Transcript of PSS-1
-
Tested by ( for spaceage) Witnessed by (ADDC)
Name:
Signature:
Date:
SAT REPORT PSS
11kV/415V substation
CLIENT : ADDC CONSULTANT
CONTRACTOR : PROJECT NO : SHEET NO : 1 of 11 PSS : 01 DATE : PROJECT NAME :
NAME PLATE
Sl .No Make & Type
Rated Voltage Normal current
(A) General Check:
Sl.no Description Remarks
1 Earthing Circuit of Cubic 2 Label of Panels 3 Marking of equipment and terminals 4 Tightening of connection 5 Visual inspection of the panel and components 6 Voltage presence indication 7 Lamp Test 8 Scheme & Loop wiring verification check 9 MCBs rating as per drawing and working properly 10 SF6 Pressure Gauge
(B) Operation Check:
Sl.no Description Remarks
1 Mechanical opening and closing of C.B 2 Mechanical opening and closing of Ring Switch 3 C.B protection Trip indication 4 Mechanical opening and closing of Earth Switch 5 Pull to Trip Bar
-
Tested by ( for spaceage) Witnessed by (ADDC)
Name:
Signature:
Date:
SAT REPORT PSS
11kV/415V substation
CLIENT : ADDC CONSULTANT
CONTRACTOR : PROJECT NO : SHEET NO : 2 of 11 PSS : 01 DATE : PROJECT NAME :
(C) Interlock Check
Sl.no Description Remarks
1 Mechanical Interlock between CB & Ring Switch 2 Mechanical interlock between Earth Switch & Ring Switch
1) INSULATION RESISTANCE TEST BEFORE HI-POT
Test Connection Applied Test Voltage dc /1Min Measured Resistance () Remarks R: Y+B+E
Y: R+B+E B: R+Y+E
2) DIELECTRIC TEST (for 1 minute)
Test Connection Applied Test Voltage ac /1Min Leakage Current (mA) Remarks R: Y+B+E Y: R+B+E B: R+Y+E
3) INSULATION RESISTANCE TEST AFTER HI-POT
Test Connection Applied Test Voltage dc /1Min Measured Resistance () Remarks R: Y+B+E
5kV
Y: R+B+E B: R+Y+E
Test Equipment used:
INSTRUMENT NAME MEGGER HIGH VOLTAGE TESTER SL. NO. MAKE & MODEL CALIB. DUE
-
Tested by ( for spaceage) Witnessed by (ADDC)
Name:
Signature:
Date:
SAT REPORT PSS
11kV/415V substation
CLIENT : ADDC CONSULTANT
CONTRACTOR : PROJECT NO : SHEET NO : 3 of 11 PSS : 01 DATE : PROJECT NAME :
4) PROTECTION RELAY TEST
Relay Make/ Type SCHNEIDER ELECTRIC / MICOM P124
Transformer Rate 1500 kVA
CT Ratio 100 / 1A Relay Sl. No.
