Public Fees And Charges - Sutherland Shire...PRE APPLICATION DISCUSSIONS (PAD).....36 DEVELOPMENT...
Transcript of Public Fees And Charges - Sutherland Shire...PRE APPLICATION DISCUSSIONS (PAD).....36 DEVELOPMENT...
FEES AND CHARGES for year ending 30 June 2020
Adopted 24/6/19 COR017-19
Table Of ContentsSUTHERLAND SHIRE COUNCIL.................................................................................................................15
ACCESS ACROSS RESERVES................................................................................................................................16
ACCESS ACROSS COMMUNITY LAND...................................................................................................................................16
MEMORIALS – Refer SAF110-12..............................................................................................................................................16
RELEASE OF VEHICLES...........................................................................................................................................................16
ADMINISTRATION AND GOVERNANCE..................................................................................................................17
ACCESS TO INFORMATION (GOVERNMENT INFORMATION PUBLIC ACCESS) ACT.......................................................17
Application fee................................................................................................................................................................................................17
Processing Fees.............................................................................................................................................................................................17
Reviewing Records about personal affairs......................................................................................................................................................................................................................17
Reviewing Records about other matters..........................................................................................................................................................................................................................17
Internal Review Fee on GIPA Decisions.......................................................................................................................................................17
Copy of Monthly Application Approvals......................................................................................................................................................17
Subpoenas......................................................................................................................................................................................................17
ANIMAL MANAGEMENT...........................................................................................................................................18
ANIMAL SHELTER.....................................................................................................................................................................18
Impounding Charges – Dogs and Cats........................................................................................................................................................18
Surrender Fees – Dogs..................................................................................................................................................................................18
Sale of Dogs/Cats...........................................................................................................................................................................................18
COMPANION ANIMALS.............................................................................................................................................................18
Dog and Cat Registration (Under Companion Animals Act 1998).............................................................................................................18
Compliance Certificate (Under Companion Animals Act 1998).................................................................................................................18
HEARING & ASSESSMENT PANEL..........................................................................................................................................19
ECONOMIC AND COMMUNITY DEVELOPMENT....................................................................................................20
BUSINESS SUPPORT AND INDUSTRY ENGAGEMENT.........................................................................................................20
CERTIFICATES..........................................................................................................................................................21
CERTIFICATE REGISTRATION.................................................................................................................................................21
BUILDING CERTIFICATES (Clause 260 EPA Regulation)......................................................................................................21
a) Dwellings and outbuildings only..............................................................................................................................................................21
b) For buildings other than dwellings or outbuildings...............................................................................................................................21
BUSHFIRE RISK CERTIFICATES..............................................................................................................................................21
FLOOD INFORMATION AND REVIEW......................................................................................................................................22
LAND TITLE................................................................................................................................................................................22
PLANNING CERTIFICATES.......................................................................................................................................................22
OUTSTANDING NOTICES.........................................................................................................................................................22
RATES CERTIFICATES.............................................................................................................................................................23
SUBDIVISION CONSTRUCTION CERTIFICATES....................................................................................................................23
PC APPOINTMENT (For inspection of Subdivision Construction Works with nil public infrastructure works)...............23
PC APPOINTMENT (for inspection of Subdivision Construction Works with public infrastructure works).....................23
SWIMMING POOL SAFETY.......................................................................................................................................................23
CHILDRENS SERVICES............................................................................................................................................24
ADMINISTRATION CHARGES APPLICABLE TO ALL CHILDREN'S SERVICES...................................................................24
BEFORE AND AFTER SCHOOL CARE....................................................................................................................................24
EARLY EDUCATION CENTRES................................................................................................................................................24
Page 2 of 150
FAMILY DAY CARE....................................................................................................................................................................25
FDC EDUCATOR FEES..............................................................................................................................................................25
VACATION CARE.......................................................................................................................................................................25
TRAINING...................................................................................................................................................................................26
COPYING AND PRINTING.........................................................................................................................................27
ELECTRONIC FILE MANAGEMENT.........................................................................................................................................27
FIELD FILE PREPARATION......................................................................................................................................................27
PHOTOCOPYING / SCANNING / PRINTING OF ELECTRONIC DOCUMENTS FEES............................................................27
LAND INFORMATION / MAPS...................................................................................................................................................28
1. GIS Maps and Images................................................................................................................................................................................28
2. Electronic Sale of Spatial Data (max of 4 layers, excludes ALS contours and spot heights).............................................................28
3. Electronic Sale of ALS Spot Heights or 0.5m ALS Contours.................................................................................................................28
4. Digital Ortho rectified Aerial Photography – Urban Area Tiles 1km x 1km...........................................................................................28
5. Professional Services................................................................................................................................................................................28
6. LEP Maps....................................................................................................................................................................................................29
7. DCP (B&W)..................................................................................................................................................................................................29
PLANNING..................................................................................................................................................................................29
1. Local Environmental Plan.........................................................................................................................................................................29
2. Development Control Plan and Specifications........................................................................................................................................29
3. Contributions Plans...................................................................................................................................................................................30
4. Other Publications......................................................................................................................................................................................30
5. Planning Proposal Request.......................................................................................................................................................................30
DEVELOPMENT.........................................................................................................................................................31
ACTIVITY APPLICATIONS.........................................................................................................................................................31
(a) Install a manufactured home, moveable dwelling or associated structure on land...........................................................................31
(b) Install a domestic oil or solid fuel heating appliance other than a portable appliance.....................................................................31
(c) For all other activities requiring approval under Chapter 7 of the LG Act..........................................................................................31
(d) Install or alter a waste treatment device or human waste storage facility (includes on-site septic systems & Domestic Grey water Treatment Systems).............................................................................................................................................................................31
(e) Mobile Food Vending – New or Vehicles Renewal Application............................................................................................................31
(f) Caravan Parks Renewal Application........................................................................................................................................................31
CERTIFICATION SERVICES * Previously Southern Sydney Building Certifiers. Revised structure per EHR075-15.......31
CERTIFICATION SERVICES WITHIN SUTHERLAND SHIRE..................................................................................................32
1A. Construction Certificate class 1 and 10 structures.............................................................................................................................32
1B. Construction Certificate class 2 to 9 structures.................................................................................................................................32
2A. PC Appointment & Inspection Fees (PC fee includes specified inspections and an Occupation Certificate, whether interim or final), class 1 and 10 structuresA.................................................................................................................................................................33
2B. PC Appointment & Inspection Fees (PC fee includes specified inspections and an Occupation Certificate, whether interim or final), class 2 to 9 structures.........................................................................................................................................................................33
3A. Complying Development Certificates, class 1 and 10 structures.......................................................................................................34
3B. Complying Development Certificates, class 2 to 9 structures............................................................................................................34
4. Letters of Confirmation of Inspection Results........................................................................................................................................35
5. Certificate for confirmation of Classification of Building.......................................................................................................................35
6. Applications for Certificates under Section 88G of the Conveyancing Act..........................................................................................35
CERTIFICATION SERVICES OUTSIDE SUTHERLAND SHIRE...............................................................................................35
7A. Construction Certificates........................................................................................................................................................................35
7B. Complying Development Certificate Applications................................................................................................................................35
7C. PC Appointments & Inspections and issue of Final Occupation Certificate.....................................................................................35
DESIGN REVIEW FORUM (ARCHITECTURAL DESIGN REVIEW PANEL)............................................................................35
Page 3 of 150
PRE APPLICATION DISCUSSIONS (PAD)...............................................................................................................................36
DEVELOPMENT APPLICATIONS (Clause 246B EPA Regulation).........................................................................................36
Estimated Cost of Development...................................................................................................................................................................36
Exceptions and variations to these DA fees:...............................................................................................................................................37
(i) Dwelling Houses with an estimated construction cost of $100,000 or less. (Clause 247 EPA Regn)....................................................................................................................37
(ii) Subdivision....................................................................................................................................................................................................................................................................37
(iii) Fee for an application for one or more advertisements (Clause 246B EPA Regn)................................................................................................................................................37
(iv) Additional fees for integrated development or concurrence of public authority...................................................................................................................................................37
(v) Development not involving the erection of a building, the carrying out of work, the subdivision of land or the demolition of a building or work (Clause 250 EPA Regulation)..........................................................................................................................................................................................................................................................................38
(vi) Designated Development (Clause 251 EPA Regn)....................................................................................................................................................................................................38
(vii) When 2 or more fees are applicable (Clause 254 EPA Regn).................................................................................................................................................................................38
(viii) S8.2(1)(a) Review of determination (Clause 257 EPA Regn)..................................................................................................................................................................................38In the case of a request that does not involve works..............................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................38
(ix) Section 8.2(1)(c) Review of rejected application (Clause 257A)..............................................................................................................................................................................39
(x) Modification of a consent – Minor Modification.........................................................................................................................................................................................................39
(xi) Modification of a consent – Minimal Environmental Impact....................................................................................................................................................................................39
(xiiv) Section8.2(1)(b) review of modification application (Clause 258A)......................................................................................................................................................................40
(xiv) Extension of lapsing period of a development consent.........................................................................................................................................................................................40
Development Assessment Document Production......................................................................................................................................41
ADVERTISING AND NEIGHBOUR NOTIFICATION..................................................................................................................41
Development required to be advertised and/or neighbour notified by DCP (including modifications of consents lodged under S4.55(1A).........................................................................................................................................................................................................41
Notification / Advice / Post Determination Notification..............................................................................................................................41
Stamping Additional Approved Plans – per copy or re-issue of e-plans..................................................................................................42
TREE REMOVAL APPLICATION FEE.......................................................................................................................................42
TREE REPLANTING FEE...........................................................................................................................................................42
LANDSCAPE INSPECTION FEE...............................................................................................................................................42
FIRE SAFETY MATTERS...........................................................................................................................................................43
BOARDING HOUSE INSPECTIONS..........................................................................................................................................43
ISSUING COMPLIANCE COST NOTICES.................................................................................................................................43
PUBLIC PLACE ENVIRONMENTAL, DAMAGE & PERFORMANCE SECURITY BOND/ADMINISTRATION FEE................44
DRIVEWAY CONSTRUCTION AND FRONTAGE WORKS APPROVALS...............................................................45
PROPERTY ALIGNMENT LEVELS – SUPPLY OF INFORMATION.........................................................................................45
DRIVEWAY CONSTRUCTION APPROVAL (under the ROADS ACT)....................................................................................45
DETAILED FRONTAGE WORKS APPROVALS (under the ROADS ACT).............................................................................45
Application fee for Roads Act Approval for Road & Frontage Works (Detailed Frontage Works Approval)........................................45
ECONOMIC AND COMMUNITY DEVELOPMENT....................................................................................................46
BANNER ADVERTISING............................................................................................................................................................46
EVENTS – GENERAL.................................................................................................................................................................46
EVENTS – CATEGORY 1 EVENTS / ORGANISATIONS..........................................................................................................47
Commercial Large Scale Events...................................................................................................................................................................47
CX1 Location.......................................................................................................................................................................................................................................................................47
Skateparks,CX2, CX3 & CX4 Locations............................................................................................................................................................................................................................47
Ancillary Event support requirements..............................................................................................................................................................................................................................47
EVENTS – CATEGORY 2 EVENTS / ORGANISATIONS..........................................................................................................47
Commercial Small scale Events (less than 1000 people)...........................................................................................................................47
CX1 Locations.....................................................................................................................................................................................................................................................................47
Skateparks, CX2,CX3 and CX4 Locations........................................................................................................................................................................................................................47
EVENTS – CATEGORY 3 EVENTS / ORGANISATIONS..........................................................................................................48
Community Based Events for Not-for-Profit................................................................................................................................................48
All Locations.......................................................................................................................................................................................................................................................................48
Ancillary Event support requirements..............................................................................................................................................................................................................................48
EVENTS – CATEGORY 4 EVENTS / ORGANISATIONS..........................................................................................................48
Page 4 of 150
Commercial Large Scale Events | Long term (> 2 weeks)..........................................................................................................................48
EVENTS – CATEGORY 5 BEACH/OCEAN EVENTS................................................................................................................48
Peak (Dec/Jan/Feb).........................................................................................................................................................................................48
Fee per Operational Day (or part there of).......................................................................................................................................................................................................................48
Off Peak (March to November)......................................................................................................................................................................48
Fee per Operational Day (or part there of).......................................................................................................................................................................................................................48
EVENTS – CIRCUSES................................................................................................................................................................49
EVENTS – HIRE FEES...............................................................................................................................................................49
EVENTS – MOBILE FOOD VENDOR.........................................................................................................................................49
PRODUCT SAMPLING...............................................................................................................................................................49
CORPORATE CX1 LOCATIONS....................................................................................................................................................................49
SMALL BUSINESS TRADER – PUBLIC AREA HIRE...............................................................................................................49
CX1,CX2,CX3 and CX4 Locations.................................................................................................................................................................49
TEMPORARY EVENT ROAD CLOSURE APPLICATION.........................................................................................................49
EVENTS & PERFORMING ARTS..............................................................................................................................50
ENGADINE THEATRE AND COMMUNITY CENTRE................................................................................................................50
Movie Rate (Performance Space)..................................................................................................................................................................50
Full Facility......................................................................................................................................................................................................50
Performance Space (Halls 1 and 2, Dressing Rooms)................................................................................................................................50
Other Charges.................................................................................................................................................................................................50
Stage Hire:.......................................................................................................................................................................................................51
Halls 1 and 2 combined..................................................................................................................................................................................51
Hall 1 or 2........................................................................................................................................................................................................51
Meeting Rooms 1 and 2.................................................................................................................................................................................51
Meeting Room 1..............................................................................................................................................................................................51
Meeting Room 2 (with kitchenette)...............................................................................................................................................................52
SUTHERLAND ENTERTAINMENT CENTRE.............................................................................................................................52
STANDARD RATE...........................................................................................................................................................................................52
Auditorium Rental...............................................................................................................................................................................................................................................................52Monday – Thursday (January – December)...........................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................52
Black Box / Meeting Room Rental.....................................................................................................................................................................................................................................53Monday – Thursday (January to December)..........................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................53
Foyer Hire (Ground Floor or First Floor)..........................................................................................................................................................................................................................54
TICKETING SERVICE FEES...........................................................................................................................................................................54
Ticketing Fees (paid by hirer per ticket)...........................................................................................................................................................................................................................54
Transaction Fees (paid by purchaser per transaction)...................................................................................................................................................................................................55
ADDITIONAL FEES.........................................................................................................................................................................................55
SCHOOL OF ARTS.....................................................................................................................................................................56
COMMERCIAL / PROFIT MAKING THEATRE COMPANIES / ORGANISATIONS INCLUDING SCHOOL..................................................56
Stage Productions..............................................................................................................................................................................................................................................................56
Sutherland Memorial School of Arts Technical Charges................................................................................................................................................................................................56
Other Functions..................................................................................................................................................................................................................................................................56
NON PROFIT MAKING THEATRE COMPANIES AND ORGANISATIONS...................................................................................................56
Stage Productions..............................................................................................................................................................................................................................................................56
Sutherland Memorial School of Arts Technical Charges................................................................................................................................................................................................57
Other Functions..................................................................................................................................................................................................................................................................57
STALLHOLDER FEES................................................................................................................................................................57
FILMING.....................................................................................................................................................................58
Itemised Fees – Council Controlled Property.........................................................................................................................58
Application Fees – Private........................................................................................................................................................58
Other Fees..................................................................................................................................................................................59
Bond............................................................................................................................................................................................59
Page 5 of 150
Venue Fees.................................................................................................................................................................................59
FOOTPATH USE........................................................................................................................................................60
OUTDOOR EATING APPROVALS............................................................................................................................................60
SHOPFRONT DISPLAY CONSENTS.........................................................................................................................................60
A-FRAME APPROVALS.............................................................................................................................................................60
GOLF COURSE FEES...............................................................................................................................................61
THE RIDGE GOLF COURSE......................................................................................................................................................61
Green fees.......................................................................................................................................................................................................61
Weekday 9 holes.................................................................................................................................................................................................................................................................61
Weekday 18 holes...............................................................................................................................................................................................................................................................61
Weekend & Public Holidays 9 holes.................................................................................................................................................................................................................................61
Weekend & Public Holidays18 holes................................................................................................................................................................................................................................61
Twilight Golf (mid week only)........................................................................................................................................................................61
Corporate days (weekday only 18 holes).....................................................................................................................................................62
THE RIDGE GOLF DRIVING RANGE........................................................................................................................................62
Warm up bucket of balls................................................................................................................................................................................62
Bucket of Balls................................................................................................................................................................................................62
Bay Hire...........................................................................................................................................................................................................62
KAREELA GOLF COURSE........................................................................................................................................................63
Weekdays (excl. P/Hols.)...............................................................................................................................................................................63
18 Holes...............................................................................................................................................................................................................................................................................63
9 Holes.................................................................................................................................................................................................................................................................................63
Twilight Golf........................................................................................................................................................................................................................................................................63
Weekends & Public Hols................................................................................................................................................................................63
18 Holes...............................................................................................................................................................................................................................................................................63
9 Holes.................................................................................................................................................................................................................................................................................63
Twilight Golf........................................................................................................................................................................................................................................................................63
WOOLOOWARE GOLF COURSE..............................................................................................................................................64
Weekdays (excl. P/Hols.)...............................................................................................................................................................................64
18 Holes...............................................................................................................................................................................................................................................................................64
9 Holes (only available during Off Peak Times)...............................................................................................................................................................................................................64
Use of short game practice area (per hour).....................................................................................................................................................................................................................64
Corporate Events (18 Holes Only).....................................................................................................................................................................................................................................64
Twilight Golf....................................................................................................................................................................................................64
Weekends & Public Hols................................................................................................................................................................................64
18 Holes...............................................................................................................................................................................................................................................................................64
9 Holes (only available during Off Peak Times)...............................................................................................................................................................................................................65
HAZELHURST GALLERY..........................................................................................................................................66
COMMUNITY ARTS CENTRE....................................................................................................................................................66
Centre Initiated Programs..............................................................................................................................................................................66
Artists Access.................................................................................................................................................................................................66
Hazelhurst Student Kiln Firing......................................................................................................................................................................66
BROADHURST GALLERY HIRE...............................................................................................................................................67
Studio Hire......................................................................................................................................................................................................67
Theatrette Hire................................................................................................................................................................................................67
REGIONAL ART GALLERY.......................................................................................................................................................67
HAZELHURST GARDENS.........................................................................................................................................................68
HAZELHURST ART ON PAPER AWARD.................................................................................................................................68
EQUIPMENT HIRE......................................................................................................................................................................68
MERCHANDISE..........................................................................................................................................................................68
HIRE OF FACILITIES – CHILDREN'S SERVICES FACILITIES RENTAL................................................................69
Page 6 of 150
RENTAL FOR MIRANDA CHILDREN’S CENTRE.....................................................................................................................69
OTHER CHARGES.....................................................................................................................................................................69
HIRE OF FACILITIES – COMMUNITY CENTRES.....................................................................................................70
BONDS AND GENERIC FEES (to be applied where no suitable fee exists at that hall)......................................................70
Keys and Swipe Cards...................................................................................................................................................................................70
Definitions.......................................................................................................................................................................................................70
Other Charges.................................................................................................................................................................................................70
Storage and Equipment.................................................................................................................................................................................71
ALFORDS POINT COMMUNITY CENTRE................................................................................................................................72
ANZAC OVAL YOUTH AND RECREATION CENTRE..............................................................................................................72
Main Hall..........................................................................................................................................................................................................72
Meeting Rooms (Combined)..........................................................................................................................................................................72
Meeting Room 2 (kitchen)..............................................................................................................................................................................73
Meeting Room 1..............................................................................................................................................................................................73
Gymnasium.....................................................................................................................................................................................................73
Clubrooms.......................................................................................................................................................................................................73
BILLA ROAD PLAYGROUP HALL............................................................................................................................................73
BOOMERANG HALL..................................................................................................................................................................74
BUNDEENA COMMUNITY CENTRE........................................................................................................................................74
Main Hall..........................................................................................................................................................................................................74
Horderns Room (formerly Arts & Craft Room)............................................................................................................................................74
Jibbon Room (formerly Seniors Room).......................................................................................................................................................75
BUNDEENA RESERVE POLICE AID STATION........................................................................................................................75
CARINGBAH SENIOR CITIZENS HALL....................................................................................................................................75
Hall...................................................................................................................................................................................................................75
Meeting Room.................................................................................................................................................................................................75
COMO SCHOOL OF ARTS........................................................................................................................................................75
Discount Rate.................................................................................................................................................................................................76
Full Rate..........................................................................................................................................................................................................76
CRONULLA CENTRAL COMMUNITY CENTRE........................................................................................................................76
Full Hall............................................................................................................................................................................................................76
Hall 1 (with main kitchen).............................................................................................................................................................................77
Hall 2 (with kitchenette).................................................................................................................................................................................77
Meeting Room 1..............................................................................................................................................................................................77
Meeting Room 2..............................................................................................................................................................................................77
Meeting Room Combined..............................................................................................................................................................................78
GRAYS POINT COMMUNITY HALL..........................................................................................................................................78
Mary Brack Room...........................................................................................................................................................................................78
GUNNAMATTA BAY PAVILION................................................................................................................................................79
Main Hall..........................................................................................................................................................................................................79
Activity Room 2..............................................................................................................................................................................................79
Activity Room 3..............................................................................................................................................................................................79
Committee Room............................................................................................................................................................................................80
GYMEA BAY COMMUNITY AND RECREATIONAL CENTRE..................................................................................................80
GYMEA BAY RESOURCE CENTRE..........................................................................................................................................80
Function Room...............................................................................................................................................................................................80
Playgroup Room.............................................................................................................................................................................................81
Page 7 of 150
GYMEA COMMUNITY CENTRE.................................................................................................................................................81
Large Hall........................................................................................................................................................................................................81
Small Hall/Lapidary Extension......................................................................................................................................................................81
ILLAWONG COMMUNITY CENTRE..........................................................................................................................................82
Office 3............................................................................................................................................................................................................82
Weekly Rate (exclusive use) Office 3...........................................................................................................................................................82
Main Hall..........................................................................................................................................................................................................82
Offices 1 (South) and 2 (North).....................................................................................................................................................................82
Weekly Rate (exclusive use) Offices 1 and 2...............................................................................................................................................82
JANNALI COMMUNITY CENTRE..............................................................................................................................................83
Main Hall..........................................................................................................................................................................................................83
Meeting Room.................................................................................................................................................................................................83
LOFTUS COMMUNITY CENTRE...............................................................................................................................................83
Main Hall..........................................................................................................................................................................................................83
Activity Room.................................................................................................................................................................................................83
Meeting Room.................................................................................................................................................................................................84
MAIANBAR COMMUNITY HALL...............................................................................................................................................84
MARTON HALL KURNELL........................................................................................................................................................84
Main Hall..........................................................................................................................................................................................................84
Meeting Room.................................................................................................................................................................................................85
MENAI CHILDRENS SERVICES CENTRE (or Menai Demountable Building).......................................................................85
MENAI COMMUNITY CENTRE..................................................................................................................................................85
Main Hall (Full Hall)........................................................................................................................................................................................85
Large Hall (Hall 2)...........................................................................................................................................................................................85
Small Hall........................................................................................................................................................................................................86
Activity Room.................................................................................................................................................................................................86
Training Room................................................................................................................................................................................................86
Meeting Room.................................................................................................................................................................................................86
Outreach / Counselling Room.......................................................................................................................................................................86
THE MILL ROOMS......................................................................................................................................................................87
MIRANDA COMMUNITY CENTRE.............................................................................................................................................87
Main Hall (Glad Ashworth Room)..................................................................................................................................................................87
The Committee Room....................................................................................................................................................................................87
Waratah...........................................................................................................................................................................................................87
Wattle...............................................................................................................................................................................................................87
Wattle/Waratah – Combined..........................................................................................................................................................................88
Endeavour Room............................................................................................................................................................................................88
MIRANDA YOUTH CENTRE......................................................................................................................................................88
MULTI PURPOSE CENTRE.......................................................................................................................................................89
Disabled Groups (office rent per term).........................................................................................................................................................89
Main Hall..........................................................................................................................................................................................................89
Meeting Room.................................................................................................................................................................................................89 ...............................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................89
OYSTER BAY CHILDRENS RESOURCE CENTRE..................................................................................................................90
OYSTER BAY COMMUNITY HALL............................................................................................................................................90
Main Hall..........................................................................................................................................................................................................90
Meeting Room.................................................................................................................................................................................................90
OYSTER BAY OVAL HALL........................................................................................................................................................90
Main Hall..........................................................................................................................................................................................................90
Page 8 of 150
PORT HACKING COMMUNITY CENTRE Main Hall.................................................................................................................91
SANDY POINT COMMUNITY CENTRE.....................................................................................................................................91
Squash Court..................................................................................................................................................................................................92
Meeting Room.................................................................................................................................................................................................92
STAPLETON AVENUE COMMUNITY CENTRE........................................................................................................................92
Full Hall (Halls 1 & 2)......................................................................................................................................................................................92
Hall 1 or 2........................................................................................................................................................................................................92
Meeting Rooms 1 & 2.....................................................................................................................................................................................93
Meeting Rooms 1 or 2....................................................................................................................................................................................93
Kitchen (for separate use not in conjunction with other areas)................................................................................................................93
Carparking.......................................................................................................................................................................................................93
SUTHERLAND SENIORS CENTRE...........................................................................................................................................93
SYLVANIA COMMUNITY CENTRE............................................................................................................................................93
SYLVANIA HEIGHTS COMMUNITY CENTRE...........................................................................................................................94
TAREN POINT YOUTH CENTRE...............................................................................................................................................94
VENETIA STREET COMMUNITY COTTAGE (Sylvania Heights)............................................................................................95
WORONORA HEIGHTS COMMUNITY CENTRE.......................................................................................................................95
Main Hall..........................................................................................................................................................................................................95
Meeting Room.................................................................................................................................................................................................95
Weekly Rate (exclusive use) Meeting Room:...............................................................................................................................................95
YARRAWARRAH COMMUNITY HALL......................................................................................................................................96
Main Hall..........................................................................................................................................................................................................96
Meeting Room.................................................................................................................................................................................................96
HIRE OF FACILITIES – ECONOMIC & COMMUNITY DEVELOPMENT..................................................................97
CASUAL LEASING PER SITE...................................................................................................................................................97
HIRE OF FACILITIES – GENERAL...........................................................................................................................98
HIRE OF FACILITIES – PUBLIC LIABILITY INSURANCE.......................................................................................99
PUBLIC LIABILITY INSURANCE PREMIUMS..........................................................................................................................99
HIRE OF FACILITIES – SPORT...............................................................................................................................100
LICENCE COMMERCIAL ACTIVITY ON COUNCIL LAND.....................................................................................................100
FIELDS......................................................................................................................................................................................100
Sporting Association Management Fee.....................................................................................................................................................100
Turf fields (Excluding Waratah Athletics Track)........................................................................................................................................100
Waratah Athletics Track...............................................................................................................................................................................101
Turf/Cricket Wickets – per day....................................................................................................................................................................101
Synthetic Field Hire (Kareela Sporting Fields)..........................................................................................................................................101
Floodlighting – Synthetics...........................................................................................................................................................................101
Utility Charges – General Use.....................................................................................................................................................................101
SYLVANIA WATERS & THE RIDGE ATHLETICS TRACKS...................................................................................................102
HIRE OF FACILITIES – TENNIS COURTS..............................................................................................................103
DAY USE / HOUR:....................................................................................................................................................................103
NIGHT USE / HOUR:................................................................................................................................................................103
COACHING / HOUR:................................................................................................................................................................103
HIRE OF FACILITIES – WEDDING / CEREMONY / PICNIC BOOKINGS..............................................................104
PARKS / RECREATION AREAS INCLUDING WEDDINGS / CEREMONIES.........................................................................104
PICNICS....................................................................................................................................................................................104
Page 9 of 150
STREET STALLS......................................................................................................................................................................104
OTHER CHARGES...................................................................................................................................................................104
INSPECTIONS..........................................................................................................................................................105
INSPECTION FEES / REGISTRATION – BROTHELS............................................................................................................105
INSPECTION FEES – DEVELOPMENT...................................................................................................................................105
INSPECTION FEES / REGISTRATION – FOOD BUSINESSES..............................................................................................105
Food Handlers Course.................................................................................................................................................................................105
Food Act 2003 – Preparation of Notice under Food Act...........................................................................................................................105
Food Act 2003 – Prescribed Annual Administration Charge under Food Act.......................................................................................105
Public Health Regulation 2012....................................................................................................................................................................106
Clause 97 Fee for improvement notices and prohibition orders.................................................................................................................................................................................106
INSPECTION FEES – PUBLIC SWIMMING POOLS...............................................................................................................106
INSPECTION FEES – REMOVING BUILDINGS......................................................................................................................106
INSPECTION FEES / REGISTRATION – SALONS, SKIN PENETRATION PREMISES, MORTUARIES..............................106
INSPECTION FEES – WASTE TREATMENT..........................................................................................................................107
INSPECTION FEES – WATER COOLING TOWERS...............................................................................................................107
INSPECTION FEES – WATER TESTING.................................................................................................................................107
LEISURE CENTRES – SUTHERLAND, CARINGBAH, ENGADINE AND MENAI INDOOR SPORTS..................108
AQUATICS................................................................................................................................................................................108
SLC – STEAM ROOM / SPA / SWIM (only available at SLC)................................................................................................108
FITNESS....................................................................................................................................................................................109
FITNESS MEMBERSHIPS........................................................................................................................................................109
Links Pay.......................................................................................................................................................................................................109
FITNESS GENERAL.................................................................................................................................................................110
EXERCISE PHYSIOLOGY SERVICES.....................................................................................................................................110
PERSONAL TRAINING – 45 minute sessions.......................................................................................................................110
1 person.........................................................................................................................................................................................................110
2 people.........................................................................................................................................................................................................110
3 – 6 people...................................................................................................................................................................................................110
SWIM SCHOOL – Learn to Swim & Development Squads...................................................................................................111
Adult/Masters Squads..................................................................................................................................................................................111
Elite/Competitive Program...............................................................................................................................................................................................................................................111SLC/ELC...............................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................111
SCHOOLS PROGRAMS...........................................................................................................................................................111
CRECHE....................................................................................................................................................................................112
FUN & FITNESS (School Holiday Programs)........................................................................................................................112
PARTIES...................................................................................................................................................................................112
FACILITIES HIRE......................................................................................................................................................................112
Casual Facilities Hire...................................................................................................................................................................................112
Event Facilities Hire.....................................................................................................................................................................................112
Programmed Facilities Hire (for purposes other than Swim Coaching).................................................................................................113
Court Hire – Permanent Per hour................................................................................................................................................................113
Court Hire – Casual Per Hour......................................................................................................................................................................113
Other..............................................................................................................................................................................................................113
COMO LEARNERS POOL........................................................................................................................................................114
General Entry................................................................................................................................................................................................114
Event Facilities Hire.....................................................................................................................................................................................114
COMMERICAL SPONSORSHIP ARRANGEMENTS...............................................................................................................114
Page 10 of 150
Commercial sponsorship arrangements....................................................................................................................................................114
Sponsored athlete's program......................................................................................................................................................................115
LIBRARY SERVICES...............................................................................................................................................116
FINES FOR OVERDUE ITEMS.................................................................................................................................................116
LOST AND DAMAGED ITEMS.................................................................................................................................................116
COPYING/PRINTING/FAXING.................................................................................................................................................116
Photocopying/Computer Printouts – per sheet.........................................................................................................................................117
RESEARCH SERVICES...........................................................................................................................................................117
COMMUNITY PROGRAMS/EVENTS.......................................................................................................................................117
LOCAL STUDIES PHOTOGRAPHS.........................................................................................................................................117
COMPUTER ACCESS..............................................................................................................................................................118
MEETING ROOM WITH WIFI & ATTENDED HIRE (CENTRAL & ENGADINE BRANCH LIBRARIES)................................118
LIFEGUARD.............................................................................................................................................................119
SURF AWARENESS.................................................................................................................................................................119
SURF SURVIVAL PROGRAM..................................................................................................................................................119
HIRE FEES................................................................................................................................................................................119
Equipment Hire – IRB equipped with 2 Lifeguards...................................................................................................................................119
Equipment Hire – Jetbike, equipped with 1 Lifeguard..............................................................................................................................119 .............................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................119
Equipment Hire – 4 x 4, equipped with 1 Lifeguard..................................................................................................................................120
Picnics/Other – Lifeguard hire per hour.....................................................................................................................................................120
Professional Services – Water Safety Assessment/Advice/Management..............................................................................................120
Tractor Hire 4 x 4, equipped with 1 Lifeguard and bucket........................................................................................................................120
Vehicle Cleaning...........................................................................................................................................................................................120
Vehicle Recovery..........................................................................................................................................................................................120
WASTE REMOVAL...................................................................................................................................................................120
CANCELLATION FEE..............................................................................................................................................................120
PARKING PERMITS.................................................................................................................................................121
CAR PARKING PERMITS........................................................................................................................................................121
TRADE PARKING PERMITS....................................................................................................................................................121
PAYMENTS..............................................................................................................................................................122
CREDIT CARD MERCHANT SURCHARGE FEE / TRANSACTION FEE...............................................................................122
DISHONOURED / REJECTED PAYMENTS.............................................................................................................................122
LATE PAYMENT PENALTY.....................................................................................................................................................122
PERSONAL TRAINERS / FITNESS GROUPS........................................................................................................123
PROFESSIONAL SERVICES...................................................................................................................................124
BUILDING PROJECT SUPERVISION......................................................................................................................................124
BUILDING TRADES..................................................................................................................................................................124
Trade Services..............................................................................................................................................................................................124
DESIGN.....................................................................................................................................................................................125
ENVIRONMENTAL SCIENCE – CONSULTATIONS................................................................................................................125
GENERAL FEES AND CHARGES (WHERE NOT PRESCRIBED BY REGULATION)..........................................................125
1. Labour costs.............................................................................................................................................................................................125
2. External services......................................................................................................................................................................................125
3. Plant and equipment................................................................................................................................................................................126
4. Release of Vehicle Fee from Council controlled access i.e: parks/reserves/facilities......................................................................126
Page 11 of 150
LEGAL SERVICES...................................................................................................................................................................127
PARKS MAINTENANCE...........................................................................................................................................................127
RESEARCH...............................................................................................................................................................................127
VEHICLE SERVICING..............................................................................................................................................................127
PROPERTY AND LAND MANAGEMENT................................................................................................................128
CLOTHING RECYCLE BINS ON COUNCIL LAND FEE..........................................................................................................128
EASEMENT NEGOTIATIONS..................................................................................................................................................128
LEASES OF COMMUNITY LAND............................................................................................................................................128
PROPERTY SERVICES APPLICATION – USE OF COUNCIL LAND.....................................................................................128
PUBLIC WHARVES COMMERCIAL USE................................................................................................................................129
ROAD LEASE FEES.................................................................................................................................................................129
SECTION 611 CHARGES (LOCAL GOVERNMENT ACT 1993).............................................................................................129
RATES AND PROPERTY........................................................................................................................................130
RATES.......................................................................................................................................................................................130
Insertion of Publicity Pamphlets with Rate Notice/Instalment Notices...................................................................................................130
Legal Costs...................................................................................................................................................................................................130
SUPPLY OF PROPERTY DATA...............................................................................................................................................130
REGULATION..........................................................................................................................................................131
ENVIRONMENT PROTECTION AND REGULATION..............................................................................................................131
Advertising Signs/Abandoned/Unattended Articles.................................................................................................................................131
Companion Animals.....................................................................................................................................................................................131
Environmental Fines....................................................................................................................................................................................131
Heavy Vehicle Weight Fines........................................................................................................................................................................131
Parking Fines................................................................................................................................................................................................131
PROTECTION OF ENVIRONMENT OPERATIONS ACT.........................................................................................................131
Preparation of Notice under POEO Act......................................................................................................................................................131
ROADS AND ENGINEERING APPROVALS...........................................................................................................132
ON-ROAD WORK ZONES........................................................................................................................................................132
ON-ROAD WORK ZONES (DUAL OCCUPANCY & SMALL DEVELOPMENT).....................................................................132
PENALTY NOTICE OFFENCES (SUBJECT TO REGULATION CHANGES).........................................................................132
SKIP BINS – Refer EHR043-14................................................................................................................................................132
CONSTRUCTION WORKS WITHIN A PUBLIC PLACE..........................................................................................................132
Temporary Road Closures Application Fee...............................................................................................................................................132
SHORING & ANCHORING.......................................................................................................................................................132
HOARDINGS.............................................................................................................................................................................133
BARRICADES...........................................................................................................................................................................133
USE OF ROAD RESERVE FOR STANDING OF CRANES, CONCRETE PUMPS, ETC........................................................133
ROAD RESTORATION WORKS..............................................................................................................................134
ROAD OPENINGS AND RESTORATIONS..............................................................................................................................134
Road Carriageways......................................................................................................................................................................................134
Asphaltic Concrete Surface on all base types...............................................................................................................................................................................................................134
Cement Concrete Surface................................................................................................................................................................................................................................................134
Footpaths......................................................................................................................................................................................................134
Plain Concrete...................................................................................................................................................................................................................................................................134
Exposed Aggregate Concrete.........................................................................................................................................................................................................................................135
Asphaltic Concrete...........................................................................................................................................................................................................................................................135
Segmental (Brick/block) Paving on Granular Base.......................................................................................................................................................................................................135
Page 12 of 150
Segmental (Brick/Block) Paving on Concrete Base......................................................................................................................................................................................................135
Concrete Footpath Crossings.....................................................................................................................................................................135
100mm thick, Plain Concrete...........................................................................................................................................................................................................................................135
150mm thick, Plain Concrete...........................................................................................................................................................................................................................................136
200mm thick, Plain Concrete...........................................................................................................................................................................................................................................136
100mm thick, Exposed Aggregate Concrete..................................................................................................................................................................................................................136
150mm thick, Exposed Aggregate Concrete..................................................................................................................................................................................................................136
200mm thick, Exposed Aggregate Concrete..................................................................................................................................................................................................................136
100mm thick Decorative Concrete E.g. Baumanite, Faux Brick...................................................................................................................................................................................137
150mm thick Decorative Concrete E.g. Baumanite, Faux Brick...................................................................................................................................................................................137
200mm thick Decorative Concrete E.g. Baumanite, Faux Brick...................................................................................................................................................................................137
125mm thick Honed finished concrete (ie; Cronulla Precinct )....................................................................................................................................................................................137
Footpaths – white exposed aggregate concrete (ie: Miranda CBD)............................................................................................................................................................................137
Asphaltic Concrete...........................................................................................................................................................................................................................................................137
Granite tiles on concrete base........................................................................................................................................................................................................................................138
Formed or Turfed Areas...................................................................................................................................................................................................................................................138
New Construction of Concrete Footpath Crossings.....................................................................................................................................................................................................138
Kerb & Gutter................................................................................................................................................................................................138
Kerb & Gutter, Barrier Kerb, Mountable Kerb................................................................................................................................................................................................................139
Concrete Dish Crossing...................................................................................................................................................................................................................................................139
Trench Backfill Compaction Testing..............................................................................................................................................................................................................................140
SALES......................................................................................................................................................................141
NURSERY – PLANTS ETC.......................................................................................................................................................141
NURSERY – TREE GUARD.....................................................................................................................................................141
STORE – SUPPLIES.................................................................................................................................................................141
SIGNS........................................................................................................................................................................................141
Community Information Signs....................................................................................................................................................................141
SHIRE PROMOTIONAL PRODUCTS.......................................................................................................................................141
WASTE.....................................................................................................................................................................143
BUSINESS WASTE..................................................................................................................................................................143
Charge for Actual Use under Section 502, payable when incurred CONFIDENTIAL.............................................................................143
Supply of Bins at functions.........................................................................................................................................................................143
Delivery and Recovery of Bins........................................................................................................................................................................................................................................143
Building Cleaning.........................................................................................................................................................................................143
Trade Services (provided to non-residential assets only)........................................................................................................................144
DOMESTIC WASTE..................................................................................................................................................................144
Annual Charges under Section 496 of the Local Government Act 1993.................................................................................................144
Definitions: -..................................................................................................................................................................................................144
“Regular Service”.............................................................................................................................................................................................................................................................144
“Shared Service”..............................................................................................................................................................................................................................................................144
“Service Availability Vacant Land Charge”....................................................................................................................................................................................................................144
"Improved Land Availability Charge" – Recycling, Cleanup and Greenwaste Service.............................................................................................................................................145
"Regular Additional Service" – RAS...............................................................................................................................................................................................................................145
"Strata Additional Service" – 240L – SAS......................................................................................................................................................................................................................145
"Greenwaste Improved Service" (Non Fire Prone Area)...............................................................................................................................................................................................145
"Greenwaste Improved Service" (Fire Prone Area).......................................................................................................................................................................................................145
"Recycle Improved Service"............................................................................................................................................................................................................................................145
Additional Putrescible Waste Collection Services....................................................................................................................................145
Fee for a specific period garbage service......................................................................................................................................................................................................................145
STORMWATER LEVY..............................................................................................................................................................146
Charges under Section 496A of the Local Government Act 1993...........................................................................................................146
Commercial Property – Other than properties in a strata scheme.............................................................................................................................................................................146
Commercial Property – Properties in a strata scheme, greater of:.............................................................................................................................................................................146
Industrial Property – Other than properties in a strata scheme..................................................................................................................................................................................146
Industrial Property – Properties in a strata scheme, greater of:..................................................................................................................................................................................146
Page 13 of 150
SUTHERLAND SHIRE COUNCILGENERAL INFORMATION
NATIONAL DISABILITY INSURANCE SCHEME - NDISConcessions and subsidies may alter with the Federal Government's NDIS scheme. Full fees may apply to NDIS recipients.
