PSC Incident Report Short

download PSC Incident Report Short

of 5

Transcript of PSC Incident Report Short

  • 7/29/2019 PSC Incident Report Short

    1/5

    Hydroblast HoseFailure

    Calvert City, KYSeptember 12, 2011

    Presented By PSCOctober 25, 2011

  • 7/29/2019 PSC Incident Report Short

    2/5

    Date: Monday September 12, 2011 J ob Start: Approximately 8:30 AM

    Time Of Incident: 9:00 AM

    J ob Scope: Hydroblast TLE

    Shotgun Cone, South Tube Face

    Flex Lance Tubes From North End

    Task Being Performed: Shotgunning SouthTube Face

    Direct Cause: Hose Failed At CrimpConnected to Shotgun

    Injury Scope: Water Cut Below Right PectoralMuscle.

    Result: Employee passed away at 10:28 AM -Marshall County Hospital, Calvert City KY

    Incident Detail

    ConeTube Face

  • 7/29/2019 PSC Incident Report Short

    3/5

    Injured worker - EE1 (J ob Leader):

    8 Years PSC (2001-2004, 2007-Present). 10 Years Industrial Cleaning Total

    Co worker - EE2

    2 Years PSC. Over 13 Years Industrial Related Operator Positions

    Crew performed this specific job 2-3 times per week

    Same equipment setup

    Requested, well regarded by client

    Both had received numerous local Safety Treasure Chest awards for Above andBeyond safety performance

    Pump: NLB #427 Fitted With 20K PSI fluid end

    No Indication Of Pump Malfunction

    Pressure Relief Systems In Place

    Crew Detail

  • 7/29/2019 PSC Incident Report Short

    4/5

    PSC Shotgun Safety Requirements

    Shoulder Stock

    Minimum 48 Barrel to Tip Prevent Cutting Feet

    Optional: Stabilizer Handle

    Guarded Pressure Relief Trigger SoWorker Controls Pressure Discharge

    Six Foot Shroud Protects Worker In Case Of Hose Failure

    Shroud Attaches To Gun Over HoseConnection

    High Pressure Hose Rated at 1.5XMAWP and 2.5X Burst Pressure

    Top Image:http://www.advancedpressuresystems.com/images/PDF/SafetyShrouds-2010.pdfBottom Image: http://www.waterblast.com/Products/Detail.aspx?id=3287Used for illustrative purposes only.

    http://www.advancedpressuresystems.com/images/PDF/SafetyShrouds-2010.pdfhttp://www.waterblast.com/Products/Detail.aspx?id=3287http://www.waterblast.com/Products/Detail.aspx?id=3287http://www.advancedpressuresystems.com/images/PDF/SafetyShrouds-2010.pdf
  • 7/29/2019 PSC Incident Report Short

    5/5

    Long Term Direction

    Develop a robust mechanical integrity program for hydroblast pressure

    systems Certification standards for all pressure rated components with a common identification

    system for each pressure

    Maintenance and inspection standards to ensure safe use over equipment life (using 3rd

    party testing)

    Upgraded procurement controls to eliminate non compliant equipment

    Review and modification of PSCs safety program Specific opportunities for improvement anticipated in:

    Field JSA design and job procedure communication

    Observation process and field verification/validation of procedure compliance

    Hazard identification and stop work program integrity

    Communications and Training PSC training and worker certification by pressure rating

    PSC training on SOP upgrades

    Client training on key hydroblasting hazards and pressure system identification

    Communicate to competitors and industry safety organizations