    Production Scheduler

    Infosys Technologies Ltd

    2006 This report contains information that is confidential and proprietary to Infosys Technologies Ltd. and is solely for the use of Infosys. No

    part of it may be used, circulated, quoted, or reproduced for distribution outside Infosys Technologies Ltd. If you are not the intended recipient ofthis report, you are hereby notified that the use, circulation, quoting, or reproducing of this report is strictly prohibited and may be unlaful.

    !"N#I$%NTI&L

  • 8/10/2019 PS Demo.pptx

    2/50

    Agenda

    Introduction to Production Scheduler

    PS integration with EBS and ASCP

    PS plan options

    PS key entities (items, safety stock, demand, work order, PS UI iews,routings, B!", resources, etc#$ and data setup in EBS

    Concepts such as lot multiple and co%products

    Comple& networks and hard links

    Se'uence dependent setups and changeoer rules

    ork order and planned order scheduling

    )epetitie manufacturing optimi*ation

    Enhancements of EBS%PS + integration

    Page

  • 8/10/2019 PS Demo.pptx

    3/50

    !racle Adanced PlanningComplete E%Business Planning Solution

    Page -

    Collaborative Planning CP

    Sales and Operations

    Planning

    From short-term to long-term

    CPSC Exception Management

    PSProduction Scheduling

    ASCPDistribution Planning

    GOPGlobal Order Promising

    ASCPSuppl Chain ! Manu"acturing Planning

    IO#nventor Optimi$ation

    DPDemand Planning

    SCISuppl Chain #ntelligence

    SNO%et&or' Design

    Fromd

    etailtosummar

    DevelopMar'etSell

    Order

    Plan

    Procure

    Ma'e

    Ful"ill

    Service

    Maintain

    Finance()

    Pro*ectsAll Product+

    Customer+

    ! Supplier

    #n"ormation

  • 8/10/2019 PS Demo.pptx

    4/50

    Production Scheduling Integration.escription

    Page /

    &d'anced (upply !hain )lanning )roduction (cheduling

    )lan for multiple facilities

    *hich plant ma+es hat products

    and hen

    )rebuilds based on capacity shortages

    &lternate facilities, suppliers and

    processes

    (chedule a single facility

    (equence )roduction to meet

    demands on this facility

    &ccount for detailed production

    constraints and come up ith ane-ecutable schedule

    Constrained dependent demands,

    Independent Demands, Planned Orders

    Detailed Sequence of activities near term to

    constrain the medium / long term plan

  • 8/10/2019 PS Demo.pptx

    5/50

    Production Scheduling Integration.escription 0 1ogical Information 2low

    Page 3

    ASCP

    Planned Orders

    Planned Order Demands

    Sales Orders

    orecasts

    Production Scheduling

    Source E)P!or" Order #eschedules

    Ne$ !or" Orders

    Items

    %ill of &aterials

    #outings

    #esources

    !or" Order

    Sales Orders

    On 'and

    (

    (

    (

  • 8/10/2019 PS Demo.pptx

    6/50

    Production Scheduling Integration.escription 0 "odes of )unning PS

    Page 4

    unning )( /(tandaloneunning )( ith reference to an

    &(!) )lan

    (chedule or+ orders only(chedule or+ orders and plannedorders

    #orecast demands specified 'ia$emand schedules

    #orecast demands come in 'ia thereferenced &(!) plan

    Interorg demands included only'ia internal sales orders

    Interorg demands also includeplanned order demands from the&(!) plan

    Items to be included in )(

    specified 'ia specification ofcategory sets 1 categories

    Items to be included in )( deri'ed

    from the items in the &(!) plan

    No #orecast consumption#orecast consumption performed in&(!) is retained ithin )(