HOLDER OF A COMPANION CARDIt was resolved per FIN107-09 “That concessional entry to Council facilities be provided to holders of the Seniors Card andPension Concession Card, and that free entry to Council facilities be provided to carers of Companion Card holders asissued by the Department of Ageing, Disability and Home Care””.
GST STATUSThe schedule has been prepared using the best available information in relation to the GST impact on the fees and chargesat the time of publication.
PRICING POLICYCouncil has determined these fees & Charges in accordance with Section 610D of the Local Government Act.
610D How does a council determine the amount of a fee for a service?(1) A council, if it determines the amount of a fee for a service, must take into consideration the following factors:(a) the cost to the council of providing the service,(b) the price suggested for that service by any relevant industry body or in any schedule of charges published, from timeto time, by the Department,(c) the importance of the service to the community,(d) any factors specified in the regulations.(2) The cost to the council of providing a service in connection with the exercise of a regulatory function need not be theonly basis for determining the approved fee for that service.(3) A higher fee or an additional fee may be charged for an expedited service provided, for example, in a case of urgency.
Fees and charges have been classified into the following four categories:-Bond - Price charged is refundable bond or damage security deposit required to be paid to Council to ensure specificconditions are fulfilled.Reg - Price charged for this good/service is prescribed by State or Federal Government Regulation(subject to change withchange to regulation).Future - Price charged is inappropriate to determine in advance as programs and services may vary constantly based oncommunity needs, seasonal variances, external resources used, etc.PubExh-Fee for Services from 1 July able to be applied once the draft fees have been approved by Council for publicexhibition.Other - Price of this good/service is set taking into consideration the cost of providing the service and the prices chargedfor similar goods/services provided by like Councils and other providers.
Year 18/19 Year 19/20
Name Fee Fee Account GST Pricing Policy
(incl. GST) (incl. GST)
Page 14 of 150
Year 18/19 Year 19/20
Name Fee Fee Account GST Pricing Policy
(incl. GST) (incl. GST)
ACCESS ACROSS RESERVES
ACCESS ACROSS COMMUNITY LAND
Subject to the provisions of the Community Land Management Act
Application fee $160.00 $165.00 GL650-522003-22041
N Other
1 Day Access ONLY – up to 5 days $210.00 $215.00 GL650-522003-22041
N Other
Access in excess of 5 days and up to 90 days (Passive Reserves & Fire Trails)
$695.00 $715.00 GL650-522003-22041
N Other
Asset protection Bond – maximum $5,200.00 $5,200.00 GL900-100000-71036
N Bond
Asset protection Bond – minimum $300.00 $300.00 GL900-100000-71036
N Bond
Planting of Memorial Tree with Tree Guard $655.00 $720.00 GL650-522004-22034
Y Other
Planting of Memorial Tree with Tree Guard – Additional Saturday planting charge
$150.00 $165.00 GL650-522004-22034
Y Other
MEMORIALS – Refer SAF110-12
Release of Vehicles from Lilli Pilli Baths Reserve between 10.00pm and 6.00 am
$165.00 $170.00 GL650-522001-22041
Y Other
Release of Vehicles from Camellia Gardens Carparkbetween 5pm and 7am
$165.00 $170.00 GL650-522001-22041
Y Other
Release of Vehicles from Joseph Banks Native Plants Reserve between 7pm and 7am
$165.00 $170.00 GL650-522001-22041
Y Other
RELEASE OF VEHICLES
Year 18/19 Year 19/20
Name Fee Fee Account GST Pricing Policy
(incl. GST) (incl. GST)
Page 15 of 150
Year 18/19 Year 19/20
Name Fee Fee Account GST Pricing Policy
(incl. GST) (incl. GST)
ADMINISTRATION AND GOVERNANCE
ACCESS TO INFORMATION (GOVERNMENT INFORMATION PUBLIC ACCESS) ACT
Application fee
50% fee reduction for Pensioners/children/non profit organisations
Application fee $30.00 $30.00 GL220-512057-22004
N Reg
First Twenty (20) Hours Free, after which following hourly charges apply – rate per hour
$30.00 $30.00 GL220-512057-22004
N Reg
Processing Fees
Reviewing Records about personal affairs
Reviewing Records about other matters
First Hour Free, after which following hourly charges apply:
Review and Determination – rate per hour $30.00 $30.00 GL220-512057-22004
N Reg
Internal Review Fee on GIPA Decisions
50% fee reduction for Pensioners/children/non profit organisations
Internal Review Fee on GIPA Decisions $40.00 $40.00 GL220-512057-22004
N Reg
Copy of Monthly Application Approvals $80.00 $82.00 GL220-514000-24028
N Other
Bulk Back Dated Approvals (3 Month Listing – Per List)
$80.00 $82.00 GL220-514000-24028
N Other
Copy of Monthly Application Approvals
Subpoena Conduct Fee $115.00 $118.00 GL220-512057-22004
N Other
Subpoena Processing Fee – per hour $82.00 $85.00 GL220-512057-22004
N Other
Subpoena Conduct Fee – Council as First defendant $30.00 $31.00 GL220-512057-22004
N Other
Subpoenas
Year 18/19 Year 19/20
Name Fee Fee Account GST Pricing Policy
(incl. GST) (incl. GST)
Page 16 of 150
Year 18/19 Year 19/20
Name Fee Fee Account GST Pricing Policy
(incl. GST) (incl. GST)
ANIMAL MANAGEMENT
ANIMAL SHELTER
Impounding Charges – Dogs and Cats
Dogs / cats sold from the animal shelter must be micro-chipped and registered. Total sale price will be the sum of registration fee, microchipping fee and price of dog / cat. Desexing costs are, if required, are to be borne by the purchaser as provided by a vet.
Animal Assessment $77.00 $79.00 GL175-511096-22004
N Other
Impounding $115.00 $118.00 GL175-511045-22004
N Other
Sustenance – per day $37.00 $38.00 GL175-511096-22004
N Other
Surrender Fees – Pensioner $210.00 $215.00 GL175-511096-22004
N Other
Surrender Fees – Other $415.00 $430.00 GL175-511096-22004
N Other
Surrender Fees – Dogs
Dogs / cats sold from the animal shelter must be micro-chipped and registered. Total sale price will be the sum of registrationfee, microchipping fee and price of dog / cat.
Sale of Dogs/Cats
Note: Management may negotiate reduced sale rates during peak breeding periods and in the best interest of companionanimal rehoming and reducing euthanasia rates in line with Mayoral Minute No: 11/2001- 02
Cost of Dog $270.00 $280.00 GL175-511096-22004
Y Other
Cost of Cat $160.00 $164.00 GL175-511096-22004
Y Other
Microchipping $62.00 $64.00 GL175-511096-22004
Y Other
Microchipping Special Event (Companion Animal Education)
$16.00 $16.50 GL175-511096-22004
Y Other
COMPANION ANIMALS
Dog and Cat Registration (Under Companion Animals Act 1998)
Amounts, terms and conditions as prescribed by regulations set by the State Government.
Compliance Certificate (Under Companion Animals Act 1998)
In accordance with Clause 25 of the Companion Animals Regulation 2008.
Year 18/19 Year 19/20
Name Fee Fee Account GST Pricing Policy
(incl. GST) (incl. GST)
Page 17 of 150
Year 18/19 Year 19/20
Name Fee Fee Account GST Pricing Policy
(incl. GST) (incl. GST)
HEARING & ASSESSMENT PANEL
Review to revoke Dangerous/Menacing Dog Order Application. (3 Panel Members)
$315.00 $325.00 GL175-511096-22004
N Other
3 x Panel members required to review request to revoke Dangerous/Menacing Dog Order (Review not to be undertaken until service fee is remitted)
Year 18/19 Year 19/20
Name Fee Fee Account GST Pricing Policy
(incl. GST) (incl. GST)
Page 18 of 150
Year 18/19 Year 19/20
Name Fee Fee Account GST Pricing Policy
(incl. GST) (incl. GST)
ECONOMIC AND COMMUNITY DEVELOPMENT
BUSINESS SUPPORT AND INDUSTRY ENGAGEMENT
Rates negotiated with Economic and Community Development Unit
Event Sponsorship As negotiated Event Dependent
Y Future
Seminar /Workshop Attendance As negotiated Event Dependent
Y Future
Marketing / Advertising Contribution Fee As negotiated Event Dependent
Y Future
Tourism Merchandise As negotiated Event Dependent
Y Future
Other Fees & charges applicable to Economic and Community Development be set to cover cost plus margin; reviewed to reflect current market as negotiated by Unit Manager
As negotiated Various Y Future
Market Stalls As negotiated Event Dependent
N Future
Business permit to 'trade out' front of business – Daily
$26.00 $27.00 Commercial Centre
Dependant
N Other
Performance Permit Outdoor Eating/Shopfront Area – Daily
$27.00 $28.00 Commercial Centre
Dependant
N Other
Year 18/19 Year 19/20
Name Fee Fee Account GST Pricing Policy
(incl. GST) (incl. GST)
Page 19 of 150
Year 18/19 Year 19/20
Name Fee Fee Account GST Pricing Policy
(incl. GST) (incl. GST)
CERTIFICATES
Deposited Plan and Land Title Information $52.00 $52.00 GL220-512064-22005
N Other
CERTIFICATE REGISTRATION
BUILDING CERTIFICATES (Clause 260 EPA Regulation)
Where an application for a building certificate is made after 1 September 2008 and either development consent, a complying development certificate or a construction certificate was required but not applied for, the fee for the building certificate is the fee that would have been payable for either the development consent, complying development certificate or the construction certificate, whichever is applicable. This fee is limited to any erection or alteration of a building in the period 24 months immediately preceding the date of the application for the building certificate.
Building Certificate Fee (Unauthorised Works) Fee equal to the feeotherwise payable for aDevelopment Application
and Construction Certificatefor the works.
GL414-549004-22037
N Reg
The additional fee is in accordance with the Environmental Planning & Assessment Regulation 2000Clause 260 3 (A) and 3 (B) and is equal to the fee otherwise payable for a Development Application andConstruction Certificate for the works.The Unauthorised Works Processing Fee for BC Applications is charged as a result of there being unauthorisedworks within the subject development.
Dwelling and Outbuilding Fee $250.00 $250.00 GL414-549004-22037
N Reg
a) Dwellings and outbuildings only
Floor not exceeding 200m² $250.00 $250.00 GL414-549004-22037
N Reg
Floor area between 200m² – 2,000m² $250.00 + 50c for every sqmtr over 200m².
GL414-549004-22037
N Reg
Floor area in excess of 2,000m² $1,165.00 + 7.5c for everysq mtr over 2,000m².
GL414-549004-22037
N Reg
Additional Inspections – per inspection. A reinspection fee will also be charged (per reinspection).
$90.00 $90.00 GL414-549004-22037
N Reg
b) For buildings other than dwellings or outbuildings
Bushfire Risk Certificates $390.00 $400.00 GL400-548009-22037
Y Other
BUSHFIRE RISK CERTIFICATES
Year 18/19 Year 19/20
Name Fee Fee Account GST Pricing Policy
(incl. GST) (incl. GST)
Page 20 of 150
Year 18/19 Year 19/20
Name Fee Fee Account GST Pricing Policy
(incl. GST) (incl. GST)
FLOOD INFORMATION AND REVIEW
General Assessment of Flood Studies and Stormwater Designs
$430.00 $440.00 GL710-543002-22018
N Other
Additional Checking Fee for Each Re-Assessment $215.00 $220.00 GL710-543002-22018
N Other
Flood Information Sheet $335.00 $345.00 GL710-543002-22018
N Other
Sylvania Waterways Floor Level Information $105.00 $110.00 GL710-543002-22018
N Other
Subdivision Application base fee;additional charges apply as below according to type (base fee only applies for re-endorsing previously endorsed documentation)
$350.00 $360.00 GL400-548011-22037
N Other
Torrens (including Community) Base fee plus $300 per lot toa maximum of $5,000
GL400-548011-22037
N Other
Strata base fee plus $300 per lot with a maximum total of
$5,000
GL400-548011-22037
N Other
Stratum Base fee plus $300 per lot created with a maximum
total of $7,000
GL400-548011-22037
N Other
All other property matters including instruments, covenants, consolidation, redefinition, boundary adjustment
Base fee plus $400 GL400-548011-22037
N Other
LAND TITLE
Planning Certificate (Previous Section 149(2)) $53.00 $53.00 GL440-552003-22001
N Reg
Planning Certificate (Previous Section 149(2) (5)) $133.00 $133.00 GL440-552003-22001
N Reg
Copies of Planning Certificates $42.00 $43.00 GL440-552003-22041
N Other
Urgency Fee $80.00 $82.00 GL440-552003-22041
N Other
PLANNING CERTIFICATES
OUTSTANDING NOTICES
(Section 735A Local Govt Act, Section 121ZP EPA Act) Both provided.
Outstanding Notices (Section 735A Local Govt Act, Section 121ZP EPA Act) Both provided.
$140.00 $145.00 GL411-549008-22021
N Other
Year 18/19 Year 19/20
Name Fee Fee Account GST Pricing Policy
(incl. GST) (incl. GST)
Page 21 of 150
Year 18/19 Year 19/20
Name Fee Fee Account GST Pricing Policy
(incl. GST) (incl. GST)
RATES CERTIFICATES
S603 of Local Govt. Act 1993 $80.00 $85.00 GL211-513010-22001
N Reg
S603 Rates Certificate Urgency Fee – Fee to Expedite (Intended production within 24 hours)
$42.00 $43.00 GL211-513011-22041
N Other
S603 Refund Penalty Charge $16.00 $16.50 GL211-513011-22041
N Other
SUBDIVISION CONSTRUCTION CERTIFICATES
(No inspections included) - Applicable where Council is appointed PCA
Small lot subdivision up to 5 lots $1,000 plus $500 per lot GL400-548011-22037
N Other
Medium size subdivision up to 20 lots $5,000 plus $500 per lot GL400-548011-22037
N Other
Large subdivision greater than 20 lots $10,000 plus $500 per lot GL400-548011-22037
N Other
PC APPOINTMENT (For inspection of Subdivision Construction Works with nil public infrastructure works)
(For inspection of Subdivision Construction Works with nil public infrastructure works)
Subdivision – PC appointment base fee with additional charges as below
$2,000.00 $2,050.00 GL400-548011-22037
N Other
Inspections: Miscellaneous or reinspections $350.00 $360.00 GL400-548011-22037
N Other
Subdivision – PC appointment base fee with additional charges as below
$1,300.00 $1,340.00 GL662-535014-22037
N Other
PC appointment base fee plus additional per lot $215.00 $220.00 GL662-535014-22037
N Other
Inspections: Miscellaneous or reinspections for PC with public infrastructure works
$270.00 $280.00 GL662-535014-22037
N Other
PC APPOINTMENT (for inspection of Subdivision Construction Works with public infrastructure works)
SWIMMING POOL SAFETY
(Fees Amended EHR031-14)
Inspection Fee – Initial Inspection $150.00 $150.00 GL414-549014-22037
Y Reg
Subsequent Unsatisfactory Inspection $100.00 $100.00 GL414-549014-22037
Y Reg
Certificate of Safety – Child-Resistant Barrier Exemption
$70.00 $250.00 GL414-549014-22037
N Reg
Year 18/19 Year 19/20
Name Fee Fee Account GST Pricing Policy
(incl. GST) (incl. GST)
Page 22 of 150
Year 18/19 Year 19/20
Name Fee Fee Account GST Pricing Policy
(incl. GST) (incl. GST)
CHILDRENS SERVICES
Late pick up fee per 15 minutes or part there of (when late picking up child)
$18.00 $18.00 Various N Other
Dishonoured transactions (Refer to Payments – Finance)
Refer to Finance Various N Other
Debt Collection – First reminder $12.00 $12.00 Various Y Other
Debt Collection – Second reminder $17.00 $17.00 Various Y Other
Debt Collection – Termination $25.00 $25.00 Various Y Other
Application for Child Care Fee (applicable for Early Education Centres & Family Day Care)
$20.00 $20.00 Various N Other
Issue of account & / or CCB Statement $5.00 $5.00 Various N Other
Centrelink Benefit amendment fee (charge based onper week of transactions)
$25.00 $25.00 Various N Other
National Disability Insurance Scheme Services Price on Application Various N Future
Wetbag $15.00 $15.00 GL180-503145-22026
N Other
ADMINISTRATION CHARGES APPLICABLE TO ALL CHILDREN'S SERVICES
Before School Care $19.00 $19.50 GL183-503090-22025
N Other
After School Care $23.50 $24.00 GL183-503090-22025
N Other
Casual rate before school care $21.00 $21.50 GL183-503090-22025
N Other
Casual rate after school care $25.50 $26.00 GL183-503090-22025
N Other
Non Notification Fee (applicable where no notification has been provided on children's attendance per session per family)
$10.00 $10.00 GL183-503090-22025
N Other
Annual Non refundable fee per child, per calendar year
$50.00 $50.00 GL183-503089-22025
N Other
BEFORE AND AFTER SCHOOL CARE
0-2's per child per day $110.00 $115.00 Various N Other
2-3's per child per day $104.00 $107.00 Various N Other
3-5's per child per day $99.00 $102.00 Various N Other
Holding Deposit – per day enrolled (refundable if child commences in the position and 2 weeks notice is provided upon leaving the centre)
$120.00 $120.00 Various N Bond
Vacation Care/Pupil Fee days etc. (5-8 year olds must have attended school)
$54.00 $55.00 Various N Other
EARLY EDUCATION CENTRES
Year 18/19 Year 19/20
Name Fee Fee Account GST Pricing Policy
(incl. GST) (incl. GST)
Page 23 of 150
Year 18/19 Year 19/20
Name Fee Fee Account GST Pricing Policy
(incl. GST) (incl. GST)
FAMILY DAY CARE
Payable weekly with fees
Scheme Contribution – per hour (or part thereof) perchild per day
$1.30 $1.45 GL182-503085-22024
N Other
Parent Enrolment Fee per child (on enrolment) $50.00 $50.00 GL182-503086-22024
N Other
Playsession Transport Fee (per hour) $31.50 $32.50 GL182-503087-22024
N Other
Start Up Fee New Educators (Payable on application -Non Refundable, split into two payments)
$500.00 $500.00 GL182-503062-22024
Y Other
Educator Levy (payable on 52 weeks) Per Week $35.00 $35.00 GL182-503075-22024
N Other
Excursions & Family Events As per agreed rate GL182-503079-24025
N Future
Educator Events & professional Learning As per agreed rate GL182-503160-24025
Y Future
Relief care (coordinated by FDC Coordination unit) Per Block of Care Requested
$30.00 $30.00 GL182-503122-22024
N Other
Alternate Care (coordinated by FDC Coordination unit) Per Block of Care Requested
$60.00 $60.00 GL182-503122-22024
N Other
Additional services in excess of standard support Per Hour
$54.00 $56.00 GL182-503000-22024
Y Other
Late timesheet fee per child (charge applied when submission is not received by due date & time & /or submitted without required data)
$11.00 $11.00 GL182-503075-22024
Y Other
Relief educator costs (per hour incl. super) – Assistant
$31.42 $32.23 GL182-503122-22024
N Other
Relief educator costs (per hour incl. super) – Diploma
$40.09 $41.09 GL182-503122-22024
N Other
Relief educator costs (per hour incl. super) – Early Childhood Teacher
$58.53 $60.00 GL182-503122-22024
N Other
Bond for new Family Day Care Educators (refundable upon scheme receiving notice in accordance to the Educator Agreement, return of documentation & nil account balance)
$800.00 $800.00 GL900-100000-71036
N Bond
FDC EDUCATOR FEES
Vacation Care Early bird rate (dates for Early bird pricing will be available on each program)
$54.00 $55.00 GL183-503091-22026
N PubExh
Vacation care daily rate $59.00 $60.00 GL183-503091-22026
N PubExh
Excursions As per program GL183-503079-22026
N Future
VACATION CARE
Year 18/19 Year 19/20
Name Fee Fee Account GST Pricing Policy
(incl. GST) (incl. GST)
Page 24 of 150
Year 18/19 Year 19/20
Name Fee Fee Account GST Pricing Policy
(incl. GST) (incl. GST)
TRAINING
Training – Non accredited (minimum per session) Price on application GL180-503134-22027
Y Future
Year 18/19 Year 19/20
Name Fee Fee Account GST Pricing Policy
(incl. GST) (incl. GST)
Page 25 of 150
Year 18/19 Year 19/20
Name Fee Fee Account GST Pricing Policy
(incl. GST) (incl. GST)
COPYING AND PRINTING
ELECTRONIC FILE MANAGEMENT
Fee per application for the electronic file management of Development Applications and accompanying information
Up to $5,000 $40.00 $40.00 GL220-514001-22043
N Other
$5,001 to $250,000 $70.00 $72.00 GL220-514001-22043
N Other
$250,001 to $500,000 $115.00 $120.00 GL220-514001-22043
N Other
$500,001 to $1 million $160.00 $165.00 GL220-514001-22043
N Other
$1,000,001 to $10 million $230.00 $236.00 GL220-514001-22043
N Other
Over $10 million $360.00 $370.00 GL220-514001-22043
N Other
Fee for the electronic file management of Engineering Drawings per application
$48.00 $50.00 GL220-514001-22043
N Other
Fee per application for the electronic file management of Applications and accompanying information
FIELD FILE PREPARATION
Photocopies – Paper (Per Sheet) A2, A1, A0 $22.00 $23.00 GL220-512057-22004
N Other
Photocopies – Paper (Per Sheet) A2, A1, AO reduction to A3
$11.00 $11.50 GL220-512057-22004
N Other
Photocopies – Paper (Per Sheet) A4 black and white
$0.55 $0.60 GL220-512057-22004
N Other
Photocopies – Paper (Per Sheet) A3 black and white
$1.05 $1.10 GL220-512057-22004
N Other
Photocopies – Paper (Per Sheet) A4 colour $2.10 $2.20 GL220-512057-22004
N Other
Photocopies – Paper (Per Sheet) A3 colour $4.10 $4.20 GL220-512057-22004
N Other
Provision of Electronic Information on Flash Drive orCD-Rom
$10.50 $11.00 GL220-512057-22004
N Other
Scanning of Information / Compilation of Electronic Materials (includes up to one hour first hour)
$40.00 $41.00 GL220-512057-22004
N Other
Scanning of Information / Compilation of Electronic Materials (per hour after the first hour)
$40.00 $41.00 GL220-512057-22004
N Other
PHOTOCOPYING / SCANNING / PRINTING OF ELECTRONIC DOCUMENTS FEES
Year 18/19 Year 19/20
Name Fee Fee Account GST Pricing Policy
(incl. GST) (incl. GST)
Page 26 of 150
Year 18/19 Year 19/20
Name Fee Fee Account GST Pricing Policy
(incl. GST) (incl. GST)
LAND INFORMATION / MAPS
All GIS Prints including Aerial Photography etc are on standard paper
1. GIS Maps and Images
All digital images are in either PDF, JPG or TIFF formatAll include 0.5 hour setup and manipulation costs
A4 $16.00 $16.50 GL220-514006-24028
N Other
A3 $27.00 $28.00 GL220-514006-24028
N Other
A2 $47.00 $48.00 GL220-514006-24028
N Other
A1 $72.00 $74.00 GL220-514006-24028
N Other
AO $100.00 $103.00 GL220-514006-24028
N Other
1:13000 Series (85cm x 145cm) $130.00 $135.00 GL220-514006-24028
N Other
Cost per Hectare (<5ha total cost) $72.00 $74.00 GL220-514006-24028
N Other
Cost per Hectare (>5ha <10ha additional amount) $11.00 $11.50 GL220-514006-24028
N Other
Cost per Hectare (>10Ha) Price on application GL220-514006-24028
N Future
2. Electronic Sale of Spatial Data (max of 4 layers, excludes ALS contours and spot heights)
Average suburban block approx 600sqm $72.00 $74.00 GL220-514006-24028
N Other
First Ha $210.00 $215.00 GL220-514006-24028
N Other
Per additional Ha $55.00 $55.00 GL220-514006-24028
N Other
3. Electronic Sale of ALS Spot Heights or 0.5m ALS Contours
1st Tile $210.00 $216.00 GL220-514006-24028
N Other
Per additional tile $105.00 $110.00 GL220-514006-24028
N Other
4. Digital Ortho rectified Aerial Photography – Urban Area Tiles 1km x 1km
Hourly charge for data analysis and manipulation $150.00 $155.00 GL220-514006-24028
N Other
5. Professional Services
Year 18/19 Year 19/20
Name Fee Fee Account GST Pricing Policy
(incl. GST) (incl. GST)
Page 27 of 150
Year 18/19 Year 19/20
Name Fee Fee Account GST Pricing Policy
(incl. GST) (incl. GST)
6. LEP Maps
LEP A3 map. Standard scale $27.00 $28.00 GL220-514006-24028
N Other
LEP A3 map. Special plot (Any location and scale) $37.00 $38.00 GL220-514006-24028
N Other
LEP East & West LZN – Land Zoning Map series (85cm x 145cm each)
$255.00 $265.00 GL220-514006-24028
N Other
LEP A3 LZN – Land Zoning map set (20 pages) $265.00 $275.00 GL220-514006-24028
N Other
LEP A3 map set (min 10 pages + $12.50 for each additional page)
$130.00 $135.00 GL220-514006-24028
N Other
LEP FBL Data (Residential lot only – providing FBL as points)
$72.00 $74.00 GL220-514006-24028
N Other
LEP Hourly charge for data analysis and manipulation
$150.00 $155.00 GL220-514006-24028
N Other
A3 map. Standard plot – 1:8000 $27.00 $28.00 GL220-514006-24028
N Other
A3 map. Special plot (Any location and scale) $32.00 $33.00 GL220-514006-24028
N Other
A1 map. Standard plot – 1:8000 $37.00 $38.00 GL220-514006-24028
N Other
A1 map. Special plot (Any location and scale) $47.00 $48.00 GL220-514006-24028
N Other
A3 bound set per theme. Standard plot – 1:8000 (6 B&W Maps)
$110.00 $115.00 GL220-514006-24028
N Other
A1 bound set per theme. Standard plot – 1:8000 (6 B&W Maps)
$110.00 $115.00 GL220-514006-24028
N Other
A3 bound set all themes. Standard plot – 1:8000 (8 themes)
$475.00 $490.00 GL220-514006-24028
N Other
A1 bound set all themes. Standard plot – 1:8000 (7 themes, Flood is only in A3)
$475.00 $490.00 GL220-514006-24028
N Other
7. DCP (B&W)
Bound Document $57.00 $59.00 GL440-552004-22002
N Other
PLANNING
1. Local Environmental Plan
DCP Document (in folder) $320.00 $330.00 GL440-552004-22002
N Other
2. Development Control Plan and Specifications
Year 18/19 Year 19/20
Name Fee Fee Account GST Pricing Policy
(incl. GST) (incl. GST)
Page 28 of 150
Year 18/19 Year 19/20
Name Fee Fee Account GST Pricing Policy
(incl. GST) (incl. GST)
3. Contributions Plans
Developer Contributions S7.11 $32.00 $33.00 GL440-552004-22002
N Other
Developer Contributions S7.12 $32.00 $33.00 GL440-552004-22002
N Other
4. Other Publications
General photocopying charges - Refer to Copying and Printing
Planning Proposal – 30% refund if the proposal does not proceed to Gateway
$60,000.00 $60,000.00 GL440-552004-22002
N Other
Public hearing costs – Per Property & Land Management
Incurred cost plus 5% GL440-552004-22002
N Other
5. Planning Proposal Request
Year 18/19 Year 19/20
Name Fee Fee Account GST Pricing Policy
(incl. GST) (incl. GST)
Page 29 of 150
Year 18/19 Year 19/20
Name Fee Fee Account GST Pricing Policy
(incl. GST) (incl. GST)
DEVELOPMENT
Fee Manufactured Home Moveable Dwelling $250.00 $260.00 GL411-549001-22021
N Other
ACTIVITY APPLICATIONS
(a) Install a manufactured home, moveable dwelling or associated structure on land.
Fee Domestic Oil or Solid Fuel Heating $185.00 $190.00 GL411-549001-22021
N Other
(b) Install a domestic oil or solid fuel heating appliance other than a portable appliance
Fee All Other Activities $300.00 $310.00 GL400-548014-22003
N Other
(c) For all other activities requiring approval under Chapter 7 of the LG Act.
Fee Waste Treatment Device or Human Waste Storage Facility
$195.00 $200.00 GL411-549001-22021
N Other
(d) Install or alter a waste treatment device or human waste storage facility (includeson-site septic systems & Domestic Grey water Treatment Systems)
High Risk – Van $165.00 $170.00 GL411-549001-22021
N Other
Low Risk – Bike $92.00 $95.00 GL411-549001-22021
N Other
(e) Mobile Food Vending – New or Vehicles Renewal Application
Charge per site $5.00 $5.00 GL411-549001-22001
N Reg
Each subsequent reinspection required as part of the renewal process.
$105.00 $110.00 GL411-549001-22001
N Other
(f) Caravan Parks Renewal Application
Additional Inspections due to unsatisfactory inspection result, unauthorised works or substantiated complaints
$255.00 $260.00 GL400-548020-22003
Y Other
CERTIFICATION SERVICES * Previously Southern Sydney Building Certifiers. Revised structure per EHR075-15
continued on next page ...
Year 18/19 Year 19/20
Name Fee Fee Account GST Pricing Policy
(incl. GST) (incl. GST)
Page 30 of 150
Year 18/19 Year 19/20
Name Fee Fee Account GST Pricing Policy
(incl. GST) (incl. GST)
Modification of a Construction Certificate or Complying Development Certificate after Determination
50% of original fee or a minimum fee $250 for a minor change subject to
support by Manager or Director
GL400-548017-22003
Y Other
Certificate Registration – fee per certificate $36.00 $36.00 GL220-512052-22042
N Reg
Issue of additional Occupation Certificates, where additional inspections were required, additional inspection fees apply
$255.00 $260.00 GL400-548020-22003
Y Other
CERTIFICATION SERVICES * Previously Southern Sydney Building Certifiers. Revised structure per EHR075-15 [continued]
Swimming Pools; includes pool fencing and associated pool decking if applicable
$755.00 $775.00 GL400-548017-22003
Y Other
Demolition $430.00 $445.00 GL400-548017-22003
Y Other
Cost of works < $5,001 $500.00 $515.00 GL400-548017-22003
Y Other
Cost of works exceeds $5,000 to $20,000 $550 plus an additional $5 per $1,000 (or part thereof) by which the estimated cost
exceeds $5,000
GL400-548017-22003
Y Other
Cost of works exceeds $20,000 to $250,000 $715.00 plus an additional $5.50 per $1,000 (or part
thereof) by which the estimated cost exceeds
$20,000
GL400-548017-22003
Y Other
Cost of works exceeds $250,000 to $2,000,000 $1,750 plus an additional $3.00 per $1,000 (or part
thereof) by which estimated cost exceeds $250,000
GL400-548017-22003
Y Other
Works in excess of $2,000,000 By written quotation based on an hourly rate of $255
GL400-548017-22003
Y Other
CERTIFICATION SERVICES WITHIN SUTHERLAND SHIRE
1A. Construction Certificate class 1 and 10 structures
Change of use / Establish (Initial) Use / Fit Out $1,270.00 $1,310.00 GL400-548017-22003
Y Other
Cost of works < $5,000 $670.00 $690.00 GL400-548017-22003
Y Other
Cost of works exceeds $5,000 to $20,000 $670 plus an additional $5 per $1,000 (or part thereof) by which the estimated cost
exceeds $5,000
GL400-548017-22003
Y Other
Cost of works exceeds $20,000 to $250,000 $800 plus an additional $5.50 per $1,000 (or part
thereof) by which the estimated cost exceeds
$20,000
GL400-548017-22003
Y Other
1B. Construction Certificate class 2 to 9 structures
continued on next page ...
Year 18/19 Year 19/20
Name Fee Fee Account GST Pricing Policy
(incl. GST) (incl. GST)
Page 31 of 150
Year 18/19 Year 19/20
Name Fee Fee Account GST Pricing Policy
(incl. GST) (incl. GST)
Cost of works exceeds $250,000 to $1,500,000 $2,500 plus an additional $3.50 per $1,000 (or part
thereof) by which the estimated cost exceeds
$250,000
GL400-548017-22003
Y Other
Works in excess of $1,500,000 By written quotation based on an hourly rate of $255
GL400-548017-22003
Y Other
1B. Construction Certificate class 2 to 9 structures [continued]
Swimming Pools; includes pool fencing and associated pool decking if applicable
$745.00 $765.00 GL400-548020-22003
Y Other
Cost of works < $6,000 – up to 2 inspections – additional inspections attract additional inspection fees
$520.00 $535.00 GL400-548020-22003
Y Other
Cost of works $6,001 – $20,000 – up to 3 inspections – additional inspections attract additionalinspection fees
$805.00 $830.00 GL400-548020-22003
Y Other
Cost of works $20,001 – $100,000 – up to 4 inspections – additional inspections attract additionalinspection fees
$860.00 $885.00 GL400-548020-22003
Y Other
Cost of works $100,001 – $150,000 – up to 5 inspections – additional inspections attract additionalinspection fees
$1,400.00 $1,440.00 GL400-548020-22003
Y Other
Cost of works $150,001 – $250,000 – up to 6 inspections – additional inspections attract additionalinspection fees
$1,660.00 $1,710.00 GL400-548020-22003
Y Other
Cost of works $250,001 – $2,000,000 – up to 7 inspections for one dwelling – additional inspections attract additional inspection fees. Additional dwellings attract a further fee of $600.00 per dwelling and additional inspection fees after 7 inspections.
$2,510.00 $2,580.00 GL400-548020-22003
Y Other
Works in excess of $2,000,000 By written quotation based on an hourly rate of $255
GL400-548020-22003
Y Other
Occupation Certificate – if not issued within 5 years of initial PC appointment – provides research, 2 inspections and issue of certificate
Twice PC fee that applies at the time of booking the initial
inspection
GL400-548020-22003
Y Other
2A. PC Appointment & Inspection Fees (PC fee includes specified inspections and an Occupation Certificate, whether interim or final), class 1 and 10 structuresA
Cost of works < $5,001 – Mandatory inspections arespecified in the PC agreement. Additional inspections attract the additional inspections fee
$650.00 $670.00 GL400-548020-22003
Y Other
Cost of works exceeds $5,000 and less than $250,000 – Mandatory inspections are specified in the PC agreement. Additional inspections attract theadditional inspections fee
$750 plus an additional $3 per $1,000 (or part thereof) by which the estimated cost
exceeds $5,000
GL400-548020-22003
Y Other
Cost of works exceeds $250,000 and less than $2,000,000 – Mandatory inspections are specified inthe PC agreement. Additional inspections attract theadditional inspections fee
$1,600 plus an additional $2.50 per $1,000 (or part
thereof) by which the estimated cost exceeds
$250,000
GL400-548020-22003
Y Other
2B. PC Appointment & Inspection Fees (PC fee includes specified inspections and an Occupation Certificate, whether interim or final), class 2 to 9 structures
continued on next page ...
Year 18/19 Year 19/20
Name Fee Fee Account GST Pricing Policy
(incl. GST) (incl. GST)
Page 32 of 150
Year 18/19 Year 19/20
Name Fee Fee Account GST Pricing Policy
(incl. GST) (incl. GST)
Works in excess of $2,000,000 – Mandatory inspections are specified in the PC agreement. Additional inspections attract the additional inspections fee
By written quotation based on an hourly rate of $255
GL400-548020-22003
Y Other
Change of Use for small business/commercial includes 2 inspections and issue of occupation certificate
$750.00 $770.00 GL400-548020-22003
Y Other
Occupation Certificate – if not issued within 5 years of initial PC appointment – provides research, 2 inspections and issue of certificate
Twice PC fee that applies at the time of booking the initial
inspection
GL400-548020-22003
Y Other
2B. PC Appointment & Inspection Fees (PC fee includes specified inspections and an Occupation Certificate, whether interim or final), class 2 to 9 structures [continued]
Cost of works < $5,001 – Mandatory inspections arespecified in the PC agreement. Additional inspections attract the additional inspections fee
$675.00 $695.00 GL400-548012-22003
Y Other
Cost of works exceeds $5,000 to $20,000 $670 plus an additional $4 per $1,000 (or part thereof)
of the estimated cost by which the estimated cost
exceeds $5000
GL400-548012-22003
Y Other
Cost of works exceeds $20,000 to $250,000 $700 plus an additional $4.50 per $1,000 (or part thereof) of the estimated
cost by which the estimated cost exceeds $20,000
GL400-548012-22003
Y Other
Cost of works exceeds $250,000 to $1,500,000 $2,000 plus an additional $2.00 per $1,000 (or part
thereof over $250k) of the estimated cost to a maximum of $3,000
GL400-548012-22003
Y Other
Swimming Pools; includes pool fencing and associated pool decking if applicable
$690.00 $710.00 GL400-548012-22003
Y Other
Demolition $450.00 $465.00 GL400-548012-22003
Y Other
Works in excess of $1,500,000 By written quotation based on an hourly rate of $255
GL400-548012-22003
Y Other
Home Business CDC (General Development Code) $300.00 $310.00 GL400-548012-22003
Y Other
3A. Complying Development Certificates, class 1 and 10 structures
Cost of works < $30,001 $1,510.00 $1,550.00 GL400-548012-22003
Y Other
Cost of works exceeds $30,000 and less than $1,000,001
$1,500 plus an additional $25 per $1,000 (or part
thereof) of the estimated cost by which the estimated
cost exceeds $30,000
GL400-548012-22003
Y Other
Works in excess of $1,000,000 By written quotation based on an hourly rate of $255
GL400-548012-22003
Y Other
3B. Complying Development Certificates, class 2 to 9 structures
Year 18/19 Year 19/20
Name Fee Fee Account GST Pricing Policy
(incl. GST) (incl. GST)
Page 33 of 150
Year 18/19 Year 19/20
Name Fee Fee Account GST Pricing Policy
(incl. GST) (incl. GST)
4. Letters of Confirmation of Inspection Results
Fee Confirmation Letter $255.00 $260.00 GL400-548020-22003
Y Other
Fee Confirmation Certificate $255.00 $260.00 GL400-548020-22003
N Other
5. Certificate for confirmation of Classification of Building
No inspection required $10.00 $10.00 GL400-548001-22003
N Reg
Section 88G Certificate $35.00 $35.00 GL400-548001-22003
N Reg
Expedited assessment and issue $90.00 $90.00 GL400-548001-22003
N Reg
6. Applications for Certificates under Section 88G of the Conveyancing Act
By written quotation based on an hourly rate $255.00 $260.00 GL400-548000-22003
Y Other
CERTIFICATION SERVICES OUTSIDE SUTHERLAND SHIRE
7A. Construction Certificates
By written quotation based on an hourly rate $255.00 $260.00 GL400-548000-22003
Y Other
7B. Complying Development Certificate Applications
By written quotation based on an hourly rate $255.00 $260.00 GL400-548000-22003
Y Other
Occupation Certificate – if not issued within 5 years of initial PC appointment – provides research, 2 inspections and issue of certificate
Twice PC fee that applies at the time of booking the initial
inspection
GL400-548000-22003
Y Other
7C. PC Appointments & Inspections and issue of Final Occupation Certificate
Applicants shall contribute to the cost of operating the Panel and pre - application discussions are optional. A contributionshall be paid when the development application is submitted or a pre - application discussion is requested for - residentialflat buildings; new buildings or major extensions in commercial centres; town houses/villa house developments containing6 or more dwellings; housing for older persons; cluster housing; new industrial buildings over 2000m²; public/communitybuildings.