I> t> Io > to > I>> t>> Io >> to >>
(a)OVERCURRENT (I>) Set
Value (A)
APPLIED CURRENT (A)
PICK UP CURRENT (A) CALCULATED TIME (sec)
MEASURED TIME (sec)
R-Y Y-B B-R R-Y Y-B B-R
2 x Is
5 x Is
(b) OVERCURRENT (I>>) Set
Value (A)
APPLIED CURRENT (A)
PICK UP CURRENT (A) CALCULATED TIME (sec)
Y-B
MEASURED TIME (sec)
R-Y Y-B B-R R-Y Y-B B-R
2 x Is
(c) EARTH FAULT (Ie>) Set
Value (A)
APPLIED CURRENT (A)
PICK UP CURRENT (A) CALCULATED TIME (sec) MEASURED TIME (sec)
2 x Is
5 x Is
(d) EARTH FAULT (Ie>>) Set
Value (A)
APPLIED CURRENT (A)
PICK UP CURRENT (A) CALCULATED TIME (sec) MEASURED TIME (sec)
2 x Is
-
Tested by ( for spaceage) Witnessed by (ADDC)
Name:
Signature:
Date:
SAT REPORT PSS
11kV/415V substation
Fault Record: Record No : Threshold : Fault : Magnitude :
Remarks: Trip Test: Connected through (1) Primary Injection (2) Secondary Injection
1. Phase fault: 2. Earth Fault :
Relay Final Setting: In : 1A kVA : 1500 CT Ratio : 100/1 A
O/C Curve: IEC SI
E/F Curve: IEC SI
5) CT RATIO TEST
PROTECTION CT
Injected Current (A) Measured Current (A)
CT RATIO FOR
100 / 1 A
RY / RN YB / YN BR / BN R Y B N -- -- -- --
-- -- -- -- -- -- -- --
E / F -- -- -- --
-- -- -- -- -- -- -- --
POLARITY CHECKS:
Observations of Polarity Checks for Protection CT Remarks R - Phase Y - Phase B - Phase
CLIENT : ADDC CONSULTANT
CONTRACTOR : PROJECT NO : SHEET NO : 4 of 11 PSS : 01 DATE : PROJECT NAME :
I> t> I>> t>>
Ie> t> Ie>> t>>
-
Tested by ( for spaceage) Witnessed by (ADDC)
Name:
Signature:
Date:
SAT REPORT PSS
11kV/415V substation
CLIENT : ADDC CONSULTANT
CONTRACTOR : PROJECT NO : SHEET NO : 5 of 11 PSS : 01 DATE : PROJECT NAME :
6) Metering core- Y-Phase
Make/Type : Sl .No CT Ratio VA/Cl
Ratio Test Core No. Ref CT Ratio (A) Primary injected current (A) Secondary measured current (A)
S1-S2
7) Earth Fault Indicator:
Make/Type : TRIP LEVEL: 25, 50, 100 A Set trip level : Serial No. : Pick up Value : Supply : Reset time : 4 hrs LED Indicaton :
Test Equipment used:
INSTRUMENT NAME SEC IN KIT MULTIMETER SL. NO. MAKE & MODEL CALIB. DUE
8) Earth Resistance ():
TRM Body Transformer body Transformer neutral
Test Equipment used:
INSTRUMENT NAME DIGITAL GROUND TESTER SL. NO. DGT/SP/01 MAKE & MODEL Megger & DET4TC2 CALIB. DUE
-
Tested by ( for spaceage) Witnessed by (ADDC)
Name:
Signature:
Date:
SAT REPORT PSS
11kV/415V substation
CLIENT : ADDC CONSULTANT
CONTRACTOR : PROJECT NO : SHEET NO : 6 of 11 PSS : 01 DATE : PROJECT NAME :
9) Transformer Test Report
Name Plate Details SIEMENS TRANSFORMERS LLC
Sl.No 10003214 Year of Manufacture 2014
Rating KVA 1500 Type of Cooling ONAN Frequency (Hz) 50
Rated Voltage (kV) 11 / 0.415 Impedance Normal Tap (%) 5.75
Temperature Rise Oil/Winding 0C 45 / 55 Vector Group Symbol Dyn11
Rated Current (A) 78.7 / 2086.8 Oil Weight (Lit) 861
Total Weight (Kg) 4350
(a) Visual Check:
Sl.No Description Remarks 01 Installing according to drawing 02 No Oil leakage & Oil Level position correct 03 All drain valves are fully closed 04 No visible cracks or breaks to bushing 05 All bushing connections are fully tightened 06 Main tank grounding correct 07 Neutral grounding is correct (fixed, tightened & insulated) 08 Pressure relief valve are correctly installed 09 Earthing of cable boxes and other removable parts 10 Winding temperature are correctly installed