  • 8/10/2019 PS Demo.pptx

    7/50

    Production Scheduling Integration.escription 0 System Information 2low

    Page 5

    Client PC

    Collections

    PS

    ,ro&ser

    PS &odel ilesSnapshot PS Data

    rom Planning Server

    Oracle Applications

    )ogin

    Planning

    Data

    )epositor

    Define Schedule

    names and Options

    Invo"e Data Snapshot

    Open PS

    !or"*ench

    Pu*lish Schedule from PS

    +#elease Process

    E,S

    Source

  • 8/10/2019 PS Demo.pptx

    8/50

    Production Scheduling Integration.escription % )esponsi6ility

    Page 7

    A %e& )esponsibilit Production Scheduler. is available

    to access the PS application

  • 8/10/2019 PS Demo.pptx

    9/50

    Production Scheduling Integration.escription 0 "enu 2unctions

    Page 8

    Access the PS /or'bench

    De"ine Options "or a PS

    Schedule

    De"ine a PS Schedule %ame

    0ie& the Schedule options in a

    )ead Onl. mode

  • 8/10/2019 PS Demo.pptx

    10/50

    Production Scheduling Integration.escription 0 Schedule 9ames

    Page :;

    Enter the name and description "or

    the production schedule

    Select to access Schedule options

    Select to create a cop o" this

    schedule name and all o" its

    currentl de"ined options

  • 8/10/2019 PS Demo.pptx

    11/50

    Production Scheduling Integration.escription 0 Copy Schedule !ptions

    Page ::

    Speci" %ame and Description "or the cop

    being created

  • 8/10/2019 PS Demo.pptx

    12/50

    Production Scheduling Integration.escription 0 Schedule !ptions %

  • 8/10/2019 PS Demo.pptx

    13/50

    Production Scheduling Integration.escription 0 Schedule !ptions % Scope

    Page :-

    Set o" categories &ithin the speci"ied

    categor set determine the set o" items in the

    PS schedule i" no ASCP plan re"erence is

    speci"ied

    #" no ASCP Plan re"erence is speci"ied+

    demand schedules can be speci"ied as

    input to the PS schedule

    %umber o" das prior to schedule start date &ithin&hich to consider sales orders as valid demands to

    PS

    1he ASCP Plan re"erence "or this PS

    Schedule

    ,ehavior o" the demand time "ence

    depends on &hether ASCP plan is

    re"erenced or not 2see %otes "orDetails3

  • 8/10/2019 PS Demo.pptx

    14/50

    Production Scheduling Integration.escription 0 Schedule !ptions 0 Schedule Parameters

    Page :/

  • 8/10/2019 PS Demo.pptx

    15/50

    Production Scheduling Integration.escription 0 Schedule !ptions 0 .isplay Parameters

    Page :3

    Controls the displa in the PS user

    inter"ace4 Determines ho& to create

    "olders "or Demands+ Supplies and

    /or' Orders

  • 8/10/2019 PS Demo.pptx

    16/50

    Production Scheduling Integration.escription 0 Schedule !ptions 0 )un !ptimi*ation

    Page :4

    Parameters used to enable )un

    Optimi$ation in PS4 See PS user

    guide "or more details on )un

    Optimi$ation and related

    parameters

  • 8/10/2019 PS Demo.pptx

    17/50

    Page :5

    Assem*l- Pac"ing.esting

    Primar- #outing/%O&

    SP0AS&0&1

    SP0AS&0C1

    Simultaneous resources

    SP0P2G0&1

    SP0P2G0&10A).

    Alternate resources

    SP0.S.0&1

    SP0.S.0C1

    Sequential resources

    SP0rame

    SP0!heel

    SP0)eather0Seat

    SP0Pac"

    SP0C-cle0Std

    Assem*l- Pac"ing.esting .ransfer

    Alternate #outing/%O&

    SP0.S.0&1

    SP0.S.0C1

    Sequential resources

    SP0P2G0&1 SP0)0&1SP0AS&0&1

    SP0AS&0C1

    Simultaneous resources

    SP0rame

    SP0!heel

    SP0Cushion0Seat

    SP0C-cle0Std

    SP0Pac"

  • 8/10/2019 PS Demo.pptx

    18/50

    Page :7

  • 8/10/2019 PS Demo.pptx

    19/50

    Page :8

  • 8/10/2019 PS Demo.pptx

    20/50

    Page ;

  • 8/10/2019 PS Demo.pptx

    21/50

    Page :

