7/29/2019 PSC Incident Report Short
1/5
Hydroblast HoseFailure
Calvert City, KYSeptember 12, 2011
Presented By PSCOctober 25, 2011
-
7/29/2019 PSC Incident Report Short
2/5
Date: Monday September 12, 2011 J ob Start: Approximately 8:30 AM
Time Of Incident: 9:00 AM
J ob Scope: Hydroblast TLE
Shotgun Cone, South Tube Face
Flex Lance Tubes From North End
Task Being Performed: Shotgunning SouthTube Face
Direct Cause: Hose Failed At CrimpConnected to Shotgun
Injury Scope: Water Cut Below Right PectoralMuscle.
Result: Employee passed away at 10:28 AM -Marshall County Hospital, Calvert City KY
Incident Detail
ConeTube Face
-
7/29/2019 PSC Incident Report Short
3/5
Injured worker - EE1 (J ob Leader):
8 Years PSC (2001-2004, 2007-Present). 10 Years Industrial Cleaning Total
Co worker - EE2
2 Years PSC. Over 13 Years Industrial Related Operator Positions
Crew performed this specific job 2-3 times per week
Same equipment setup
Requested, well regarded by client
Both had received numerous local Safety Treasure Chest awards for Above andBeyond safety performance
Pump: NLB #427 Fitted With 20K PSI fluid end
No Indication Of Pump Malfunction
Pressure Relief Systems In Place
Crew Detail
-
7/29/2019 PSC Incident Report Short
4/5
PSC Shotgun Safety Requirements
Shoulder Stock
Minimum 48 Barrel to Tip Prevent Cutting Feet
Optional: Stabilizer Handle
Guarded Pressure Relief Trigger SoWorker Controls Pressure Discharge
Six Foot Shroud Protects Worker In Case Of Hose Failure
Shroud Attaches To Gun Over HoseConnection
High Pressure Hose Rated at 1.5XMAWP and 2.5X Burst Pressure
Top Image:http://www.advancedpressuresystems.com/images/PDF/SafetyShrouds-2010.pdfBottom Image: http://www.waterblast.com/Products/Detail.aspx?id=3287Used for illustrative purposes only.
http://www.advancedpressuresystems.com/images/PDF/SafetyShrouds-2010.pdfhttp://www.waterblast.com/Products/Detail.aspx?id=3287http://www.waterblast.com/Products/Detail.aspx?id=3287http://www.advancedpressuresystems.com/images/PDF/SafetyShrouds-2010.pdf -
7/29/2019 PSC Incident Report Short
5/5
Long Term Direction
Develop a robust mechanical integrity program for hydroblast pressure
systems Certification standards for all pressure rated components with a common identification
system for each pressure
Maintenance and inspection standards to ensure safe use over equipment life (using 3rd
party testing)
Upgraded procurement controls to eliminate non compliant equipment
Review and modification of PSCs safety program Specific opportunities for improvement anticipated in:
Field JSA design and job procedure communication
Observation process and field verification/validation of procedure compliance
Hazard identification and stop work program integrity
Communications and Training PSC training and worker certification by pressure rating
PSC training on SOP upgrades
Client training on key hydroblasting hazards and pressure system identification
Communicate to competitors and industry safety organizations