DESIGN REVIEW FORUM (ARCHITECTURAL DESIGN REVIEW PANEL)
NOTE : For small to medium developments, in the case of residential applications, 20 dwellings or less, a 50% discount beoffered for second and subsequent visits relating to a particular proposal.
For non residential development small to medium is defined as having a construction value of less than $6 million
continued on next page ...
Year 18/19 Year 19/20
Name Fee Fee Account GST Pricing Policy
(incl. GST) (incl. GST)
Page 34 of 150
Year 18/19 Year 19/20
Name Fee Fee Account GST Pricing Policy
(incl. GST) (incl. GST)
Villas/Townhouses $2,970.00 $3,050.00 GL201-512006-22037
N Other
Seniors Living $2,660.00 $2,730.00 GL201-512006-22037
N Other
Industrial $2,860.00 $2,940.00 GL201-512006-22037
N Other
Commercial $2,970.00 $3,050.00 GL201-512006-22037
N Other
Mixed Residential/Commercial & Residential Flat Buildings
$3,370.00 $3,460.00 GL201-512006-22037
N Other
DESIGN REVIEW FORUM (ARCHITECTURAL DESIGN REVIEW PANEL) [continued]
Pre-development application service (single dwellinghouses)
$100.00 $100.00 GL400-548014-22003
Y Other
Dwellings (up to 2) or development with a cost of work not exceeding $500,000 to clarify the application of this fee and allow a fee to be charged in relation to these types of proposals.
$380.00 $390.00 GL400-548014-22003
Y Other
Dwellings (3 – 14 dwellings) or development with a cost of work not exceeding $2 million
$600.00 $615.00 GL400-548014-22003
Y Other
Dwellings (15 – 49 dwellings) or development with a cost of work between $2 million and $7 million
$2,500.00 $2,570.00 GL400-548014-22003
Y Other
Dwellings (50 or more dwellings) or development with a cost of work exceeding $7 million
$4,650.00 $4,770.00 GL400-548014-22003
Y Other
PRE APPLICATION DISCUSSIONS (PAD)
The estimated cost will be determined by reference to a genuine estimate of the construction costs of the building or workor the costs of the demolition. If a genuine estimate is not provided with the application Council will prepare an estimatethat will form the basis for the calculation.
DEVELOPMENT APPLICATIONS (Clause 246B EPA Regulation)
Estimated Cost of Development
This fee does not cover pre-application discussions, mediation, advertising or consideration of public submissions.
For staged development, the total DA fee for all stages must not exceed the fee that would be charged if the proposal wassubmitted as one application. Council will determine the appropriate proportion of the fee to be paid with each stage basedon the amount of development proposed and the amount of assessment required.
Up to $5,000 $110.00 $110.00 GL400-548014-22037
N Reg
$5,001–$50,000 $170, plus an additional $3 for each $1,000 (or part of
$1,000) of the estimated cost.
GL400-548014-22037
N Reg
$50,001–$250,000 $352, plus an additional $3.64 for each $1,000 (or
part of $1,000) by which the estimated cost exceeds
$50,000.
GL400-548014-22037
N Reg
continued on next page ...
Year 18/19 Year 19/20
Name Fee Fee Account GST Pricing Policy
(incl. GST) (incl. GST)
Page 35 of 150
Year 18/19 Year 19/20
Name Fee Fee Account GST Pricing Policy
(incl. GST) (incl. GST)
$250,001 – $500,000 $1,160, plus an additional $2.34 for each $1,000 (or
part of $1,000) by which the estimated cost exceeds
$250,000.
GL400-548014-22037
N Reg
$500,001 – $1,000,000 $1,745, plus an additional $1.64 for each $1,000 (or
part of $1,000) by which the estimated cost exceeds
$500,000.
GL400-548014-22037
N Reg
$1,000,001 – $10,000,000 $2,615, plus an additional $1.44 for each $1,000 (or
part of $1,000) by which the estimated cost exceeds
$1,000,000.
GL400-548014-22037
N Reg
More than $10,000,000 $15,875, plus an additional $1.19 for each $1,000 (or
part of $1,000) by which the estimated cost exceeds
$10,000,000.
GL400-548014-22037
N Reg
Estimated Cost of Development [continued]
Fee Dwelling Houses cost $100,000 or less Maximum fee $455.00 GL400-548014-22037
N Reg
Exceptions and variations to these DA fees:
(i) Dwelling Houses with an estimated construction cost of $100,000 or less. (Clause 247 EPA Regn)
New Road (Clause 249 EPA Regn) $665.00 plus $65.00 per additional lot
GL400-548014-22037
N Reg
No New Road (Clause 249 EPA Regn) $330.00 plus $53.00 per additional lot
GL400-548014-22037
N Reg
Strata (Clause 249 EPA Regn) $330.00 plus $65.00 per additional lot
GL400-548014-22037
N Reg
(ii) Subdivision
Fee One or More Advertisements $285.00 plus $93.00 for each subsequent sign or the fee calculated from the D.A.
fee table, whichever is the greater.
GL400-548014-22037
N Reg
(iii) Fee for an application for one or more advertisements (Clause 246B EPA Regn)
Fee Integrated Development or Concurrence of Public Authority
Additional fee of $140.00 plus $320.00 for each
approval body
GL400-548014-22037
N Reg
(iv) Additional fees for integrated development or concurrence of public authority
Year 18/19 Year 19/20
Name Fee Fee Account GST Pricing Policy
(incl. GST) (incl. GST)
Page 36 of 150
Year 18/19 Year 19/20
Name Fee Fee Account GST Pricing Policy
(incl. GST) (incl. GST)
(v) Development not involving the erection of a building, the carrying out of work, the subdivision ofland or the demolition of a building or work (Clause 250 EPA Regulation)
Fee Development not involving the erection of a building etc
Maximum fee $285.00 GL400-548014-22037
N Reg
Fee Designated Development Minimum fee $920.00 GL400-548014-22037
N Reg
(vi) Designated Development (Clause 251 EPA Regn)
Fee 2 or More Applicable Fees Maximum fee is the sum of the two fees
GL400-548014-22037
N Reg
(vii) When 2 or more fees are applicable (Clause 254 EPA Regn)
Fee Request not Involving Works 50% of original DA fee GL400-548014-22037
N Reg
(viii) S8.2(1)(a) Review of determination (Clause 257 EPA Regn)
In the case of a request that does not involve works
Fee Dwelling-house Cost of $100,000 or less $190.00 $190.00 GL400-548014-22037
N Reg
In the case of a request that involves the erection of a dwelling-house with an estimated cost of $100,000 or less
Up to $5,000 $55.00 $55.00 GL400-548014-22037
N Reg
$5,001-$250,000 $85.00 plus an additional $1.50 for each $1,000.00 (or
part of $1,000.00) of the estimated cost.
GL400-548014-22037
N Reg
$250,001-$500,000 $500.00, plus an additional $0.85 for each $1,000.00 (orpart of $1,000.00) by which the estimated cost exceeds
$250,000.00.
GL400-548014-22037
N Reg
$500,001-$1,000,000 $712.00, plus an additional $0.50 for each $1,000.00 (orpart of $1,000.00) by which the estimated cost exceeds
$500,000.00.
GL400-548014-22037
N Reg
In the case of a request for any other development application, the following fees:-
Estimated Cost of Development
continued on next page ...
Year 18/19 Year 19/20
Name Fee Fee Account GST Pricing Policy
(incl. GST) (incl. GST)
Page 37 of 150
Year 18/19 Year 19/20
Name Fee Fee Account GST Pricing Policy
(incl. GST) (incl. GST)
$1,000,001-$10,000,000 $987.00, plus an additional $0.40 for each $1,000.00 (orpart of $1,000.00) by which the estimated cost exceeds
$1,000,000.00.
GL400-548014-22037
N Reg
More than $10,000,000 $4,737.00, plus an additional$0.27 for each $1,000.00 (orpart of $1,000.00) by which the estimated cost exceeds
$10,000,000.00.
GL400-548014-22037
N Reg
Additional Amount plus an additional amount of not more than $620 if notice of the application is required
to be given under S82A of the Act
GL400-548014-22037
N Reg
Estimated Cost of Development [continued]
where estimated cost of development is less than $100,000
$55.00 $55.00 GL400-548014-22037
N Reg
where estimated cost of development is $100,000 ormore and less than or equal to $1,000,000
$150.00 $150.00 GL400-548014-22037
N Reg
where estimated cost of development is more than $1,000,000
$250.00 $250.00 GL400-548014-22037
N Reg
(ix) Section 8.2(1)(c) Review of rejected application (Clause 257A)
Section 4.55(1) to correct a minor error, misdescription or miscalculation (Clause 258 EPA Regn)
$71.00 $71.00 GL400-548016-22001
N Reg
NB This fee may be waived where Council is satisfied that it was responsible for the error to be corrected by the modification application.
(x) Modification of a consent – Minor Modification
Section 4.55(1A) (Clause 258 EPA Regn) 50% of original fee up to a maximum fee of $645.00.
GL400-548016-22001
N Reg
(xi) Modification of a consent – Minimal Environmental Impact
Fee If Original Fee less than $100 50% of original fee GL400-548016-22001
N Reg
(xii) Maximum fee under S4.55(2), or S4.56 which is not of minimal environmental impact or is a modification of a court approved consent
If the original fee was less than $100
Year 18/19 Year 19/20
Name Fee Fee Account GST Pricing Policy
(incl. GST) (incl. GST)
Page 38 of 150
Year 18/19 Year 19/20
Name Fee Fee Account GST Pricing Policy
(incl. GST) (incl. GST)
If the original fee was $100 or more
In the case of an application that does not involve works
Fee If Original Fee more than $100 Non Works 50% of original fee GL400-548016-22001
N Reg
Fee Dwelling-house Estimated Cost of $100,000 or less
$190.00 $190.00 GL400-548016-22001
N Reg
In the case of a request that involves the erection of a dwelling-house with an estimated cost of $100,000 or less
Up to $5,000 $55.00 $55.00 GL400-548016-22001
N Reg
$5,001-$250,000 $85.00, plus an additional $1.50 for each $1,000.00 (or
part of $1,000.00) of the estimated cost.
GL400-548016-22001
N Reg
$250,001-$500,000 $500.00, plus an additional $0.85 for each $1,000.00 (orpart of $1,000.00) by which the estimated cost exceeds
$250,000.00.
GL400-548016-22001
N Reg
$500,001-$1,000,000 $712.00, plus an additional $0.50 for each $1,000.00 (orpart of $1,000.00) by which the estimated cost exceeds
$500,000.00.
GL400-548016-22001
N Reg
$1,000,001-$10,000,000 $987.00, plus an additional $0.40 for each $1,000.00 (orpart of $1,000.00) by which the estimated cost exceeds
$1,000,000.00.
GL400-548016-22001
N Reg
More than $10,000,000 $4,737.00, plus an additional$0.27 for each $1,000.00 (orpart of $1,000.00) by which the estimated cost exceeds
$10,000,000.00.
GL400-548016-22001
N Reg
In the case of a request for any other development application the following fees:– (plus an additional amount of not more than $665 if notice of the application is required to be given under S4.55(2) or S4.56 of the Act.)
Estimated Cost of Development (Maximum Fee Payable)
Fee Section8.2(1)(b)review 50% of the original fee payable
GL400-548016-22001
N Reg
(xiiv) Section8.2(1)(b) review of modification application (Clause 258A)
Fee Extension of Lapsing Period $530.00 $545.00 GL400-548014-22037
N Other
(xiv) Extension of lapsing period of a development consent
Year 18/19 Year 19/20
Name Fee Fee Account GST Pricing Policy
(incl. GST) (incl. GST)
Page 39 of 150
Year 18/19 Year 19/20
Name Fee Fee Account GST Pricing Policy
(incl. GST) (incl. GST)
Development Assessment Document Production
Section 4.55 or 4.56 document production fee is based on the value of the original applicationApplication less than $1m $155.00 $160.00 GL400-548022-
22037N Other
Application $1m – $5m $360.00 $370.00 GL400-548022-22037
N Other
Application greater than $5m – $10m $720.00 $740.00 GL400-548022-22037
N Other
Application greater than $10m $1,030.00 $1,060.00 GL400-548022-22037
N Other
Designated development $2,220.00 $2,220.00 GL400-548006-22003
N Reg
ADVERTISING AND NEIGHBOUR NOTIFICATION
Development required to be advertised and/or neighbour notified by DCP (including modifications of consents lodged under S4.55(1A)
Development that is assessed as requiring advertising will require payment of the Advertising fee in order for the assessment to be finalised. Occasionally this may not be determined until assessment has commenced. In such instances the fee is required in order for the assessment to continue.
Advertisement $520.00 $535.00 GL400-548006-22003
N Other
Readvertising – when required $520.00 $535.00 GL400-548006-22003
N Other
Where an application requires renotification, for instance in the case of amended plans, renotification attracts the same feeas the initial notification process.
Notification / Advice / Post Determination Notification
Please note that from time to time other fees as required by NSW State Government Authorities may apply (ie integratedDevelopment, Concurrence fee).
Neighbour Notification – cost of development up to $150,000
$135.00 $140.00 GL400-548007-22003
N Other
Neighbour Notification – cost of development between $150,001 and $500,000
$260.00 $265.00 GL400-548007-22003
N Other
Neighbour Notification – cost of development greater than $500,001 up to and including $1 million
$415.00 $430.00 GL400-548007-22003
N Other
Neighbour Notification – cost of development greater $1 million and up to $3 million.
$570.00 $585.00 GL400-548007-22003
N Other
Neighbour Notification – cost of development greater than $3 million up to and including $5 million
$690.00 $710.00 GL400-548007-22003
N Other
Neighbour Notification – cost of development greater than $5 million up to and including $10 million
$950.00 $975.00 GL400-548007-22003
N Other
Neighbour Notification – cost of development greater than $10 million
$1,250.00 $1,290.00 GL400-548007-22003
N Other
continued on next page ...
Year 18/19 Year 19/20
Name Fee Fee Account GST Pricing Policy
(incl. GST) (incl. GST)
Page 40 of 150
Year 18/19 Year 19/20
Name Fee Fee Account GST Pricing Policy
(incl. GST) (incl. GST)
Neighbour Notification for Modification Applications (4.55 or 4.56) – calculated as above to a maximum fee
$1,000.00 $1,000.00 GL400-548007-22003
N Reg
Neighbour Notification for Review Applications (S8.2(1)(a)) – calculated as above to a maximum fee
$1,000.00 $1,000.00 GL400-548007-22003
N Reg
Notification / Advice / Post Determination Notification [continued]
Stamping Additional Approved Plans – per copy or re-issue of e-plans
$240.00 $245.00 GL400-548014-22003
N Other
Stamping Additional Approved Plans – per copy or re-issue of e-plans
TREE REMOVAL APPLICATION FEE
(Refer PLN005-17)
Application Fee General without TRAQ report and Review of Determination
$160.00 $164.00 GL413-549023-22037
N Other
Application Fee without TRAQ report Pensioner 50% Discount
$80.00 $82.00 GL413-549023-22037
N Other
Application Fee with Tree Risk Assessment Qualification (TRAQ)
$35.00 $35.00 GL413-549023-22037
N Reg
TREE REPLANTING FEE
(Refer DAP010-13)
Planting of Trees within Road Reserves per replacement tree required
$415.00 $430.00 GL413-549022-22037
Y Other
5L tree, staked caged and bordered including 2 year maintenance period.
Per Tree $110.00 $115.00 GL413-549022-22037
Y Other
(Refer EHR069-15 & PLN004-19)
LANDSCAPE INSPECTION FEE
Inspection of Landscaping as per approved plans – Dwellings – Initial Fee
$230.00 $230.00 GL413-549024-22037
N Other
Inspection of Landscaping as per approved plans – Dwellings – Subsequent Fee
$100.00 $100.00 GL413-549024-22037
N Other
Inspection of Landscaping as per approved plans – Dual Occupancy – Initial Fee
$230.00 $230.00 GL413-549024-22037
N Other
Inspection of Landscaping as per approved plans – Dual Occupancy – Subsequent Fee
$100.00 $100.00 GL413-549024-22037
N Other
Inspection of Landscaping as per approved plans – Town Houses (4 or less) – Initial Fee
$400.00 $400.00 GL413-549024-22037
N Other
Inspection of Landscaping as per approved plans – Town Houses (4 or less) – Subsequent Fee
$400.00 $400.00 GL413-549024-22037
N Reg
Inspection of Landscaping as per approved plans – Town Houses (more than 4) – Initial Fee
$600.00 $600.00 GL413-549024-22037
N Other
continued on next page ...
Year 18/19 Year 19/20
Name Fee Fee Account GST Pricing Policy
(incl. GST) (incl. GST)
Page 41 of 150
Year 18/19 Year 19/20
Name Fee Fee Account GST Pricing Policy
(incl. GST) (incl. GST)
Inspection of Landscaping as per approved plans – Town Houses (more than 4) – Subsequent Fee
$600.00 $600.00 GL413-549024-22037
N Other
Inspection of Landscaping as per approved plans – Units less than 25 – Initial Fee
$800.00 $800.00 GL413-549024-22037
N Other
Inspection of Landscaping as per approved plans – Units less than 25 – Subsequent Fee
$800.00 $800.00 GL413-549024-22037
N Other
Inspection of Landscaping as per approved plans – Units equal to or greater than 25 less than 50 – Initial Fee
$1,200.00 $1,200.00 GL413-549024-22037
N Other
Inspection of Landscaping as per approved plans – Units equal to or greater than 25 less than 50 – Subsequent Fee
$1,200.00 $1,200.00 GL413-549024-22037
N Other
Inspection of Landscaping as per approved plans – Units equal to or greater than 50 – Initial Fee
$3,000.00 $3,000.00 GL413-549024-22037
N Other
Inspection of Landscaping as per approved plans – Units equal to or greater than 50 – Subsequent Fee
$3,000.00 $3,000.00 GL413-549024-22037
N Other
Inspection of Landscaping as per approved plans – Commercial/Industrial Sites – Initial Fee
$400.00 $400.00 GL413-549024-22037
N Other
Inspection of Landscaping as per approved plans – Commercial/Industrial Sites – Subsequent Fee
$400.00 $400.00 GL413-549024-22037
N Other
LANDSCAPE INSPECTION FEE [continued]
Fire Safety Administration Fee relating to annual firesafety statements
$135.00 $145.00 GL414-549007-22003
Y Other
Inspection of premises as a result of Council's Fire Safety Program Per Hour or part thereof
$135.00 $139.00 GL414-549007-22003
Y Other
Fire Safety advice fee Per Hour or part thereof $135.00 $139.00 GL414-549007-22003
N Other
Bushfire Safety Administration Fee $25.00 $26.00 GL400-548014-22003
Y Other
FIRE SAFETY MATTERS
BOARDING HOUSE INSPECTIONS
(Refer EHR048-13)
Initial Inspection Fee $215.00 $220.00 GL412-549026-22037
N Other
Subsequent (Reinspection) Fee $142.00 $146.00 GL412-549026-22037
N Other
Environmental Building and Compliance Officer – per hour
$85.00 $85.00 GL412-549003-22037
N Reg
Environmental Building and Compliance Supervisor – per hour
$130.00 $130.00 GL412-549003-22037
N Reg
ISSUING COMPLIANCE COST NOTICES
Year 18/19 Year 19/20
Name Fee Fee Account GST Pricing Policy
(incl. GST) (incl. GST)
Page 42 of 150
Year 18/19 Year 19/20
Name Fee Fee Account GST Pricing Policy
(incl. GST) (incl. GST)
PUBLIC PLACE ENVIRONMENTAL, DAMAGE & PERFORMANCE SECURITY BOND/ADMINISTRATION FEE
This refundable bond is used to recover costs incurred to rectify any damage to Council's assets and or the environmentas a result of the implementation of the development.
Bank Guarantees are only considered for bond values exceeding $50,000.
Development Value $50,001 – $150,000 $2,750.00 $2,750.00 GL900-100000-71007
N Bond
Development Value $150,001 – $300,000 $3,750.00 $3,750.00 GL900-100000-71007
N Bond
Development Value $300,001 – $600,000 $5,800.00 $5,800.00 GL900-100000-71007
N Bond
Development Value $600,001 – $1,000,000 $9,000.00 $9,000.00 GL900-100000-71007
N Bond
Development Value $1,000,001 – $1,500,000 $10,500 GL900-100000-71007
N Bond
Development Value Greater than $1,500,000 Individual Assessment GL900-100000-71007
N Bond
Demolition/Earthworks $3,800.00 $3,800.00 GL900-100000-71007
N Bond
Swimming Pools $2,750.00 $2,750.00 GL900-100000-71007
N Bond
Removing Buildings $10,300.00 $10,300.00 GL900-100000-71007
N Bond
Administration Fee for Bonds this is a non-refundable administration fee. Where the bond provided is a Bank Guarantee, the administration fee must be paid separately.
$220.00 $225.00 GL662-535007-22037
N Other
Tree Placement and Maintenance Bond (PBE Order)
Individual Assessment GL900-100000-71007
N Bond
Year 18/19 Year 19/20
Name Fee Fee Account GST Pricing Policy
(incl. GST) (incl. GST)
Page 43 of 150
Year 18/19 Year 19/20
Name Fee Fee Account GST Pricing Policy
(incl. GST) (incl. GST)
DRIVEWAY CONSTRUCTION AND FRONTAGE WORKS APPROVALS
Property Alignment Levels (existing kerb & gutter) $290.00 $300.00 GL662-535012-22018
N Other
Property Alignment Levels (no existing kerb & gutter)
$835.00 $860.00 GL662-535012-22018
N Other
PROPERTY ALIGNMENT LEVELS – SUPPLY OF INFORMATION
Driveway Construction Approval – Single Residential Dwelling (includes a Formwork Inspection)
$345.00 $355.00 GL610-528004-22001
N Other
Driveway Construction Approval – Large Developments including dual occupancy
$425.00 $600.00 GL662-535012-22001
N Other
Additional Inspection $120.00 $125.00 Various N Other
DRIVEWAY CONSTRUCTION APPROVAL (under the ROADS ACT)
For the Total Development Works Value under $300,000 – Detailed Frontage Works Application
$615.00 $635.00 GL662-535009-22018
N Other
For the Total Development Works Value greater than $300,000 – Detailed Frontage Works Application
0.2% of the value of Development Value to a
maximum of $30,000
GL662-535009-22018
N Other
Additional Checking Fee for Each Re-Assessment ofPlans
$320.00 $330.00 GL662-535009-22018
N Other
Pre-Commencement & Final Inspection of Public Place – per inspection
$220.00 $225.00 GL662-535008-22018
N Other
DETAILED FRONTAGE WORKS APPROVALS (under the ROADS ACT)
Application fee for Roads Act Approval for Road & Frontage Works (Detailed Frontage Works Approval) (This does not include any design plans)
Year 18/19 Year 19/20
Name Fee Fee Account GST Pricing Policy
(incl. GST) (incl. GST)
Page 44 of 150
Year 18/19 Year 19/20
Name Fee Fee Account GST Pricing Policy
(incl. GST) (incl. GST)
ECONOMIC AND COMMUNITY DEVELOPMENTNB Refer Appendix for Sutherland Shire Open Space CX Levels
BANNER ADVERTISING
Restriction: Bookings cannot be made more than 9 months in advance
Applicant will be required to complete standard event application form prior to consultation with Council.
EVENTS – GENERAL
Also : The applicant agreeing to meet all relevant and current policy requirements in respect of :- Public Liability Insurance ($20million)- Public Property care, control and management
The cost of any damage exceeding the value of the bond will be met by the hirer.
Any facility damage exceeding the value of the bond will be met by the event organiser.
Asset Protection Bond – CX1 location $6,000.00 $6,000.00 GL900-100000-71036
N Bond
Asset Protection Bond – CX2 location $4,000.00 $4,000.00 GL900-100000-71036
N Bond
Asset Protection Bond – CX3 location $2,000.00 $2,000.00 GL900-100000-71036
N Bond
Asset Protection Bond – CX4 location $750.00 $750.00 GL900-100000-71036
N Bond
Charge per day for utilities – where individual meter reading is unavailable
$105.00 $105.00 GL112-502029-24030
Y Other
Keys – Bond $100.00 $100.00 GL900-100000-71036
N Bond
Event cancellation Administration Fee $100.00 $100.00 GL112-502029-24030
Y Other
Cancelling event within 1 week of event or after all processing is completed
Event Application Urgent Processing Fee $100.00 $100.00 GL112-502029-24030
Y Other
For applications requiring fast track processing within 2 weeks of an event
Carpark Closure Signage Fee $100.00 $100.00 GL112-502029-24030
Y Other
For signage provision, install and removal when carparks are requested to be closed
Asset Protection Bond – Major Events $0.00 $10,000.00 GL900-100000-71036
N Bond
Year 18/19 Year 19/20
Name Fee Fee Account GST Pricing Policy
(incl. GST) (incl. GST)
Page 45 of 150
Year 18/19 Year 19/20
Name Fee Fee Account GST Pricing Policy
(incl. GST) (incl. GST)
EVENTS – CATEGORY 1 EVENTS / ORGANISATIONS
Commercial events eg Surf league, National Series events, road closures, commercially operated events
Bin (waste) costs charged as per listed Waste Management fees
Cleansing - Quoted for individual events and billed directly to organiser
Fee per operational day $1,500.00 $1,520.00 GL112-502029-24030
Y Other
Fee per non-operational day (ie set up and pack up) $1,000.00 $1,125.00 GL112-502029-24030
Y Other
Commercial Large Scale Events
CX1 Location
Fee per operational day $1,060.00 $1,080.00 GL112-502029-24030
Y Other
Fee per non-operational day (ie set up and pack up) $790.00 $810.00 GL112-502029-24030
Y Other
Skateparks,CX2, CX3 & CX4 Locations
Ancillary Event support requirements
Power activation and metre reading at hired venues - Refer to Professional Services, Building Trades
Charge per day for Utilities – where individual meter reading is unavailable
$110.00 $115.00 GL682-539000-22018
Y Other
Commercial events (small scale less than 1000 people)
EVENTS – CATEGORY 2 EVENTS / ORGANISATIONS
Bin (waste) costs charged as per listed Waste Management fees
Cleansing - Quoted for individual events and billed directly to organiser
Fee per day $1,240.00 $1,280.00 GL112-502029-24030
Y Other
Commercial Small scale Events (less than 1000 people)
CX1 Locations
Fee per day $515.00 $530.00 GL112-502029-24030
Y Other
Skateparks, CX2,CX3 and CX4 Locations
Year 18/19 Year 19/20
Name Fee Fee Account GST Pricing Policy
(incl. GST) (incl. GST)
Page 46 of 150
Year 18/19 Year 19/20
Name Fee Fee Account GST Pricing Policy
(incl. GST) (incl. GST)
EVENTS – CATEGORY 3 EVENTS / ORGANISATIONS
Community based events for not-for-profit eg Charity, sporting clubs and associations, volunteer organisations
Fee per day $260.00 $270.00 GL112-502029-24030
Y Other
Fee per hour (up to 4 hrs) $26.00 $27.00 GL112-502029-24030
Y Other
Community Based Events for Not-for-Profit
All Locations
Ancillary Event support requirements
Power activation and metre reading at hired venues - Refer to Professional Services, Building Trades
Charge per day for Utilities – where individual meter reading is unavailable
$72.00 $74.00 GL682-539000-22018
Y Other
Fee per operational day $770.00 $790.00 GL112-502029-24030
Y Other
Fee per non-operational day (ie set up and pack up) $465.00 $480.00 GL112-502029-24030
Y Other
EVENTS – CATEGORY 4 EVENTS / ORGANISATIONS
Commercial Large Scale Events | Long term (> 2 weeks)
Medium Scale Commercial Events $0.00 $600.00 GL112-502029-24030
Y Other
Large Scale Commercial event $1,000.00 $1,030.00 GL112-502029-24030
Y Other
Small Scale event / Community / Not for Profit $300.00 $310.00 GL112-502029-24030
Y Other
NB: Exemptions apply to SLSNSW/SNSW affiliated organisations
EVENTS – CATEGORY 5 BEACH/OCEAN EVENTS
Peak (Dec/Jan/Feb)
Fee per Operational Day (or part there of)
Medium Scale Commercial Events $0.00 $300.00 GL112-502029-24030
Y Other
Off Peak (March to November)
Fee per Operational Day (or part there of)
continued on next page ...
Year 18/19 Year 19/20
Name Fee Fee Account GST Pricing Policy
(incl. GST) (incl. GST)
Page 47 of 150
Year 18/19 Year 19/20
Name Fee Fee Account GST Pricing Policy
(incl. GST) (incl. GST)
Large Scale Commercial event $500.00 $512.50 GL112-502029-24030
Y Other
Small Scale event / Community / Not for Profit $150.00 $154.00 GL112-502029-24030
Y Other
NB: Exemptions apply to SLSNSW/SNSW affiliated organisations
Fee per Operational Day (or part there of) [continued]
EVENTS – CIRCUSES
Charging of a bond is at the discretion of Council and the bond charged will be decided by Council in accordance with the activity and open space used by the circus. The cost of any facility damage exceeding the value of the bond will bemet by the Circus/Carnival operator.
EVENTS – HIRE FEES
All stall holders must supply evidence that they are covered by public liability insurance for markets.
Fee per day or part thereof $260.00 $270.00 GL112-502029-24030
Y Other
Fee per week or part thereof $925.00 $950.00 GL112-502029-24030
Y Other
EVENTS – MOBILE FOOD VENDOR
Product Sampling/ Promotion – Rate per hour $206.00 $210.00 GL112-502043-24030
N Other
Product Sampling/ Promotion – Rate per day (8 hours)
$1,240.00 $1,280.00 GL112-502043-24030
N Other
PRODUCT SAMPLING
CORPORATE CX1 LOCATIONS
(excludes land based personal trainers/fitness groups)
SMALL BUSINESS TRADER – PUBLIC AREA HIRE
Hire fee per week or part thereof $1,650.00 $1,700.00 GL112-502029-24030
Y Other
Fee per day or part thereof $260.00 $270.00 GL112-502029-24030
Y Other
CX1,CX2,CX3 and CX4 Locations
Advertising Fee $275.00 $285.00 GL201-512118-22004
N Other
TEMPORARY EVENT ROAD CLOSURE APPLICATION
Year 18/19 Year 19/20
Name Fee Fee Account GST Pricing Policy
(incl. GST) (incl. GST)
Page 48 of 150
Year 18/19 Year 19/20
Name Fee Fee Account GST Pricing Policy
(incl. GST) (incl. GST)
EVENTS & PERFORMING ARTS
ENGADINE THEATRE AND COMMUNITY CENTRE
1034 - 1036 Old Princes Highway Engadine
Day Rate $660.00 $680.00 GL125-512043-22030
Y Other
Bond $500.00 $500.00 GL900-100000-71036
N Bond
Movie Rate (Performance Space)
Rate includes 8 hours of technical support and operable wall movement
Full Facility
Rates Applicable from 1 January 2020
1 Day only $1,800.00 $1,850.00 GL125-512043-22030
Y Other
Subsequent per day $1,170.00 $1,200.00 GL125-512043-22030
Y Other
Bond $1,100.00 $1,100.00 GL900-100000-71036
N Bond
Rate includes 8 hours of technical support and operable wall movement
Performance Space (Halls 1 and 2, Dressing Rooms)
Rates Applicable from 1 January 2020
1 Day only $1,600.00 $1,640.00 GL125-512043-22030
Y Other
Subsequent per day $1,170.00 $1,200.00 GL125-512043-22030
Y Other
Bond $1,100.00 $1,100.00 GL900-100000-71036
N Bond
Non Refundable Booking Fee – Performance Events $165.00 $170.00 GL125-512043-22030
Y Other
Technical Support (minimum 8 hour block included in day rates (time must include bump in and bump out))
Technical Support in excess of 8 hours, per hour $90.00 $93.00 GL125-512043-22030
Y Other
Retractable Seating (Hall 2 west) $132.00 $136.00 GL125-512043-22030
Y Other
Operable Wall Movement (retracted/replaced) $360.00 $370.00 GL125-512043-22030
Y Other
Other Charges
Year 18/19 Year 19/20
Name Fee Fee Account GST Pricing Policy
(incl. GST) (incl. GST)
Page 49 of 150
Year 18/19 Year 19/20
Name Fee Fee Account GST Pricing Policy
(incl. GST) (incl. GST)
Stage Hire:
Stage per piece $125.00 $130.00 GL125-512043-22030
Y Other
Additional Items (steps and skirting) $57.00 $59.00 GL125-512043-22030
Y Other
Rates Applicable from 1 January 2020
Halls 1 and 2 combined
Function Rate $1,200.00 $1,230.00 GL125-512043-22030
Y Other
Bond $500.00 $500.00 GL900-100000-71036
N Bond
Full Rate per hour (plus Operable Wall Movement) $120.00 $125.00 GL125-512043-22030
Y Other
Discount Rate per hour (plus Operable Wall Movement)
$70.00 $72.00 GL125-512043-22030
Y Other
Rates Applicable from 1 January 2020
Hall 1 or 2
Full Rate per hour $42.00 $43.00 GL125-512043-22030
Y Other
Discount Rate per hour $26.00 $27.00 GL125-512043-22030
Y Other
Minimum Hire Amount (Casual) – 1 hour $62.00 $64.00 GL125-512043-22030
Y Other
Function Rate $600.00 $615.00 GL125-512043-22030
Y Other
Bond $500.00 $500.00 GL900-100000-71036
N Bond
Full Rate per hour $35.00 $36.00 GL125-512043-22030
Y Other
Discount Rate per hour $26.00 $27.00 GL125-512043-22030
Y Other
Minimum Hire Amount (Casual) – 1 hour $45.00 $46.00 GL125-512043-22030
Y Other
Function Rate $250.00 $255.00 GL125-512043-22030
Y Other
Bond $300.00 $300.00 GL900-100000-71036
N Bond
Meeting Rooms 1 and 2
Full Rate per hour $24.00 $25.00 GL125-512043-22030
Y Other
Meeting Room 1
continued on next page ...
Year 18/19 Year 19/20
Name Fee Fee Account GST Pricing Policy
(incl. GST) (incl. GST)
Page 50 of 150
Year 18/19 Year 19/20
Name Fee Fee Account GST Pricing Policy
(incl. GST) (incl. GST)
Discount Rate per hour $16.00 $16.00 GL125-512043-22030
Y Other
Minimum Hire Amount (Casual) – 1 hour $31.00 $32.00 GL125-512043-22030
Y Other
Meeting Room 1 [continued]
Full Rate per hour $28.00 $29.00 GL125-512043-22030
Y Other
Discount Rate per hour $20.00 $20.50 GL125-512043-22030
Y Other
Minimum Hire Amount (Casual) – 1 hour $38.00 $39.00 GL125-512043-22030
Y Other
Function Rate $140.00 $144.00 GL125-512043-22030
Y Other
Bond $150.00 $150.00 GL900-100000-71036
N Bond
Meeting Room 2 (with kitchenette)
Additional Information
SUTHERLAND ENTERTAINMENT CENTRE
1. Conditions of hire and additional rental charges are listed in the Sutherland Entertainment Centre booking contract andare available from centre staff.
2. A deposit is required for any hire of the Sutherland Entertainment Centre, being $1,500 per day for the auditorium or$250 per day for the Black Box.
3. The Sutherland Entertainment Centre (SEC) provides a full box office service including call centre, counter sales andweb bookings. All tickets must be sold exclusively through the SEC Box Office.
4. The SEC also provides promotional packages, catering packages and food and bar services.
5. Centre Management may negotiate reduced rental rates during off-peak periods.
6. No subsidy applies on Saturdays
LOCALNON-PROFIT COMMUNITYGROUPSRECEIVE AONETHIRDSUBSIDYONALL FEESANDCHARGES LISTEDBELOW AS 'STANDARD RATES', SUNDAY TO FRIDAY ONLY.
STANDARD RATE
Rates Applicable from 1 January 2020
Auditorium Rental
Daily rental constitutes 10 hours of continuous use of the Auditorium between 8.00am and midnight sharp and includes a technician for 9.5 hours.
Per Day $3,500.00 $3,590.00 GL120-504075-22031
Y Other
Monday – Thursday (January – December)
continued on next page ...
Year 18/19 Year 19/20
Name Fee Fee Account GST Pricing Policy
(incl. GST) (incl. GST)
Page 51 of 150
Year 18/19 Year 19/20
Name Fee Fee Account GST Pricing Policy
(incl. GST) (incl. GST)
4 Hour (Maximum) $2,600.00 $2,670.00 GL120-504075-22031
Y Other
Per Additional Hour (over 10) $350.00 $360.00 GL120-504075-22031
Y Other
Monday – Thursday (January – December) [continued]
Per Day $4,200.00 $4,310.00 GL120-504075-22031
Y Other
4 Hour (Maximum) $3,100.00 $3,180.00 GL120-504075-22031
Y Other
Per Additional Hour (over 10) $450.00 $465.00 GL120-504075-22031
Y Other
Friday – Sunday (January – October)
Per Day $5,000.00 $5,130.00 GL120-504075-22031
Y Other
4 Hour (Maximum) $3,750.00 $3,850.00 GL120-504075-22031
Y Other
Per Additional Hour (over 10) $450.00 $465.00 GL120-504075-22031
Y Other
Friday – Sunday (November – December)
Per Day $6,000.00 $6,150.00 GL120-504075-22031
Y Other
4 Hour (Maximum) $4,500.00 $4,620.00 GL120-504075-22031
Y Other
Per Additional Hour (over 10) $600.00 $615.00 GL120-504075-22031
Y Other
Public Holidays (January – December)
Package Rate As quoted GL120-504075-22031
Y Future
Packages
Black Box / Meeting Room Rental
Daily rental constitutes 8 hours of continuous use of combined Black Box/Meeting Room between the hours of 8.00amand midnight.
