Week 1 10th-17th
September
Week 2 18th-25th
September
Week 3 26th sep-3rd
October
Week 4 4th_ 11th October
Project schedule-Anthony
Target audience questionnaire and
interviews-(ask at least
ten people for questionnaire and three
people for the
interview)everyone
(Video Research)
Representation-(Research into Ideology,
Representation, Star Image & Power & Conclusions drawn)
Sagar
(Video Research)
Proposal-
Brief
Research findings
Initial idea
Final idea
Production team roles
- everyone
(Video Proposal)
Similar text analysis- (1music
video per group member, analysed critically and in depth.)
-everyone (Video Research)
Target audience questionnaireanalys
es- Zayd
(Video Research)
Institutional context-
indie / major record label interests)-
Zayd
professional job roles-Anthony
(Video Research)
Script development
Storyboard- Anthony
Characterization-Zayd
Product design- David
(Video Script Development)
Genre conventions-(A
full report based on your group’s
secondary research) Sagar
(Video Research)
Target audience interview analyses-
David
(Video Research)
Conclusion-(a full
conclusion on the findings from the
similar text analysis and genre
conventions.)Anthony
(Video Research)
Subject matter(
Research into the artist / artists and song (inc lyrics) featured in your music video with Conclusions drawn. Follow-up research into the ideas / mise-en-scene, shooting & editing styles etc you will be using to visualise the song. (Video Research)
- everyone
Week 5 12th- 19th
October
Week 6-7 20th-27th October
Week 8 28thsep- 4th November
Week 9-11 5th – 12th November
Misc production paperwork-
Meeting form
Risk assessment
Permission of access from
Consent form
Copyright clearance -David (Video Miscellaneous Production Paperwork)
Shoot Edit
- everyone
Shoot Edit
- everyone
Shoot Edit
- everyone
Shoot - everyone
Week 12 13th-20th November
Week 13 21st-28th November
Week 14 28th-30th November
Shoot- everyone
Edit- everyone
Shoot- everyone
Edit- everyone
Edit- everyone
Week 15 3rd -10th January
Week 16 11th-18th January
Week 17 19th-26th January
Print Research
Forms and conventions- Sagar
Print construction Advertisement first
draft - Anthony Front of sleeve first
draft – David-Zayd Music information
leaflet first draft-Sagar
Print construction
Advertisement final draft- Anthony
Front of sleeve final draft – David-Zayd
Music information leaflet final draft-Sagar
Print Planning
Briefing: photoshop
Edit -everyone
Week 15 27th January-4thFebruary
Week 16 5th-6th February
Audience Feedback –everyone