Transcript of Public Hearings December 3, 2013. Case: CDR-13-05-135 Project: AIPO / South Orange Properties PD...
Public Hearings
December 3, 2013
Board of County Commissioners
Case: CDR-13-05-135
Project: AIPO / South Orange Properties PD
Applicant: Mark Jacobson, Bowyer-Singleton
District: 4
Acreage: ~339 acres
Request: A substantial change to convert 35 of the previously approved 350 townhomes into 35 single-family
detached units
AIPO / South Orange Properties PDAIPO / South Orange Properties PD
AIPO / South Orange Properties PDZoning MapAIPO / South Orange Properties PDZoning Map
AIPO / South Orange Properties PDFuture Land Use MapAIPO / South Orange Properties PDFuture Land Use Map
Action Requested
Make a finding of consistency with the Comprehensive Plan and approve the substantial change to the AIPO / South Orange Properties Planned Development, subject to the conditions listed in the staff report.
AIPO / South Orange Properties PDAIPO / South Orange Properties PD
Case: PSP-13-04-100
Project: Lake Barton PD / La Shore PSP
Applicant: Quang Lam, Lam Civil Engineering, Inc.
District: 4
Acreage: ~18.6 acres
Request: Construction of 14 single-family dwelling units and one (1)
commercial lot
Lake Barton PD / La Shore PSPLake Barton PD / La Shore PSP
Lake Barton PD / La Shore PSPLake Barton PD / La Shore PSP
Lake Barton PD / La Shore PSPLake Barton PD / La Shore PSP
Lake Barton PD / La Shore PSPLake Barton PD / La Shore PSP
Action Requested
Make a finding of consistency with the Comprehensive Plan and approve the Lake Barton PD / La Shore PSP subject to the conditions listed in the staff report.
Lake Barton PD / La Shore PSPLake Barton PD / La Shore PSP
Case: PSP-13-07-180
Project: DeValk PD / DeValk PSP
Applicant: Robert B. Paymayesh, PE Group, LLC.
District: 4
Acreage: ~9.67 acres
Request: Construction of 42 detached single- family dwelling units
DeValk PD / DeValk PSPDeValk PD / DeValk PSP
DeValk PD / DeValk PSPDeValk PD / DeValk PSP
DeValk PD / DeValk PSPDeValk PD / DeValk PSP
Action Requested
Make a finding of consistency with the Comprehensive Plan and approve the DeValk PD / DeValk PSP, subject to the conditions listed in the staff report.
DeValk PD / DeValk PSPDeValk PD / DeValk PSP
Case: PSP-13-04-087
Project: Lake Reams Neighborhood PD / Peachtree Estates Parcel 18 PSP
Applicant: Geoffrey L. Summitt, G.L. Summitt Engineering, Inc.
District: 1
Acreage: ~6.66 acres
Request: Construction of 28 single-family dwelling units
Lake Reams Neighborhood PD / Peachtree Estates Parcel 18 PSPLake Reams Neighborhood PD / Peachtree Estates Parcel 18 PSP
Lake Reams Neighborhood PD / Peachtree Estates Parcel 18 PSPLake Reams Neighborhood PD / Peachtree Estates Parcel 18 PSP
Lake Reams Neighborhood PD / Peachtree Estates Parcel 18 PSPLake Reams Neighborhood PD / Peachtree Estates Parcel 18 PSP
Action Requested
Make a finding of consistency with the Comprehensive Plan and approve the Lake Reams Neighborhood PD / Peachtree Estates Parcel 18 PSP, subject to the conditions listed in the staff report.
Lake Reams Neighborhood PD / Peachtree Estates Parcel 18 PSPLake Reams Neighborhood PD / Peachtree Estates Parcel 18 PSP
Case: CDR-13-07-192
Project: High Point PD
Applicant: Sam Sebaali, Florida Engineering Group, Inc.
District: 4
Acreage: ~482 acres (overall PD)~28.5 acres (subject PD tract)
Request: A substantial change to expand the types of allowable uses within “PD Industrial Tract B” to include C-1 uses (with exceptions)
High Point Planned Development (PD) High Point Planned Development (PD)
High Point Planned Development (PD) Zoning MapHigh Point Planned Development (PD) Zoning Map
High Point Planned Development (PD) Future Land Use MapHigh Point Planned Development (PD) Future Land Use Map
Action Requested
Make a finding of consistency with the Comprehensive Plan and approve the substantial change to the High Point Planned Development, subject to the conditions listed in the staff report.
High Point Planned Development (PD) High Point Planned Development (PD)
Case: CDR-13-09-230
Project: Waterford Oaks PD
Applicant: Mitch Collins, Mitch Collins P.E., Inc.
District: 4
Acreage: ~17.53 acres
Request: A substantial change to the PD by granting a waiver from
Orange County Code Section 38-1477 to allow Phase 1 parking spaces only, to be located on a separate lot and beyond 300 feet from the principal entrance.
Waterford Oaks Planned Development (PD)Waterford Oaks Planned Development (PD)
Waterford OaksPlanned Development (PD)Zoning Map
Waterford OaksPlanned Development (PD)Zoning Map
Waterford OaksPlanned Development (PD)Future Land Use Map
Waterford OaksPlanned Development (PD)Future Land Use Map
Action Requested
Make a finding of consistency with the Comprehensive Plan and approve the substantial change to the Waterford Oaks Planned Development, subject to the conditions listed in the staff report.