Per Day $650.00 $670.00 GL120-504075-22031
Y Other
4 Hour (Maximum) $480.00 $495.00 GL120-504075-22031
Y Other
Monday – Thursday (January to December)
continued on next page ...
Year 18/19 Year 19/20
Name Fee Fee Account GST Pricing Policy
(incl. GST) (incl. GST)
Page 52 of 150
Year 18/19 Year 19/20
Name Fee Fee Account GST Pricing Policy
(incl. GST) (incl. GST)
Per Additional Hour (over 8) $120.00 $123.00 GL120-504075-22031
Y Other
Monday – Thursday (January to December) [continued]
Per Day $800.00 $820.00 GL120-504075-22031
Y Other
4 Hour (Maximum) $600.00 $615.00 GL120-504075-22031
Y Other
Per Additional Hour (over 8) $200.00 $205.00 GL120-504075-22031
Y Other
Friday – Sunday (January to December)
Per Day $1,270.00 $1,310.00 GL120-504075-22031
Y Other
4 Hour (Maximum) $1,110.00 $1,140.00 GL120-504075-22031
Y Other
Per Additional Hour (over 8) $185.00 $190.00 GL120-504075-22031
Y Other
Public Holidays
Per Day $850.00 $875.00 GL120-504075-22031
Y Other
Per Night $1,000.00 $1,030.00 GL120-504075-22031
Y Other
Package Rate (includes Food and Beverages) As quoted GL120-504075-22031
Y Future
Foyer Hire (Ground Floor or First Floor)
TICKETING SERVICE FEES
Ticketing Fees (paid by hirer per ticket)
Discounts are offered for e-ticketing only packages - details available from SEC Management.
Ticket booking fees Community (per ticket) $3.00 $3.10 GL120-504075-22031
Y Other
Ticket booking fees non-Community (per ticket) $4.00 $4.10 GL120-504075-22031
Y Other
Complimentary ticket booking fee (issued at hirer request)
$1.00 $1.05 GL120-504075-22031
Y Other
Ticket set up to sell for events at other Council venues via SEC box office
$350.00 $360.00 GL120-504075-22031
Y Other
Ticket set up fee – free ticketed events $350.00 $360.00 GL120-504075-22031
Y Other
Transaction Fee – Schools (less than 3 performances)
2.5% per transaction plus $1per ticket
GL120-504075-22031
Y Other
Transaction Fee – School (3 performances or more) GL120-504075-22031
Y Other
continued on next page ...
Year 18/19 Year 19/20
Name Fee Fee Account GST Pricing Policy
(incl. GST) (incl. GST)
Page 53 of 150
Year 18/19 Year 19/20
Name Fee Fee Account GST Pricing Policy
(incl. GST) (incl. GST)
Transaction Fee – School (3 performances or more) 2.1% per transaction plus $1per ticket
GL120-504075-22031
Y Other
Ticketing Fees (paid by hirer per ticket) [continued]
Ticket transaction fee $1.00 $3.50 GL120-504075-22031
Y Other
Ticket transaction fee – Schools $0.50 $1.00 GL120-504075-22031
Y Other
Transaction Fees (paid by purchaser per transaction)
LOCALNON-PROFIT COMMUNITYGROUPSRECEIVE AONETHIRDSUBSIDYONALL FEESANDCHARGES LISTEDBELOW AS 'STANDARD RATES'.
ADDITIONAL FEES
Two pillar signs $350.00 $360.00 GL120-504075-22031
Y Other
Black Box av fee standard rate $100.00 $103.00 GL123-504045-22031
Y Other
Centrestage DL flyer inserts standard rate $650.00 $670.00 GL120-504075-22031
Y Other
DL flyer seat drop $120.00 $123.00 GL120-504075-22031
Y Other
D Cinema additional equipment fee standard rate $350.00 $360.00 GL123-504045-22031
Y Other
Full Marketing package – standard rate $1,400.00 $1,440.00 GL120-504075-22031
Y Other
Late Conclusion Fee after 12am – per 30 minutes beyond booking
Double applicable rate GL120-504075-22031
Y Other
Late Payment Fee (applicable after 30 days) $200.00 $205.00 GL120-504075-22031
Y Other
Piano hire (includes tuning) $550.00 $565.00 GL120-504054-22031
Y Other
Reset Fee in 10 hour booking standard rate $620.00 $640.00 GL120-504075-22031
Y Other
Sutherland Entertainment Centre Membership Fee $15.00 $15.50 GL120-504075-22031
Y Other
Technical Equipment Fee (levy for any SEC A/V equipment) standard rate
$465.00 $480.00 GL123-504045-22031
Y Other
Additional Technician hours above 9.5 included in Auditorium booking
$90.00 $93.00 GL120-504054-22031
Y Other
Additional Technician Fee (when 2nd tech required, per hour minimum 4 hrs)
$90.00 $93.00 GL120-504054-22031
Y Other
Hirer breaches of terms and conditions Costs plus 5% GL120-504054-22031
Y Other
Year 18/19 Year 19/20
Name Fee Fee Account GST Pricing Policy
(incl. GST) (incl. GST)
Page 54 of 150
Year 18/19 Year 19/20
Name Fee Fee Account GST Pricing Policy
(incl. GST) (incl. GST)
SCHOOL OF ARTS
1. Conditions of hire and additional rental charges are listed in the Sutherland School of Arts booking contract and areavailable from centre staff.
2. A deposit will be required prior to securing any booking at the Sutherland School of Arts, being $150 for a single daybooking or $450 for a multi-day booking.
Rates Applicable from 1 January 2020
COMMERCIAL / PROFIT MAKING THEATRE COMPANIES / ORGANISATIONS INCLUDING SCHOOL
Performance $600.00 $615.00 GL123-504045-22031
Y Other
Each additional performance on the same day $185.00 $190.00 GL123-504045-22031
Y Other
Rehearsal $300.00 $310.00 GL123-504045-22031
Y Other
Theatre holding rate per day $135.00 $140.00 GL123-504045-22031
Y Other
Stage Productions
Resetting technical (lighting and sound) facilities following a performance
$300.00 $310.00 GL123-504045-22031
Y Other
Technician Fee (per hour) $90.00 $93.00 GL123-504045-22031
Y Other
Sutherland Memorial School of Arts Technical Charges
Other Functions
Hire of All Facilities (theatre, foyer, kitchen and also technical facilities, if required, no technical staff etc are included)
Evening (6.30pm to midnight) $1,000.00 $1,030.00 GL123-504045-22031
Y Other
Daytime 8.00am to 5.30pm (up to 4 hours max) $635.00 $655.00 GL123-504045-22031
Y Other
Daytime 8.00am to 6.00pm (from 4 to 10 hours) $1,200.00 $1,230.00 GL123-504045-22031
Y Other
Security Breach Callout Fee $350.00 $360.00 GL123-504050-22031
Y Other
Hirer breaches of terms and conditions Costs plus 5% GL123-504050-22031
Y Other
Performance $295.00 $305.00 GL123-504045-22031
Y Other
NON PROFIT MAKING THEATRE COMPANIES AND ORGANISATIONS
Stage Productions
continued on next page ...
Year 18/19 Year 19/20
Name Fee Fee Account GST Pricing Policy
(incl. GST) (incl. GST)
Page 55 of 150
Year 18/19 Year 19/20
Name Fee Fee Account GST Pricing Policy
(incl. GST) (incl. GST)
Each additional performance on any one day $160.00 $164.00 GL123-504045-22031
Y Other
Rehearsal $225.00 $230.00 GL123-504045-22031
Y Other
Theatre Holding Rate per day $105.00 $110.00 GL123-504045-22031
Y Other
Stage Productions [continued]
Resetting technical (lighting and sound) facilities following a performance
$300.00 $310.00 GL123-504045-22031
Y Other
Technician Fee (per hour) $90.00 $93.00 GL123-504045-22031
Y Other
Sutherland Memorial School of Arts Technical Charges
Other Functions
Hire of All Facilities (theatre, foyer, kitchen and also technical facilities, if required, but not an SMSA technician)
Evening (6.30pm to midnight) $450.00 $465.00 GL123-504045-22031
Y Other
Daytime 8.00am to 5.30pm (up to 4 hours max) $555.00 $570.00 GL123-504045-22031
Y Other
Daytime 8.00am to 6.00pm (from 4 to 10 hours) $765.00 $785.00 GL123-504045-22031
Y Other
Security Breach Callout Fee $350.00 $360.00 GL123-504050-22031
Y Other
Hirer breaches of terms and conditions Costs plus 5% GL123-504050-22031
Y Other
1 x Single Fete Stall 2.4m x 2.4m $150.00 $154.00 Various Y Other
1 x Double Fete Stall 4.8m x 2.4m $250.00 $260.00 Various Y Other
1 x Single Fete Stall Site Only 3m x 3m $125.00 $128.00 Various Y Other
Electricity per appliance $18.00 $18.50 Various Y Other
Council's electrician will provide appropriate fluro lighting inside a stall and appropriate external lighting for vanc/pop up marqueesar no charge to the stall holder
STALLHOLDER FEES
Year 18/19 Year 19/20
Name Fee Fee Account GST Pricing Policy
(incl. GST) (incl. GST)
Page 56 of 150
Year 18/19 Year 19/20
Name Fee Fee Account GST Pricing Policy
(incl. GST) (incl. GST)
FILMINGFees may be waivered or reduced in accordance with the Local Government Filming Protocol 2009 (page 23 section 6).
No Application Fee (Ultra Low Impact) $105.00 $110.00 GL113-502036-22036
N Other
Consideration based on:No more than 10 crewNo disruption is caused to the Council's stakeholders, retailers or motorists or other events in the vicinity of the activitiesActivities are contained to footways or public open space areas onlyPublic safety is maintained at the locations at all times during the conduct of the activitiesVehicles associated with the conduct of the activities are legally parked at all times and are not driven onto footways, parks orplaza areas
Application Fee – non refundable (Low Impact) $210.00 $215.00 GL113-502036-22036
N Other
Consideration based on:11 - 25 CrewNo more than 4 trucks/vansNo constructionMinimal equipment/lightingSmall or no unit base requiredUsually 1-2 location
Application Fee – non refundable (Medium Impact) $425.00 $440.00 GL113-502036-22036
N Other
Consideration based on:26 - 50 crewNo more than 10 trucksSome constructionEquipment used for example, dolly, trucks, medium-sized cranes, jibsUnit base requiredNo more than 4 locations
Application Fee – non refundable (High Impact) $685.00 $705.00 GL113-502036-22036
N Other
Consideration based on:> 50 crew> 10 trucksSignificant constructionExtensive equipmentLarge unit base required> 4 locations
Itemised Fees – Council Controlled Property
When a production is filming on private property or areas not controlled by the Council, and the council is required to approve parking plans or unit base plans
$195.00 $200.00 GL113-502036-22036
N Other
An additional 75% of the application fee will apply if: 75% of the application fee (non-refundable)
GL113-502036-22036
N Other
1. a major revision arises where significant changes occur in the timing and nature of the filming activity, and2. where this could seriously disrupt arrangements made by surrounding businesses and residents in anticipation of the filmingactivity or
Application Fees – Private
continued on next page ...
Year 18/19 Year 19/20
Name Fee Fee Account GST Pricing Policy
(incl. GST) (incl. GST)
Page 57 of 150
Year 18/19 Year 19/20
Name Fee Fee Account GST Pricing Policy
(incl. GST) (incl. GST)
An additional 75% of the application fee will apply if: 75% of the application fee (non-refundable)
GL113-502036-22036
N Other
1. a major revision arises where significant changes occur in the timing and nature of the filming activity, and2. where this could seriously disrupt arrangements made by surrounding businesses and residents in anticipation of the filmingactivity or3. where the approval requires the consideration of a number of new matters by Council.
Application Fees – Private [continued]
Traffic Control Assessment – Traffic Management Plan – Police Consultation (Low Impact)
$160.00 $165.00 GL113-502036-22036
N Other
Traffic Control Assessment – Traffic Management Plan RTA consultation (medium/high)
$320.00 $330.00 GL113-502036-22036
N Other
Location research/site inspection/supervision (per hour)
$71.00 $73.00 GL113-502036-22036
N Other
Access to available power on site (per day) $71.00 $73.00 GL113-502036-22036
N Other
Site preparation (per hour) $71.00 $73.00 GL113-502036-22036
N Other
Animals – per day (high impact productions) $530.00 $545.00 GL113-502036-22036
N Other
Animals – half day (high impact productions) $265.00 $275.00 GL113-502036-22036
N Other
Photographic Stills $125.00 $130.00 GL113-502036-22036
N Other
Amenity Cleaning Fee $95.00 $98.00 GL113-502036-22036
N Other
Other Fees
Bond
NB Non standard projects are subject to risk assessment. Bond to be set at a reasonable level to be negotiated between council and filmmaker depending on risk assessment.
Crew 26+ $1,100.00 $1,100.00 GL900-100000-71036
N Bond
Crew: Up to 25 $500.00 $500.00 GL900-100000-71036
N Bond
Existing venue fees will be applicable as per SSC schedule of fees and charges (per location)
Various GL113-502036-22036
N Other
Council Venue Hire Half Day (for all other Council venues not already covered in SSC schedule of feesand charges) per location.
$390.00 $400.00 GL113-502036-22036
N Other
Council Venue Full Day (for all other Council venuesnot already covered in SSC schedule of fees and charges) per location.
$655.00 $675.00 GL113-502036-22036
N Other
Venue Fees
Year 18/19 Year 19/20
Name Fee Fee Account GST Pricing Policy
(incl. GST) (incl. GST)
Page 58 of 150
Year 18/19 Year 19/20
Name Fee Fee Account GST Pricing Policy
(incl. GST) (incl. GST)
FOOTPATH USE
Application Fee – for preparation and issuing of Outdoor Eating Licences
$260.00 $270.00 GL167-509116-24002
N Other
A security deposit is required when an Outdoor Eating Licence is commenced. The bond should be in the form of a Bank Guarantee or similar and is to be equivalent to three months rent
3 months rent GL900-100000-71036
N Bond
Areas in Cronulla covered by fixed umbrella and side panels. Per m² per annum
$465.00 $480.00 GL167-509116-24002
N Other
Zone 1: Cronulla Plaza and Perryman Plaza. Per m²per annum
$385.00 $395.00 GL167-509116-24002
N Other
Zone 2: Cronulla (excl zone 1 areas), Gymea, Menai, Sutherland. Per m² per annum
$310.00 $320.00 GL167-509116-24002
N Other
Zone 3: Caringbah, Engadine, Jannali, Kirrawee, Miranda. Per m² per annum
$260.00 $270.00 GL167-509116-24002
N Other
Zone 4: Bundeena, Heathcote, Sylvania, Sylvania Heights and other centres. Per m² per annum
$155.00 $160.00 GL167-509116-24002
N Other
OUTDOOR EATING APPROVALS
Application fee for preparation and issuing of Shopfront Display Consents
$125.00 $130.00 GL167-509199-24002
N Other
A security deposit is required when a Shopfront Display Consent is commenced. The bond should be in the form of a Bank Guarantee or similar and is to be equivalent to three months rent
3 months rent GL900-100000-71036
N Bond
Zone 1: Cronulla Plaza and Perryman Plaza. $185.00 $190.00 GL167-509199-24002
N Other
Zone 2: Cronulla (excl zone 1 areas), Gymea, Menai, Sutherland
$170.00 $175.00 GL167-509199-24002
N Other
Zone 3: Caringbah, Engadine, Jannali, Kirrawee, Miranda.
$155.00 $160.00 GL167-509199-24002
N Other
Zone 4: Bundeena, Heathcote, Sylvania, Sylvania Heights and other centres.
$105.00 $108.00 GL167-509199-24002
N Other
SHOPFRONT DISPLAY CONSENTS
Maximum fee charged $285.00 $285.00 GL167-509002-24002
N Other
Replacement of A-Frame adhesive label $10.00 $10.50 GL167-509002-24002
N Other
A-FRAME APPROVALS
Year 18/19 Year 19/20
Name Fee Fee Account GST Pricing Policy
(incl. GST) (incl. GST)
Page 59 of 150
Year 18/19 Year 19/20
Name Fee Fee Account GST Pricing Policy
(incl. GST) (incl. GST)
GOLF COURSE FEES
THE RIDGE GOLF COURSE
Discounted Fees: Off Peak Times or at the discretion of the operator.
Public $28.00 $28.50 GL702-542014-22035
Y Other
Seniors/pensioners $18.50 $19.00 GL702-542014-22035
Y Other
Child $15.50 $15.00 GL702-542014-22035
Y Other
Green fees
Weekday 9 holes
Public $38.00 $39.00 GL702-542014-22035
Y Other
Seniors/pensioners $28.00 $29.00 GL702-542014-22035
Y Other
Child $20.00 $20.50 GL702-542014-22035
Y Other
Weekday 18 holes
Public $28.00 $28.50 GL702-542014-22035
Y Other
Seniors/pensioners $28.00 $28.50 GL702-542014-22035
Y Other
Child $15.00 $15.00 GL702-542014-22035
Y Other
Weekend & Public Holidays 9 holes
Public $45.00 $46.00 GL702-542014-22035
Y Other
Seniors/pensioners $45.00 $46.00 GL702-542014-22035
Y Other
Child $20.00 $20.00 GL702-542014-22035
Y Other
Weekend & Public Holidays18 holes
Public $20.00 $20.00 GL702-542014-22035
Y Other
Seniors/pensioners $15.00 $15.00 GL702-542014-22035
Y Other
Twilight Golf (mid week only)
continued on next page ...
Year 18/19 Year 19/20
Name Fee Fee Account GST Pricing Policy
(incl. GST) (incl. GST)
Page 60 of 150
Year 18/19 Year 19/20
Name Fee Fee Account GST Pricing Policy
(incl. GST) (incl. GST)
Child $10.00 $10.00 GL702-542014-22035
Y Other
Junior Program/School Sport $9.30 $10.00 GL702-542014-22035
Y Other
Use of short game practice area (per hour) $6.00 $6.00 GL702-542014-22035
Y Other
Use of short game with balls purchased $0.00 $3.00 GL702-542014-22035
Y Other
Twilight Golf (mid week only) [continued]
80 players or less – rate per player $38.00 $39.00 GL702-542014-22035
Y Other
More than 80 players – rate per player $33.00 $34.00 GL702-542014-22035
Y Other
Corporate days (weekday only 18 holes)
THE RIDGE GOLF DRIVING RANGE
Warm up bucket of balls
Promotional and off-peak rates at discretion of operator.
50% off standard rate– only when purchased with round of golf – Promotional and off-peak rates at discretion of Operator
50% GL702-542017-22035
Y Other
Bucket of Balls
Off Peak Rate (at discretion of operator)
Large Bucket – 100 Balls $20.00 $20.00 GL702-542017-22035
Y Other
Medium Bucket – 60 Balls $15.00 $15.00 GL702-542017-22035
Y Other
Small Bucket – 30 Balls $10.00 $10.00 GL702-542017-22035
Y Other
Community Group Bookings – 100 balls (20 person minimum) per person
$14.50 $14.50 GL702-542017-22035
Y Other
Bay Hire
Year 18/19 Year 19/20
Name Fee Fee Account GST Pricing Policy
(incl. GST) (incl. GST)
Page 61 of 150
Year 18/19 Year 19/20
Name Fee Fee Account GST Pricing Policy
(incl. GST) (incl. GST)
KAREELA GOLF COURSE
Discounted Fees: Off Peak Times or at the discretion of the operator.Water Levy Fee: at discretion of operator
Public $28.00 $30.00 N/a Y Other
Members $19.50 $22.00 N/a Y Other
Pensioners/Seniors $19.50 $24.00 N/a Y Other
Children $15.50 $16.00 N/a Y Other
Weekdays (excl. P/Hols.)
18 Holes
Public $18.50 $22.00 N/a Y Other
Members $16.50 $18.00 N/a Y Other
Pensioners/Seniors $16.50 $20.00 N/a Y Other
Children $12.50 $13.00 N/a Y Other
School Sport $12.50 $13.00 N/a Y Other
9 Holes
2 Hours Before Sunset or as stipulated $14.50 $18.00 N/a Y Other
Twilight Golf
Public $31.00 $34.00 N/a Y Other
Members $23.00 $24.00 N/a Y Other
Pensioners/Seniors $31.00 $32.00 N/a Y Other
Children $18.50 $19.00 N/a Y Other
Weekends & Public Hols.
18 Holes
Public $23.00 $26.00 N/a Y Other
Members $18.50 $20.00 N/a Y Other
Pensioners/Seniors $23.00 $25.00 N/a Y Other
Children $15.50 $16.00 N/a Y Other
9 Holes
2 Hours Before Sunset or as stipulated $15.50 $18.00 N/a Y Other
Twilight Golf
Year 18/19 Year 19/20
Name Fee Fee Account GST Pricing Policy
(incl. GST) (incl. GST)
Page 62 of 150
Year 18/19 Year 19/20
Name Fee Fee Account GST Pricing Policy
(incl. GST) (incl. GST)
WOOLOOWARE GOLF COURSE
Discounted Fees: Off Peak Times or at the discretion of the operator.
Public $35.00 $36.00 N/a Y Other
Members $26.00 $26.00 N/a Y Other
Concession (Seniors, Pensioners & Students) $26.00 $27.00 N/a Y Other
Children $15.00 $15.00 N/a Y Other
Weekdays (excl. P/Hols.)
18 Holes
Public $26.00 $27.00 N/a Y Other
Concession (Seniors, Pensioners & Students) $24.00 $25.00 N/a Y Other
Children $15.00 $15.00 N/a Y Other
School Sport $8.50 $8.50 N/a Y Other
Golf Awareness Program $8.50 $8.50 N/a Y Other
9 Holes (only available during Off Peak Times)
Use of short game practice area (per hour) $5.10 $5.30 N/a Y Other
Use of short game practice area (per hour)
40 Players or less $35.00 $35.00 N/a Y Other
41 to 80 Players $33.00 $33.00 N/a Y Other
81 to 120 Players $31.00 $31.00 N/a Y Other
121+ Players $29.00 $29.00 N/a Y Other
Corporate Events (18 Holes Only)
Seniors (mid week) $0.00 $16.00 GL702-542016-22035
Y Other
1 Hour Before Sunset or as stipulated (Mid week) $18.00 $18.00 N/a Y Other
1 Hour Before Sunset or as stipulated (Weekend) $21.00 $22.00 N/a Y Other
Members (mid week) $8.50 $8.80 N/a Y Other
Members (weekend) $10.50 $11.00 N/a Y Other
Twilight Golf
Public $41.00 $42.00 N/a Y Other
Weekends & Public Hols.
18 Holes
continued on next page ...
Year 18/19 Year 19/20
Name Fee Fee Account GST Pricing Policy
(incl. GST) (incl. GST)
Page 63 of 150
Year 18/19 Year 19/20
Name Fee Fee Account GST Pricing Policy
(incl. GST) (incl. GST)
Members $29.00 $29.00 N/a Y Other
Concession (Seniors, Pensioners & Students) $40.00 $41.00 N/a Y Other
Children $18.00 $18.00 N/a Y Other
18 Holes [continued]
Public $29.00 $30.00 N/a Y Other
Consession (Seniors, Pensioners & Students) $29.00 $30.00 N/a Y Other
Children $18.00 $18.00 N/a Y Other
9 Holes (only available during Off Peak Times)
Year 18/19 Year 19/20
Name Fee Fee Account GST Pricing Policy
(incl. GST) (incl. GST)
Page 64 of 150
Year 18/19 Year 19/20
Name Fee Fee Account GST Pricing Policy
(incl. GST) (incl. GST)
HAZELHURST GALLERY
COMMUNITY ARTS CENTRE
Centre Initiated Programs
Rates are applicable for a calendar year ie January to December
Adult Term Programs – maximum (10% discount for members of the Friends of Hazelhurst)
$440.00 $455.00 GL134-505050-22032
Y Other
Children/Youth Term Programs – maximum (10% discount for members of the Friends of Hazelhurst)
$250.00 $255.00 GL134-505050-22032
Y Other
Children/Youth School Holiday Programs maximum (10% discount for members of the Friends of Hazelhurst)
$110.00 $113.00 GL134-505050-22032
Y Other
Public Programs/Short Courses/Weekend Workshops (10% discount for members of the Friends of Hazelhurst)
As Advertised GL134-505050-22032
Y Future
Materials for art classes and public programs As Advertised GL134-505050-22032
Y Future
School Excursion Art Trail + 2 Workshops – per participant, minimum 18/group
$20.00 $20.50 GL134-505050-22032
Y Other
School Excursion Art Trail + 2 Workshops – minimum fee
$360.00 $360.00 GL134-505050-22032
Y Other
School Excursion Art in the Garden 90 min – per participant, max 20/group
$12.00 $12.00 GL134-505050-22032
Y Reg
School Excursion Art in the Garden 90 min – minimum fee
$180.00 $180.00 GL134-505050-22032
Y Other
School programs other As Advertised GL134-505050-22032
Y Future
School Excursions/Requested Classes – cancellation fee
25% of participation fee GL134-505050-22032
Y Other
New Media Studio Programs (10% discount for members of the Friends of Hazelhurst)
As Advertised GL134-505050-22032
Y Future
Art Trail Education Notes – per student $3.00 $3.00 GL134-505050-22032
Y Other
Early Education As Advertised GL134-505050-22032
Y Future
Per Artist / Half Day (3 hours) $38.00 $38.00 GL130-505025-22032
Y Other
Per Artist / 1 Day (4-6 hours) $60.00 $62.00 GL130-505025-22032
Y Other
Artists Access
Kiln firing charges for works larger than 30 cm h x 40 cm w
Hazelhurst Student Kiln Firing
Electric kiln bisque per kg $7.00 $7.20 GL134-505050-22032
Y Other
continued on next page ...
Year 18/19 Year 19/20
Name Fee Fee Account GST Pricing Policy
(incl. GST) (incl. GST)
Page 65 of 150
Year 18/19 Year 19/20
Name Fee Fee Account GST Pricing Policy
(incl. GST) (incl. GST)
Electric kiln earthenware glaze per kg $8.00 $8.20 GL134-505050-22032
Y Other
Gas Kiln per kg $10.00 $10.50 GL134-505050-22032
Y Other
Hazelhurst Student Kiln Firing [continued]
Commission on Sales 30% GL130-505002-24034
Y Other
Cancellation Fee 25% of hire charges GL130-505025-22032
Y Other
All hire categories, individual artist, small group and incorporated groups from March 2020 (including drum and southern foyer and preparators fees – conditions apply).
$990.00 $1,020.00 GL130-505025-22032
Y Other
Preparator's Fee $45.00 $45.00 GL130-505025-22032
Y Other
BROADHURST GALLERY HIRE
Studio/room hire half day (3 hours) $95.00 $98.00 GL130-505025-22032
Y Other
Studio/room hire whole day $175.00 $180.00 GL130-505025-22032
Y Other
Community Group Studio Access (Per person/hour) $2.00 $2.00 GL130-505025-22032
Y Other
Kiln Hire – per firing – External Hirers only $93.00 $96.00 GL130-505025-22032
Y Other
Studio Hire
Per Half Day (3 hours) $180.00 $185.00 GL130-505027-22032
Y Other
Per Full Day $360.00 $370.00 GL130-505027-22032
Y Other
Hire of audio visual equipment $90.00 $93.00 GL130-505027-22032
Y Other
Theatrette Hire
General Entry Free Y Other
Special Exhibitions As Advertised GL131-505045-22032
Y Future
Gallery Foyer and Deck Function Hire Fee $705.00 $725.00 GL130-505029-22032
Y Other
Gallery Foyer Hire During Opening Hours (Max 2 hours)
$210.00 $216.00 GL130-505029-22032
Y Other
REGIONAL ART GALLERY
Year 18/19 Year 19/20
Name Fee Fee Account GST Pricing Policy
(incl. GST) (incl. GST)
Page 66 of 150
Year 18/19 Year 19/20
Name Fee Fee Account GST Pricing Policy
(incl. GST) (incl. GST)
HAZELHURST GARDENS
Weddings ceremonies and like event (including photography) max 2 hours
$480.00 $495.00 GL130-505024-22032
Y Other
Cancellation Fee 25% of hire fee GL130-505024-22032
Y Other
Photography Fee, excluding ceremony/event, max 1hours
$165.00 $170.00 GL130-505028-22032
N Other
Technical Assistance and Security – per person, perhour
$60.00 $62.00 GL130-505024-22032
Y Other
Post event cleaning/pack-up fee $160.00 $164.00 GL130-505024-22032
Y Other
Entry/Handling Fee (maximum 3 works per artist) $47.00 $48.00 GL131-505016-24025
Y Other
HAZELHURST ART ON PAPER AWARD
Standard frames per frame per week $16.00 $16.00 GL130-505024-22032
Y Other
Data projector, PA or DVD for function hire $160.00 $164.00 GL130-505024-22032
Y Other
EQUIPMENT HIRE
Consigned Goods – arts & crafts 30% commission GL130-505002-24034
Y Other
Consigned Merchandise – publications & art materials
as advertised GL130-505002-24034
Y Future
General Merchandise Prices as per RRP GL130-505002-24034
Y Other
Made by Hand Market inside stall space (2m x 1.5m)
$115.00 $120.00 Various Y Other
Made by Hand Market inside suitcase stall space (1m x 1m)
$75.00 $77.00 Various Y Other
Made by Hand Market outside marquee stall space (3m x 3m)
$125.00 $130.00 Various Y Other
Made by Hand Market trestle table hire $15.00 $15.00 Various Y Other
Film Club general 12 months membership $55.00 $50.00 GL133-505041-22032
Y Other
Film Club Friends of Hazelhurst 12 month membership
$50.00 $45.00 GL133-505041-22032
Y Other
Photocopying – B&W $0.45 $0.50 GL130-505024-22032
Y Other
Photocopying – Colour $1.50 $1.55 GL130-505024-22032
Y Other
Photocopying – Transparency $2.00 $2.00 GL130-505024-22032
Y Other
MERCHANDISE
Year 18/19 Year 19/20
Name Fee Fee Account GST Pricing Policy
(incl. GST) (incl. GST)
Page 67 of 150
Year 18/19 Year 19/20
Name Fee Fee Account GST Pricing Policy
(incl. GST) (incl. GST)
HIRE OF FACILITIES – CHILDREN'S SERVICES FACILITIES RENTAL
31A Wandella Road Miranda
RENTAL FOR MIRANDA CHILDREN’S CENTRE
Wombat Occasional Care – Rate per hour $13.00 $15.00 GL183-503123-22025
Y Other
Commercial Groups – Rate per Hour $20.50 $21.50 GL183-503123-22025
Y Other
Community Groups (Not for Profit) – Rate per Hour $14.50 $15.50 GL183-503123-22025
Y Other
Storage Levy (per week including holidays) $12.00 $12.50 GL183-503123-22025
Y Other
Please refer to Community Centre & Halls Bonds and Generic Fees Section for fees payable for waste disposal, key deposit/bond, cleaning & storage levies.
OTHER CHARGES
Year 18/19 Year 19/20
Name Fee Fee Account GST Pricing Policy
(incl. GST) (incl. GST)
Page 68 of 150
Year 18/19 Year 19/20
Name Fee Fee Account GST Pricing Policy
(incl. GST) (incl. GST)
HIRE OF FACILITIES – COMMUNITY CENTRES
BONDS AND GENERIC FEES (to be applied where no suitable fee exists at thathall)
Under the terms and conditions of Council’s Hire Agreements for Regular Hire, where payment of a security bond is requested and a bond fee is not already adopted by Council, the bond shall be equivalent to one months’ rent currentlypaid by the group.
Non-refundable booking deposit applicable for casual users
$60.00 $62.00 Various Y PubExh
Failure to return keys by the following business day or specified time as approved by Community Facilities Management (charge applies per day).
$0.00 $70.00 GL206-512000-22030
Y PubExh
Charge applies per day, maximum 7 days. Afterwards forfeit bond.
Failure to pick up keys (causing an after-hours service)
$0.00 $110.00 GL206-512000-22030
Y PubExh
Key Deposit (refundable) – for viewing of buildings $50.00 $50.00 GL900-100000-71036
N Bond
Loss of Keys (including replacement) $0.00 $110.00 GL206-512000-22030
Y PubExh
Applies to Casual, Permanent and Licensed Clients.
Key Bond $70.00 $70.00 GL900-100000-71036
N Bond
Special Key Bond – "smartkeys" $150.00 $150.00 GL900-100000-71036
N Bond
Key and Swipe card replacement will be charged at the cost of replacement plus an administration charge.
$52.00 $54.00 Various Y PubExh
High Risk Bond $1,500.00 $1,500.00 GL900-100000-71036
N Bond
Extreme Risk bond $5,000.00 $5,000.00 GL900-100000-71036
N Bond
Keys and Swipe Cards
Function is period of no more than ten hours
Definitions
A short function is a period of no more than four hours - 60% of full function rate
NB Per Term refers to School terms (four per annum)
Minimum Hire Period - 1 hour
Alarm callout for all facilities $60.00 $62.00 Various Y PubExh
Disturbance of the peace: noise pollution, resident's complaints (written complaints to be provided)
$0.00 $100.00 GL206-512000-22030
Y PubExh
Other Charges
continued on next page ...
Year 18/19 Year 19/20
Name Fee Fee Account GST Pricing Policy
(incl. GST) (incl. GST)
Page 69 of 150
Year 18/19 Year 19/20
Name Fee Fee Account GST Pricing Policy
(incl. GST) (incl. GST)
Failure to secure facility (including alarm/security response/securing premises)
From $60 to $100dependent on the type of
security matter
Various Y PubExh
Misrepresentation and/or failure to disclose correct or all information pertaining to the booking
Forfeit of bond and any otheradditional costs per quote for
works to be undertaken
GL206-512000-22030
Y PubExh
• Including but not limited to: nature of the function, identity of person making the booking (bookings can only be made bypersons aged 18 and over), exceeding the capacity of the centre and consumption of alcohol on the premises without Counciland NSW Police approval.
Call-out due to hirer negligence – minimum charge $270.00 $280.00 Various Y PubExh
Election Day Hire $0.00 $1,100.00 GL206-512000-22030
Y PubExh
Access outside approved booked hours (without Council consent)
$80 plus applicable hourlyrate.
GL206-512000-22030
Y PubExh
Fire Brigade Callout Fee As prescribed by Fire NSW Various N Other
Function Waste Disposal Fee $175.00 $180.00 Various Y PubExh
Late payment fee $22.00 $25.00 Various Y PubExh
Minimum Administration Fee $31.00 $32.00 Various Y PubExh
Minimum Cleaning Fee $85.00 $88.00 Various Y PubExh
Security Guard Fee (per hour) $42.00 $44.00 Various Y PubExh
Urgent Booking Fee (3 working days notice or less) $60.00 $60.00 Various Y PubExh
Utilities Surcharge per hour $2.20 $2.20 GL206-512167-22030
Y PubExh
Not applicable for facilities that operate through a management committee
Function/Event raising funds for registered charities and Schools
80% of the Full Rate Various Y PubExh
Other Charges [continued]
Storage Levy (per week) – small $8.30 $8.50 Various Y PubExh
Storage Levy (per week) – medium $10.50 $11.00 Various Y PubExh
Storage Levy (per week) – large $21.00 $22.00 Various Y PubExh
Storage Levy (per week) – Small Room $46.50 $48.00 Various Y PubExh
Failure to store equipment (e.g. tables/chairs) and toturn off any electrics (e.g. lights/fans/air conditioning) at the end of the hire period
$0.00 $50.00 GL206-512000-22030
Y PubExh
All goods/equipment brought into the facility by the hirer must be removed no later than the booked end time.
