@ At2nd SecondAve AvenueBdy or Bdry BoundaryBF 74817 or (74817-02) Bridge File NumberBr BridgeBvd BoulevardCntrl ControlCr CreekCty County(E) East JunctionE EastEB or EBL East Bound LaneECL East Corporate (or City) LimitG/S Grade Separation StructureHwy HighwayIncl IncludesImp ImprovementInt IntersectionIntch InterchangeIR Indian ReserveIrrig IrrigationJct JunctionLR Local RoadMS Metis SettlementMtn Mountain(N) North JunctionN NorthNB or NBL North Bound LaneNC- North-Central RegionNCL North Corporate (or City) LimitR or Riv RiverRge RangeRd or Rds Road or RoadsRsrve Reserve(S) South JunctionS SouthSB or SBL South Bound LaneSCL South Corporate (or City) Limitsel selectiveSRA Safety Rest AreaSt StreetTr TrailTwp TownshipVIS Vehicle Inspection Station(W) West JunctionW WestWB or WBL West Bound LaneWCL West Corporate (or City) Limit
-
Highway Location Type of WorkEstimatedLength (km)
Tentative Government-Owned Transportation ProjectsNear Completion, Underway or Scheduled
in 2008-2011MAJOR PROVINCIAL HIGHWAY PROJECTS
(Major Construction and Rehabilitation)
1 Provincial Highway 1 Over Local Road Flyover, 14 Km East of Seebe (Community Underpass)
Structure Replacement . Contract for 2008 Construction.
1 Highway 22 Over Highway 1 Interchange, 14 Km W of Calgary
Bridge Rehabilitation .
1 Interchange @ Hwy 9/Hwy 797 Interchange - Grade, Base, Paving . Contract for 2007 & 2008 Construction.
1 Structure: Interchange (79471-01) Hwy9/Hwy797 Interchange - Bridge Structure . Contract for 2007 & 2008 Construction.
1 W of Hwy 56 - E of Hwy 56 (WBL) Preservation/Overlay 16
1 Highway 1 Over Gershaw Drive Interchange, At Medicine Hat (WBL)
Bridge Rehabilitation .
1 Highway 1 Over Gershaw Drive Interchange, At Medicine Hat (EBL)
Bridge Rehabilitation .
1 CPR Overpass on Highway 1, 1 Km SE of Medicine Hat Boundary (EBL)
Bridge Rehabilitation .
1 CPR Overpass on Highway 1, 1 Km SE of Medicine Hat Boundary (WBL)
Bridge Rehabilitation .
1A Canmore Preservation/Overlay 15
1A E of Old Fort Cr - Ghost R Revision BF07691,77106 Widen And Overlay 15
1A Hwy 1X - E of Old Fort Creek BF09400,09401 Widen And Overlay 15
1A W of Ghost River - E of Ghost River Preservation/Overlay 20Contract for 2008 Construction.
1A E of Hwy 22 - E of Town of Cochrane ECL Preservation/Overlay 6
1A Calgary ECL - Hwy 1 Preservation/Overlay 5
Monday, April 14, 2008 Page 1 of 28
-
Highway Location Type of WorkEstimatedLength (km)
Tentative Government-Owned Transportation ProjectsNear Completion, Underway or Scheduled
in 2008-2011MAJOR PROVINCIAL HIGHWAY PROJECTS
(Major Construction and Rehabilitation)
2 S of Hwy 511 - Fort Macleod SCL Preservation/Overlay 11
2 S of Hwy 519 - Claresholm SCL (NBL) Preservation/Overlay 15
2 Hwy 2: ITS/Safety Improvements Miscellaneous .
2 Claresholm SCL - Stavely (SBL & NBL) Preservation/Overlay 10Contract for 2007 & 2008 Construction.
2 N of Stavely - Nanton NCL SBL Preservation/Overlay 25
2 Nanton NCL - N of Cayley (N & SBL) Preservation/Overlay 24
2 N of Cayley - Hwy 23 NB & SBL Preservation/Overlay 27Contract for 2007 & 2008 Construction.
2 Interchange Conversion @ CPR Overpass, S of Aldersyde
Interchange Upgrading . Contract for 2007 & 2008 Construction.
2 17th Ave, Peigan, Anderson/Bow Bottom, Glenmore Tr & Southland Dr. (Intch Loops, Ramps, & Cross Roads)
Preservation/Overlay .
2 Intch Loops, Ramps, Cross Rds @ 16th, 32nd, 64th Ave, Memorial, & McKnight
Preservation/Overlay . Contract for 2008 Construction.
2 Barlow Tr/Peigan Tr Intch Imp Deerfoot Trail Interchange Upgrading . Contract for 2008 Construction.
2 Beddington Tr - 64th Ave Widening Deerfoot Trail(BF 81800Z1&2)
Reconstruct/Re-Alignment 2
2 32nd Avenue Improvement(EBL) (within Deerfoot right of way)
Grading, Base, Full Paving .
2 Deerfoot Trail Intch Completion CALGARY STONEY TRAIL NW
Interchange - Grade, Base, Paving .
