioned in 2012
• Polotsk HPP (17 MW) on the Western Dvina River, Belarus. Under construction
• HPP Mtkvari (53 MW) on the Mtkvari (Kura) River, Georgia. Under construction
• Iova HPP-10 (96 MW) on the Iova River, Russian Federation. Design for rehabilitation of units (in progress) Grodno HPP
Polotsk HPP
HPP Mtkvari
Iova HPP-10
Designs of HPPs in Vietnam
• HPP Can Don (77.6 MW) on the Be River. Commissioned in 2003
• HPP Thak Mo (150 MW) on the Be River. Commissioned in 1995
• HPP Nam Chien (200 MW) on the Nam Chien River.Under commissioning.
HPP Can Don
HPP Thak Mo
HPP Nam Chien
Designs of HPPs in Vietnam (cont.)
• HPP Yali (720 MW) on theSesan River. Commissioned in 2002
• HPP Sesan 3А (108 MW)on the Sesan River. Commissioned in 2006
• HPP Huong Dien (81 MW)on the Bo River. Commissioned in 2011
HPP Sesan 3А
HPP Yali
HPP Huong Dien
Design of a HPP in Ethiopia
The Grand EthiopianRenaissance Dam Project(6,000 MW) on the Blue NileRiver. Design optimization,according to which the plant isbeing built
Upon completion, the plant willbecome the largest HPP inAfrica and one of the largest inthe world
Grand Ethiopian Renaissance Dam Project
Major outcomes of the design optimization:
• Total capacity increase from 5,250 to 6,000 MW• Unit capacity increase from 350 to 375 MW• Maximum output increase by 475 GWh• Cost reduction by 124 million euro
Hydro Project San Rafael
Designs of hydro projects in Mexico and Venezuela
• Hydro Project San Rafael on the Río Grande de Santiago, Mexico. Commissioned in 1995
• Hydro Scheme Uribante-Caparo on the Uribante, Dorados, Comburite, and Caparo Rivers, Venezuela. Feasibility study (2005)
Hydro Scheme Uribante-Caparo
HPPs and hydrotechnical structures overseas
• Navigation structure at LuangPrabang on the Mekong River, Laos.Feasibility study (2010-2011)
• Nasyriah Pumping Station, Iraq.Commissioned in 2008
• HPP Naghlu (100 MW) on the Kabul and Panjshir Rivers, Afghanistan. Rehabilitation of the plant (including replacement of auxiliary equipment), switchyard, and communication systems
Navigation structure at Luang Prabang
Nasyriah Pumping Station
HPP Naghlu
Address:9 Lenin Avenue, Kharkiv 61166, UkraineTel.: - Reception: +38 (057) 717-57-05- Marketing service: +38 (057) 717-57-41Fax: +38 (057) 717-57-01
E-mail: [email protected]: http://www.uhp.kharkov.ua