$0.00 $200.00 GL206-512000-22030
Y PubExh
Use of prohibited items (e.g. fireworks,barbeques, other articles deemed to be objectionable and disposing of flammable items)
$200 in addition to any othercosts as per quote for works
to be undertaken
GL206-512000-22030
Y PubExh
Storage and Equipment
Year 18/19 Year 19/20
Name Fee Fee Account GST Pricing Policy
(incl. GST) (incl. GST)
Page 70 of 150
Year 18/19 Year 19/20
Name Fee Fee Account GST Pricing Policy
(incl. GST) (incl. GST)
ALFORDS POINT COMMUNITY CENTRE
48R Coachwood Crescent Alfords Point
Full Rate – per hour $27.00 $30.00 GL206-512129-22030
Y PubExh
Discount Rate – per hour $13.50 $16.00 GL206-512129-22030
Y PubExh
Event/Function Rate:applies to capped hourly Event/Function rates
$225.00 $250.00 GL206-512129-22030
Y PubExh
Hourly Event/Function Rate (applies to all events and functions and all bookings from 4pm Friday, Saturday, Sunday and Public Holidays to all groups incl. Not for Profit) : capped at the event/function rate
$0.00 $45.00 GL206-512129-22030
Y PubExh
Bond $300.00 $500.00 GL900-100000-71036
N Bond
ANZAC OVAL YOUTH AND RECREATION CENTRE
111 Anzac Avenue Engadine
Full Rate per hour $25.00 $28.00 GL206-512122-22030
Y PubExh
Discount Rate per hour $14.50 $17.00 GL206-512122-22030
Y PubExh
Event/Function Rate:applies to capped hourly Event/Function rates
$285.00 $315.00 GL206-512122-22030
Y PubExh
Hourly Event/Function Rate (applies to all events and functions and all bookings from 4pm Friday, Saturday, Sunday and Public Holidays to all groups incl. Not for Profit) : capped at the event/function rate
$0.00 $42.00 GL206-512122-22030
Y PubExh
Bond $400.00 $500.00 GL900-100000-71036
N Bond
Main Hall
Full Rate per hour $24.00 $26.00 GL206-512122-22030
Y PubExh
Discount Rate per hour $12.50 $14.50 GL206-512122-22030
Y PubExh
Event/Function Rate:applies to capped hourly Event/Function rates
$180.00 $205.00 GL206-512122-22030
Y PubExh
Hourly Event/Function Rate (applies to all events and functions and all bookings from 4pm Friday, Saturday, Sunday and Public Holidays to all groups incl. Not for Profit) : capped at the event/function rate
$0.00 $38.00 GL206-512122-22030
Y PubExh
Bond $200.00 $500.00 GL900-100000-71036
N Bond
Meeting Rooms (Combined)
Year 18/19 Year 19/20
Name Fee Fee Account GST Pricing Policy
(incl. GST) (incl. GST)
Page 71 of 150
Year 18/19 Year 19/20
Name Fee Fee Account GST Pricing Policy
(incl. GST) (incl. GST)
Meeting Room 2 (kitchen)
Full Rate per hour $16.50 $19.00 GL206-512122-22030
Y PubExh
Discount Rate per hour $9.30 $12.00 GL206-512122-22030
Y PubExh
Full Rate per hour $14.50 $17.00 GL206-512122-22030
Y PubExh
Discount Rate per hour $8.30 $10.50 GL206-512122-22030
Y PubExh
Meeting Room 1
Full Rate per hour $31.00 $34.00 GL206-512122-22030
Y PubExh
Discount Rate per hour $16.50 $19.00 GL206-512122-22030
Y PubExh
Hourly Event/Function Rate (applies to all events and functions and all bookings from 4pm Friday, Saturday, Sunday and Public Holidays to all groups incl. Not for Profit) : capped at the event/function rate
$0.00 $50.00 GL206-512122-22030
Y PubExh
Gymnasium
Per Term (Football, Rugby League, Cricket) $625.00 $645.00 GL206-512122-22030
Y PubExh
Full Rate per hour $28.00 $29.00 GL206-512122-22030
Y PubExh
Discount Rate per hour $15.50 $16.00 GL206-512122-22030
Y PubExh
Clubrooms
50R Billa Road Bangor
BILLA ROAD PLAYGROUP HALL
Full Rate per hour $17.50 $20.00 GL206-512034-22030
Y PubExh
Discount Rate Day Rate per hour $11.50 $14.00 GL206-512034-22030
Y PubExh
Event/Function Rate:applies to capped hourly Event/Function rates
$105.00 $130.00 GL206-512034-22030
Y PubExh
Hourly Event/Function Rate (applies to all events and functions and all bookings from 4pm Friday, Saturday, Sunday and Public Holidays to all groups incl. Not for Profit) : capped at the event/function rate
$0.00 $28.00 GL206-512034-22030
Y PubExh
Bond $200.00 $500.00 GL900-100000-71036
N Bond
Year 18/19 Year 19/20
Name Fee Fee Account GST Pricing Policy
(incl. GST) (incl. GST)
Page 72 of 150
Year 18/19 Year 19/20
Name Fee Fee Account GST Pricing Policy
(incl. GST) (incl. GST)
BOOMERANG HALL
57A Princes Highway Sylvania
Full Rate per hour $26.00 $29.00 GL206-512032-22030
Y PubExh
Discount Rate per hour $14.50 $17.00 GL206-512032-22030
Y PubExh
Event/Function Rate:applies to capped hourly Event/Function rates
$300.00 $330.00 GL206-512032-22030
Y PubExh
Hourly Event/Function Rate (applies to all events and functions and all bookings from 4pm Friday, Saturday, Sunday and Public Holidays to all groups incl. Not for Profit) : capped at the event/function rate
$0.00 $43.00 GL206-512032-22030
Y PubExh
Bond $200.00 $500.00 GL900-100000-71036
N Bond
BUNDEENA COMMUNITY CENTRE
17-37 Liverpool St Bundeena
Full Rate per hour $22.00 $25.00 GL206-512027-22030
Y PubExh
Discount Rate per hour $11.50 $14.00 GL206-512027-22030
Y PubExh
Event/Function Rate:applies to capped hourly Event/Function rates
$270.00 $300.00 GL206-512027-22030
Y PubExh
Hourly Event/Function Rate (applies to all events and functions and all bookings from 4pm Friday, Saturday, Sunday and Public Holidays to all groups incl. Not for Profit) : capped at the event/function rate
$0.00 $37.00 GL206-512027-22030
Y PubExh
Bond $300.00 $500.00 GL900-100000-71036
N Bond
Main Hall
Full Rate per hour $17.50 $19.00 GL206-512027-22030
Y PubExh
Discount Rate per hour $9.30 $11.00 GL206-512027-22030
Y PubExh
Hourly Event/Function Rate (applies to all events and functions and all bookings from 4pm Friday, Saturday, Sunday and Public Holidays to all groups incl. Not for Profit) : capped at the event/function rate
$0.00 $28.00 GL206-512027-22030
Y PubExh
Horderns Room Exclusive use (profit) per week $60.00 $60.00 GL206-512027-22030
Y PubExh
Horderns Room Exclusive use (non-profit) per week $30.00 $30.00 GL206-512027-22030
Y PubExh
Horderns Room (formerly Arts & Craft Room)
Year 18/19 Year 19/20
Name Fee Fee Account GST Pricing Policy
(incl. GST) (incl. GST)
Page 73 of 150
Year 18/19 Year 19/20
Name Fee Fee Account GST Pricing Policy
(incl. GST) (incl. GST)
Jibbon Room (formerly Seniors Room)
Full Rate per hour $0.00 $20.00 GL206-512027-22030
Y PubExh
Discount Rate per hour $0.00 $12.00 GL206-512027-22030
Y PubExh
Exclusive use (profit) per week $120.00 $120.00 GL206-512027-22030
Y PubExh
Exclusive use (non-profit) per week $60.00 $60.00 GL206-512027-22030
Y PubExh
Hourly Event/Function Rate (applies to all events and functions and all bookings from 4pm Friday, Saturday, Sunday and Public Holidays to all groups incl. Not for Profit) : capped at the event/function rate
$0.00 $28.00 GL206-512027-22030
Y PubExh
75 Loftus Street, Bundeena
BUNDEENA RESERVE POLICE AID STATION
CARINGBAH SENIOR CITIZENS HALL
376-382 Port Hacking Road Caringbah
Full Rate per hour $31.00 $34.00 GL206-512117-22030
Y PubExh
Discount Rate per hour $16.50 $19.00 GL206-512117-22030
Y PubExh
Event/Function Rate:applies to capped hourly Event/Function rates
$340.00 $370.00 GL206-512117-22030
Y PubExh
Hourly Event/Function Rate (applies to all events and functions and all bookings from 4pm Friday, Saturday, Sunday and Public Holidays to all groups incl. Not for Profit) : capped at the event/function rate
$0.00 $51.00 GL206-512117-22030
Y PubExh
Bond $400.00 $500.00 GL900-100000-71036
N Bond
Hall
Full Rate per hour $16.50 $19.00 GL206-512117-22030
Y PubExh
Discount Rate per hour $10.50 $13.00 GL206-512117-22030
Y PubExh
Meeting Room
COMO SCHOOL OF ARTS
15-17 Novara Crescent Como
Event/Function Rate:applies to capped hourly Event/Function rates
$365.00 $395.00 Community Committee
Y PubExh
continued on next page ...
Year 18/19 Year 19/20
Name Fee Fee Account GST Pricing Policy
(incl. GST) (incl. GST)
Page 74 of 150
Year 18/19 Year 19/20
Name Fee Fee Account GST Pricing Policy
(incl. GST) (incl. GST)
Hourly Event/Function Rate (applies to all events and functions and all bookings from 4pm Friday, Saturday, Sunday and Public Holidays to all groups incl. Not for Profit) : capped at the event/function rate
$0.00 $40.00 Community Committee
Y PubExh
Bond $300.00 $500.00 Community Committee
N Bond
Both Halls: Minimum Causal Hire – 1 hour $41.50 $43.00 Community Committee
Y PubExh
COMO SCHOOL OF ARTS [continued]
Small Hall per hour $11.50 $14.00 Community Committee
Y PubExh
Large Hall per hour $14.50 $17.00 Community Committee
Y PubExh
Both Halls per hour $19.50 $22.00 Community Committee
Y PubExh
Discount Rate
Small Hall per hour $14.50 $17.00 Community Committee
Y PubExh
Large Hall per hour $24.00 $27.00 Community Committee
Y PubExh
Both Halls per hour $29.00 $32.00 Community Committee
Y PubExh
Full Rate
CRONULLA CENTRAL COMMUNITY CENTRE
38-60 Croydon Street Cronulla
Full Rate per hour $60.00 $62.00 GL206-512042-22030
Y PubExh
Discount Rate per hour $36.00 $39.00 GL206-512042-22030
Y PubExh
Event/Function Rate:applies to capped hourly Event/Function rates
$570.00 $605.00 GL206-512042-22030
Y PubExh
Hourly Event/Function Rate (applies to all events and functions and all bookings from 4pm Friday, Saturday, Sunday and Public Holidays to all groups incl. Not for Profit) : capped at the event/function rate
$0.00 $96.00 GL206-512042-22030
Y PubExh
Bond $600.00 $500.00 GL900-100000-71036
N Bond
Full Hall
Year 18/19 Year 19/20
Name Fee Fee Account GST Pricing Policy
(incl. GST) (incl. GST)
Page 75 of 150
Year 18/19 Year 19/20
Name Fee Fee Account GST Pricing Policy
(incl. GST) (incl. GST)
Hall 1 (with main kitchen)
Full Rate per hour $44.50 $48.00 GL206-512042-22030
Y PubExh
Discount Rate per hour $31.00 $34.00 GL206-512042-22030
Y PubExh
Event/Function Rate:applies to capped hourly Event/Function rates
$485.00 $520.00 GL206-512042-22030
Y PubExh
Hourly Event/Function Rate (applies to all events and functions and all bookings from 4pm Friday, Saturday, Sunday and Public Holidays to all groups incl. Not for Profit) : capped at the event/function rate
$0.00 $73.00 GL206-512042-22030
Y PubExh
Bond $500.00 $500.00 GL900-100000-71036
N Bond
Full Rate per hour $39.00 $42.00 GL206-512042-22030
Y PubExh
Discount Rate per hour $26.00 $29.00 GL206-512042-22030
Y PubExh
Event/Function Rate:applies to capped hourly Event/Function rates
$400.00 $430.00 GL206-512042-22030
Y PubExh
Hourly Event/Function Rate (applies to all events and functions and all bookings from 4pm Friday, Saturday, Sunday and Public Holidays to all groups incl. Not for Profit) : capped at the event/function rate
$0.00 $64.00 GL206-512042-22303
Y PubExh
Bond $500.00 $500.00 GL900-100000-71036
N Bond
Hall 2 (with kitchenette)
Full Rate per hour $33.00 $36.00 GL206-512042-22030
Y PubExh
Discount Rate per hour $21.00 $24.00 GL206-512042-22030
Y PubExh
Event/Function Rate:applies to capped hourly Event/Function rates
$205.00 $230.00 GL206-512042-22030
Y PubExh
Hourly Event/Function Rate (applies to all events and functions and all bookings from 4pm Friday, Saturday, Sunday and Public Holidays to all groups incl. Not for Profit) : capped at the event/function rate
$0.00 $54.00 GL206-512042-22030
Y PubExh
Bond $300.00 $500.00 GL900-100000-71036
N Bond
Meeting Room 1
Full Rate per hour $33.00 $36.00 GL206-512042-22030
Y PubExh
Discount Rate per hour $21.00 $24.00 GL206-512042-22030
Y PubExh
Meeting Room 2
continued on next page ...
Year 18/19 Year 19/20
Name Fee Fee Account GST Pricing Policy
(incl. GST) (incl. GST)
Page 76 of 150
Year 18/19 Year 19/20
Name Fee Fee Account GST Pricing Policy
(incl. GST) (incl. GST)
Event/Function Rate:applies to capped hourly Event/Function rates
$205.00 $230.00 GL206-512042-22030
Y PubExh
Hourly Event/Function Rate (applies to all events and functions and all bookings from 4pm Friday, Saturday, Sunday and Public Holidays to all groups incl. Not for Profit) : capped at the event/function rate
$0.00 $54.00 GL206-512042-22030
Y PubExh
Bond $300.00 $500.00 GL900-100000-71036
N Bond
Meeting Room 2 [continued]
Full Rate per hour $39.00 $42.00 GL206-512042-22030
Y PubExh
Discount Rate per hour $26.00 $29.00 GL206-512042-22030
Y PubExh
Event/Function Rate:applies to capped hourly Event/Function rates
$360.00 $390.00 GL206-512042-22030
Y PubExh
Hourly Event/Function Rate (applies to all events and functions and all bookings from 4pm Friday, Saturday, Sunday and Public Holidays to all groups incl. Not for Profit) : capped at the event/function rate
$0.00 $64.00 GL206-512042-22030
Y PubExh
Bond $500.00 $500.00 GL900-100000-71036
N Bond
Meeting Room Combined
GRAYS POINT COMMUNITY HALL
116-120 Grays Point Rd Grays Point
Full Rate per hour $23.00 $26.00 GL206-512029-22030
Y PubExh
Discount Rate per hour $12.50 $15.50 GL206-512029-22030
Y PubExh
Event/Function Rate:applies to capped hourly Event/Function rates
$280.00 $310.00 GL206-512029-22030
Y PubExh
Hourly Event/Function Rate (applies to all events and functions and all bookings from 4pm Friday, Saturday, Sunday and Public Holidays to all groups incl. Not for Profit) : capped at the event/function rate
$0.00 $38.00 GL206-512029-22030
Y PubExh
Bond $300.00 $500.00 GL900-100000-71036
N Bond
Full Rate per hour $12.50 $15.50 GL206-512029-22030
Y PubExh
Discount Rate per hour $10.50 $13.00 GL206-512029-22030
Y PubExh
Mary Brack Room
Year 18/19 Year 19/20
Name Fee Fee Account GST Pricing Policy
(incl. GST) (incl. GST)
Page 77 of 150
Year 18/19 Year 19/20
Name Fee Fee Account GST Pricing Policy
(incl. GST) (incl. GST)
GUNNAMATTA BAY PAVILION
39-41 Nicholson Parade Cronulla
Storerooms: RSL Youth Club per annum $270.00 $280.00 GL206-512124-22030
Y PubExh
Gunnamatta Weight Training Room $14,080.00 $14,440.00 GL206-512124-22030
Y PubExh
Full Rate per hour $34.00 $37.00 GL206-512124-22030
Y PubExh
Discount Rate per hour $21.00 $24.00 GL206-512124-22030
Y PubExh
Event/Function Rate:applies to capped hourly Event/Function rates
$445.00 $480.00 GL206-512124-22030
Y PubExh
Hourly Event/Function Rate (applies to all events and functions and all bookings from 4pm Friday, Saturday, Sunday and Public Holidays to all groups incl. Not for Profit) : capped at the event/function rate
$0.00 $56.00 GL206-512124-22030
Y PubExh
Bond – Casual Functions $500.00 $500.00 GL900-100000-71036
N Bond
Main Hall
Full Rate per hour $32.00 $35.00 GL206-512124-22030
Y PubExh
Discount Rate per hour $15.50 $18.00 GL206-512124-22030
Y PubExh
Event/Function Rate:applies to capped hourly Event/Function rates
$455.00 $490.00 GL206-512124-22030
Y PubExh
Hourly Event/Function Rate (applies to all events and functions and all bookings from 4pm Friday, Saturday, Sunday and Public Holidays to all groups incl. Not for Profit) : capped at the event/function rate
$0.00 $52.00 GL206-512124-22030
Y PubExh
Bond – Casual Functions $400.00 $500.00 GL900-100000-71036
N Bond
Activity Room 2
Full Rate per hour $22.00 $25.00 GL206-512124-22030
Y PubExh
Discount Rate per hour $12.50 $15.50 GL206-512124-22030
Y PubExh
Event/Function Rate:applies to capped hourly Event/Function rates
$215.00 $300.00 GL206-512124-22030
Y PubExh
Hourly Event/Function Rate (applies to all events and functions and all bookings from 4pm Friday, Saturday, Sunday and Public Holidays to all groups incl. Not for Profit) : capped at the event/function rate
$0.00 $37.00 GL206-512124-22030
Y PubExh
Activity Room 3
continued on next page ...
Year 18/19 Year 19/20
Name Fee Fee Account GST Pricing Policy
(incl. GST) (incl. GST)
Page 78 of 150
Year 18/19 Year 19/20
Name Fee Fee Account GST Pricing Policy
(incl. GST) (incl. GST)
Bond – Casual Functions $400.00 $500.00 GL900-100000-71036
N Bond
Activity Room 3 [continued]
Weekly Rate (storage) – per week $46.50 $48.00 GL206-512124-22030
Y PubExh
Exclusive office Use (non profit) – per week $103.00 $106.00 GL206-512124-22030
Y PubExh
Exclusive office Use (profit) – per week $205.00 $210.00 GL206-512124-22030
Y PubExh
Full Rate per hour $15.50 $18.00 GL206-512124-22030
Y PubExh
Discount Rate per hour $10.50 $13.00 GL206-512124-22030
Y PubExh
Committee Room
GYMEA BAY COMMUNITY AND RECREATIONAL CENTRE
2 Avenel Rd Gymea Bay
Full Rate per hour $22.00 $25.00 GL206-512022-22030
Y PubExh
Discount Rate per hour $11.50 $14.00 GL206-512022-22030
Y PubExh
Event/Function Rate:applies to capped hourly Event/Function rates
$285.00 $315.00 GL206-512022-22030
Y PubExh
Hourly Event/Function Rate (applies to all events and functions and all bookings from 4pm Friday, Saturday, Sunday and Public Holidays to all groups incl. Not for Profit) : capped at the event/function rate
$0.00 $36.00 GL206-512022-22030
Y PubExh
Bond $300.00 $500.00 GL900-100000-71036
N Bond
276B Gymea Bay Road Gymea Bay
GYMEA BAY RESOURCE CENTRE
Full Rate per hour $34.00 $37.00 GL206-512164-22030
Y PubExh
Discount Rate per hour $23.00 $26.00 GL206-512164-22030
Y PubExh
Event/Function Rate:applies to capped hourly Event/Function rates
$310.00 $340.00 GL206-512164-22030
Y PubExh
Hourly Event/Function Rate (applies to all events and functions and all bookings from 4pm Friday, Saturday, Sunday and Public Holidays to all groups incl. Not for Profit) : capped at the event/function rate
$0.00 $56.00 GL206-512164-22030
Y PubExh
Function Room
continued on next page ...
Year 18/19 Year 19/20
Name Fee Fee Account GST Pricing Policy
(incl. GST) (incl. GST)
Page 79 of 150
Year 18/19 Year 19/20
Name Fee Fee Account GST Pricing Policy
(incl. GST) (incl. GST)
Bond $300.00 $500.00 GL900-100000-71036
N Bond
Function Room [continued]
Full Rate Per Hour $27.00 $30.00 GL206-512164-22030
Y PubExh
Discount Rate Per Hour $20.00 $22.00 GL206-512164-22030
Y PubExh
Event/Function Rate:applies to capped hourly Event/Function rates
$210.00 $180.00 GL206-512164-22030
Y PubExh
Hourly Event/Function Rate (applies to all events and functions and all bookings from 4pm Friday, Saturday, Sunday and Public Holidays to all groups incl. Not for Profit) : capped at the event/function rate
$0.00 $44.00 GL206-512164-22030
Y PubExh
Bond $200.00 $500.00 GL900-100000-71036
N Bond
Playgroup Room
GYMEA COMMUNITY CENTRE
31-33 Gymea Bay Road Gymea
Full Rate per hour $30.00 $33.00 Community Committee
Y PubExh
Discount Rate per hour $21.00 $24.00 Community Committee
Y PubExh
Event/Function Rate:applies to capped hourly Event/Function rates
$370.00 $400.00 Community Committee
Y PubExh
Hourly Event/Function Rate (applies to all events and functions and all bookings from 4pm Friday, Saturday, Sunday and Public Holidays to all groups incl. Not for Profit) : capped at the event/function rate
$0.00 $49.00 Community Centre
Y PubExh
Bond $400.00 $500.00 Community Committee
N PubExh
Large Hall
Full Rate per hour $19.50 $22.00 Community Committee
Y PubExh
Discount Rate per hour $14.50 $17.00 Community Committee
Y PubExh
Weekly Rate $0.00 $58.30 Community Committee
Y PubExh
Small Hall/Lapidary Extension
Year 18/19 Year 19/20
Name Fee Fee Account GST Pricing Policy
(incl. GST) (incl. GST)
Page 80 of 150
Year 18/19 Year 19/20
Name Fee Fee Account GST Pricing Policy
(incl. GST) (incl. GST)
ILLAWONG COMMUNITY CENTRE
273 Fowler Road Illawong
Full Rate per hour $11.50 $14.00 GL206-512041-22030
Y PubExh
Discount Rate per hour $8.30 $10.50 GL206-512041-22030
Y PubExh
Office 3
Full Rate $140.00 $145.00 GL206-512041-22030
Y PubExh
Discount Rate $71.00 $73.00 GL206-512041-22030
Y PubExh
Weekly Rate (exclusive use) Office 3
Full Rate per hour $26.00 $29.00 GL206-512041-22030
Y PubExh
Discount Rate per hour $13.50 $16.00 GL206-512041-22030
Y PubExh
Event/Function Rate:applies to capped hourly Event/Function rates
$340.00 $370.00 GL206-512041-22030
Y PubExh
Hourly Event/Function Rate (applies to all events and functions and all bookings from 4pm Friday, Saturday, Sunday and Public Holidays to all groups incl. Not for Profit) : capped at the event/function rate
$0.00 $43.00 GL206-512041-22030
Y PubExh
Bond $400.00 $500.00 GL900-100000-71036
N Bond
Main Hall
Full Rate per hour $14.50 $17.00 GL206-512041-22030
Y PubExh
Discount Rate per hour $8.30 $11.00 GL206-512041-22030
Y PubExh
Offices 1 (South) and 2 (North)
Full Rate $137.00 $141.00 GL206-512041-22030
Y PubExh
Discount Rate $69.00 $71.00 GL206-512041-22030
Y PubExh
Weekly Rate (exclusive use) Offices 1 and 2
Year 18/19 Year 19/20
Name Fee Fee Account GST Pricing Policy
(incl. GST) (incl. GST)
Page 81 of 150
Year 18/19 Year 19/20
Name Fee Fee Account GST Pricing Policy
(incl. GST) (incl. GST)
JANNALI COMMUNITY CENTRE
15 Jannali Avenue Jannali
Full Rate per hour $30.00 $33.00 GL206-512023-22030
Y PubExh
Discount Rate per hour $16.50 $19.00 GL206-512023-22030
Y PubExh
Event/Function Rate:applies to capped hourly Event/Function rates
$350.00 $380.00 GL206-512023-22030
Y PubExh
Hourly Event/Function Rate (applies to all events and functions and all bookings from 4pm Friday, Saturday, Sunday and Public Holidays to all groups incl. Not for Profit) : capped at the event/function rate
$0.00 $49.00 GL206-512023-22030
Y PubExh
Bond $400.00 $500.00 GL900-100000-71036
N PubExh
Main Hall
Full Rate per hour $14.50 $17.00 GL206-512023-22030
Y PubExh
Discount Rate per hour $9.30 $11.00 GL206-512023-22030
Y PubExh
Meeting Room
LOFTUS COMMUNITY CENTRE
129R Loftus Avenue Loftus
Full Rate per hour $22.00 $25.00 GL206-512028-22030
Y PubExh
Discount Rate per hour $14.50 $17.00 GL206-512028-22030
Y PubExh
Event/Function Rate:applies to capped hourly Event/Function rates
$370.00 $400.00 GL206-512028-22030
Y PubExh
Hourly Event/Function Rate (applies to all events and functions and all bookings from 4pm Friday, Saturday, Sunday and Public Holidays to all groups incl. Not for Profit) : capped at the event/function rate
$0.00 $36.00 GL206-512028-22030
Y PubExh
Bond $400.00 $500.00 GL900-100000-71036
N Bond
Main Hall
Full Rate per hour $13.50 $16.00 GL206-512028-22030
Y PubExh
Discount Rate per hour $7.20 $10.00 GL206-512028-22030
Y PubExh
Activity Room
continued on next page ...
Year 18/19 Year 19/20
Name Fee Fee Account GST Pricing Policy
(incl. GST) (incl. GST)
Page 82 of 150
Year 18/19 Year 19/20
Name Fee Fee Account GST Pricing Policy
(incl. GST) (incl. GST)
Hourly Event/Function Rate (applies to all events and functions and all bookings from 4pm Friday, Saturday, Sunday and Public Holidays to all groups incl. Not for Profit) : capped at the event/function rate
$0.00 $23.00 GL206-512028-22030
Y PubExh
Activity Room [continued]
Full Rate per hour $0.00 $12.00 GL206-512028-22030
Y PubExh
Discount Rate per hour $0.00 $8.00 GL206- Y PubExh
Meeting Room
MAIANBAR COMMUNITY HALL
48R Pacific Crescent Maianbar
Full Rate per hour $18.50 $21.00 Community Committee
Y PubExh
Discount Rate per hour $9.30 $12.00 Community Committee
Y PubExh
Event/Function Rate: applies to capped hourly Event/Function Rates
$0.00 $120.00 Community Committee
Y PubExh
Hourly Event/Function Rate (applies to all events and functions and all bookings from 4pm Friday, Saturday, Sunday and Public Holidays to all groups incl. Not for Profit) : capped at the event/function rate
$0.00 $33.00 Community Committee
Y PubExh
Tables and Chairs per set $19.50 $20.00 Community Committee
Y PubExh
Small tables and Chairs per set $11.50 $12.00 Community Committee
Y PubExh
Bond for use of tables and chairs $100.00 $100.00 Community Committee
N Bond
Bond $200.00 $500.00 Community Committee
N Bond
MARTON HALL KURNELL
92 Captain Cook Drive Kurnell
Full Rate per hour $16.50 $19.00 GL206-512128-22030
Y PubExh
Discount Rate per hour $8.30 $10.00 GL206-512128-22030
Y PubExh
Event/Function Rate:applies to capped hourly Event/Function rates
$170.00 $195.00 GL206-512128-22030
Y PubExh
Hourly Event/Function Rate (applies to all events and functions and all bookings from 4pm Friday, Saturday, Sunday and Public Holidays to all groups incl. Not for Profit) : capped at the event/function rate
$0.00 $27.00 GL206-512128-22030
Y PubExh
Main Hall
continued on next page ...
Year 18/19 Year 19/20
Name Fee Fee Account GST Pricing Policy
(incl. GST) (incl. GST)
Page 83 of 150
Year 18/19 Year 19/20
Name Fee Fee Account GST Pricing Policy
(incl. GST) (incl. GST)
Bond $200.00 $500.00 GL900-100000-71036
N Bond
Main Hall [continued]
Full Rate per hour $9.30 $10.00 GL206-512128-22030
Y PubExh
Discount Rate per hour $6.20 $7.00 GL206-512128-22030
Y PubExh
Meeting Room
MENAI CHILDRENS SERVICES CENTRE (or Menai Demountable Building)
4R Hall Drive Menai
MENAI COMMUNITY CENTRE
34 Allison Cres Menai
Full Rate per hour $43.50 $47.00 GL206-512026-22030
Y PubExh
Discount Rate per hour $26.00 $29.00 GL206-512026-22030
Y PubExh
Event/Function Rate:applies to capped hourly Event/Function rates
$370.00 $400.00 GL206-512026-22030
Y PubExh
Hourly Event/Function Rate (applies to all events and functions and all bookings from 4pm Friday, Saturday, Sunday and Public Holidays to all groups incl. Not for Profit) : capped at the event/function rate
$0.00 $72.00 GL206-512026-22030
Y PubExh
Bond $400.00 $500.00 GL900-100000-71036
N Bond
Main Hall (Full Hall)
Full Rate per hour $31.00 $34.00 GL206-512026-22030
Y PubExh
Discount Rate per hour $18.50 $21.00 GL206-512026-22030
Y PubExh
Event/Function Rate:applies to capped hourly Event/Function rates
$290.00 $320.00 GL206-512026-22030
Y PubExh
Hourly Event/Function Rate (applies to all events and functions and all bookings from 4pm Friday, Saturday, Sunday and Public Holidays to all groups incl. Not for Profit) : capped at the event/function rate
$0.00 $51.00 GL206-512036-22030
Y PubExh
Bond $300.00 $500.00 GL900-100000-71036
N PubExh
Large Hall (Hall 2)
Year 18/19 Year 19/20
Name Fee Fee Account GST Pricing Policy
(incl. GST) (incl. GST)
Page 84 of 150
Year 18/19 Year 19/20
Name Fee Fee Account GST Pricing Policy
(incl. GST) (incl. GST)
Small Hall
Full Rate per hour $23.00 $26.00 GL206-512026-22030
Y PubExh
Discount Rate per hour $14.50 $17.00 GL206-512026-22030
Y PubExh
Event/Function Rate:applies to capped hourly Event/Function rates
$120.00 $145.00 GL206-512026-22030
Y PubExh
Hourly Event/Function Rate (applies to all events and functions and all bookings from 4pm Friday, Saturday, Sunday and Public Holidays to all groups incl. Not for Profit) : capped at the event/function rate
$0.00 $38.00 GL206-512026-22030
Y PubExh
Bond $200.00 $500.00 GL900-100000-71036
N Bond
Full Rate per hour $23.50 $26.50 GL206-512026-22030
Y PubExh
Discount Rate per hour $13.50 $16.00 GL206-512026-22030
Y PubExh
Event/Function Rate:applies to capped hourly Event/Function rates
$175.00 $200.00 GL206-512026-22030
Y PubExh
Hourly Event/Function Rate (applies to all events and functions and all bookings from 4pm Friday, Saturday, Sunday and Public Holidays to all groups incl. Not for Profit) : capped at the event/function rate
$0.00 $39.00 GL206-512026-22030
Y PubExh
Bond $200.00 $500.00 GL900-100000-71036
N Bond
Activity Room
Full Rate per hour $26.00 $29.00 GL206-512026-22030
Y PubExh
Discount Rate per hour $15.50 $18.00 GL206-512026-22030
Y PubExh
Training Room
Full Rate per hour $19.50 $22.00 GL206-512026-22030
Y PubExh
Discount Rate per hour $11.50 $14.00 GL206-512026-22030
Y PubExh
Per Week (3 Bridges Community Inc.) $85.00 $110.00 GL206-512026-22030
Y PubExh
Meeting Room
Full Rate per hour $16.50 $19.00 GL206-512026-22030
Y PubExh
Outreach / Counselling Room
continued on next page ...
Year 18/19 Year 19/20
Name Fee Fee Account GST Pricing Policy
(incl. GST) (incl. GST)
Page 85 of 150
Year 18/19 Year 19/20
Name Fee Fee Account GST Pricing Policy
(incl. GST) (incl. GST)
Discount Rate per hour $8.30 $10.00 GL206-512026-22030
Y PubExh
Outreach / Counselling Room [continued]
132 Old Illawarra Rd Barden Ridge
THE MILL ROOMS
MIRANDA COMMUNITY CENTRE
95 Karimbla Rd Miranda
Full Rate per hour $31.00 $34.00 GL206-512021-22030
Y PubExh
Discount Rate per hour $18.00 $20.00 GL206-512021-22030
Y PubExh
Event/Function Rate:applies to capped hourly Event/Function rates
$340.00 $370.00 GL206-512021-22030
Y PubExh
Hourly Event/Function Rate (applies to all events and functions and all bookings from 4pm Friday, Saturday, Sunday and Public Holidays to all groups incl. Not for Profit) : capped at the event/function rate
$0.00 $51.00 GL206-512021-22030
Y PubExh
Bond $400.00 $500.00 GL900-100000-71036
N Bond
Main Hall (Glad Ashworth Room)
Full Rate per hour $17.50 $12.00 GL206-512021-22030
Y PubExh
Discount Rate per hour $11.50 $8.00 GL206-512021-22030
Y PubExh
The Committee Room
Full Rate per hour $0.00 $20.00 GL206-512021-22030
Y PubExh
Discount Rate per hour $0.00 $14.00 GL206-512021-22030
Y PubExh
Hourly Event/Function Rate (applies to all events and functions and all bookings from 4pm Friday, Saturday, Sunday and Public Holidays to all groups incl. Not for Profit) : capped at the event/function rate
$0.00 $28.00 GL206-512021-22030
Y PubExh
Waratah
Full Rate per hour $0.00 $20.00 GL206-512021-22030
Y PubExh
Wattle
continued on next page ...
Year 18/19 Year 19/20
Name Fee Fee Account GST Pricing Policy
(incl. GST) (incl. GST)
Page 86 of 150
Year 18/19 Year 19/20
Name Fee Fee Account GST Pricing Policy
(incl. GST) (incl. GST)
Discount Rate per hour $0.00 $14.00 GL206-512021-22030
Y PubExh
Hourly Event/Function Rate (applies to all events and functions and all bookings from 4pm Friday, Saturday, Sunday and Public Holidays to all groups incl. Not for Profit) : capped at the event/function rate
$0.00 $28.00 GL206-512021-22030
Y PubExh
Wattle [continued]
Full Rate per hour $30.00 $32.00 GL206-512021-22030
Y PubExh
Discount Rate per hour $16.50 $19.00 GL206-512021-22030
Y PubExh
Event/Function Rate:applies to capped hourly Event/Function rates
$215.00 $240.00 GL206-512021-22030
Y PubExh
Hourly Event/Function Rate (applies to all events and functions and all bookings from 4pm Friday, Saturday, Sunday and Public Holidays to all groups incl. Not for Profit) : capped at the event/function rate
$0.00 $48.00 GL206-512021-22030
Y PubExh
Bond $200.00 $500.00 GL900-100000-71036
N Bond
Wattle/Waratah – Combined
Full Rate Per Hour $30.00 $33.00 GL206-512021-22030
Y PubExh
Discount Rate Per Hour $16.50 $19.00 GL206-512021-22030
Y PubExh
Event/Function Rate:applies to capped hourly Event/Function rates
$250.00 $260.00 GL206-512021-22030
Y PubExh
Hourly Event/Function Rate (applies from 4pm Friday, Saturday, Sunday and Public Holidays to all groups incl. Not for Profit) : capped at the event/function rate
$0.00 $49.00 GL206-512021-22030
Y PubExh
Bond $400.00 $500.00 GL900-100000-71036
N Bond
Community Restaurant per week $210.00 $215.00 GL206-512021-22030
Y PubExh
Endeavour Room
MIRANDA YOUTH CENTRE
2 Central Rd Miranda
Full Rate per hour (Hall or Gym) $31.00 $34.00 GL206-512121-22030
Y PubExh
Discount Rate per hour (Hall or Gym) $14.50 $17.00 GL206-512121-22030
Y PubExh
Gymnasium – per term hire $1,970.00 $2,020.00 GL206-512121-22030
Y PubExh
Event/Function Rate:applies to capped hourly Event/Function rates
$340.00 $370.00 GL206-512121-22030
Y PubExh
continued on next page ...
Year 18/19 Year 19/20
Name Fee Fee Account GST Pricing Policy
(incl. GST) (incl. GST)
Page 87 of 150
Year 18/19 Year 19/20
Name Fee Fee Account GST Pricing Policy
(incl. GST) (incl. GST)
Hourly Event/Function Rate (applies to all events and functions and all bookings from 4pm Friday, Saturday, Sunday and Public Holidays to all groups incl. Not for Profit) : capped at the event/function rate
$0.00 $51.00 GL206-512121-22030
Y PubExh
Bond $300.00 $500.00 GL900-100000-71036
N Bond
MIRANDA YOUTH CENTRE [continued]
MULTI PURPOSE CENTRE
123 Flora Street Sutherland
Toy Library $48.50 $50.00 GL206-512040-22030
Y PubExh
Civic Disability Services $1,760.00 $1,810.00 GL206-512040-22030
Y PubExh
Civic Disability Services (Saturday disco and squaredance) per hour
$10.50 $13.00 GL206-512040-22030
Y PubExh
Sylvanvale Office $580.00 $595.00 GL206-512040-22030
Y PubExh
Disabled Groups (office rent per term)
Full Rate per hour $23.00 $26.00 GL206-512040-22030
Y PubExh
Discount Rate per hour $14.50 $17.00 GL206-512040-22030
Y PubExh
Event/Function Rate:applies to capped hourly Event/Function rates
$265.00 $295.00 GL206-512040-22030
Y PubExh
Hourly Event/Function Rate (applies to all events and functions and all bookings from 4pm Friday, Saturday, Sunday and Public Holidays to all groups incl. Not for Profit) : capped at the event/function rate
$0.00 $38.00 GL206-512040-22030
Y PubExh
Bond $300.00 $500.00 GL900-100000-71036
N PubExh
Main Hall
Full Rate per hour $17.50 $20.00 GL206-512040-22030
Y PubExh
Discount Rate per hour $11.50 $14.00 GL206-512040-22030
Y PubExh
Event/Function Rate:applies to capped hourly Event/Function rates
$0.00 $132.00 GL206-512040-22030
Y PubExh
Hourly Event/Function Rate (applies to all events and functions and all bookings from 4pm Friday, Saturday, Sunday and Public Holidays to all groups incl. Not for Profit) : capped at the event/function rate
$0.00 $32.00 GL206-512040-22030
Y PubExh
Meeting Room
Year 18/19 Year 19/20
Name Fee Fee Account GST Pricing Policy
(incl. GST) (incl. GST)
Page 88 of 150
Year 18/19 Year 19/20
Name Fee Fee Account GST Pricing Policy
(incl. GST) (incl. GST)
OYSTER BAY CHILDRENS RESOURCE CENTRE
119 Como Road, Oyster BayDiscount Rate (Sutherland Zoned Playgroups) per week
$153.00 $157.00 GL206-512050-22030
Y PubExh
OYSTER BAY COMMUNITY HALL
17 Como Road Oyster Bay
Full Rate per hour $25.00 $28.00 GL206-512031-22030
Y PubExh
Discount Rate per hour $14.50 $17.00 GL206-512031-22030
Y PubExh
Event/Function Rate:applies to capped hourly Event/Function rates
$255.00 $285.00 GL206-512031-22030
Y PubExh
Hourly Event/Function Rate (applies to all events and functions and all bookings from 4pm Friday, Saturday, Sunday and Public Holidays to all groups incl. Not for Profit) : capped at the event/function rate
$0.00 $41.00 GL206-512031-22030
Y PubExh
Bond $300.00 $500.00 GL900-100000-71036
N Bond
Main Hall
Full Rate per hour $14.50 $17.00 GL206-512031-22030
Y PubExh
Discount Rate per hour $10.50 $12.00 GL206-512031-22030
Y PubExh
Event/Function Rate:applies to capped hourly Event/Function rates
$180.00 $180.00 GL206-512031-22030
Y PubExh
Hourly Event/Function Rate (applies to all events and functions and all bookings from 4pm Friday, Saturday, Sunday and Public Holidays to all groups incl. Not for Profit) : capped at the event/function rate
$0.00 $24.00 GL206-512031-22030
Y PubExh
Bond $200.00 $500.00 GL900-100000-71036
N Bond
Meeting Room
OYSTER BAY OVAL HALL
88R Como Rd Oyster Bay
Full Rate per hour $31.00 $34.00 Community Committee
Y PubExh
Discount Rate per hour $14.50 $17.00 Community Committee
Y PubExh
Main Hall
continued on next page ...