2 CPR and CNR Overpass on Deerfoot Trail, At Calgary (SBL)
Bridge Rehabilitation .
Monday, April 14, 2008 Page 2 of 28
-
Highway Location Type of WorkEstimatedLength (km)
Tentative Government-Owned Transportation ProjectsNear Completion, Underway or Scheduled
in 2008-2011MAJOR PROVINCIAL HIGHWAY PROJECTS
(Major Construction and Rehabilitation)
2 CPR and CNR Overpass on Deerfoot Trail, At Calgary (NBL)
Bridge Rehabilitation .
2 Structure: 196 Ave Br Twinning Deerfoot Trail (82011E-01)
Interchange - Bridge Structure .
2 Structure: Deerfoot Trail SB Bridges BF 82401S1-01, BF 82401S1-02
Interchange - Bridge Structure . Contract for 2007 & 2008 Construction.
2 64 Avenue North Over Deerfoot Trail Interchange, At Calgary
Bridge Rehabilitation . Contract for 2008 Construction.
2 N of McKnight Boulevard - S of City of Calgary NCL (SBL)
Preservation/Overlay 9
2 Bow River Calf Robe Bridge on Highway 2/Deerfoot Trail, At Calgary
Bridge Rehabilitation .
2 S of Crossfield - N of Acme Road Interchange NBL & SBL
4 - Lane Median Widening 21Contract for 2007 & 2008 Construction.
2 Structure: Yankee Valley Boulevard Intch Airdrie Interchange - Bridge Structure .
2 Yankee Valley Boulevard Interchange (East Side Ramps & Loop)
Interchange Upgrading .
2 Access Management: Minor Access Removals @ Various Locations
Access Control .
2 North Innisfail Interchange: Ramp Upgrading Interchange Upgrading . Contract for 2007 & 2008 Construction.
2 N of South Innisfail Intch - N of North Innisfail Interchange (BF 74817)
4 - Lane Median Widening 5Contract for 2007 & 2008 Construction.
2 South Innisfail Intch Surfacing 2nd Stage Paving .
Monday, April 14, 2008 Page 3 of 28
-
Highway Location Type of WorkEstimatedLength (km)
Tentative Government-Owned Transportation ProjectsNear Completion, Underway or Scheduled
in 2008-2011MAJOR PROVINCIAL HIGHWAY PROJECTS
(Major Construction and Rehabilitation)
2 Major Access Closure in Red Deer County, rear Service Road Construction required at:Twp Rd 360, Twp Rd 392
Access Control .
2 CNR Overpass on Highway 2, 5 Km N of Red Deer (SBL)
Bridge Rehabilitation . Contract for 2008 Construction.
2 CNR Overpass on Highway 2, 5 Km N of Red Deer (NBL)
Bridge Rehabilitation . Contract for 2008 Construction.
2 S of Hwy 53 - Hwy 53 (SBL) Preservation/Overlay 2
2 Roadside Turnout: SRA C-009 A (SBL), S of Ponoka. (Type A Turnout)
Rest Area/Truck Turnout .
2 Major Access Closure in Lacombe County, rear Service Road construction required at : 1 mile N of Hwy 597, Twp Rd 400, Grumpy's Diner, Duckett Road, Wolf Creek
Access Control .
2 S of Hwy 604 - Hwy 53 (NBL) Preservation/Overlay 11
2 Hwy 39 - S of Ellerslie Road (SB & NB) Preservation/Overlay 22Contract for 2008 Construction.
2 Airport Road - Edmonton SCL (Lighting) Construct Lighting . Contract for 2008 Construction.
2 50 Street Over Highway 2 Interchange, At NW Boundary of Leduc
Bridge Rehabilitation .
2 Intersection Improvements @ Twp Road 562 & 564 Intersection Improvement . Contract for 2008 Construction.
2 S of Hwy 651 - N of Hwy 651 Preservation/Overlay 7Contract for 2007 & 2008 Construction.
2 Baptiste Creek Bridge on Highway 2, 19 Km NW of Athabasca
Structure Replacement . Contract for 2008 Construction.
2 S of Island Lake - W of Lawrence Lake Preservation/Overlay 16
Monday, April 14, 2008 Page 4 of 28
-
Highway Location Type of WorkEstimatedLength (km)
Tentative Government-Owned Transportation ProjectsNear Completion, Underway or Scheduled
in 2008-2011MAJOR PROVINCIAL HIGHWAY PROJECTS
(Major Construction and Rehabilitation)
2 N of Otauwau River - Slave Lake Preservation/Overlay 22Contract for 2007 & 2008 Construction.
2 E of Kinuso - Faust Preservation/Overlay 13
2 Watercourse Culvert on Provincial Highway 2 Near Canyon Creek
Structure Replacement . Contract for 2008 Construction.
2 Swan River Bridge on Highway 2, 3 Km SE of Kinuso Bridge Rehabilitation .
2 E of High Prairie - W of High Prairie Preservation/Overlay 3
2 Intersection Improvement: @ 55 St/RR 172 (High Prairie)
Intersection Improvement . Contract for 2008 Construction.
