Public Hearing Proposed Trail and Overlook Improvements

12
03/20/2013 Public Hearing Ridgway Parkway Trail Improvements SP 091070019 1 Project Title 1) Text Public Hearing Ridgway Parkway Proposed Trail and Overlook Improvements State Aid Project 091070019 March 20, 2013

Transcript of Public Hearing Proposed Trail and Overlook Improvements

03/20/2013Public Hearing ‐ Ridgway Parkway Trail Improvements

SP 091‐070‐019 1

Project Title

1) Text

Public HearingRidgway Parkway Proposed Trail and Overlook Improvements

State Aid Project 091‐070‐019

March 20, 2013 

03/20/2013Public Hearing ‐ Ridgway Parkway Trail Improvements

SP 091‐070‐019 2

Project TitleProject Location

Text

03/20/2013Public Hearing ‐ Ridgway Parkway Trail Improvements

SP 091‐070‐019 3

Project TitleProject Background: Grand Rounds Missing Link Development Study (2008)

03/20/2013Public Hearing ‐ Ridgway Parkway Trail Improvements

SP 091‐070‐019 4

Project Title

Text

Project Process since September 2012

PROJECT GOAL: MN‐DoT approval of path alignments and overlook area in park

‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐1) Public Meetings

• 09/18/2012  Windom Park neighborhood• 01/15/2013  public open house• 02/12/2013  Saint Anthony Village City Council

2) Other stakeholder outreach• 01/10/2013 Honeywell Aerospace• 02/27/2013 Site meeting with area residents

3) Technical Advisory Committee (re: preferred alignment)• City of Saint Anthony Village DPW• City of Minneapolis DPW• Hennepin County Transportation• MPRB Planning staff and consultant team

4) MPRB staff input• Forestry     special thanks• Golf Operations• Maintenance

03/20/2013Public Hearing ‐ Ridgway Parkway Trail Improvements

SP 091‐070‐019 5

Project Title

Notice for Open House and Hearing• postcards (833)• Govdelivery emails• MPRB web site• newspaper

03/20/2013Public Hearing ‐ Ridgway Parkway Trail Improvements

SP 091‐070‐019 7

Project Title

Text

Preliminary Engineering Concepts:Potential Future Shared‐Use Path along St. Anthony Blvd.

• existing road right‐of‐way owned by City of St. Anthony Village• implementation only in cooperation with St. Anthony Village• timing and scope of project depends on future funding availability• link to Ridgway Parkway (MPRB) and Diagonal Trail (City of Minneapolis)

03/20/2013Public Hearing ‐ Ridgway Parkway Trail Improvements

SP 091‐070‐019 8

Project Title

Text

Preliminary Engineering Concepts:Proposed Overlook Plaza at Ridgway Parkway Parking Area

03/20/2013Public Hearing ‐ Ridgway Parkway Trail Improvements

SP 091‐070‐019 9

Project TitleDetermining project impact to existing park area• 6.95 acres Ridgway Parkway “park area” used for MN‐DoT documents• 22.1 acres  actual total Ridgway Parkway area• 2.91 acres  Maximum area impacted by preliminary overlook design (shown in 

DeMinimismemorandum approved by MNDoT)• 1.95 acres  Most current design with reduced footprint

03/20/2013Public Hearing ‐ Ridgway Parkway Trail Improvements

SP 091‐070‐019 10

Project TitleComments received to date

“I am thrilled to hear that the park board is planning this expansion of the trails in Northeast Minneapolis. … The plans for the overlook are just stunning… Thank you for this proposal! I sincerely hope that it is funded and enacted.”

“As a resident or NE Minneapolis (23rd & Stinson) I think this is an excellent plan with many benefits…”

• Protect memorial tree planted at overlook

• Consider reducing the size of the overlook area

• Consider Dark Sky principles when designing lighting

• Honeywell Aerospace: supports the project

• City of St. Anthony Village City Council : supports the project

03/20/2013Public Hearing ‐ Ridgway Parkway Trail Improvements

SP 091‐070‐019 11

Project TitleExample of overlook area design with reduced footprint

sq ftEXISTING PRAIRIE 130,714       

PROPOSED OVERLOOK AND TRAILORIGINAL FOOTPRINT 25,239          

REDUCED FOOTPRINT 14,004          reduced impact to prairie by 45%

03/20/2013Public Hearing ‐ Ridgway Parkway Trail Improvements

SP 091‐070‐019 12

Project TitleNext Steps

1) MNDoT’s required Public Comment period open until April 9.

2) Submit Preliminary Engineering package to MNDoT and to the Park Board for approval.

3) Following approvals, seek Board authorization to pursue final design and schedule construction for Ridgway Parkway trail and overlook improvements only.