Year 18/19 Year 19/20
Name Fee Fee Account GST Pricing Policy
(incl. GST) (incl. GST)
Page 89 of 150
Year 18/19 Year 19/20
Name Fee Fee Account GST Pricing Policy
(incl. GST) (incl. GST)
Event/Function Rate:applies to capped hourly Event/Function rates
$205.00 $230.00 Community Committee
Y PubExh
Hourly Event/Function Rate (applies to all events and functions and all bookings from 4pm Friday, Saturday, Sunday and Public Holidays to all groups incl. Not for Profit) : capped at the event/function rate
$0.00 $51.00 Community Committee
Y PubExh
Bond $300.00 $500.00 Community Committee
N PubExh
Main Hall [continued]
PORT HACKING COMMUNITY CENTRE Main Hall
184 Gannons Road South Caringbah
Full Rate per hour $29.00 $32.00 GL206-512037-22030
Y PubExh
Discount Rate per hour $16.50 $19.00 GL206-512037-22030
Y PubExh
Event/Function Rate:applies to capped hourly Event/Function rates
$380.00 $410.00 GL206-512037-22030
Y PubExh
Hourly Event/Function Rate (applies to all events and functions and all bookings from 4pm Friday, Saturday, Sunday and Public Holidays to all groups incl. Not for Profit) : capped at the event/function rate
$0.00 $48.00 GL206-512037-22030
Y PubExh
Bond $400.00 $500.00 GL900-100000-71036
N Bond
Training Room 1 Endeavour Seniors Computer Clubper week
$44.50 $46.00 GL206-512037-22030
Y PubExh
BBFHS (Botany Bay Family History Society) Room per week
$115.00 $120.00 GL206-512037-22030
Y PubExh
Croquet Club per week $110.00 $115.00 GL206-512037-22030
Y PubExh
SANDY POINT COMMUNITY CENTRE
200 St George Crescent Sandy Point
Full Rate $20.00 $19.00 Community Committee
Y PubExh
Discount Rate per hour $12.00 $12.50 Community Committee
Y PubExh
Event/Function Rate:applies to capped hourly Event/Function rates
$360.00 $370.00 Community Committee
Y PubExh
Hourly Event/Function Rate (applies to all events and functions and all bookings from 4pm Friday, Saturday, Sunday and Public Holidays to all groups incl. Not for Profit) : capped at the event/function rate
$0.00 $32.00 Community Committee
Y PubExh
Bond $400.00 $500.00 Community Committee
N Bond
Year 18/19 Year 19/20
Name Fee Fee Account GST Pricing Policy
(incl. GST) (incl. GST)
Page 90 of 150
Year 18/19 Year 19/20
Name Fee Fee Account GST Pricing Policy
(incl. GST) (incl. GST)
Squash Court
per hour $16.00 $15.00 Community Committee
Y PubExh
per half hour $12.00 $12.50 Community Committee
Y PubExh
Full Rate per hour $14.00 $14.50 Community Committee
Y PubExh
Discount Rate per hour $8.00 $8.50 Community Committee
Y PubExh
Meeting Room
STAPLETON AVENUE COMMUNITY CENTRE
3A Stapleton Ave Sutherland
Full Rate per hour $52.00 $56.00 GL206-512038-22030
Y PubExh
Discount Rate per hour $29.00 $32.00 GL206-512038-22030
Y PubExh
Event/Function Rate:applies to capped hourly Event/Function rates
$370.00 $400.00 GL206-512038-22030
Y PubExh
Hourly Event/Function Rate (applies to all events and functions and all bookings from 4pm Friday, Saturday, Sunday and Public Holidays to all groups incl. Not for Profit) : capped at the event/function rate
$0.00 $86.00 GL206-512038-22030
Y PubExh
Bond $400.00 $500.00 GL900-100000-71036
N Bond
Full Hall (Halls 1 & 2)
Full Rate per hour $29.00 $32.00 GL206-512038-22030
Y PubExh
Discount Rate per hour $15.50 $18.00 GL206-512038-22030
Y PubExh
Event/Function Rate:applies to capped hourly Event/Function rates
$205.00 $230.00 GL206-512038-22030
Y PubExh
Hourly Event/Function Rate (applies to all events and functions and all bookings from 4pm Friday, Saturday, Sunday and Public Holidays to all groups incl. Not for Profit) : capped at the event/function rate
$0.00 $48.00 GL206-512038-22030
Y PubExh
Bond $400.00 $500.00 GL900-100000-71036
N Bond
Hall 1 or 2
Year 18/19 Year 19/20
Name Fee Fee Account GST Pricing Policy
(incl. GST) (incl. GST)
Page 91 of 150
Year 18/19 Year 19/20
Name Fee Fee Account GST Pricing Policy
(incl. GST) (incl. GST)
Meeting Rooms 1 & 2
Full Rate per hour $36.00 $39.00 GL206-512038-22030
Y PubExh
Discount Rate per hour $19.50 $22.00 GL206-512038-22030
Y PubExh
Full Rate per hour $19.50 $22.00 GL206-512038-22030
Y PubExh
Discount rate per hour $11.50 $14.00 GL206-512038-22030
Y PubExh
Meeting Rooms 1 or 2
Full Rate per hour $21.00 $24.00 GL206-512038-22030
Y PubExh
Discount Rate per hour $11.50 $14.00 GL206-512038-22030
Y PubExh
Kitchen (for separate use not in conjunction with other areas)
Per space, per annum $520.00 $535.00 GL206-512038-22030
Y PubExh
Carparking
SUTHERLAND SENIORS CENTRE
749 Old Princes Hwy Sutherland
Full Rate per hour $26.00 $29.00 GL206-512116-22030
Y PubExh
Discount Rate per hour $14.50 $17.00 GL206-512116-22030
Y PubExh
Event/Function Rate:applies to capped hourly Event/Function rates
$295.00 $325.00 GL206-512116-22030
Y PubExh
Hourly Event/Function Rate (applies to all events and functions and all bookings from 4pm Friday, Saturday, Sunday and Public Holidays to all groups incl. Not for Profit) : capped at the event/function rate
$0.00 $43.00 GL206-512116-22030
Y PubExh
Bond $300.00 $500.00 GL900-100000-71036
N Bond
SYLVANIA COMMUNITY CENTRE
18-30 Canberra Road Sylvania
Full Rate per hour $25.00 $28.00 GL206-512030-22030
Y PubExh
Discount Rate per hour $14.50 $17.00 GL206-512030-22030
Y PubExh
continued on next page ...
Year 18/19 Year 19/20
Name Fee Fee Account GST Pricing Policy
(incl. GST) (incl. GST)
Page 92 of 150
Year 18/19 Year 19/20
Name Fee Fee Account GST Pricing Policy
(incl. GST) (incl. GST)
Event/Function Rate:applies to capped hourly Event/Function rates
$240.00 $260.00 GL206-512030-22030
Y PubExh
Hourly Event/Function Rate (applies to all events and functions and all bookings from 4pm Friday, Saturday, Sunday and Public Holidays to all groups incl. Not for Profit) : capped at the event/function rate
$0.00 $41.00 GL206-512030-22030
Y PubExh
Bond $300.00 $500.00 GL900-100000-71036
N Bond
SYLVANIA COMMUNITY CENTRE [continued]
SYLVANIA HEIGHTS COMMUNITY CENTRE
288 Box Road Sylvania
Full Rate per hour $24.00 $27.00 GL206-512020-22030
Y PubExh
Discount Rate per hour $11.50 $14.00 GL206-512020-22030
Y PubExh
Event/Function Rate:applies to capped hourly Event/Function rates
$225.00 $250.00 GL206-512020-22030
Y PubExh
Hourly Event/Function Rate (applies to all events and functions and all bookings from 4pm Friday, Saturday, Sunday and Public Holidays to all groups incl. Not for Profit) : capped at the event/function rate
$0.00 $40.00 GL206-512030-22030
Y PubExh
Bond $300.00 $500.00 GL900-100000-71036
N Bond
TAREN POINT YOUTH CENTRE
135 Taren Point Rd Taren Point
Full Rate (per badminton court per hour) $19.50 $22.00 GL206-512123-22030
Y PubExh
Discount Rate (per badminton court per hour) $16.50 $19.00 GL206-512123-22030
Y PubExh
Full Rate (2 courts per hour) $36.00 $39.00 GL206-512123-22030
Y PubExh
Discount Rate (2 courts per hour) $29.00 $32.00 GL206-512123-22030
Y PubExh
Full Rate (3 courts per hour) $54.00 $58.00 GL206-512123-22030
Y PubExh
Discount Rate (3 courts per hour) $41.50 $45.00 GL206-512123-22030
Y PubExh
Full size facility per hour $59.00 $63.00 GL206-512123-22030
Y PubExh
Full size facility discount rate per hour $29.00 $32.00 GL206-512123-22030
Y PubExh
Year 18/19 Year 19/20
Name Fee Fee Account GST Pricing Policy
(incl. GST) (incl. GST)
Page 93 of 150
Year 18/19 Year 19/20
Name Fee Fee Account GST Pricing Policy
(incl. GST) (incl. GST)
VENETIA STREET COMMUNITY COTTAGE (Sylvania Heights)
88 Venetia Street Sylvania
Civic Disability Services per week $153.00 $157.00 GL206-512039-22030
Y PubExh
Full Rate per hour $21.00 $24.00 GL206-512039-22030
Y PubExh
Discount Rate per hour $14.50 $17.00 GL206-512039-22030
Y PubExh
Event/Function Rate:applies to capped hourly Event/Function rates
$195.00 $220.00 GL206-512039-22030
Y PubExh
Hourly Event/Function Rate (applies to all events and functions and all bookings from 4pm Friday, Saturday, Sunday and Public Holidays to all groups incl. Not for Profit) : capped at the event/function rate
$0.00 $35.00 GL206-512039-22030
Y PubExh
Bond $200.00 $500.00 GL900-100000-71036
N Bond
67A Warrangarree Drive and Willaroo Avenue Woronora Heights
WORONORA HEIGHTS COMMUNITY CENTRE
Full Rate per hour $24.00 $27.00 GL206-512025-22030
Y PubExh
Discount Rate per hour $14.50 $17.00 GL206-512025-22030
Y PubExh
Event/Function Rate:applies to capped hourly Event/Function rates
$295.00 $325.00 GL206-512025-22030
Y PubExh
Hourly Event/Function Rate (applies to all events and functions and all bookings from 4pm Friday, Saturday, Sunday and Public Holidays to all groups incl. Not for Profit) : capped at the event/function rate
$0.00 $40.00 GL206-512025-22030
Y PubExh
Bond – casual hirers $300.00 $500.00 GL900-100000-71036
N Bond
Main Hall
Full Rate per hour $14.50 $15.00 GL206-512025-22030
Y PubExh
Discount Rate per hour $7.20 $8.00 GL206-512025-22030
Y PubExh
Meeting Room
Full Rate $134.00 $138.00 GL206-512025-22030
Y PubExh
Discount Rate $69.00 $71.00 GL206-512025-22030
Y PubExh
Weekly Rate (exclusive use) Meeting Room:
Year 18/19 Year 19/20
Name Fee Fee Account GST Pricing Policy
(incl. GST) (incl. GST)
Page 94 of 150
Year 18/19 Year 19/20
Name Fee Fee Account GST Pricing Policy
(incl. GST) (incl. GST)
YARRAWARRAH COMMUNITY HALL
Cnr Old Bush Road and Laurina Avenue Yarrawarrah
Full Rate per hour $25.50 $28.00 GL206-512033-22030
Y PubExh
Discount Rate per hour $14.50 $17.00 GL206-512033-22030
Y PubExh
Event/Function Rate:applies to capped hourly Event/Function rates
$255.00 $285.00 GL206-512033-22030
Y PubExh
Hourly Event/Function Rate (applies to all events and functions and all bookings from 4pm Friday, Saturday, Sunday and Public Holidays to all groups incl. Not for Profit) : capped at the event/function rate
$0.00 $41.00 GL206-512033-22030
Y PubExh
Bond $300.00 $500.00 GL900-100000-71036
N Bond
Main Hall
Full Rate per hour $16.50 $19.00 GL206-512033-22030
Y PubExh
Discount Rate per hour $11.50 $14.00 GL206-512033-22030
Y PubExh
Event/Function Rate:applies to capped hourly Event/Function rates
$180.00 $180.00 GL206-512033-22030
Y PubExh
Hourly Event/Function Rate (applies to all events and functions and all bookings from 4pm Friday, Saturday, Sunday and Public Holidays to all groups incl. Not for Profit) : capped at the event/function rate
$0.00 $27.00 GL206-512033-22030
Y PubExh
Bond $200.00 $500.00 GL900-100000-71036
N Bond
Meeting Room
Year 18/19 Year 19/20
Name Fee Fee Account GST Pricing Policy
(incl. GST) (incl. GST)
Page 95 of 150
Year 18/19 Year 19/20
Name Fee Fee Account GST Pricing Policy
(incl. GST) (incl. GST)
HIRE OF FACILITIES – ECONOMIC & COMMUNITY DEVELOPMENTSpecial Conditions: For Conditions of use please contact the Economic and Community Development Unit
Business Rateable Area – Daily $105.00 $110.00 GL112-502006-24030
Y Other
Business Externals – Daily $205.00 $210.00 GL112-502006-24030
Y Other
Community/Charity Cronulla – Daily $52.00 $54.00 GL112-502006-24030
Y Other
Community/Charity Other Centres – Daily $25.00 $26.00 GL112-502006-24030
Y Other
CASUAL LEASING PER SITE
Year 18/19 Year 19/20
Name Fee Fee Account GST Pricing Policy
(incl. GST) (incl. GST)
Page 96 of 150
Year 18/19 Year 19/20
Name Fee Fee Account GST Pricing Policy
(incl. GST) (incl. GST)
HIRE OF FACILITIES – GENERAL
Hire of the Training Room at Rural Fire Service Heathcote
$195.00 $200.00 GL732-527002-22048
Y Other
Year 18/19 Year 19/20
Name Fee Fee Account GST Pricing Policy
(incl. GST) (incl. GST)
Page 97 of 150
Year 18/19 Year 19/20
Name Fee Fee Account GST Pricing Policy
(incl. GST) (incl. GST)
HIRE OF FACILITIES – PUBLIC LIABILITY INSURANCE
The following charges apply to all eligible users of a Council-owned/controlled facility.
PUBLIC LIABILITY INSURANCE PREMIUMS
Non-Eligible users will need to provide evidence of their own liability insurance cover with Council's interest noted thereon.
Permanent user of a Council facility (per annum) $170.00 $175.00 Various Y Other
Casual hire of a Council facility for a party or function (per function)
$85.00 $88.00 Various Y Other
Casual Hire of a Council facility other than a party orfunction (per usage)
$22.00 $23.00 Various Y Other
Use of a Council facility for a meeting (per usage) $11.00 $11.50 Various Y Other
Year 18/19 Year 19/20
Name Fee Fee Account GST Pricing Policy
(incl. GST) (incl. GST)
Page 98 of 150
Year 18/19 Year 19/20
Name Fee Fee Account GST Pricing Policy
(incl. GST) (incl. GST)
HIRE OF FACILITIES – SPORT
Bond means guarantee compliance with licensed conditions.
LICENCE COMMERCIAL ACTIVITY ON COUNCIL LAND
PLI means “Public Liability Insurance
“Demonstration” means the operating of any machinery, utensil, or other object so as to show part of its capacity or abilityand includes any performance by persons or animals, any public address, or other such means intended to attract publicattention.
Fee per hour $200.00 $205.00 GL650-522010-22036
Y Other
Asset protection Bond – access. N Bond
Please refer to Access Across Community Land
Asset protection Bond – events N Bond
Please refer to Events - General
FIELDS
Associations up to 500 members $100.00 $103.00 GL700-542067-22033
Y Other
Associations >500, up to 5,000 members $200.00 $205.00 GL700-542067-22033
Y Other
Associations >5,000 members $300.00 $310.00 GL700-542067-22033
Y Other
Sporting Association Management Fee
Only applicable to field use outside of Council's Field Allocation process (at Association level) and commercial activities /corporate days / coaching clinics eg football academies.
Turf fields (Excluding Waratah Athletics Track)
Sports fields rate only to be used for organised sport, i.e.. cricket match, football game, etc. Presentation picnics, etc., tobe charged at rate shown for organised picnics on recreational areas.
Per day (6+ hours) – applicable outside of Council's field allocation process
$380.00 $390.00 Various Y Other
Per half day (2 to 6 hours) – applicable outside of Council's field allocation process
$210.00 $215.00 Various Y Other
Up to 2 hours – applicable outside of Council's field allocations process
$100.00 $105.00 Various Y Other
Year 18/19 Year 19/20
Name Fee Fee Account GST Pricing Policy
(incl. GST) (incl. GST)
Page 99 of 150
Year 18/19 Year 19/20
Name Fee Fee Account GST Pricing Policy
(incl. GST) (incl. GST)
Waratah Athletics Track
Casual Hire $380.00 $390.00 GL700-542031-22033
Y Other
Use by Shire Schools (hire fee) $250.00 $260.00 GL700-542031-22033
Y Other
Use by Schools outside the Shire (hire fee) $350.00 $360.00 GL700-542031-22033
Y Other
Additional cleaning fee if required outside of Council's standard service provision
$165.00 $170.00 GL700-542031-22033
Y Other
Turf Cricket Wickets – (day of play) $565.00 $580.00 GL700-542031-22033
Y Other
Turf Cricket Wickets (preparation for play) $50.00 $52.00 GL700-542031-22033
Y Other
Turf/Cricket Wickets – per day
Synthetic Field Hire (Kareela Sporting Fields)
Applicable to SSC synthetic field use - rates are per field per hour
Commercial use / out of shire sporting teams etc – per hour per field
$190.00 $195.00 GL700-542033-22033
Y Other
Community Rate (no discount) – per hour per field $75.00 $77.00 GL700-542033-22033
Y Other
Discounted Community Rate Training and Competition (Saturday and Sunday) – per hour per field
$47.50 $48.70 GL700-542033-22033
Y Other
Discounted Community Rate Training and Competition (Monday to Friday) – per hour per field
$42.50 $44.00 GL700-542033-22033
Y Other
Discounted Community Rate (Shire public schools &very low intensity users) – per hour per field
$20.00 $20.50 GL700-542033-22033
Y Other
Floodlighting – Synthetics
Applicable to SSC synthetic field use with floodlighting - rates are per hour, per booking
Floodlight per hour, per field (100lux) $5.50 $5.70 GL700-542012-22033
Y Other
Additional Floodlight Timer Reset (In addition to Council standard of 3 times per year).
$115.00 $120.00 GL700-542027-22033
Y Other
Electricity (floodlighting and clubhouses), water (clubhouses) and fees for Council Services (such as waste services). Any fees associated with damage caused by user group
At cost GL700-542067-22033
Y Other
Additional cleaning fee only (outside of Council standard service provision)
$165.00 $170.00 GL700-542031-22033
Y Other
Utility Charges – General Use
Year 18/19 Year 19/20
Name Fee Fee Account GST Pricing Policy
(incl. GST) (incl. GST)
Page 100 of 150
Year 18/19 Year 19/20
Name Fee Fee Account GST Pricing Policy
(incl. GST) (incl. GST)
SYLVANIA WATERS & THE RIDGE ATHLETICS TRACKS
Hire Fee (Shire Schools) $300.00 $310.00 Various Y Other
Hire Fee (out of Shire schools) $400.00 $410.00 Various Y Other
Additional cleaning fee if required outside of Council's standard service provision
$165.00 $170.00 Various Y Other
Regional / Zone Carnivals Cleaning Fee $235.00 $240.00 Various Y Other
Casual Hire – Per day $515.00 $530.00 Various Y Other
Casual Hire – Per Half day $280.00 $290.00 Various Y Other
Casual Hire – 2 Hours – minimum $155.00 $160.00 Various Y Other
Year 18/19 Year 19/20
Name Fee Fee Account GST Pricing Policy
(incl. GST) (incl. GST)
Page 101 of 150
Year 18/19 Year 19/20
Name Fee Fee Account GST Pricing Policy
(incl. GST) (incl. GST)
HIRE OF FACILITIES – TENNIS COURTS
Casual Bookings $21.00 $22.00 Various Y Other
Permanent Bookings including mid-week comp $18.00 $18.50 Various Y Other
DAY USE / HOUR:
Casual Bookings $25.00 $26.00 Various Y Other
Permanent Bookings $19.50 $20.00 Various Y Other
NIGHT USE / HOUR:
Permanent Coaching $24.50 $25.50 Various Y Other
Casual Coaching $31.00 $32.00 Various Y Other
COACHING / HOUR:
Year 18/19 Year 19/20
Name Fee Fee Account GST Pricing Policy
(incl. GST) (incl. GST)
Page 102 of 150
Year 18/19 Year 19/20
Name Fee Fee Account GST Pricing Policy
(incl. GST) (incl. GST)
HIRE OF FACILITIES – WEDDING / CEREMONY / PICNIC BOOKINGS
INCLUDING E G WATERHOUSE NATIONAL CAMELLIA GARDENS/JOSEPH BANKS NATIVE PLANT RESERVE
PARKS / RECREATION AREAS INCLUDING WEDDINGS / CEREMONIES
NB High season period includes: all public holiday long weekends, the period between mid December to end of Januaryand the Easter school holidays.
* A refund of the hire fee only will be provided for wet weather cancellations only - Customer needs to contact Council within2 weeks after the event.
Non Refundable Administration Fee $103.00 $105.00 Various Y PubExh
Ceremony/Hire Fee – Low/Shoulder Period $310.00 $315.00 Various Y PubExh
Ceremony/Hire Fee – High Season Period $465.00 $470.00 Various Y PubExh
Cancellation Fee * (if less than 28 days notice given) $46.00 $50.00 Various Y PubExh
* For wet weather cancellations cleaning Fee only will be refundable upon request to Council after the event.
PICNICS
NB Bookings for schools within the Shire are taken all year. Bookings for schools outside the Shire are taken after 1 Julyeach year
Non Refundable Booking Fee $103.00 $105.00 GL206-512081-22034
Y PubExh
Greater 100 – Cleaning Fee $210.00 $215.00 GL786-545110-22034
Y Other
Greater 200 – Cleaning Fee $340.00 $350.00 GL786-545110-22034
Y Other
Greater 300 – Cleaning Fee $425.00 $440.00 GL786-545110-22034
Y Other
Greater 400 – Cleaning Fee $535.00 $550.00 GL786-545110-22034
Y Other
Greater 500 – Cleaning Fee $630.00 $650.00 GL786-545110-22034
Y Other
Greater 600 – Cleaning Fee $740.00 $760.00 GL786-545110-22034
Y Other
Cancellation Fee * $46.00 $50.00 GL206-512081-22034
Y PubExh
Bands in Parks (non refundable) $57.00 $60.00 GL201-512119-22034
Y PubExh
STREET STALLS
Minimum Administration Charge $62.00 $64.00 GL206-512081-22034
Y PubExh
OTHER CHARGES
Year 18/19 Year 19/20
Name Fee Fee Account GST Pricing Policy
(incl. GST) (incl. GST)
Page 103 of 150
Year 18/19 Year 19/20
Name Fee Fee Account GST Pricing Policy
(incl. GST) (incl. GST)
INSPECTIONS
Brothels $175.00 $180.00 GL411-549015-22021
N Other
INSPECTION FEES / REGISTRATION – BROTHELS
Pre-commencement and final inspection $360.00 $370.00 GL400-548014-22003
Y Other
Final or progress inspection of building work approved prior to the requirement for a Construction Certificate
$360.00 $370.00 GL400-548014-22003
Y Other
INSPECTION FEES – DEVELOPMENT
Food Business Inspection or Reinspection (Commercial operation)
$150.00 $155.00 GL411-549015-22021
N Other
Food Business – School Canteens (Commercial) & Childcare Centres – Refer EAP016-13
$135.00 $140.00 GL411-549015-22021
N Other
Food Act 2003 Temporary Food Stall Inspection $0.00 $65.00 GL411-549015-22021
N Other
Special Advisory Inspection/ Services for Food Premises. Does not apply to School Canteens or Early Education Centres
$150.00 $155.00 GL411-549015-22021
N Other
INSPECTION FEES / REGISTRATION – FOOD BUSINESSES
Food Handlers Course $80.00 $80.00 GL411-549001-22021
Y Other
Food Handlers Course
Food Act 2003 – Preparation of Notice under Food Act
NB It is not mandatory to charge the prescribed fee of $330. Council will advise on each particular instance.
Prescribed Administration fee to issue an Improvement Notice under the Food Act
$330.00 $330.00 GL411-549010-22021
N Reg
Food Act 2003 – Prescribed Annual Administration Charge under Food Act
NB It is not mandatory to charge the Annual Administration Charge and, if the charge is to be raised, it is not mandatory to raise it at the maximum charge prescribed. It is also not mandatory to raise the charge on an ongoing basis. Council will advise on each particular instance.
Less than 5 FTE Food Handlers (Maximum) $390.00 $390.00 GL411-549015-22021
N Reg
6 – 50 FTE Food Handlers (Maximum) $800.00 $800.00 GL411-549015-22021
N Reg
51 or more FTE Food Handlers (Maximum) $3,500.00 $3,500.00 GL411-549015-22021
N Reg
Year 18/19 Year 19/20
Name Fee Fee Account GST Pricing Policy
(incl. GST) (incl. GST)
Page 104 of 150
Year 18/19 Year 19/20
Name Fee Fee Account GST Pricing Policy
(incl. GST) (incl. GST)
Public Health Regulation 2012
(a) in the case of an improvement notice or a prohibition order given to an occupier of premises at which there is a regulated system:
$560.00 $560.00 GL411-549010-22021
N Reg
(b) in any other case: $270.00 $270.00 GL411-549010-22021
N Reg
Clause 97 Fee for improvement notices and prohibition orders
Inspection and testing of Public Swimming Pools $135.00 $140.00 GL411-549015-22021
N Other
Notification for registration of a Public Swimming Pool. Not Mandatory – Maximum Prescribed Fee
$100.00 $100.00 GL411-549015-22021
N Reg
INSPECTION FEES – PUBLIC SWIMMING POOLS
(a) Within Shire $390.00 $400.00 GL400-548014-22003
N Other
(b) From outside Shire $795.00 $815.00 GL400-548014-22003
N Other
INSPECTION FEES – REMOVING BUILDINGS
Beauty Salon $135.00 $140.00 GL411-549015-22021
N Other
Depilation $135.00 $140.00 GL411-549015-22021
N Other
Ear Piercing $135.00 $140.00 GL411-549015-22021
N Other
Tattooist $135.00 $140.00 GL411-549015-22021
N Other
Acupuncture $135.00 $140.00 GL411-549015-22021
N Other
Special Advisory Inspection $135.00 $140.00 GL411-549015-22021
N Other
Mortuary Inspection $135.00 $140.00 GL411-549015-22021
N Other
Inspection of Caravan Parks (other than as part of the renewal process)
$135.00 $140.00 GL411-549015-22021
N Other
Reinspections for Salon, Skin penetration & Mortuary Premises and Caravan Parks (other than as part of the renewal process)
$135.00 $140.00 GL411-549015-22021
N Other
Notification for registration of a Skin Penetration Premise. Not Mandatory – Maximum Prescribed Fee
$100.00 $100.00 GL411-549015-22021
N Reg
INSPECTION FEES / REGISTRATION – SALONS, SKIN PENETRATION PREMISES, MORTUARIES
Year 18/19 Year 19/20
Name Fee Fee Account GST Pricing Policy
(incl. GST) (incl. GST)
Page 105 of 150
Year 18/19 Year 19/20
Name Fee Fee Account GST Pricing Policy
(incl. GST) (incl. GST)
INSPECTION FEES – WASTE TREATMENT
Inspection, reinspection or dye testing of a waste treatment device or human waste storage facility (includes on-site septic systems & Domestic Grey water Treatment Systems)
$165.00 $170.00 GL411-549015-22021
N Other
Inspection of Water Cooling Towers – for up to 5 cooling towers located on the site
$150.00 $155.00 GL411-549015-22021
N Other
Inspection of Water Cooling Towers – for each additional 5 cooling towers located on the site or part thereof
$150.00 $155.00 GL411-549015-22021
N Other
Notification for registration of a Water Cooling or Warm Water Systems – Not Mandatory – Maximum Prescribed Fee
$100.00 $100.00 GL411-549015-22021
N Reg
INSPECTION FEES – WATER COOLING TOWERS
INSPECTION FEES – WATER TESTING
Any water testing undertaken - Fee depends on test carried out
Year 18/19 Year 19/20
Name Fee Fee Account GST Pricing Policy
(incl. GST) (incl. GST)
Page 106 of 150
Year 18/19 Year 19/20
Name Fee Fee Account GST Pricing Policy
(incl. GST) (incl. GST)
LEISURE CENTRES – SUTHERLAND, CARINGBAH, ENGADINE AND MENAI INDOOR SPORTSAll Multi visit passes have a 12 month expiryAdult is 16 yrs and overConcession is Child 3 - 16 years, or Full time student, or Holder of Govt issued Senior or Pension card
Swim SLC – Adult $8.50 $8.70 GL152-507012-22015
Y Other
Swim SLC – Concession $6.50 $6.70 GL152-507012-22015
Y Other
Swim CLC/ELC – Adult $7.50 $7.70 Various Y Other
Swim CLC/ELC – Concession $5.80 $5.90 Various Y Other
Swim – Family (Max 2 Adults & 3 Children) or (1 adult and up to 4 children)
$26.50 $27.00 Various Y Other
Swim – Children under 3 (free with full paying adult) Free - Y Other
Carers Card holders only Free - Y Other
Facilities Fee (3yrs and over) $2.00 $2.00 Various Y Other
15 Visit Swim Pass – Adult $110.00 $117.00 Various Y Other
15 Visit Swim Pass – Concession $84.00 $90.00 Various Y Other
12 Month Aquatic – Adult $880.00 $900.00 Various Y Other
12 Month Aquatic – Concession $655.00 $670.00 Various Y Other
12 Month Aquatic – Family (2 Adults & 3 Children) Children 18+ to enter Steam room/Spa
$2,140.00 $2,190.00 Various Y Other
Water Polo / Beach Volleyball SLC – Adult $8.50 $8.70 GL152-507052-22015
Y Other
Water Polo / Beach Volleyball SLC – Concession $6.50 $6.70 GL152-507052-22015
Y Other
Water Polo ELC/CLC – Adult $7.50 $7.70 Various Y Other
Water Polo ELC/CLC – Concession $5.80 $5.90 Various Y Other
15 Visit Pass Water Polo – Adult $110.00 $117.00 Various Y Other
15 Visit Pass Water Polo – Concession $84.00 $90.00 Various Y Other
Dive Ticket (per person) $21.00 $22.00 Various Y Other
100m Swim Test (supervised with certifcate issued) & NSW Police Aquatic Rescue test
$10.50 $11.00 Various Y Other
Special Event days At discretion of management Various Y Future
AQUATICS
Steam room/Spa/Swim – Adult only $17.00 $17.40 Various Y Other
Steam room/Spa/Swim – Concession $11.00 $11.30 Various Y Other
Steam room/Spa/Swim Upgrade from Swim/class ticket – Adult
$8.60 $8.70 Various Y Other
Steam room/Spa/Swim Upgrade from Swim/class ticket – Concession
$4.90 $4.60 Various Y Other
15 Visit Pass Steam room/Spa/Swim – Adult $226.00 $234.00 Various Y Other
15 Visit Pass Steam room/Spa/Swim – Concession $148.00 $152.00 Various Y Other
SLC – STEAM ROOM / SPA / SWIM (only available at SLC)
Year 18/19 Year 19/20
Name Fee Fee Account GST Pricing Policy
(incl. GST) (incl. GST)
Page 107 of 150
Year 18/19 Year 19/20
Name Fee Fee Account GST Pricing Policy
(incl. GST) (incl. GST)
FITNESS
Casual fitness/multi visit pass purchases include: 1 class visit or 1 cardio/weights room visit + 1 swim per entry.
Casual Fitness Adult – Session price for Specialised program – Non Member – total cost payable is proportionate to number of sessions scheduled
$22.00 $22.00 Various Y Other
Casual Fitness Full-time Student/Casual fitness visitor for 2nd class on same day) – Session price for Specialised program – Member – total cost payable is proportionate to number of sessions scheduled
$15.00 $15.00 Various Y Other
Casual Fitness – Senior/Pensioner $12.00 $12.50 Various Y Other
Fitness 15 Visit Pass – Adult/GP Referral non concession
$295.00 $297.00 Various Y Other
Fitness 15 Visit Pass – Full-time Student/LTS and Squad Passholders
$202.00 $203.00 Various Y Other
Fitness 15 Visit Pass – Senior/Pensioner/GP Referral concession
$160.00 $168.00 Various Y Other
Membership provides access to all Leisure Centres and includes all group fitness classes, gym, cardio, swimming, steamroom/spa (steam room/spa SLC only). Memberships include bimonthly fitness test & program. Excludes: Swim School,Squad, Volleyball, Water polo & Schools. All memberships are subject to approval of Pre-Exercise Questionnaire. (16 years- weights, cardio, pump, boxing, all fitness memberships - Conditions apply).
FITNESS MEMBERSHIPS
12 Month Fitness Membership – Adult/GP Referral non-concession
$1,090.00 $1,110.00 Various Y Other
12 Month Fitness Membership – Full-time Student/Senior/ Pensioner /GP Referral concession
$875.00 $880.00 Various Y Other
Fitness & Aquatic Membership (month to month direct debit billing) Student memberships are minimum 12 months fixedterm. All new applications require the first month's fees paid up front.
Links Pay
Aquatic Membership – Adult Per month $74.00 $75.00 Various Y Other
Aquatic Membership – Concession Per month $55.00 $56.00 Various Y Other
Aquatic Membership – Family (2Adults + 3Children) Per month
$180.00 $183.00 Various Y Other
Fitness Membership – Adult/GP Referral non-concession Per month
$92.00 $93.00 Various Y Other
Fitness Membership – Senior/Pensioner/GP Referral concession/Full-time Student Per Month
$73.00 $75.00 Various Y Other
Fitness Membership Plus Creche – Adult/GP Referral non-concession Per month
$102.00 $103.00 Various Y Other
Fitness Membership Plus Creche – Senior/Pensioner/GP Referral concession/Full-time Student Per Month
$84.00 $85.00 Various Y Other
Year 18/19 Year 19/20
Name Fee Fee Account GST Pricing Policy
(incl. GST) (incl. GST)
Page 108 of 150
Year 18/19 Year 19/20
Name Fee Fee Account GST Pricing Policy
(incl. GST) (incl. GST)
FITNESS GENERAL
Early Termination of Membership administration charge
$134.00 $100.00 Various Y Other
Extended Suspension Fee (applied per week over &above standard allowances on all memberships)
$10.50 $11.20 Various Y Other
Replacement Membership Card fee $5.00 $5.00 Various Y Other
Fitness Test or Program $124.00 $125.00 Various Y Other
Fitness Rehab Provider – 3 Month Membership (only available for approved RTW plan)
$475.00 $490.00 Various Y Other
Customised Group Training session – includes 1 instructor. Additional charges will apply for programsrequiring additional instructors.
$185.00 $190.00 Various Y Other
Promotional Membership Pricing based on specificpromotions
Various Y Future
Council Employees Payroll Deductions (fortnightly) $42.50 $42.90 Various Y Other
Services provided to eligible patients under Medicare, DVA,Workers Compensation, CTP or NDIS
As per scheduled fee for specific service
Various Y Other
Initial / long consultation (>45mins) $88.00 $90.00 Various Y Other
Standard consultation $67.00 $69.00 Various Y Other
GPERS program package (initial and final consultations plus 10 exercise sessions)
$160.00 $165.00 Various Y Other
GPERS 10 Exercise session pass (for eligible Medicare and DVA patients to complete initial GPERS)
$57.00 $60.00 Various Y Other
EXERCISE PHYSIOLOGY SERVICES
Single Session $64.00 $66.00 Various Y Other
6 Sessions Pass $365.00 $376.00 Various Y Other
12 Sessions Pass $695.00 $715.00 Various Y Other
PERSONAL TRAINING – 45 minute sessions
1 person
Single Session $86.00 $88.00 Various Y Other
6 Sessions Pass $490.00 $500.00 Various Y Other
2 people
Single Session $96.00 $98.00 Various Y Other
6 Sessions Pass $545.00 $560.00 Various Y Other
3 – 6 people
Year 18/19 Year 19/20
Name Fee Fee Account GST Pricing Policy
(incl. GST) (incl. GST)
Page 109 of 150
Year 18/19 Year 19/20
Name Fee Fee Account GST Pricing Policy
(incl. GST) (incl. GST)
SWIM SCHOOL – Learn to Swim & Development Squads
Note: All Swim School and Squad Fees include entry for pupil and one carer (at time of the lesson).
per lesson $18.00 $18.50 Various N Other
Private Lessons – 1/2 Hour, per person, per lesson $54.00 $56.00 Various N Other
Masters Casual Squad $18.50 $19.00 Various Y Other
12 Session card – Adult/Full Time Student $154.00 $157.00 Various Y Other
12 Session card – Senior/Pensioner $98.00 $100.00 Various Y Other
12 Session card – Current Gym Membership $139.00 $142.00 Various Y Other
Adult/Masters Squads
Elite/Competitive Program
Direct debit per month
10 sessions per week, per month $197.00 $202.00 Various Y Other
7 sessions per week, per month $166.00 $170.00 Various Y Other
6 sessions per week, per month $161.00 $165.00 Various Y Other
5 session per week, per month $149.00 $155.00 Various Y Other
4 sessions per week, per month $143.00 $146.00 Various Y Other
3 sessions per week, per month $115.00 $118.00 Various Y Other
2 sessions per week, per month $74.00 $76.00 Various Y Other
SLC/ELC
6-10 sessions per week, per month $165.00 $170.00 Various Y Other
Up to 6 sessions per week, per month $154.00 $158.00 Various Y Other
Up to 5 sessions per week Masters, per month $144.00 $148.00 Various Y Other
3 sessions per week, per month $108.00 $111.00 Various Y Other
CLC
SCHOOLS PROGRAMS
(Teachers accompanying school students as part of meeting their duty of care obligations under the requirements of the NSW Dept of Education are granted free spectator entry)
Swim School (incl. cap), FlippaBall, Fitness classes (minimum number per class), Stroke Correction, Squad.
$10.60 $10.80 Various Y Other
Royal Life Saving (45min – 1hr lesson) $10.60 $10.80 Various N Other
Royal Life Saving (day long lesson) $24.00 $25.00 Various N Other
Water Polo without referee $6.50 $6.70 Various Y Other
Recreation Day (minimum 20 students) $17.00 $17.50 Various Y Other
Bus transport to and from school (Min numbers per bus apply)
Cost to Council Various Y Other
Year 18/19 Year 19/20
Name Fee Fee Account GST Pricing Policy
(incl. GST) (incl. GST)
Page 110 of 150
Year 18/19 Year 19/20
Name Fee Fee Account GST Pricing Policy
(incl. GST) (incl. GST)
CRECHE
Compulsory fee per child per visit (1.5 hr) $4.00 $4.00 Various Y Other
15 Visit Pass Crèche $58.00 $58.00 Various Y Other
MISC holiday programs – Supervised activities 1.5hrs duration (Kids Club, Learn to Play Basketball,Bubble Soccer, etc)
$16.50 $17.00 Various Y Other
SLC Fun & Fitness / MISC multi sports full day – 9.00-3.00pm
$45.50 $46.50 Various Y Other
FUN & FITNESS (School Holiday Programs)
MISC: Unsupervised Party (includes facility hire, equipment hire, chips, drink, & cake), per head.
$15.00 $15.50 GL151-507057-22033
Y Other
MISC: Supervised Party (includes 1 hour staff supervision, facility hire, equipment hire, chips, drink, & cake), per head. Add on applicable fee to include Bubble Soccer
$18.50 $19.00 GL151-507057-22033
Y Other
MISC: Additional party court time – Staff Fee $37.00 $38.00 GL151-507055-22033
Y Other
MISC: Additional party court time – Court Fee $74.00 $76.00 GL151-507055-22033
Y Other
PARTIES
1) Casual Hire requires 50% deposit of fees payable at time of booking
FACILITIES HIRE
2) Late Cancellation (Less than 24 hours notice) - Full hire rates.3) Permanent booking requires a minimum booking of 26 hours
Beach Volleyball Court Per half Hour $22.50 $23.00 Various Y Other
Lane hire, per lane per hour $142.00 $146.00 Various Y Other
Indoor pool aqua area hire, per hour $72.00 $74.00 Various Y Other
Conference/Training Room Per Hour $35.00 $36.00 Various Y Other
Conference/Training Room Per Day $206.00 $220.00 Various Y Other
Gym areas (per area, per hour) $83.00 $86.00 Various Y Other
Casual Facilities Hire
Exclusive use of facility without provision of customised set-up. Hire fees for events subject to volume discount based onnumber of players, officials and spectators guaranteed to the event. Volume discount is based on a percentage of totalfacilities hire charges / total entry charges.
Event Facilities Hire
Event hire applies for all events where registration fees, fees above pool entry fees and the like are levied to participants(directly or indirectly)
Utility pool hire, per half pool blocks, per half day $211.00 $220.00 Various Y Other
Olympic pool hire, per half pool blocks, per half day $360.00 $370.00 Various Y Other
continued on next page ...
Year 18/19 Year 19/20
Name Fee Fee Account GST Pricing Policy
(incl. GST) (incl. GST)
Page 111 of 150
Year 18/19 Year 19/20
Name Fee Fee Account GST Pricing Policy
(incl. GST) (incl. GST)
Indoor pool, per quarter pool block, per 2 hrs $146.00 $150.00 Various Y Other
Extended use of pools in conjunction with event, perlane / hour or part thereof
$37.00 $38.00 Various Y Other
School Carnival Administration booking fee (non-refundable)
$57.00 $60.00 Various Y Other
PA System Hire $72.00 $74.00 Various Y Other
Lifeguard Hire Charge (per hour) $57.00 $60.00 Various Y Other
Event Facilities Hire [continued]
Exclusive use of facility without provision of customised set-up. Hire fees apply only for annual programs subject to minimumvolume bookings (participants and duration), paid for up-front quarterly.
