Public Hearing on Proposed Closure of Allegheny 1 Elementary School Wednesday, February 15, 2012...

17
Public Hearing on Proposed Closure of Allegheny 1 Elementary School Wednesday, February 15, 2012 Hollidaysburg Area Senior High School Auditorium 7 p.m. Moderator: David Andrews, Esquire

Transcript of Public Hearing on Proposed Closure of Allegheny 1 Elementary School Wednesday, February 15, 2012...

Page 1: Public Hearing on Proposed Closure of Allegheny 1 Elementary School Wednesday, February 15, 2012 Hollidaysburg Area Senior High School Auditorium 7 p.m.

Public Hearing on Proposed Closure of

Allegheny 1 Elementary School

Wednesday, February 15, 2012Hollidaysburg Area Senior High School

Auditorium7 p.m.

Moderator: David Andrews, Esquire

Page 2: Public Hearing on Proposed Closure of Allegheny 1 Elementary School Wednesday, February 15, 2012 Hollidaysburg Area Senior High School Auditorium 7 p.m.

Allegheny 1

Built in 1954• Enrollment when opened was 190

Addition added in 1968 • Seven classrooms • Library• Bathroom

Page 3: Public Hearing on Proposed Closure of Allegheny 1 Elementary School Wednesday, February 15, 2012 Hollidaysburg Area Senior High School Auditorium 7 p.m.

Reasons for Recommending School Closure

• Cost prohibitive repairs and renovations

Substantial renovations are necessary to comply with building codes and to adequately address electrical, site and potential structural concerns.

Page 4: Public Hearing on Proposed Closure of Allegheny 1 Elementary School Wednesday, February 15, 2012 Hollidaysburg Area Senior High School Auditorium 7 p.m.

Allegheny 1 Elementary SchoolCondition Assessment Report

By Gwin, Dobson & Foreman, Inc. Consulting Engineers

W. Andrew Arnold, P.E.

Page 5: Public Hearing on Proposed Closure of Allegheny 1 Elementary School Wednesday, February 15, 2012 Hollidaysburg Area Senior High School Auditorium 7 p.m.

Topics of Review

Site – drainage, parking requirements

Architectural and structural – roofing, windows, asbestos abatement, terrazzo flooring, space requirements

Heating, Ventilation and Air Conditioning – boiler system, unit ventilators, steam piping

Plumbing – domestic water piping, sanitary waste and vent system, storm drainage system, fuel gas system, fixtures, fire suppression

Electrical – transformer, switchboard and branch panels, emergency generator, receptacles, interior and exterior lighting, technology, fire alarm, security

Page 6: Public Hearing on Proposed Closure of Allegheny 1 Elementary School Wednesday, February 15, 2012 Hollidaysburg Area Senior High School Auditorium 7 p.m.

Estimated costs associated with addressing current functional issues and

to become code compliant:

• Site: $230,000 minimum• Architectural and structural: $855,000 to $1.06• Heating, Ventilation, and Air Conditioning: $750,000 to $800,000• Plumbing: $330,000 to $345,000• Electrical: $630,00 to $685,000

TOTAL: $2.8 to $3.2 million

Page 7: Public Hearing on Proposed Closure of Allegheny 1 Elementary School Wednesday, February 15, 2012 Hollidaysburg Area Senior High School Auditorium 7 p.m.

Reasons for Recommending School Closure

Budget Constraints • Spending limits• Taxing limits• State budget

Page 8: Public Hearing on Proposed Closure of Allegheny 1 Elementary School Wednesday, February 15, 2012 Hollidaysburg Area Senior High School Auditorium 7 p.m.

Reasons for Recommending School Closure

– District-wide Declining Enrollment• In 2002 there were 3858 students today we have 3490

2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 20123200

3300

3400

3500

3600

3700

3800

3900

Enrollment

Page 9: Public Hearing on Proposed Closure of Allegheny 1 Elementary School Wednesday, February 15, 2012 Hollidaysburg Area Senior High School Auditorium 7 p.m.

Estimated Savings

• Building Operational Costs: $90,000 • Salaries and Benefits: $600,000

• Repairs & Renovations: $2.8 to $3.2 mil

Page 10: Public Hearing on Proposed Closure of Allegheny 1 Elementary School Wednesday, February 15, 2012 Hollidaysburg Area Senior High School Auditorium 7 p.m.

Attendance Areas• Studentsin the Evergreen, Carson Valley, Fox Hollow and Hixton Areas will attend CWL (highlighted in green).

• Students along Mill Rdand in the Willowbrook area will attend FOT (highlighted in yellow).

Page 11: Public Hearing on Proposed Closure of Allegheny 1 Elementary School Wednesday, February 15, 2012 Hollidaysburg Area Senior High School Auditorium 7 p.m.

Transportation

• Five buses currently service Allegheny 1 – (11, 12, 18, 19, 40)

• Most students who currently ride bus 12 will go to Foot of Ten

• Students who currently ride buses 11, 18, 19, or 40 will go to Charles W. Longer

• Students may have 5 to 10 minute longer ride times.

Page 12: Public Hearing on Proposed Closure of Allegheny 1 Elementary School Wednesday, February 15, 2012 Hollidaysburg Area Senior High School Auditorium 7 p.m.

Proposed Transition Plan

• Charles W. Longer• 163 will move from A1 to CWL

• Foot of Ten Elementary• 57 students will move to FOT

Average class sizeKindergarten - 2nd

22 students

Average class size3rd through 6th

24 students

CWL Enrollment

538

Foot of Ten Enrollment

602

Page 13: Public Hearing on Proposed Closure of Allegheny 1 Elementary School Wednesday, February 15, 2012 Hollidaysburg Area Senior High School Auditorium 7 p.m.

Enrollment and Building CapacityCharles W. Longer

Current Enrollment: 375

Proposed Enrollment: 538

Building Capacity: 650

Page 14: Public Hearing on Proposed Closure of Allegheny 1 Elementary School Wednesday, February 15, 2012 Hollidaysburg Area Senior High School Auditorium 7 p.m.

Enrollment and Building CapacityFoot of Ten

Current Enrollment: 545

Proposed Enrollment: 602

Building Capacity: 650

Page 15: Public Hearing on Proposed Closure of Allegheny 1 Elementary School Wednesday, February 15, 2012 Hollidaysburg Area Senior High School Auditorium 7 p.m.

Building Capacity

Allegheny 1 Charles W. Longer

Foot of Ten Frankstown100

200

300

400

500

600

700

800

900

1000

1100

Current EnrollmentProposed EnrollmentCapacity

Page 16: Public Hearing on Proposed Closure of Allegheny 1 Elementary School Wednesday, February 15, 2012 Hollidaysburg Area Senior High School Auditorium 7 p.m.

Timeline

• The board of education vote regarding Allegheny 1 will be held no earlier than

May 16, 2012.

• If the board votes to close the school, several orientations will be held in the spring to acclimate students, parents, and teachers with their new school.

Page 17: Public Hearing on Proposed Closure of Allegheny 1 Elementary School Wednesday, February 15, 2012 Hollidaysburg Area Senior High School Auditorium 7 p.m.

PUBLIC COMMENT