Waterford OaksPlanned Development (PD)Waterford OaksPlanned Development (PD)
Case: LUP-13-06-147
Project: Zanzibar PD / LUP
Applicant: Marc D. Stehli, Miller Legg
District: 1
Acreage: ~254.33 acres
Request: A rezoning from A-1 (Citrus Rural District) to PD (Planned
Development District) to allow for the development of 480 single-family residential units, and to grant nine (9) waivers from Orange County Code.
Zanzibar Planned Development (PD)Zanzibar Planned Development (PD)
Zanzibar Planned Development (PD)Zoning MapZanzibar Planned Development (PD)Zoning Map
Zanzibar PD / LUPFuture Land Use MapZanzibar PD / LUPFuture Land Use Map
Zanzibar Planned Development (PD)Aerial MapZanzibar Planned Development (PD)Aerial Map
Zanzibar Planned Development (PD)Land Use Plan (LUP)Zanzibar Planned Development (PD)Land Use Plan (LUP)
Action Requested
Make a finding of consistency with the Comprehensive Plan and approve the Zanzibar Planned Development / Land Use Plan, subject to the conditions listed in the Staff Report.
Zanzibar Planned Development (PD)Zanzibar Planned Development (PD)
Case: LUP-13-06-144
Project: Coranado Townhomes PD
Applicant: Max Sabeti, New Earth Properties, LLP
District: 5
Acreage: ~9.39 acres
Request: A rezoning from A-2 (Farmland Rural District) to PD (Planned Development District) to allow for the development of 44 single-family attached townhomes.
Coranado TownhomesPlanned Development (PD)Coranado TownhomesPlanned Development (PD)
Coranado TownhomesPlanned Development (PD)Zoning Map
Coranado TownhomesPlanned Development (PD)Zoning Map
Coranado TownhomesPlanned Development (PD)Future Land Use Map
Coranado TownhomesPlanned Development (PD)Future Land Use Map
Coranado TownhomesPlanned Development (PD)Aerial Map
Coranado TownhomesPlanned Development (PD)Aerial Map
Coranado TownhomesPlanned Development (PD)Land Use Plan (LUP)
Coranado TownhomesPlanned Development (PD)Land Use Plan (LUP)
Action Requested
Coranado TownhomesPlanned Development (PD)Coranado TownhomesPlanned Development (PD)
Make a finding of consistency with the Comprehensive Plan and approve the Coranado Townhomes PD / LUP, subject to the conditions listed in the staff report.
Case: PSP-13-01-012
Project: Village F Master PD / Parcel N-24, Portion of N-23A, N23B, N-25A, N-25B & N-26A PSP
Applicant: John Prowell, VHB Miller Sellen
District: 1
Acreage: ~47.41 acres
Request: Construction of 115 detached single- family dwelling units
Village F Master PD / Parcel N-24, Portion of N-23A, N23B, N-25A, N-25B & N-26A PSP
Village F Master PD / Parcel N-24, Portion of N-23A, N23B, N-25A, N-25B & N-26A PSP
Village F Master PD / Parcel N-24, Portion of N-23A, N23B, N-25A, N-25B & N-26A PSP
Village F Master PD / Parcel N-24, Portion of N-23A, N23B, N-25A, N-25B & N-26A PSP
Village F Master PD / Parcel N-24, Portion of N-23A, N23B, N-25A, N-25B & N-26A PSP
Village F Master PD / Parcel N-24, Portion of N-23A, N23B, N-25A, N-25B & N-26A PSP
Village F Master PD / Parcel N-24, Portion of N-23A, N23B, N-25A, N-25B & N-26A PSP
Village F Master PD / Parcel N-24, Portion of N-23A, N23B, N-25A, N-25B & N-26A PSP
Action RequestedMake a finding of consistency with the Comprehensive Plan and approve the Village F Master PD / Parcel N-24, Portion of N-23A, N23B, N-25A, N-25B & N-26A PSP, subject to the conditions listed in the staff report.
Village F Master PD / Parcel N-24, Portion of N-23A, N23B, N-25A, N-25B & N-26A PSP
Village F Master PD / Parcel N-24, Portion of N-23A, N23B, N-25A, N-25B & N-26A PSP
Case: PSP-13-05-131
Project: Hamlin PD / UNP / Overlook 2 at Hamlin PSP
Applicant: Scott Stearns, Bowyer-Singleton
District: 1
Acreage: ~144.86 acres
Request: Construction of 265 single-family dwelling units
Hamlin PD / UNP / Overlook 2 at Hamlin PSPHamlin PD / UNP / Overlook 2 at Hamlin PSP
Hamlin PD / UNP / Overlook 2 at Hamlin PSPHamlin PD / UNP / Overlook 2 at Hamlin PSP
Hamlin PD / UNP / Overlook 2 at Hamlin PSPHamlin PD / UNP / Overlook 2 at Hamlin PSP
Hamlin PD / UNP / Overlook 2 at Hamlin PSPHamlin PD / UNP / Overlook 2 at Hamlin PSP
Action Requested
Make a finding of consistency with the Comprehensive Plan and approve the Hamlin PD / UNP / Overlook 2 at Hamlin PSP subject to the conditions listed in the staff report.
Hamlin PD / UNP / Overlook 2 at Hamlin PSPHamlin PD / UNP / Overlook 2 at Hamlin PSP
Public Hearings
December 3, 2013
Board of County Commissioners