Programmed Facilities Hire (for purposes other than Swim Coaching).
Programmed hire only available to non-commercial / not for profit groups based in the Sutherland Shire local governmentarea.
No discounts or exemptions apply to entry fees in conjunction with programmed hire.
Utility pool hire, per half pool blocks, per 2 hrs $77.00 $80.00 Various Y Other
Olympic pool hire, per half pool blocks, per 2 hrs $124.00 $130.00 Various Y Other
Indoor pool, per quarter pool block, per 2 hrs $77.00 $78.00 Various Y Other
Extended use of pools in conjunction with annual program booking, per lane, per hour or part thereof
$23.00 $24.00 Various Y Other
30m x 15m court $60.00 $62.00 GL151-507047-22033
Y Other
30m x 15m court Off Peak (Mon-Fri 9am-1pm) $49.50 $51.00 GL151-507047-22033
Y Other
Court Hire – Permanent Per hour
30m x 15m court $74.00 $76.00 GL151-507044-22033
Y Other
Badminton – per court per hour $25.00 $26.00 GL151-507044-22033
Y Other
Table Tennis – per table per hour $14.50 $15.00 GL151-507044-22033
Y Other
Court Hire – Casual Per Hour
Individual Casual Entry $5.20 $6.00 GL151-507046-22033
Y Other
RC Cars & Planes Entry $11.50 $12.00 GL151-507055-22033
Y Other
Room hire / hour – permanent $33.00 $35.00 GL151-507106-22033
Y Other
School Use / per student (school run programs) $4.10 $4.20 GL151-507048-22033
Y Other
Other
continued on next page ...
Year 18/19 Year 19/20
Name Fee Fee Account GST Pricing Policy
(incl. GST) (incl. GST)
Page 112 of 150
Year 18/19 Year 19/20
Name Fee Fee Account GST Pricing Policy
(incl. GST) (incl. GST)
School Use / per student (centre run programs) minimum numbers apply
$9.30 $9.50 GL151-507048-22033
Y Other
Recreation day (maximum 6 hrs) $16.50 $17.00 GL151-507048-22033
Y Other
Bubble Soccer – per person (minimum of 8) $16.50 $17.00 GL151-507043-22033
Y Other
MISC administered competitions – Registration & competition fees proportionate to length of specific competition
Up to $76 per round plus registration fee
GL151-507045-22033
Y Other
Last YR FeeUp to $70 per round plus
registration fee
Event booking deposit (calculated as 4hrs of court hire)
Up to $304 GL151-507047-22033
Y Other
Last YR FeeUp to $288
Chair Hire – Events Only $2.10 $2.20 GL151-507055-22033
Y Other
Table Hire – Events Only $3.10 $3.30 GL151-507055-22033
Y Other
Other [continued]
COMO LEARNERS POOL
General Entry
Open October to March only. Refer to website for details of opening hours.
All Swimming Free - Y Other
Event Facilities Hire
Exclusive use of facility without provision of customised set-up.
Private pool hire prior to public opening hours for self catering party. 2 hours including Lifeguard. Maximum 30 people.
$320.00 $330.00 GL152-507012-22015
Y Other
Commercial sponsorship arrangements entered into on a case by case basis with fully commercial enterprises seeking toprovide a comparative or better market value package of benefits in return for facilities use.
COMMERICAL SPONSORSHIP ARRANGEMENTS
Commercial sponsorship arrangements
Commercial Sponsorship Arrangements As per agreement & withdelegated approval
Various Y Future
Year 18/19 Year 19/20
Name Fee Fee Account GST Pricing Policy
(incl. GST) (incl. GST)
Page 113 of 150
Year 18/19 Year 19/20
Name Fee Fee Account GST Pricing Policy
(incl. GST) (incl. GST)
Sponsored athlete's program
Sponsored athlete's program for amateur athletes, based in the Sutherland Shire local government area, over the age of16 years, and competing regularly at national level. Guidelines as endorsed by Council with details on application.
Sponsored Athletes Program As per agreement & withdelegated approval
Various Y Future
Year 18/19 Year 19/20
Name Fee Fee Account GST Pricing Policy
(incl. GST) (incl. GST)
Page 114 of 150
Year 18/19 Year 19/20
Name Fee Fee Account GST Pricing Policy
(incl. GST) (incl. GST)
LIBRARY SERVICES
A loan period of 21 days applies for most items
FINES FOR OVERDUE ITEMS
A fine is incurred for any overdue item on a daily basis
Depending upon the balance of outstanding fines borrowing privileges may be withdrawn.
Adults Material – on 5th day after due date, $3.00 $3.10 GL140-506016-24001
N Other
Adults Material – per day from 6th day onwards untilmaximum fine is reached.
$0.50 $0.55 GL140-506016-24001
N Other
Junior Material – on 5th day after due date, $0.50 $0.50 GL140-506016-24001
N Other
Junior Material – per day from 6th day onwards until maximum fine is reached.
$0.10 $0.10 GL140-506016-24001
N Other
Maximum fine per Item – Adult $12.50 $13.00 GL140-506016-24001
N Other
Maximum fine per Item – Junior $3.10 $3.10 GL140-506016-24001
N Other
Maximum fine per magazine – Adult $5.50 $5.85 GL140-506016-24001
N Other
LOST AND DAMAGED ITEMS
Replacement cost as assessed plus processing fee
Lost and Damaged Items – replacement cost as assessed plus processing fee
As assessed GL140-506017-22029
N Future
Processing cost for lost and damaged items $17.00 $17.00 GL140-506017-22029
N Other
Processing cost for lost and damaged serials $4.20 $4.40 GL140-506017-22029
N Other
Processing cost for lost or damaged AV cases, inserts, RFID tags
$7.00 $7.20 GL140-506017-22029
N Other
Magazine – Adult – Replacement Cost $7.00 $7.00 GL140-506017-22029
N Other
Magazine – Junior – Replacement Cost $4.00 $4.00 GL140-506017-22029
N Other
Reservations – per Adult item $1.20 $1.20 GL140-506017-22029
N Other
Book Club Kits – Reservation per item $1.20 $1.20 GL140-506017-22029
N Other
Lost Library Card Replacement Cost $4.70 $4.90 GL140-506017-22029
N Other
Reader/Printer Copying A4 $0.75 $0.80 GL140-506002-22029
Y Other
Reader/Printer Copying A3 $0.90 $0.95 GL140-506002-22029
Y Other
COPYING/PRINTING/FAXING
continued on next page ...
Year 18/19 Year 19/20
Name Fee Fee Account GST Pricing Policy
(incl. GST) (incl. GST)
Page 115 of 150
Year 18/19 Year 19/20
Name Fee Fee Account GST Pricing Policy
(incl. GST) (incl. GST)
3D Printing – per hour up to maximum 3 hrs $3.60 $4.00 GL140-506002-22029
Y Other
COPYING/PRINTING/FAXING [continued]
Black and White A4 $0.20 $0.20 GL140-506002-22029
Y Other
Black and White A4 Double Sided $0.40 $0.40 GL140-506002-22029
Y Other
Black and White A3 $0.40 $0.40 GL140-506002-22029
Y Other
Black and White A3 Double Sided $0.80 $0.80 GL140-506002-22029
Y Other
Colour-Public A4 $1.00 $1.00 GL140-506002-22029
Y Other
Colour-Public A3 $2.00 $2.00 GL140-506002-22029
Y Other
Printing Card (to enable printing for non-library members) + printing charges
$0.00 $1.00 GL140-506002-22029
Y Other
Photocopying/Computer Printouts – per sheet
Standard – per hour $67.00 $69.00 GL140-506000-22029
N Other
Express Level Inter-Library Loans (2 hr) (in conjunction with Research Service) – plus handling fee and ILRS charge incurred from other libraries
$60.00 $60.00 GL140-506011-22029
Y Other
Inter-Library Loans and Requests for Purchase – Handling Fee (plus full cost recovery if a charge is made by the lending library)
$4.80 $5.00 GL140-506011-22029
Y Other
RESEARCH SERVICES
Programs and events Various GL140-506005-22029
Y Future
Programs and events – Consumables Market Price GL140-506005-22029
Y Future
COMMUNITY PROGRAMS/EVENTS
Reproductions (Non Commercial) Various GL140-506000-22029
Y Future
Reproductions (Commercial) Various GL140-506000-22029
Y Future
Publications/Promotional Material/Web Display Various GL140-506000-22029
Y Future
LOCAL STUDIES PHOTOGRAPHS
Year 18/19 Year 19/20
Name Fee Fee Account GST Pricing Policy
(incl. GST) (incl. GST)
Page 116 of 150
Year 18/19 Year 19/20
Name Fee Fee Account GST Pricing Policy
(incl. GST) (incl. GST)
COMPUTER ACCESS
USB Sticks Market Price GL140-506023-22029
Y Future
Commercial Rate per hour $40.00 $43.00 GL140-506000-22029
Y Other
Non-Profit Rate per hour $25.00 $25.00 GL140-506000-22029
Y Other
MEETING ROOM WITH WIFI & ATTENDED HIRE (CENTRAL & ENGADINE BRANCH LIBRARIES)
Year 18/19 Year 19/20
Name Fee Fee Account GST Pricing Policy
(incl. GST) (incl. GST)
Page 117 of 150
Year 18/19 Year 19/20
Name Fee Fee Account GST Pricing Policy
(incl. GST) (incl. GST)
LIFEGUARD
Per student $8.50 $8.80 GL172-511030-22020
Y Other
If the number of students in the class exceeds 20, an additional Lifeguard will be required
$57.00 $59.00 GL172-511030-22020
Y Other
Lifeguard Hire per hour $57.00 $59.00 GL172-511030-22020
Y Other
SURF AWARENESS
Per student $36.00 $37.00 GL172-511030-22020
Y Other
If the number of students in the class exceeds 20, an additional Lifeguard will be required
$57.00 $59.00 GL172-511030-22020
Y Other
Lifeguard Hire per hour $57.00 $59.00 GL172-511030-22020
Y Other
SURF SURVIVAL PROGRAM
When managing beach events for community based organisations:
HIRE FEES
1. Where Council refuses vehicle access to the beach, Lifeguard vehicles may be allocated for operational purposes withoutincurring vehicle hire charge as specified in the fees and charges schedule. Priority will be given to not for profit communitygroups.
2. On occasions Lifeguard services can be allocated to assist with public safety and water based event management withoutincurring a Lifeguard or equipment hire fee when deemed necessary to ensure public safety as part of normal life guardingduties.
3. Other additional Lifeguard Services may be provided at an amount negotiated by Council and the Manager Public Safety& Lifeguards.
Community Groups within Shire/hour $120.00 $123.00 GL172-511000-22020
Y Other
Community Groups outside Shire/hour $130.00 $135.00 GL172-511000-22020
Y Other
Corporate rate per hour $180.00 $185.00 GL172-511000-22020
Y Other
Equipment Hire – IRB equipped with 2 Lifeguards
Community Groups within Shire/hour $77.00 $79.00 GL172-511000-22020
Y Other
Community Groups outside Shire/hour $103.00 $106.00 GL172-511000-22020
Y Other
Corporate rate per hour $180.00 $185.00 GL172-511000-22020
Y Other
Equipment Hire – Jetbike, equipped with 1 Lifeguard
Year 18/19 Year 19/20
Name Fee Fee Account GST Pricing Policy
(incl. GST) (incl. GST)
Page 118 of 150
Year 18/19 Year 19/20
Name Fee Fee Account GST Pricing Policy
(incl. GST) (incl. GST)
Equipment Hire – 4 x 4, equipped with 1 Lifeguard
Community Groups within Shire/hour $77.00 $79.00 GL172-511000-22020
Y Other
Community Groups outside Shire/hour $88.00 $91.00 GL172-511000-22020
Y Other
Corporate rate per hour $103.00 $106.00 GL172-511000-22020
Y Other
School groups $60.00 $62.00 GL172-511030-22020
Y Other
Community and Corporate per hour $57.00 $59.00 GL172-511030-22020
Y Other
Picnics/Other – Lifeguard hire per hour
Manager/Coordinator/Duty Officer – Per hour $155.00 $160.00 GL172-511000-22020
N Other
Professional service fee for public & ocean safety event management/assessment/advice/consultation
Professional Services – Water Safety Assessment/Advice/Management
Corporate rate per hour $155.00 $160.00 GL172-511000-22020
Y Other
Tractor Hire 4 x 4, equipped with 1 Lifeguard and bucket
Cleaning fee for use of lifeguard vehicles (if required)
$52.00 $54.00 GL172-511000-22020
Y Other
Vehicle Cleaning
Recovery of unapproved vehicle stranded on beach $103.00 $106.00 GL172-511000-22020
Y Other
Vehicle Recovery
Hand cleaning – Lifeguard per hour $57.00 $59.00 GL172-511000-22020
Y Other
Beach Cleaning Machine $155.00 $160.00 GL172-511000-22020
Y Other
WASTE REMOVAL
A fee will be charged for cancellation of lifeguard hire services if the cancellation occurs within 12 hours of the booking.
$57.00 $59.00 GL172-511030-22020
Y Other
CANCELLATION FEE
Year 18/19 Year 19/20
Name Fee Fee Account GST Pricing Policy
(incl. GST) (incl. GST)
Page 119 of 150
Year 18/19 Year 19/20
Name Fee Fee Account GST Pricing Policy
(incl. GST) (incl. GST)
PARKING PERMITS
Charge for annual permit $32.00 $33.00 GL650-522010-22036
N Other
Holder of Disabled Drivers Permit $16.00 $16.50 GL650-522010-22036
N Other
Key Bond – refundable on return of key $50.00 $50.00 GL900-100000-71036
N Other
CAR PARKING PERMITS
TRADE PARKING PERMITS
(Refer SAF107-12)
Permit Parking for Trade Vehicles in Time Limited Parking Areas Per day fee per 6m parking space
$25.00 $26.00 GL720-544011-22018
N Other
Year 18/19 Year 19/20
Name Fee Fee Account GST Pricing Policy
(incl. GST) (incl. GST)
Page 120 of 150
Year 18/19 Year 19/20
Name Fee Fee Account GST Pricing Policy
(incl. GST) (incl. GST)
PAYMENTS
CREDIT CARD MERCHANT SURCHARGE FEE / TRANSACTION FEE
Subject to potential permitted surcharges proposed by Reserve Bank of Australia - Review of Card Payments Regulation
Taxable Supplies Visa/MasterCard At Cost - currently 0.45% GL212-513009-22004
Y Other
Taxable Supplies American Express At cost - currently 1.40% GL212-513009-22004
Y Other
Non Taxable Supplies Visa/MasterCard At cost - currently 0.45% GL212-513009-22004
N Other
Non Taxable Supplies American Express At cost - currently 1.40% GL212-513009-22004
N Other
Cheque, Direct Debit and Other Electronic Transactions
$23.00 $24.00 GL211-513012-22004
N Other
Each instance. To cover both bank/Australia Post charges where applicable plus Council Administration costs. Excludes Councilerrors and deceased accounts. Includes unidentified bank credits requiring a bank trace.
DISHONOURED / REJECTED PAYMENTS
Late payment of rent, outgoings or fees under leases, licences, and hall hire agreements
LATE PAYMENT PENALTY
Outstanding amount compounded at interest rate set under section 566 of the Local Government Act 1993
Year 18/19 Year 19/20
Name Fee Fee Account GST Pricing Policy
(incl. GST) (incl. GST)
Page 121 of 150
Year 18/19 Year 19/20
Name Fee Fee Account GST Pricing Policy
(incl. GST) (incl. GST)
PERSONAL TRAINERS / FITNESS GROUPSNB Refer Appendix for Sutherland Shire Open Space CX Levels.
Annual Registration Fee $250.00 $255.00 GL700-542036-22033
Y Other
Fee to replace ID Card and/or Arm Band $50.00 $52.00 GL700-542036-22033
Y Other
Year 18/19 Year 19/20
Name Fee Fee Account GST Pricing Policy
(incl. GST) (incl. GST)
Page 122 of 150
Year 18/19 Year 19/20
Name Fee Fee Account GST Pricing Policy
(incl. GST) (incl. GST)
PROFESSIONAL SERVICES
BUILDING PROJECT SUPERVISION
Fee for project supervision of buildings being constructed on Council land and also other section 94 funded or externally funded projects
(Provided to non-residential assets only)
BUILDING TRADES
Trade Services
Note: Out of hours rates for all trades & services - price on application
Carpentry – labour per hour, + cost of materials and plant hire (including 10% mark-up for handling)
$74.00 $76.00 GL743-524012-22017
Y Other
Plumbing – labour per hour, + cost of materials and plant hire (including 10% mark-up for handling)
$76.00 $78.00 GL743-524035-22017
Y Other
Gutter cleaning – labour per hour, + cost of materials and plant hire (including 10% mark-up for handling)
$72.00 $74.00 GL743-524012-22017
Y Other
Sign writing – labour per hour, + cost of materials and plant hire (including 10% mark-up for handling)
$76.00 $78.00 GL743-524039-22017
Y Other
Installation/removal of signs/Banners $72.00 $74.00 GL743-524039-22017
Y Other
Painting – labour per hour, + cost of materials and plant hire (including 10% mark-up for handling)
$72.00 $74.00 GL743-524012-22017
Y Other
Electrical – labour per hour, + cost of materials and plant hire (including 10% mark-up for handling)
$74.00 $76.00 GL743-524013-22017
Y Other
Graffiti removal – labour per hour, + cost of materials and plant hire (including 10% mark-up for handling)
$74.00 $76.00 GL743-524020-22017
Y Other
Metal Fabrication – labour per hour, + cost of materials and plant hire (including 10% mark-up for handling)
$82.00 $85.00 GL743-524012-22017
Y Other
Water Jet per hour $126.00 $130.00 GL743-524035-22017
Y Other
Leguan 125 cherry picker – hourly rate – 1 Hr labourfloat "to & from" site (labour not included)
$64.00 $66.00 GL743-524012-22017
Y Other
Scaffold – 1st lift – minimum per day $71.00 $73.00 GL743-524012-22017
Y Other
Scaffold – 2nd or more lift -minimum per day $33.00 $34.00 GL743-524012-22017
Y Other
Gernie – minimum per hour $15.00 $15.50 GL743-524020-22017
Y Other
Generator – minimum per hour $15.00 $15.50 GL743-524020-22017
Y Other
Power activation and meter reading at hired venues where electricity is not freely accessible. NB Costs could be greater subject to extent of works and power consumption (usually only affected by large events)
Min $105 (1.5 man hrs) plus min $38.00 electricity costs.
GL743-524013-22017
Y Other
Specialist contractors Works will beundertaken upon
GL743-524000-22017
Y Other
continued on next page ...
Year 18/19 Year 19/20
Name Fee Fee Account GST Pricing Policy
(incl. GST) (incl. GST)
Page 123 of 150
Year 18/19 Year 19/20
Name Fee Fee Account GST Pricing Policy
(incl. GST) (incl. GST)
Specialist contractors Works will beundertaken upon
request and charged asper the contractorsagreed schedule ofrates (i.e. labour per
hour, + cost ofmaterials and plant
hire), this will include a5% mark-up foradministration.
GL743-524000-22017
Y Other
Trade Services [continued]
Minor Design Road Works (additional to the Application Fee for Roads Act Approval for Road Works)
Individual Assessment GL610-528003-22039
Y Future
Major Design of Road Works prepared by Council (additional to the Application Fee for Roads Act Approval for Road Works). This includes an existing condition survey, design and supply of two sets of drawings.
Individual Assessment with $3,300 Minimum Fee
GL610-528003-22039
Y Future
DESIGN
ENVIRONMENTAL SCIENCE – CONSULTATIONS
NB: The hourly rates listed below are indications only. Please contact the Principal Environmental Scientist for furtherinformation.
GENERAL FEES AND CHARGES (WHERE NOT PRESCRIBED BY REGULATION)
1. Labour costs
Minimum 4 hours applies when an officer attends a call out when not rostered on duty
Public Safety Officer (Mon – Sun, 7am – 7pm) -per hour
$93.00 $96.00 Various N Other
Public Safety Officer (Mon – Sun, 7pm – 7am) – per hour
$140.00 $145.00 Various N Other
Public Safety Officer (public holidays) – per hour $235.00 $240.00 Various N Other
Coordinator & Other supervisory staff (Mon – Fri 7am – 7pm) – per hour
$155.00 $160.00 Various N Other
Coordinator & Other supervisory staff (Mon – Fri, 7pm – 7am, Saturday or Sunday) – per hour
$260.00 $270.00 Various N Other
2. External services
Costs incurred by Council
Year 18/19 Year 19/20
Name Fee Fee Account GST Pricing Policy
(incl. GST) (incl. GST)
Page 124 of 150
Year 18/19 Year 19/20
Name Fee Fee Account GST Pricing Policy
(incl. GST) (incl. GST)
3. Plant and equipment
External commercial hire rates
Release of Vehicle/Gate Opening Fee $57.00 $59.00 GL171-511060-22004
Y Other
4. Release of Vehicle Fee from Council controlled access i.e: parks/reserves/facilities
Year 18/19 Year 19/20
Name Fee Fee Account GST Pricing Policy
(incl. GST) (incl. GST)
Page 125 of 150
Year 18/19 Year 19/20
Name Fee Fee Account GST Pricing Policy
(incl. GST) (incl. GST)
LEGAL SERVICES
Legal costs – In-house lawyers (Per Hour) $350.00 $380.00 GL250-517123-24004
Y Other
In-house experts – Preparation of evidence and attendance at Court (Per Hour)
$230.00 $235.00 GL250-517123-24004
Y Other
Document processing fee – Legal Services (Per Hour)
$60.00 $60.00 GL250-517000-24004
Y Other
Notes:
PARKS MAINTENANCE
1. Percentage charged for tree maintenance relates to percentage of the tree/s on private property
2. For plant and equipment supplied, minimum duration of 4 hours to include travel time to and from site location to apply
3. Labour services provided outside of standard business hours, minimum 4 hours to apply for first 4 hours and doubletime hourly rate thereafter
Tree maintenance in part on private property % of cost charged to Council GL776-536000-22034
Y Other
Plant / equipment Cost to Council +10% mark-up for handling
Various Y Other
Contract Services Cost to Council +10% mark-up for handling
Various Y Other
Labour rate per hour (General staff) + cost of materials (including 10% mark-up for handling)
$40.00 $41.00 GL771-536001-22034
Y Other
Labour rate per hour (Supervisory staff) + cost of materials (including 10% mark-up for handling)
$58.00 $60.00 GL771-536001-22034
Y Other
Research or specific projects for government or commercial clients by the Corporate Development Unit or any other Unitof Council are subject to individual quotations. The quotation is dependent upon the size, scope, nature and location ofthe proposed project. Quotations would need to cover all costs including labour, materials, employee overheads, vehiclerunning costs, administrative overheads etc.
RESEARCH
By quotation depending on the requirements of the work required
Vehicle Servicing – labour rate per hour $84.00 $87.00 GL765-534011-22041
Y Other
Vehicle Servicing – Parts and materials cost to Council plus 20% mark up
GL765-534011-22041
Y Other
VEHICLE SERVICING
Year 18/19 Year 19/20
Name Fee Fee Account GST Pricing Policy
(incl. GST) (incl. GST)
Page 126 of 150
Year 18/19 Year 19/20
Name Fee Fee Account GST Pricing Policy
(incl. GST) (incl. GST)
PROPERTY AND LAND MANAGEMENT
CLOTHING RECYCLE BINS ON COUNCIL LAND FEE
Discounted Fees: at the discretion of the Property Services Manager
Not for profit or charity operated bin fee – per bin, per annum
$515.00 $530.00 GL164-509059-24002
N Other
Commercial operator bin fee – per bin, per annum $1,300.00 $1,340.00 GL164-509059-24002
N Other
Discounted Fees: at the discretion of the Property Services Manager
EASEMENT NEGOTIATIONS
Valuations – based on quotation provided by Council's appointed independent Valuer
As determined GL160-509079-24028
N Future
Survey Fee for creation /relocation of Easement based on quotation provided by Design & Survey Unit
As determined GL160-509079-24028
N Future
Property Services Administration Fees $1,550.00 $1,590.00 GL160-509000-24028
N Other
Development cost less than $5,000,000 – Compensation amount calculated as: Estimated costof development (from DA) x 1.5% + ($100 x lineal metre of easement)
As calculated GL166-509082-44028
Y Future
Development over $5,000,000 By negotiation GL166-509082-44028
Y Future
Advertising easements over community land s47 of the Local Government Act
At cost + 5% GL166-509082-44028
Y Other
Administration fee (Preparation of lease agreements)
$330.00 $360.00 GL160-509000-24028
Y Other
Minimum annual rent $550.00 $580.00 GL164-509030-24002
Y Other
Rectification of tenant breaches cost incurred plus 5% GL164-509030-24002
Y Other
Advertising s47 and 47A of Local Government Act 1993
cost of newspaper advertisement plus 5%
GL164-509030-24002
Y Other
LEASES OF COMMUNITY LAND
Discounted Fees: at the discretion of the Property Services Manager
PROPERTY SERVICES APPLICATION – USE OF COUNCIL LAND
Property Services Administration Fees $1,550.00 $1,600.00 GL160-509000-24028
N Other
Applicable to requests for road closure, purchase, easements, leases, reclassification,telecommunication facilities
Seeking of Land Owner’s consent $80.00 $80.00 GL160-509000-24028
N Other
continued on next page ...
Year 18/19 Year 19/20
Name Fee Fee Account GST Pricing Policy
(incl. GST) (incl. GST)
Page 127 of 150
Year 18/19 Year 19/20
Name Fee Fee Account GST Pricing Policy
(incl. GST) (incl. GST)
Telecommunication Infrastructure Fee $32,930.00 $33,753.00 GL161-509000-24002
Y Other
Telecommunication Infrastructure Fee – shelter hut and access only
$16,465.00 $16,875.00 GL161-509000-24002
Y Other
PROPERTY SERVICES APPLICATION – USE OF COUNCIL LAND [continued]
Gunnamatta Wharf $905.00 $930.00 GL164-509017-24002
Y Other
Others $905.00 $930.00 Various Y Other
PUBLIC WHARVES COMMERCIAL USE
Annual Occupation Fee – Communication Infrastructure
$0.00 $5,000.00 GL164-509000-24002
Y Other
Annual Occupation Fee – Garage/Parking $800.00 $820.00 GL164-509000-24002
Y Other
Commercial uses of Road Determined by valuation GL164-509000-24002
N Future
Reclassification of Public Land excluding public hearings and studies)
Sale Price determined by valuation + 10%
administration fee
GL164-509000-24002
N Other
Public hearings Incurred cost N Other
Property Services Administration Fee – Road Closure or Road Lease Application
$1,550.00 $1,600.00 GL160-509000-24028
N Other
ROAD LEASE FEES
S611 - Annual charge relating to pipelines or other structures under Council roads
SECTION 611 CHARGES (LOCAL GOVERNMENT ACT 1993)
As determined by valuation in accordance with Act
Year 18/19 Year 19/20
Name Fee Fee Account GST Pricing Policy
(incl. GST) (incl. GST)
Page 128 of 150
Year 18/19 Year 19/20
Name Fee Fee Account GST Pricing Policy
(incl. GST) (incl. GST)
RATES AND PROPERTY
Non Commercial Purpose: Where external organisations have publicity pamphlets approved forinsertion with Council’s mail out of rate notices/instalment notices, those organisations will be charged a fee equal to the cost incurred by council plus 10% GST.
Cost incurred by Council plus 10% GST
GL211-513042-22041
Y Other
Commercial Purpose: Where external organisations have publicity pamphlets approved for insertion with Council’s mail out of rate notices/instalment notices, those organisations will be charged a fee equal to the market rate plus 10% GST.
Market rate plus 10% GST GL211-513042-22041
Y Other
RATES
Insertion of Publicity Pamphlets with Rate Notice/Instalment Notices
Legal Costs
Amounts prescribed by legislation as set by the Attorney Generals Department.
Company/Business Search Costs At cost GL211-513025-24003
N Other
Ownership Enquiry – Property and Rating Extract $37.00 $38.00 GL220-512099-22046
N Other
SUPPLY OF PROPERTY DATA
Year 18/19 Year 19/20
Name Fee Fee Account GST Pricing Policy
(incl. GST) (incl. GST)
Page 129 of 150
Year 18/19 Year 19/20
Name Fee Fee Account GST Pricing Policy
(incl. GST) (incl. GST)
REGULATION
Impounding Charges Abandoned/Unattended Articles – Small (1 staff)
$105.00 $108.00 GL173-511082-24001
N Other
Item/article requires one or more person’s to move/lift/impound/article/item (including, but not limited to bicycles and shopping trolleys)
Impounding Charges Abandoned/Unattended Articles – Medium (2 staff and or Hiab)
$210.00 $215.00 GL173-511082-24001
N Other
Item/article requires two or more person’s to move/lift/impound/article/item.
Impounding Charges Abandoned/Unattended Articles – Large (4 staff and or Hiab)
$415.00 $430.00 GL173-511082-24001
N Other
Item/article requires four or more people or Hiab to move/lift/impound/article/item.
Impounding Charges – Advertising Signs (Small) $18.00 $18.50 GL173-511045-24001
N Other
Impounding Charges – Advertising Signs (Medium) $92.00 $95.00 GL173-511045-24001
N Other
Impounding Charges – Advertising Signs (Large) $137.00 $141.00 GL173-511045-24001
N Other
ENVIRONMENT PROTECTION AND REGULATION
Advertising Signs/Abandoned/Unattended Articles
Penalty Notice Offences Under Companion Animals Regulation 1998 (subject to change with change to regulation)
Companion Animals
Fine amounts, terms and conditions as prescribed by regulations set by the State Government.
Penalty Notice Offences Under Protection of the Environment Operations Act (subject to change with change to regulation)
Environmental Fines
Fine amounts, terms and conditions as prescribed by regulations set by the State Government.
Heavy Vehicle Weight Fines
Fine amounts, terms and conditions as prescribed by regulations set by the State Government.
Parking Fines
Fine amounts, terms and conditions as prescribed by regulations set by the State Government.
PROTECTION OF ENVIRONMENT OPERATIONS ACT
Preparation of Notice under POEO Act
NB It is not mandatory to charge the prescribed fee. Council will advise on each particular instance
Prescribed Administration fee – Health $550.00 $563.00 GL411-549010-22021
N Reg
Year 18/19 Year 19/20
Name Fee Fee Account GST Pricing Policy
(incl. GST) (incl. GST)
Page 130 of 150
Year 18/19 Year 19/20
Name Fee Fee Account GST Pricing Policy
(incl. GST) (incl. GST)
ROADS AND ENGINEERING APPROVALS
Work Zones – Application Fee $285.00 $295.00 GL662-541003-22018
N Other
Work Zone Permit Fee – weekly rate per lineal metre
$22.00 $23.00 GL662-541003-22018
N Other
Work Zone Signposting – per sign. Minimum 2 signs $205.00 $210.00 GL662-541003-22018
N Other
ON-ROAD WORK ZONES
Work Zones – Application Fee $285.00 $295.00 GL662-541003-22018
N Other
Work Zone Permit Fee – weekly rate per lineal metre
$11.00 $11.50 GL662-541003-22018
N Other
Work Zone Signposting – per sign. Minimum 2 signs $140.00 $145.00 GL662-541003-22018
N Other
ON-ROAD WORK ZONES (DUAL OCCUPANCY & SMALL DEVELOPMENT)
PENALTY NOTICE OFFENCES (SUBJECT TO REGULATION CHANGES)
Fine amounts, terms and conditions as prescribed by regulations set by the NSW Government
Application fee for placing skip bin on road reserve 2days
$31.00 $32.00 GL662-535013-22003
N Other
Application fee for placing skip bin on road reserve 7days
$88.00 $91.00 GL662-535013-22003
N Other
Application fee for placing skip bin on road reserve Maximum 14 days
$170.00 $175.00 GL662-535013-22003
N Other
SKIP BINS – Refer EHR043-14
Damage / Construction / Performance Security Bank Guarantee to the total value of the construction
within the Public Place.
N Bond
CONSTRUCTION WORKS WITHIN A PUBLIC PLACE
Temporary Road Closure – Rental rates to be assessed for individual applications.
$265.00 $275.00 GL662-535006-22018
N Other
Temporary Road Closures Application Fee
Shoring and Anchoring Application Fee – Payable atthe customer service counter only
$285.00 $292.00 GL662-535008-22003
N Other
Installation of temporary shoring anchors within roadreserve – per lineal metre of site frontage per month
$62.00 $64.00 GL662-535008-22003
N Other
SHORING & ANCHORING
Year 18/19 Year 19/20
Name Fee Fee Account GST Pricing Policy
(incl. GST) (incl. GST)
Page 131 of 150
Year 18/19 Year 19/20
Name Fee Fee Account GST Pricing Policy
(incl. GST) (incl. GST)
HOARDINGS
Hoarded Zone Application Fee (payable with lodgement of application)
$285.00 $295.00 GL662-541002-22018
N Other
Hoarded Zone Permit Fee – Type A Hoarding – Per m² per month (subject to minimum fee)
$32.00 $33.00 GL662-541002-22018
N Other
Hoarded Zone Permit Fee – Type A Hoarding – Minimum fee
$835.00 $860.00 GL662-541002-22018
N Other
Hoarded Zone Permit Fee – Type B Hoarding Per m² per month (subject to minimum fee)
$60.00 $60.00 GL662-541002-22018
N Other
Hoarded Zone Permit Fee – Type B Hoarding – Minimum fee
$2,360.00 $2,420.00 GL662-541002-22018
N Other
Barricade/Warning Lights – outside business hours (8.00am-4.00pm Mon.-Fri.) – rate per day per barricade (subject to maximum fee)
$70.00 $70.00 GL662-541002-22018
N Other
Barricade/Warning Lights – outside business hours (8.00am-4.00pm Mon.-Fri.) – maximum fee per day
$335.00 $345.00 GL662-541002-22018
N Other
BARRICADES
Crane and Concrete Pump Application Fee $285.00 $295.00 GL662-541004-22018
N Other
Damage Security Bond $6,000.00 $6,000.00 GL900-100000-71007
N Bond
Crane and Concrete Pump Fee – per lineal metre per lane per day
$47.00 $48.00 GL662-541004-22018
N Other
Crane and Concrete Pump – Additional Fee for Urgent Applications
$64.00 $66.00 GL662-541004-22018
N Other
USE OF ROAD RESERVE FOR STANDING OF CRANES, CONCRETE PUMPS, ETC.
Year 18/19 Year 19/20
Name Fee Fee Account GST Pricing Policy
(incl. GST) (incl. GST)
Page 132 of 150
Year 18/19 Year 19/20
Name Fee Fee Account GST Pricing Policy
(incl. GST) (incl. GST)
ROAD RESTORATION WORKSNOTE: Where outside business hours work apply, 30% will be added onto the Invoice.
Minimum Restoration Area 1m²
ROAD OPENINGS AND RESTORATIONS
Road Opening Single Residential Application Fee (non-refundable) payable with application
$185.00 $190.00 GL662-535006-22018
N Other
Road Opening Multiple Dwelling and Non ResidentialApplication Fee (non-refundable) payablewith application
$290.00 $300.00 GL662-535006-22018
N Other
Road Carriageways
NOTE: Private Works are Taxable - GST to be added
Asphaltic Concrete Surface on all base types
Note: Asphalt work at up to three sites within 250m of one another will be charged for as one job if all sites are included in one Restoration Order and if a single invoice is acceptable to the proponent.
Areas 0-10m² Establishment Fee $340.00 $350.00 GL753-525008-22040
N Other
Areas 0-10m² Fee per m² $187.00 $192.00 GL753-525008-22040
N Other
Areas >10 and <45m² Fee per m² $205.00 $211.00 GL753-525008-22040
N Other
Areas >45/m² and < 100m² Fee per m² $164.00 $169.00 GL753-525008-22040
N Other
Areas> 100m² Fee per m² $144.00 $148.00 GL753-525008-22040
N Other
Cement Concrete Surface
Note: Concrete work at up to three sites within 250m of one another will be charged for as one job if all sites are included in one Restoration Order and if a single invoice is acceptable to the proponent.
Establishment Fee $2,050.00 $2,110.00 GL753-525008-22040
N Other
Additional Fee per m² $232.00 $238.00 GL753-525008-22040
N Other
Footpaths
NOTE: Private Works are Taxable - GST to be added
Plain Concrete
Note: Plain concrete work at up to three sites within 250m of one another will be charged for as one job if all sites are included in one Restoration Order and if a single invoice is acceptable to the proponent.
Establishment Fee $585.00 $600.00 GL753-525008-22040
N Other
continued on next page ...
Year 18/19 Year 19/20
Name Fee Fee Account GST Pricing Policy
(incl. GST) (incl. GST)
Page 133 of 150
Year 18/19 Year 19/20
Name Fee Fee Account GST Pricing Policy
(incl. GST) (incl. GST)
Additional Fee per m² $130.00 $134.00 GL753-525008-22040
N Other
Plain Concrete [continued]
Exposed Aggregate Concrete
Note: Exposed aggregate concrete work at up to three sites within 250m of one another will be charged for as one job if all sites are included in one Restoration Order and if a single invoice is acceptable to the proponent.
Establishment Fee $650.00 $670.00 GL753-525008-22040
N Other
Additional Fee per m² $165.00 $170.00 GL753-525008-22040
N Other
Asphaltic Concrete
Note: Asphaltic concrete work at up to three sites within 250m of one another will be charged for as one job if all sites are included in one Restoration Order and if a single invoice is acceptable to the proponent.
Establishment Fee $565.00 $580.00 GL753-525008-22040
N Other
Additional Fee per m² $122.00 $126.00 GL753-525008-22040
N Other
Segmental (Brick/block) Paving on Granular Base
Note: Segmental paving work at up to three sites within 250m of one another will be charged for as one job if all sites are included in one Restoration Order and if a single invoice is acceptable to the proponent.
Establishment Fee $620.00 $640.00 GL753-525008-22040
N Other
Additional Fee per m² $235.00 $241.00 GL753-525008-22040
N Other
Segmental (Brick/Block) Paving on Concrete Base
Note: Segmental paving work at up to three sites within 250m of one another will be charged for as one job if all sites are included in one Restoration Order and if a single invoice is acceptable to the proponent.
Establishment Fee $700.00 $720.00 GL753-525008-22040
N Other
Additional Fee per m² $285.00 $295.00 GL753-525008-22040
N Other
Concrete Footpath Crossings
NOTE: Private Works are Taxable - GST to be added
100mm thick, Plain Concrete
Note: Plain concrete work at up to three sites within 250m of one another will be charged for as one job if all sites are included in one Restoration Order and if a single invoice is acceptable to the proponent.
Establishment Fee $605.00 $625.00 GL753-525008-22040
N Other
continued on next page ...
Year 18/19 Year 19/20
Name Fee Fee Account GST Pricing Policy
(incl. GST) (incl. GST)
Page 134 of 150
Year 18/19 Year 19/20
Name Fee Fee Account GST Pricing Policy
(incl. GST) (incl. GST)
Additional Fee per m² $160.00 $164.00 GL753-525008-22040
N Other
100mm thick, Plain Concrete [continued]
150mm thick, Plain Concrete
Note: Plain concrete work at up to three sites within 250m of one another will be charged for as one job if all sites are included in one Restoration Order and if a single invoice is acceptable to the proponent.
