Alton Village StreetscapingMain Street South and Queen Street East
“Phase 2”
PUBLIC INFORMATION CENTRE
Date: June 6, 2018Time: 6:30 p.m. to 8:30 p.m.Location: Alton Public School
19681 Main StreetAlton, Ontario
Alton Village StreetscapingMain Street South and Queen Street East
“Phase 2”
PUBLIC INFORMATION CENTRE
Date: June 6, 2018Time: 6:30 p.m. to 8:30 p.m.Location: Alton Public School
19681 Main StreetAlton, Ontario
Project Area – Phase 2
Shaw’s CreekPROJECT
AREA
Main Street South
Summary of the Works
• Implement urban cross section through Alton Village: • 1.8m sidewalks• Coloured impressed concrete splash pads• 4.0m lanes with ‘sharrows’ for bicycle traffic through Village, and 1.5m
separate bicycle lanes from Beechgrove to start of Village area• Street beautification including:
• Rest areas with benches, waste receptacles and bicycle racks• Landscaping and planting features• Decorative lighting
• Stormwater management improvements including permeable pavers, CB shields, oil‐grit separators and new sewers
• Community parkette at Main and Queen intersection• Traffic calming gateway features north of Beechgrove Sideroad and at
McClellan Road
Chosen Finishes / Features
Bridge/Culvert Concrete Formliners Bridge/Culvert Railings
Benches and Waste Receptacles Coloured Impressed Concrete Splash Pads
Streetlights
Summary of the Works
Summary of the Works
Summary of the Works
Conceptual RenderingMain Street Gateway Feature (Without Monument)
Conceptual RenderingMain Street Gateway Feature (With Monument)
Conceptual RenderingMain St. at McLellan Road (Looking North)
Conceptual RenderingMain St. at McLellan Road (Looking South)
Conceptual Rendering – Main St. (North of Station St.)
Conceptual Drawing – Retaining Wall
Conceptual Rendering – Main / Queen Intersection
Conceptual Rendering ‐ Queen St. Looking West
Timing – Phase Two
• Main Street South is anticipated to remain open, with lane restrictions
• Construction start date Spring 2019
• Expected construction completion in late 2019
YOUR INPUT IS IMPORTANT
Please complete a Comment Sheet before leaving
By Mail Mr. Serguei Kabanov, C.E.T.Region of PeelTransportation Division10 Peel Centre DriveSuite B, 4th FloorBrampton, ON L6T 4B9
Mr. David O’Sullivan, P.Eng.R.V. Anderson Associates Limited2001 Sheppard Avenue EastSuite 300Toronto, ON M2J 4Z8
OR
By Phone 905‐791‐7800, ext. 8754 416‐497‐8600, ext. 1245
By Fax 905‐791‐1442 416‐497‐0342
By E‐mail Serguei. [email protected] [email protected]
THANK YOU FOR ATTENDING
These presentation boards are also available for viewing at http://www.peelregion.ca/news/notices/2017/notice‐171004.htm