-
Tested by ( for spaceage) Witnessed by (ADDC)
Name:
Signature:
Date:
SAT REPORT PSS
11kV/415V substation
CLIENT : ADDC CONSULTANT
CONTRACTOR : PROJECT NO : SHEET NO : 7 of 11 PSS : 01 DATE : PROJECT NAME :
(b) Insulation Resistance Test
Winding Voltage in dc Insulation Resistance (G) Ref (V) 15sec 60sec Polarisation Index (PI) Value =
(60Sec/ 15Sec) HV to Earth 5000 HV to LV 2500
LV to Earth 1000
(c) Winding Resistance
H.V Side
Taps Resistance () 1U-1V 1V-1W 1W-1U
1 2 3 4 5
L.V Side ()
Taps Resistance () 2u-2v 2v-2w 2w-2u 2u-2n 2v-2n 2w-2n 3
(d) Magnetising Current Test
As per the test result attached
-
Tested by ( for spaceage) Witnessed by (ADDC)
Name:
Signature:
Date:
SAT REPORT PSS
11kV/415V substation
CLIENT : ADDC CONSULTANT
CONTRACTOR : PROJECT NO : SHEET NO : 8 of 11 PSS : 01 DATE : PROJECT NAME :
(e) Magnetising Core Balance test
Applied Voltage Measured Voltage Remarks
r-n
y-n
b-n r-n y-n b-n
- - -
- - -
- - -
(f) Turns Ratio Test
As per the test result attached
(g) Vector Group Test
As per the test result attached
(h) Functional Checks of Supervisory Equipments:
Sl.No Checks Remarks 01 Vertical Oil Level Switch 02 Oil Temperature Indicator 03 Pressure relief valve 04 OTI Alarm Setting Temperature ( 0 C) 05 OTI Trip Setting Temperature ( 0 C) 06 OTI alarm/trip contacts
SNAG LIST
-
Tested by ( for spaceage) Witnessed by (ADDC)
Name:
Signature:
Date:
SAT REPORT PSS
11kV/415V substation
CLIENT : ADDC CONSULTANT
CONTRACTOR : PROJECT NO : SHEET NO : 9 of 11 PSS : 01 DATE : PROJECT NAME :
MDB TESTING
Name Plate Details:
Manufacturer Serial No. Year of Mfg Normal current rating of Bus Bar Normal current rating of I/C unit Rated Voltage
(A) General Check:
Sl.no Description Remarks
1 Earthing Circuit of Cubic 2 Label of Panels 3 Marking of equipment and terminals 4 Tightening of connection 5 Visual inspection of the panel and components 6 Check function of CBs draw out rack 7 Check selector switches 8 Check manual operation of CBs 9 MCBs rating as per drawing and working properly 10 Check Fuses
-
Tested by ( for spaceage) Witnessed by (ADDC)
Name:
Signature:
Date:
SAT REPORT PSS
11kV/415V substation
CLIENT : ADDC CONSULTANT
CONTRACTOR : PROJECT NO : SHEET NO : 10 of 11 PSS : 01 DATE : PROJECT NAME :
(B) Operation Check:
Sl.no Description Remarks
1 Verify CBs open/close manual 2 Simulate external control signal and verify CBs open/close automatically 3 Verify operation of all selector switches and push buttons 4 Verify operation of all instrumentation, ammeters, voltmeters, lamps etc. 5 Verify operation of safety shutdowns, UVR, ELR 7 Verify test, rack in and rack out position 8 Verify spring charge status and indication 9 Verify auto and manual status
10 Verify CBs open, on and trip status 11 Verify remote start and stop commands
INSULATION RESISTANCE TEST
PHASE APPLIED VOLTAGE (V) IR VALUE IN REMARKS
R EARTH
Y EARTH B EARTH
R-N Y-N B-N R-Y Y-B B-R
-
Tested by ( for spaceage) Witnessed by (ADDC)
Name:
Signature:
Date:
SAT REPORT PSS
11kV/415V substation
CLIENT : ADDC CONSULTANT
CONTRACTOR : PROJECT NO : SHEET NO : 11 of 11 PSS : 01 DATE : PROJECT NAME :
For MDB, verify all outgoing MCCB I/O points
Status
Ref Q1 Q2 Q3 Q4 Q5 Q6 Q7 Q8 Q9
On status
Off status
Trip
Selector switch local mode status
Selector switch remote mode status