  • 8/10/2019 PS Demo.pptx

    22/50

    Page

  • 8/10/2019 PS Demo.pptx

    23/50

    Page -

  • 8/10/2019 PS Demo.pptx

    24/50

    Page /

  • 8/10/2019 PS Demo.pptx

    25/50

    Page 3

  • 8/10/2019 PS Demo.pptx

    26/50

    Page 4

  • 8/10/2019 PS Demo.pptx

    27/50

    Page 5

  • 8/10/2019 PS Demo.pptx

    28/50

    Page 7

  • 8/10/2019 PS Demo.pptx

    29/50

    Page 8

  • 8/10/2019 PS Demo.pptx

    30/50

    Page -;

  • 8/10/2019 PS Demo.pptx

    31/50

    1ot multiple

    Page -:

    E,S Modeling Construct PS )outing level lot multiple

    1( .he minimum of all 3Charge quantities4 for

    resources $ithin a routing +OP& Onl-

    5( .he &.6 of the first operation of the routing

    7( i8ed Order quantit- of the primar- item produced

    *- the routing

    9( i8ed )ot multiple of the primar- item produced

    *- the routing

    :( &inimum Order quantit- of the primar- item

    produced *- the routing

    ;( &a8imum Order quantit- of the primar- item

    produced *- the routing

  • 8/10/2019 PS Demo.pptx

    32/50

    Co%products

    Page -

    Co%Products defined in !P" and !S2" and 6y%productsdefined in IP and !P" are represented as part of the item

    routing in PS !S2" 1ot Based =o6s with the co%product supply flag set to>?es@ will create co%product supplies in PS# hose with theflag set to >9o@ will not

    OPM Co Product De"inition OSFM Co Product De"inition

  • 8/10/2019 PS Demo.pptx

    33/50

    Page --

  • 8/10/2019 PS Demo.pptx

    34/50

    Page -/

  • 8/10/2019 PS Demo.pptx

    35/50

    Page -3

  • 8/10/2019 PS Demo.pptx

    36/50

    Page -4

  • 8/10/2019 PS Demo.pptx

    37/50

    Page -5

  • 8/10/2019 PS Demo.pptx

    38/50

    Page -7

  • 8/10/2019 PS Demo.pptx

    39/50

    Page -8

  • 8/10/2019 PS Demo.pptx

    40/50

    Page /;

  • 8/10/2019 PS Demo.pptx

    41/50

    Page /:

  • 8/10/2019 PS Demo.pptx

    42/50

    Page /

  • 8/10/2019 PS Demo.pptx

    43/50

    Page /-

  • 8/10/2019 PS Demo.pptx

    44/50

    Page //

  • 8/10/2019 PS Demo.pptx

    45/50

    Page /3

  • 8/10/2019 PS Demo.pptx

    46/50

    Comple& routings

    Page /4

    !P" Comple& )outings 0 he Item )outing in PS will

    represent !P" comple& routing relationships ransfer Percents 6etween operations influence step

    'uantities which in turn determine resource andcomponent usages

    Standard "a& .elays 6etween operations create arioustypes of "in"a& separation constraints in PS

    E,S )epresentation o" the

    #tem6s )outing

    PS )epresentation o" the #tem6s

    )outing

    57

    87

    97

    :7

    ;7

  • 8/10/2019 PS Demo.pptx

    47/50

  • 8/10/2019 PS Demo.pptx

    48/50

    )epetitie "anufacturing !ptimi*ation

    Page /7

    >)epetitie "anufacturing !ptimi*ation@ ()"!$ addresses the following 6usinessre'uirements Scheduling of production campaigns on designated resources across manufacturing

    cycles "inimum run length constraints on these designated resources across manufacturing

    cycles !ptimi*ation of se'uence dependant changeoers on these resources during campaign

    minimum run schedule creation

  • 8/10/2019 PS Demo.pptx

    49/50

    PS 0 EBS + integration enhancements list

    ime 6ased lot multiple plan option set 6y resource

    Support 6atcha6le resources 6y grouping operations 6ased on attri6utes andattri6ute alues

    Use resource calendar for changeoers

    A6ility to specify which planned order should 6e released

    Pass forecast priorities to PS

    Use All%of%Sets for replacement groups

    Production Schedule as a source of firm planned orders to ASCP

    Use defined item and resource groupings and 6etter naming conentions

    .istinguish resources from !P" as crew or machine or tool Set campaign run optimi*ation for properties for machines in PS

    Additional lead time attri6ute in PS

    Page /8