Establishment Fee $605.00 $625.00 GL753-525008-22040
N Other
Additional Fee per m² $203.00 $209.00 GL753-525008-22040
N Other
200mm thick, Plain Concrete
Note: Plain concrete work at up to three sites within 250m of one another will be charged for as one job if all sites are included in one Restoration Order and if a single invoice is acceptable to the proponent.
Establishment Fee $605.00 $625.00 GL753-525008-22040
N Other
Additional Fee per m² $248.00 $255.00 GL753-525008-22040
N Other
100mm thick, Exposed Aggregate Concrete
Note: Exposed aggregate concrete work at up to three sites within 250m of one another will be charged for as one job if all sites are included in one Restoration Order and if a single invoice is acceptable to the proponent.
Establishment Fee $645.00 $665.00 GL753-525008-22040
N Other
Additional Fee per m² $170.00 $175.00 GL753-525008-22040
N Other
150mm thick, Exposed Aggregate Concrete
Note: Exposed aggregate concrete work at up to three sites within 250m of one another will be charged for as one job if all sites are included in one Restoration Order and if a single invoice is acceptable to the proponent
Establishment Fee $645.00 $665.00 GL753-525008-22040
N Other
Additional Fee per m² $216.00 $222.00 GL753-525008-22040
N Other
200mm thick, Exposed Aggregate Concrete
Note: Exposed aggregate concrete work at up to three sites within 250m of one another will be charged for as one job if all sites are included in one Restoration Order and if a single invoice is acceptable to the proponent
Establishment Fee $645.00 $665.00 GL753-525008-22040
N Other
Additional Fee per m² $270.00 $280.00 GL753-525008-22040
N Other
Year 18/19 Year 19/20
Name Fee Fee Account GST Pricing Policy
(incl. GST) (incl. GST)
Page 135 of 150
Year 18/19 Year 19/20
Name Fee Fee Account GST Pricing Policy
(incl. GST) (incl. GST)
100mm thick Decorative Concrete E.g. Baumanite, Faux Brick
Note: Decorative concrete work using one pattern and colour at up to three sites within 250m of one another will be charged for as one job if all sites are included in one Restoration Order and if a single invoice is acceptable to the proponent
Establishment Fee $710.00 $730.00 GL753-525008-22040
N Other
Additional Fee per m² $265.00 $275.00 GL753-525008-22040
N Other
150mm thick Decorative Concrete E.g. Baumanite, Faux Brick
Note: Decorative concrete work using one pattern and colour at up to three sites within 250m of one another will be charged for as one job if all sites are included in one Restoration Order and if a single invoice is acceptable to the proponent
Establishment Fee $710.00 $730.00 GL753-525008-22040
N Other
Additional Fee per m² $320.00 $330.00 GL753-525008-22040
N Other
200mm thick Decorative Concrete E.g. Baumanite, Faux Brick
Note: Decorative concrete work using one pattern and colour at up to three sites within 250m of one another will be charged for as one job if all sites are included in one Restoration Order and if a single invoice is acceptable to the proponent
Establishment Fee $710.00 $730.00 GL753-525008-22040
N Other
Additional Fee per m² $365.00 $375.00 GL753-525008-22040
N Other
Establishment Fee $710.00 $730.00 GL753-525008-22040
N Other
Additional Fee per m² $435.00 $450.00 GL753-525008-22040
N Other
125mm thick Honed finished concrete (ie; Cronulla Precinct )
Establishment Fee $710.00 $730.00 GL753-525008-22040
N Other
Additional Fee per m² $265.00 $275.00 GL753-525008-22040
N Other
Footpaths – white exposed aggregate concrete (ie: Miranda CBD)
Asphaltic Concrete
Note: Asphaltic concrete work at up to three sites within 250m of one another will be charged for as one job if all sites are included in one Restoration Order and if a single invoice is acceptable to the proponent.
Establishment Fee $560.00 $575.00 GL753-525008-22040
N Other
continued on next page ...
Year 18/19 Year 19/20
Name Fee Fee Account GST Pricing Policy
(incl. GST) (incl. GST)
Page 136 of 150
Year 18/19 Year 19/20
Name Fee Fee Account GST Pricing Policy
(incl. GST) (incl. GST)
Additional Fee per m² $149.00 $153.00 GL753-525008-22040
N Other
Asphaltic Concrete [continued]
Granite tiles on concrete base
Note: Granite tile work at up to three sites within 250m of one another will be charged for as one job if all sites are included in one Restoration Order and if a single invoice is acceptable to the proponent
Establishment Fee $700.00 $720.00 GL753-525008-22040
N Other
Additional Fee per m² $750.00 $770.00 GL753-525008-22040
N Other
Formed or Turfed Areas
Note: Turfing work at up to three sites within 250m of one another will be charged for as one job if all sites are includedin one Restoration Order and if a single invoice is acceptable to the proponent
Establishment Fee $265.00 $275.00 GL753-525008-22040
N Other
Additional Fee per m² $58.00 $60.00 GL753-525008-22040
N Other
New Construction of Concrete Footpath Crossings
in conjunction with current road and footpath construction projects. Note: Quotation to recover all direct costs incurred and a portion of overheads, as determined by the Director.
New Construction of Concrete Footpath Crossings, in conjunction with current road and footpath construction projects
By Quotation GL753-525008-22040
N Future
Notes:
Kerb & Gutter
Private Works are Taxable - GST to be added
1. Where works or the like, are not catered for in the above schedule, the appropriate charge be determined on the basisof recovering costs inclusive of overheads. E.g. Restoration involving varied paving and landscape works.
2. At the discretion of the Director Shire Infrastructure, for sites where a development consent has been granted, restorationmay be permitted by private contractors where road works are to be carried out as a condition of development consent,upon prepayment of full restoration costs as per schedule and refund of up to 80% of payment dependent upon satisfactoryperformance.
3. Minimum Restoration Charges at the rate of 1m² will apply for restorations less than 1m² in area.
4. A separate establishment charge will be payable for each day where asphalt paving works are not capable of beingcompleted within a single shift. Prior agreement is to be reached between Council and the proponent as to the number ofshifts required to complete the work.
5. The minimum width of road restoration will be the trench width plus 150mm on each side. Note: This applies to transversecrossings not longitudinal restorations. Longitudinal restorations shall extend to the full lane width or full road width whereapplicable. The extent to be determined by Director Shire Infrastructure.
continued on next page ...
Year 18/19 Year 19/20
Name Fee Fee Account GST Pricing Policy
(incl. GST) (incl. GST)
Page 137 of 150
Year 18/19 Year 19/20
Name Fee Fee Account GST Pricing Policy
(incl. GST) (incl. GST)
6. Council uses contract road profiling equipment to trim pavement base course material and to trim the existing asphaltadjacent to disturbed areas ready to receive new asphalt. The cutting width of the profiling equipment is not adjustable anddictates the width of the restoration where the width of the trench is <0.7m (i.e. restoration <1.0m). The finished area of therestoration will be used as the basis for the restoration charge.
Kerb & Gutter [continued]
7. Where any part of the road opening is within 1m of the lip of a kerb or where no kerb exists, the edge of bitumen, therestoration is to extend to the lip of the kerb or edge of bitumen as the case may be.
8. Where any part of the road opening is within 1m of an existing road restoration, the new restoration is to extend to thefar side of the existing restoration.
9. Where any part of a 1.2m wide paved footpath is disturbed, the Road Opening Charge will provide for replacement ofthe full width of the footpath.
10. Trench Backfill - Council permits a number of alternative backfill materials to be placed in accordance with specificationsavailable from it's Civil Operations Unit.Backfill Material Requiring Minimal Compaction - No compaction Testing Required.
A. Single Sized Aggregate 5mm or 10mm
B. Flowable Fill ( 0.5 - 2.0 MPa.) Delivered in Concrete agitator trucksBackfill Material Requiring Compaction and Compaction Testing - Testing Fee payable
A. Stabilised Sand- Compacted in 300mm layers to 95% Standard Compaction
B. Single Sized sand - Compacted in 600mm lifts to 95% Standard Compaction
C. Fine Crushed rock - Compacted in 150 mm layers 95% Standard Compaction
Asphaltic Concrete Surrounds to Temporary Dish Crossings – rate per m²
$320.00 $330.00 GL753-525008-22040
N Other
Restoration of Asphalt Disturbed During Construction of Laybacks – per layback
$320.00 $330.00 GL753-525008-22040
N Other
Concrete Kerb Ramp – per ramp $1,620.00 $1,670.00 GL753-525008-22040
N Other
Council Inspection/Supervision outside business hours (8.00am-4.00pm Mon. – Fri.) (Min. 4 hours) – rate per hour
$140.00 $145.00 GL753-525008-22040
N Other
Saw Cutting – where necessary by Council – 25mm depth – rate per lineal metre
$52.00 $54.00 GL753-525008-22040
N Other
Kerb & Gutter, Barrier Kerb, Mountable Kerb
Note: Plain concrete work at up to three sites within 250m of one another will be charged for as one job if all sites are included in one Restoration Order and if a single invoice is acceptable to the proponent.
Establishment Fee $585.00 $600.00 GL753-525008-22040
N Other
Additional Fee per m² $210.00 $216.00 GL753-525008-22040
N Other
Establishment Fee $720.00 $740.00 GL753-525008-22040
N Other
Concrete Dish Crossing
continued on next page ...
Year 18/19 Year 19/20
Name Fee Fee Account GST Pricing Policy
(incl. GST) (incl. GST)
Page 138 of 150
Year 18/19 Year 19/20
Name Fee Fee Account GST Pricing Policy
(incl. GST) (incl. GST)
Additional Fee per m² $193.00 $198.00 GL753-525008-22040
N Other
Concrete Dish Crossing [continued]
Trench Backfill Compaction Testing
(See Note 9)
Establishment Fee $320.00 $330.00 GL753-525008-22040
N Other
Additional Fee per m² $23.00 $24.00 GL753-525008-22040
N Other
Year 18/19 Year 19/20
Name Fee Fee Account GST Pricing Policy
(incl. GST) (incl. GST)
Page 139 of 150
Year 18/19 Year 19/20
Name Fee Fee Account GST Pricing Policy
(incl. GST) (incl. GST)
SALES
Notes:
NURSERY – PLANTS ETC
1. Price range within pots of the same size due to different plant species and their relative value.
2. Pricing may vary when stock is reduced to clear.
Tube stock $2.60 $2.70 GL774-536083-24028
Y Other
140mm Pots $9.00 $9.50 GL774-536083-24028
Y Other
200mm Pots $15.00 $15.50 GL774-536083-24028
Y Other
Possum boxes $55.00 $55.00 GL774-536083-24028
Y Other
Tree Guard 1600mm x 700mm dia 75mm x 75mm x 4.0mm Galv 2 Formed panels
$65.00 $67.00 GL774-536083-24028
Y Other
NURSERY – TREE GUARD
Various stock items – consumables Cost to Council +10% mark-up for handling
GL766-534000-24028
Y Other
General – labour rate per hour $49.00 $50.00 GL766-534000-24028
Y Other
STORE – SUPPLIES
Pool Signs $24.00 $25.00 GL220-514000-22006
Y Other
SIGNS
Community Information Signs
ie white on blue street blade type signs that provide directions to community organisations/facilities eg: Nursing homes, churches et
First Sign $205.00 $210.00 GL720-544010-22018
Y Other
Supplementary Signs $285.00 $290.00 GL720-544010-22018
Y Other
Shire Tie $54.00 $56.00 GL230-520040-24028
Y Other
Shire Scarf $54.00 $56.00 GL230-520040-24028
Y Other
SHIRE PROMOTIONAL PRODUCTS
continued on next page ...
Year 18/19 Year 19/20
Name Fee Fee Account GST Pricing Policy
(incl. GST) (incl. GST)
Page 140 of 150
Year 18/19 Year 19/20
Name Fee Fee Account GST Pricing Policy
(incl. GST) (incl. GST)
Full Size Woven Australian Flag – Screened Dyed $175.00 $180.00 GL230-520040-24028
Y Other
Full Size Woven Australian Flag – Sewn $205.00 $210.00 GL230-520040-24028
Y Other
Full Size Sutherland Shire Flag $390.00 $400.00 GL230-520040-24028
Y Other
Sutherland Shire Flag Hand Waver $5.30 $5.50 GL230-520040-24028
Y Other
Crossed Australian & Sutherland Shire Flag Badge $5.30 $5.50 GL230-520040-24028
Y Other
Sutherland Shire Council Badge $2.20 $2.30 GL230-520040-24028
Y Other
Promotional Presentation Folders $1.10 $1.15 GL230-520040-24028
Y Other
Council/Shire Tourism Bags $1.10 $1.15 GL230-520040-24028
Y Other
SHIRE PROMOTIONAL PRODUCTS [continued]
Year 18/19 Year 19/20
Name Fee Fee Account GST Pricing Policy
(incl. GST) (incl. GST)
Page 141 of 150
Year 18/19 Year 19/20
Name Fee Fee Account GST Pricing Policy
(incl. GST) (incl. GST)
WASTE
Note: From time to time Council provides waste collection services upon request, to schools and the like. These servicesare quoted and charged for at a rate which covers all costs plus a margin for profit.
BUSINESS WASTE
Charge for Actual Use under Section 502, payable when incurred CONFIDENTIAL
20% discount for registered charities, schools groups and not-for-profits
Supply of Bins at functions
Charge per Garbage Pick Up $11.00 $12.00 GL786-545110-22034
Y Other
Charge per Recycling Pick Up $7.00 $8.00 GL786-545110-22034
Y Other
Surcharge for weekends and public holidays 30% GL786-545110-22034
Y Other
Bin Hire Deposit $29.00 $30.00 GL786-545110-22034
Y Other
Road broom per hour rate $215.00 $220.00 GL787-545106-22034
Y Other
Litter picking / hour / staff person $72.00 $74.00 GL786-545110-22034
Y Other
Garbage truck wet hire (inc 2 staff) per hour (plus applicable tipping fees)
$245.00 $250.00 GL786-545110-22034
Y Other
Delivery and return of 1 to 3 bins – rate per bin $29.00 $30.00 GL786-545110-22034
Y Other
Delivery and return of 4 to 18 bins $95.00 $98.00 GL786-545110-22034
Y Other
Delivery and return of 19-36 bins $195.00 $200.00 GL786-545110-22034
Y Other
Delivery and return of 37-54 bins $295.00 $305.00 GL786-545110-22034
Y Other
Delivery and return of 54-72 bins $405.00 $420.00 GL786-545110-22034
Y Other
Delivery and return of 73-90 bins $525.00 $540.00 GL786-545110-22034
Y Other
Delivery and Recovery of Bins
Building Cleansing – labour per hour, + cost of materials and plant hire (including 10% mark-up for handling)
$46.00 $50.00 GL781-545095-22049
Y Other
Carpet Cleaning -inclusive of labour per hour, + costof materials and plant hire (addition of 10% mark-up for handling)
$67.00 $70.00 GL781-545078-22049
Y Other
Building Cleaning
Year 18/19 Year 19/20
Name Fee Fee Account GST Pricing Policy
(incl. GST) (incl. GST)
Page 142 of 150
Year 18/19 Year 19/20
Name Fee Fee Account GST Pricing Policy
(incl. GST) (incl. GST)
Trade Services (provided to non-residential assets only)
Landscaping – labour per hour, + cost of materials and plant hire (including 10% mark-up for handling)
$72.00 $74.00 GL780-545096-22017
Y Other
DOMESTIC WASTE
Annual Charges under Section 496 of the Local Government Act 1993
As required under Section 496 of the Local Government Act 1993, Council levies annual charges for the domestic waste management service. The service includes the weekly collection of domestic waste, including the recycling service and greenwaste service and 2 cleanup services per year. A charge on vacant land is mandatory under the Act.
A “Regular Service” annual charge of $456.30 $456.30 GL790-547037-21109
N Other
A “Shared Service” annual charge of $456.30 $456.30 GL790-547036-21109
N Other
An "Improved Land Availability Charge" – Recycling,Cleanup and Greenwaste Service annual charge of
$200.20 $200.20 GL790-547038-21109
N Other
A “Service Availability – Vacant Land” annual chargeof
$97.20 $97.20 GL790-547039-21109
N Other
Regular Additional Service – (RAS) – charge per year
$394.50 $394.50 GL790-547033-21109
N Other
Strata Additional Service – 240L – (SAS) – charge per year
$580.00 $595.00 GL790-547033-21109
N Other
Greenwaste Improved Service (Non Fire Prone Area)
$122.00 $125.00 GL790-547037-21109
N Other
Greenwaste Improved Service (Fire Prone Area) $122.00 $125.00 GL790-547037-21109
N Other
Recycle Improved Service $122.00 $145.00 GL790-547037-21109
N Other
Each of the following (*) comprises one (1) service:-
Definitions: -
“Regular Service”
* Weekly collection of putrescible waste using a 120 litre container (or two 120 litre containers if permitted), fortnightlycollection of garden waste using a 240 litre container, fortnightly collection of mixed recyclables, and a twice yearly cleanup service. This service is applicable to either rateable or rate-exempt residential properties.
The "shared service" applies to multi occupancy dwellings where owners share the use of 240 litre bins for putresciblegarbage. They also receive a recycling service (weekly or fortnightly as required), and twice yearly clean-up service. Ifrequired, a fortnightly greenwaste service is also available.
“Shared Service”
“Service Availability Vacant Land Charge”
It is mandatory for a Council to make a charge for vacant residential land, where the service is available but not actually used. The service is deemed to be available if the land is within Council’s normal collection area.
Year 18/19 Year 19/20
Name Fee Fee Account GST Pricing Policy
(incl. GST) (incl. GST)
Page 143 of 150
Year 18/19 Year 19/20
Name Fee Fee Account GST Pricing Policy
(incl. GST) (incl. GST)
"Improved Land Availability Charge" – Recycling, Cleanup and Greenwaste Service
Where a multi-occupancy complex arranges a private contractor to collect the putrescible waste, a service availability charge will apply to each unit where recycling, greenwaste and cleanup services are available. This fee also applies tostrata developments and dual occupancies for the period from the date the strata or dual occupancy is registered to the date a new service is registered to the individual property, unit or dual occupancy.
"Regular Additional Service" – RAS
Additional garbage service where the owner pays for the service and the charge is added to the Rate Notice.
"Strata Additional Service" – 240L – SAS
Additional garbage service where the strata pays for the service and the charge is added as a sundry debtor.
"Greenwaste Improved Service" (Non Fire Prone Area)
An additional greenwaste service over and above two greenwaste bins.
"Greenwaste Improved Service" (Fire Prone Area)
An additional greenwaste service over and above three greenwaste bins.
"Recycle Improved Service"
An additional recycle service over and above two recycle bins.
Annual application fee for the provision of an additional 120 litre domestic bin as a regular weekly service (ASR).
$45.00 $46.00 GL790-547033-22008
N Other
Only available for households with 6 or more residents & a health care card or medical certificate indicating special circumstances
Greenwaste Additional Bin Application Fee $45.00 $46.00 GL790-547033-22008
N Other
Recycling Additional Bin Application Fee $45.00 $46.00 GL790-547033-22008
N Other
Combined Greenwaste and Recycling Additional BinApplication Fee
$45.00 $46.00 GL790-547033-22008
N Other
Note: Where a resident is requesting an additional recycle bin plus a greenwaste bin (or up to 2 extragreenwaste bins if living in a fire prone area), they will only be charged the one administration fee statedabove at the time of transaction.
Tenant Additional Service (TAS) – upfront charge. Additional garbage service for a rental property. Thetenant pays upfront for the service each July (Refer Residential Additional Service)
Refer RAS GL790-547033-22008
N Other
Additional Putrescible Waste Collection Services
Delivery and the return of 120 Litre bin $23.00 $24.00 GL790-547033-22008
N Other
Charge per Pick Up $11.00 $12.00 GL790-547033-22008
N Other
Fee for a specific period garbage service
Year 18/19 Year 19/20
Name Fee Fee Account GST Pricing Policy
(incl. GST) (incl. GST)
Page 144 of 150
Year 18/19 Year 19/20
Name Fee Fee Account GST Pricing Policy
(incl. GST) (incl. GST)
STORMWATER LEVY
Residential Dwelling $25.00 $25.00 GL710-173270-41112
N Reg
Residential Dwelling Pensioner 50% Discount $12.50 $12.50 GL710-173270-41112
N Reg
Residential Strata Unit $12.50 $12.50 GL710-173270-41112
N Reg
Residential Strata Unit Pensioner 50% Discount $6.25 $6.25 GL710-173270-41112
N Reg
Recreational Facilities Charge $25.00 $25.00 GL710-173270-41112
N Reg
Charges under Section 496A of the Local Government Act 1993
Where total land area is equal to or less than 350m2– Minimum Charge
$25.00 $25.00 GL710-173270-41112
N Reg
Where total land area > 350m2 – charge per m 0.074132 GL710-173270-41112
N Reg
Commercial Property – Other than properties in a strata scheme
$5, or $5.00 $5.00 GL710-173270-41112
N Reg
The relevant proportion (being the proportion that the unit entitlement of an individual lot to that of the aggregate entitlement) of the maximum annual charge that would apply if the property were not in a strata scheme.
Relevant Proportion GL710-173270-41112
N Reg
Commercial Property – Properties in a strata scheme, greater of:
Where total land area is equal to or less than 350m2– Minimum Charge
$25.00 $25.00 GL710-173270-41112
N Reg
Where total land area > 350m2 – charge per m capped at $20,000
0.074132 GL710-173270-41112
N Reg
Industrial Property – Other than properties in a strata scheme
$5, or $5.00 $5.00 GL710-173270-41112
N Reg
The relevant proportion (being the proportion that the unit entitlement of an individual lot to that of the aggregate entitlement) of the maximum annual charge that would apply if the property were not in a strata scheme.
Relevant Proportion GL710-173270-41112
N Reg
Industrial Property – Properties in a strata scheme, greater of:
Year 18/19 Year 19/20
Name Fee Fee Account GST Pricing Policy
(incl. GST) (incl. GST)
Page 145 of 150
Year 18/19 Year 19/20
Name Fee Fee Account GST Pricing Policy
(incl. GST) (incl. GST)
Willarong Point
Yowie Point
Wants Point
Costens Point
Yenabilli Point Constables Point
Jibbon Beach
Port Hacking Point
The Cobblers
Oatley Point
Jew Fish PointGriffins Point
Lime Kiln Head
Alfords Point
St. Kilda Point
Rocky Point
Towra Point
Bonna Point
Carss Park
Harness Cast Point
Grays Point
Elouera Beach
Wanda Beach
Red Jacks Point
Cabbage Tree Point
Horse Rock Point
Shag Point
Taren Point
North Cronulla Beach
Cronulla Point
Blackwoods Beach
Cronulla Beach
Glaisher Point
Bass & Flinders PointHungry Point
Grahams Point
Gogerlys PointLil li Pilli Point
Point Long Nose
Gunyah Beach
Moon Point
Bottle &Glass Head
Como Bridge
Green Point Kangaroo Point
Tom Uglys Point
Captain Cook Bridge
Bald Face Point
Lightning Point
PointDanger
MansionPoint
Inscription PointSutherland Point
Yena Gap
Tabbigai Gap
Blue Hole Gap
Potter PointDoughboy
Head
Pelican Point
Caravan Head
BonnetHead
GeorgesHead
Sandy Point
SandyPoint
Shell Point
Burraneer Point
Cape Solander
Cape Baily
Tom Uglys BridgeGeorges River Bridge
Turriell Point
Jew FishBay
Gungah Bay
Hurstville Bay
Bonnet Bay
Georges River
Woronora River
KyleBayConnells
Bay
KogarahBay
Woolooware Bay
Oyster Bay
Weeney Bay
Gwawley Bay
Georges River
Oatley Bay
Botany Bay
Quibray Bay
Bate Bay
Pacific
Ocean
Dark Bay Gannons Bay
Simpson Bay
GymeaBay
Bundeena Bay
Carruthers Bay
Fishermans Bay
Burra
neer
Bay
Gunn
amatt
a Ba
y
Port Hacking
RiverHacking
Yowie
Bay
Port Hacking
ComoReserve
Camp Wanawong
Wonga
Reserve
Corea Oval
GymeaBayOval
BreenOval
TonkinOval
ShellyPark
DarookPark
PrestonPark
SeymourShawPark
Burnum BurnumSanctuary
VictoryReserve
Burnum BurnumSanctuary
SolanderPlaying
Field
CronullaPark
LakewoodCity
Reserve
MaianbarReserve
BundeenaReserve
The GlenReserve
Prince EdwardPark
Cronulla GolfClub
SylvaniaHockey
Park
Gunnamatta Park
Buckle Reserve
Wanda Reserve
Engadine Park
Waratah Park
Kareela Oval Forshaw Field
Kingswood OvalReserve
Gwawley Park Bellingara NetballCourts
Sylvania Waters Field
Woolooware Golf Club
KirraweeOval
CaringbahNorth Oval
Reserve
BurraneerPark
CasuarinaOval
CaringbahOval
DunninghamPark
John DwyerPark
Bonnet Bay Reserve
Carina B ayReserve
HawkesburyReserve
YarrawarrahReserve
The Es
planad
e
Forbes CreekReserve
Kareela GolfClub
Georges RiverNational Park
Botany Bay National Park
Georges River National Park
The Es
planad
e
Botany Bay National Park
Woolooware
Oval
Scylla BayReserve
Coonong CreekBushland
KareenaPark
Lilli Pill i PointReserve
Botany Bay National Park
RickardReserve
Cronulla SutherlandLeagues Club
Captain CookOval
Captain CookGolf Course
OakPark
Avenue
The Boulevarde
Cook
Drive
Highway
Point
Road
Kingsway
President Avenue
CaptainHeathco
te
New
Road
Road
Alford
s Poin
t Roa
d
Menai Road
Linde
n St
Acacia Road
Port
Taren
Cook Drive
Captain
Kingsway
H ig hwa y
Highway
Illawarra
President
Hack
ingRo
ad
Port
Hac
ki ng
Roa
d
Alfords
Point Road
Old Illaw
arra Road
Princ
es
Prince
s
Princes
Heathcote Road
F a rne ll R oa d
Gyme
a Ba
y R
oad
LiverpoolLocal Government
Area
KogarahLocal Government Area
HurstvilleLocal Government Area
RockdaleLocal Government
Area
BankstownLocal Government Area
A WARD
E WARD
D WARD
A WARD
C WARD
B WARD
ROYAL NATIONAL PARK
KURNELL
MENAI
HEATHCOTE
HOLSWORTHY
ENGADINE
LUCAS HEIGHTS
ILLAWONG
MIRANDA
CRONULLA
BANGOR
SYLVANIA
CARINGBAHBARDEN RIDGE
LOFTUS
COMO
KIRRAWEEGYMEA
SUTHERLAND
JANNALI TAREN POINT
CARINGBAH SOUTH
OYSTER BAY
GYMEA BAY
BURRANEER
ALFORDS POINT
BUNDEENA
WORONORA
KAREELA
YOWIE BAY
WOOLOOWARE
LILLI PILLI
GRAYS POINT
WORONORA HEIGHTS
BONNET BAY
YARRAWARRAH
SYLVANIA WATERS
MAIANBAR
PORT HACKING
KANGAROO POINT
SANDY POINT
WATERFALL
DOLANS BAY
GREENHILLS BEACH
WORONORA DAM
A WARDD WARD ROYAL NATIONAL PARK
HEATHCOTE
WATERFALL
Legend
SSC LGA Boundary
2015 Wards Boundary
Suburbs
CX Levels Park SitesCX1
CX2
CX3
CX4
Sutherland Shire Open Space CX levels
WATERFALL INSET
1:31,000
0 500 1,000 1,500 2,000 2,500 m
Scale @ A1
Page 146 of 150
Willarong Point
Costens Point
Yenabilli Point Constables Point
Jibbon Beach
Port Hacking Point
The Cobblers
St. Kilda Point
Rocky Point
Towra Point
Bonna Point
Carss Park
Elouera Beach
Wanda Beach
Red Jacks Point
Cabbage Tree Point
Horse Rock Point
Shag Point
Taren Point
North Cronulla Beach
Cronulla Point
Blackwoods Beach
Cronulla Beach
Glaisher Point
Bass & Flinders PointHungry Point
Grahams Point
Gogerlys PointLilli Pilli Point
Point Long Nose
Gunyah Beach
Tom Uglys Point
Captain Cook Bridge
Inscription PointSutherland Point
Yena Gap
Tabbigai Gap
Blue Hole Gap
Potter PointDoughboy
Head
Pelican PointSandy Point
Shell Point
Burraneer Point
Cape Solander
Cape Baily
Tom Uglys BridgeGeorges River Bridge
Turriell Point
KogarahBay
Woolooware Bay
Weeney Bay
Gwawley Bay
Georges River
Botany Bay
Quibray Bay
Bate Bay
Pacific O
cean
Gannons Bay
Simpson Bay Bundeena
Bay
CarruthersBay
Fishermans Bay
Burra
neer
Bay
Gunn
amatt
a Ba
y
Port Hacking
Yowie
Bay
Port Hacking
BreenOval
TonkinOval
ShellyPark
DarookPark
SolanderPlaying
Field
CronullaPark
MaianbarReserve
BundeenaReserve
Cronulla GolfClub
Gunnamatta Park
Wanda Reserve
Forshaw Field
Gwawley Park Sylvania Waters Field
Woolooware Golf Club
CaringbahNorth Oval
Reserve
BurraneerPark
CaringbahOval
DunninghamPark
John DwyerPark
HawkesburyReserve
The Es
planad
e
Botany Bay National Park
The Es
planad
e
Botany Bay National Park
WooloowareOval
KareenaPark
Lilli Pilli PointReserve
Botany Bay National Park
Cronulla SutherlandLeagues Club
Captain CookOval
Captain CookGolf Course
OakPark
TheBoulevarde
Cook
Drive
Point
Road
President Avenue
Captain
Taren
Cook Drive
Captain
Kingsway
Port
Hac
k ing
Roa
d
KogarahLocal Government Area
RockdaleLocal Government
Area
A WARD
A WARD
C WARD
B WARD
KURNELL
ROYAL NATIONAL PARK
CRONULLA
CARINGBAH
TAREN POINT
CARINGBAH SOUTH
BURRANEER
BUNDEENA
WOOLOOWARE
LILLI PILLI
MIRANDA
SYLVANIA
MAIANBAR
PORT HACKING
SYLVANIA WATERS
DOLANS BAY
GREENHILLS BEACH
YOWIE BAY
5Scale: @ A2 Printed: 7/04/2016
File: A2_CXlevels_Shire_A_Wards
1:28,000
0 450 900 1,350 1,800 m
A Ward Open Space CX Levels Legend2015 Ward BoundariesSuburbs
CX Levels Park SitesCX1CX2CX3CX4
This map has been produced with the most current data available to Council as supplied by various sources. INFORMATION IN THIS MAP IS SUBJECT TO COPYRIGHT. Council is not responsible for any inaccuracies in the data provided. ContactCouncil's Business Intelligence(ph. 9710 0116) for further informationProduced by Information
Management TeamPage 147 of 150
Willarong Point
Yowie Point
Wants Point
Costens Point
Yenabilli Point Constables Point
Jibbon Beach
The Cobblers
Oatley Point
Jew Fish PointGriffins Point
Lime Kiln Head
St. Kilda Point
Rocky Point
Towra Point
Carss Park
Harness Cast Point
Grays Point
Elouera Beach
Wanda Beach
Red Jacks Point
Cabbage Tree Point
Horse Rock Point
Shag Point
Taren Point
North Cronulla Beach
Cronulla Point
Blackwoods Beach
Cronulla Beach
Glaisher Point
Bass & Flinders PointHungry Point
Grahams Point
Gogerlys PointLilli Pilli Point
Gunyah Beach
Bottle &Glass Head
Como Bridge
Green Point Kangaroo Point
Tom Uglys Point
Captain Cook Bridge
Bald Face Point
Lightning Point
PointDanger
MansionPoint
Pelican Point
Caravan Head
BonnetHead
GeorgesHead
Sandy Point
Shell Point
Burraneer Point
Tom Uglys BridgeGeorges River Bridge
Turriell Point
Jew FishBay
Gungah Bay
Hurstville Bay
Bonnet Bay
Georges River
Woronora River
KyleBayConnells
Bay
KogarahBay
Woolooware Bay
Oyster Bay
Weeney Bay
Gwawley Bay
Georges River
Oatley Bay
Bate Bay
Dark Bay Gannons Bay
Simpson Bay
GymeaBay
Bundeena Bay
Carruthers Bay
Fishermans Bay
Burra
neer
Bay
Gunn
amatt
a Ba
y
Port Hacking
RiverHacking
Yowie
Bay
Port Hacking
ComoReserve
Camp Wanawong
WongaReserve
Corea Oval
GymeaBayOval
BreenOval
TonkinOval
ShellyPark
DarookPark
SeymourShawPark
Burnum BurnumSanctuary
Burnum BurnumSanctuary
SolanderPlaying
Field
CronullaPark
LakewoodCity
Reserve
MaianbarReserve
BundeenaReserve
The GlenReserve
Prince EdwardPark
Cronulla GolfClub
SylvaniaHockey
Park
Gunnamatta Park
Wanda Reserve Waratah Park
Kareela Oval Forshaw Field
Gwawley Park Bellingara NetballCourts
Sylvania Waters Field
Woolooware Golf Club Kirrawee
Oval
CaringbahNorth Oval
Reserve
BurraneerPark
CaringbahOval
DunninghamPark
John DwyerPark
Bonnet Bay Reserve
Carina BayReserve
HawkesburyReserve
The Es
planad
e
Kareela GolfClub
The Es
planad
e
WooloowareOval
Scylla BayReserve
Coonong CreekBushland
KareenaPark
Lilli Pilli PointReserve
RickardReserve
Cronulla SutherlandLeagues Club
Captain CookOval
Captain CookGolf Course
OakPark
Avenue
The Boulevarde
Point
Road
Kingsway
President Avenue
Linde
n St
Acacia Road
Port
Taren
Cook Drive
Captain
Kingsway
H ig h wa y
President
Hack
ingRo
ad
Port
Hac
k ing
Roa
d
Princes
F arn e ll R o ad
Gyme
a Ba
y R
oad
KogarahLocal Government Area
HurstvilleLocal Government Area
RockdaleLocal Government
Area
A WARD
C WARD
A WARD
B WARD
E WARD
D WARD
E WARD
ROYAL NATIONAL PARK
KURNELL
MIRANDA
CRONULLA
SYLVANIA
CARINGBAH
COMO
KIRRAWEEGYMEA
SUTHERLAND
JANNALI
LOFTUS
TAREN POINT
CARINGBAH SOUTH
ILLAWONG
OYSTER BAY
GYMEA BAY
BURRANEER
BUNDEENA
KAREELA
YOWIE BAY
WOOLOOWARE
LILLI PILLI
GRAYS POINT
BONNET BAY
WORONORA
SYLVANIA WATERS
MAIANBAR
PORT HACKING
BANGOR
KANGAROO POINT
DOLANS BAY
GREENHILLS BEACHWORONORA HEIGHTS
5Scale: @ A2 Printed: 7/04/2016
File: A2_CXlevels_Shire_B&C_Wards
1:28,000
0 450 900 1,350 1,800 m
B & C Ward Open Space CX Levels Legend2015 Ward BoundariesSuburbs
CX Levels Park SitesCX1CX2CX3CX4
This map has been produced with the most current data available to Council as supplied by various sources. INFORMATION IN THIS MAP IS SUBJECT TO COPYRIGHT. Council is not responsible for any inaccuracies in the data provided. ContactCouncil's Business Intelligence(ph. 9710 0116) for further informationProduced by Information
Management TeamPage 148 of 150
Grays Point
PointDanger
RiverHacking
Camp Wanawong
GymeaBayOval
PrestonPark
Burnum BurnumSanctuary
VictoryReserve
Burnum BurnumSanctuary
Prince EdwardPark
Engadine Park
Waratah Park
Kareela Oval
Kingswood OvalReserve
KirraweeOval
Bonnet Bay Reserve
YarrawarrahReserve
Forbes CreekReserve
Kareela GolfClub
Coonong CreekBushland
Avenue
Highway
Heathcote
New
Road
Menai Road
Linde
n St
Acacia Road
H ig h wa y
Highway
Illawarra
President
Princ
es
Princ
es
Princes
Heath cote Road
F arn e ll R o a d
Gyme
a Ba
y R
oad
E WARD
A WARD
D WARD
B WARD
C WARD
ROYAL NATIONAL PARKHEATHCOTE
ENGADINE
MENAI
HOLSWORTHY
LUCAS HEIGHTS
BARDEN RIDGE
LOFTUS
KIRRAWEESUTHERLAND
BANGOR
GYMEA
WATERFALL
WORONORA
JANNALI
WORONORA HEIGHTS
GYMEA BAY
GRAYS POINT
KAREELA
YARRAWARRAH
SYLVANIAOYSTER BAYBONNET BAY
5Scale: @ A2 Printed: 7/04/2016
File: A2_CXlevels_Shire_D_Wards
1:28,000
0 450 900 1,350 1,800 m
D Ward Open Space CX Levels Legend2015 Ward BoundariesSuburbs
CX Levels Park SitesCX1CX2CX3CX4
This map has been produced with the most current data available to Council as supplied by various sources. INFORMATION IN THIS MAP IS SUBJECT TO COPYRIGHT. Council is not responsible for any inaccuracies in the data provided. ContactCouncil's Business Intelligence(ph. 9710 0116) for further informationProduced by Information
Management TeamPage 149 of 150
Jew Fish PointGriffins Point
Lime Kiln Head
Alfords Point
Moon Point
Bottle &Glass Head
Como Bridge
Green Point
BonnetHead
GeorgesHead
SandyPoint
Jew FishBay
Gungah Bay
Hurstville Bay
Bonnet Bay
Georges River
Woronora River
Hacking
ComoReserve
Camp Wanawong
PrestonPark
Burnum BurnumSanctuary
VictoryReserve
Burnum BurnumSanctuary
LakewoodCity
Reserve The GlenReserve
Prince EdwardPark
Buckle Reserve
Engadine Park
Waratah Park
Kingswood OvalReserve
KirraweeOval
CasuarinaOval
Bonnet Bay Reserve
Carina BayReserve
YarrawarrahReserve
Forbes CreekReserve
Georges RiverNational Park
Georges River National Park
Scylla BayReserve
Highway
Heathcote
New
Road
Road
Alford
s Poin
t Roa
d
Menai Road
Linde
n St
Acacia Road
Highway
Illawarra
President
Alfords
Point Road
Old Illaw
arra Road
Princ
es
Heath cote Road
F arn e ll R o a d
LiverpoolLocal Government
Area
HurstvilleLocal Government Area
BankstownLocal Government Area
E WARD
D WARD
A WARD
C WARD
MENAI
HOLSWORTHY
ROYAL NATIONAL PARK
ENGADINE
HEATHCOTE
LUCAS HEIGHTS
ILLAWONG
BANGOR
BARDEN RIDGE
LOFTUS
COMO
SUTHERLAND
JANNALI
ALFORDS POINT
WORONORA
WORONORA HEIGHTS KIRRAWEE
BONNET BAY
YARRAWARRAH
B WARD
SANDY POINT
OYSTER BAY
5Scale: @ A2 Printed: 7/04/2016
File: A2_CXlevels_Shire_D_Wards
1:28,000
0 450 900 1,350 1,800 m
E Ward Open Space CX Levels Legend2015 Ward BoundariesSuburbs
CX Levels Park SitesCX1CX2CX3CX4
This map has been produced with the most current data available to Council as supplied by various sources. INFORMATION IN THIS MAP IS SUBJECT TO COPYRIGHT. Council is not responsible for any inaccuracies in the data provided. ContactCouncil's Business Intelligence(ph. 9710 0116) for further informationProduced by Information
Management TeamPage 150 of 150