2 W of Whitelaw - Fairview Preservation/Overlay 19
2 Fairview - Hwy 64 Preservation/Overlay 11
2 Watercourse Culvert on Hwy 2, 6 Km North of Dunvegan
Structure Replacement .
2 Structure: Peace River (73949) Dunvegan Bridge Bridge Rehabilitation . Contract for 2008 & 2009 Construction.
2 Rycroft (Inc. Service Roads) Intersection Improvement .
2 Highway 2:72 and Webster Truck Turnout Intersection Improvement . Contract for 2007 & 2008 Construction.
2A S of Hwy 543 - Hwy 7 Preservation/Overlay 11
2A S of Crossfield - S of Hwy 580 Preservation/Overlay 12Contract for 2008 Construction.
2A Hwy 2 - S of Crossfield Widen And Overlay 2Contract for 2008 Construction.
2A N of Town of Didsbury - Hwy 582 Preservation/Overlay 3
Monday, April 14, 2008 Page 5 of 28
-
Highway Location Type of WorkEstimatedLength (km)
Tentative Government-Owned Transportation ProjectsNear Completion, Underway or Scheduled
in 2008-2011MAJOR PROVINCIAL HIGHWAY PROJECTS
(Major Construction and Rehabilitation)
2A Innisfail - S of Hwy 42(Penhold) BF72630,72634,72910,72929
Widen And Overlay 15Contract for 2008 Construction.
2A Highway 2A:18 And Township Road 400 (Inc. Re-Alignment)
Intersection Improvement .
2A N of Hwy 2 - S of Town of Ponoka Preservation/Overlay 12
2A Hwy 2 - Smith 2nd Stage Paving 15Contract for 2008 Construction.
3 W of Piikani IR E Bdry - W of Hwy 2 Preservation/Overlay 6
3 Lethbridge WCL - Lethbridge ECL (E & WBL) Preservation/Overlay 14
3 E of Coaldale - W of Barnwell (WBL & EBL) Preservation/Overlay 20
3 Passing Lanes:(EBL & WBL) E of Taber - E of Bow Island
Passing/Climbing Lane 9Contract for 2007 & 2008 Construction.
3 Passing Lanes:(EBL & WBL) W of Hwy 885 - S of Medicine Hat
Passing/Climbing Lane 7Contract for 2007 & 2008 Construction.
3 Medicine Hat (Holsom Rd - Hwy 1) Reconstruct/Re-Alignment 6Contract for 2007 & 2008 Construction.
4 Hwy 501(W) - Milk River BF 84503 - River Protection Twinning - Grade, Base, Stage Paving 3Contract for 2008 Construction.
4 Milk River - N of Milk River Twinning - Grade, Base, Stage Paving 4Contract for 2007 & 2008 Construction.
4 CPR Rail Line Procurement: Milk River Miscellaneous 8
4 CPR Rail Line Installation: Milk River Miscellaneous 8Contract for 2008 Construction.
4 Structures: Milk River NB & SB (1426N-01,1426S-01)
Twinning - Structure . Contract for 2007 & 2008 Construction.
4 Bridge Approach Fills over the Milk River Bridge Approach Fills . Contract for 2007 & 2008 Construction.
Monday, April 14, 2008 Page 6 of 28
-
Highway Location Type of WorkEstimatedLength (km)
Tentative Government-Owned Transportation ProjectsNear Completion, Underway or Scheduled
in 2008-2011MAJOR PROVINCIAL HIGHWAY PROJECTS
(Major Construction and Rehabilitation)
4 Structure: CPR (81890-01) Milk River Twinning - Structure . Contract for 2007 & 2008 Construction.
5 Cardston - S of Spring Coulee Preservation/Overlay 18
9 W of Hwy 21 - E of Hwy 836 BF74487,82167,69,70 Widen And Overlay 15
9 N of Hwy 566 - S of Beiseker BF02300,74931 Widen And Overlay 20
9 N of Hwy 1 - N of Hwy 566 Preservation/Overlay 22
9 Irricana - S of Beiseker Preservation/Overlay 2
9 Structure: Rosebud River (73753-01) Irricana Widen Bridge . Contract for 2008 Construction.
9 Beiseker - W of Hwy 21 Widen And Overlay 16Contract for 2007 & 2008 Construction.
9 E of Hwy 836 - E of Hwy 840 2nd Stage Paving 14
9 Drumheller Intersection Improvement (Grove Ave, 1St Ave, 2nd Ave)
Intersection Improvement .
9 Red Deer River Bridge on Highway 9, At South Boundary of Drumheller (Construct Sidewalk, Curb & Rail)
Miscellaneous .
11 Horburg - E of Horburg Preservation/Overlay 17
11 Highway 11:10 and 766:10 (Site 0953) & Highway 11:10 and 11:12 and 766:12 (Site 0309)
Construct Lighting .
11 W of Hwy 781 - E of Hwy 2 Preservation/Overlay 17Contract for 2008 Construction.
11 E of Hwy 766 - W of Hwy 781 Preservation/Overlay 15Contract for 2008 Construction.
11 W of Hwy 20 - W of Hwy 596(EBL) Twinning - 2nd Stage Paving 13Contract for 2008 Construction.
Monday, April 14, 2008 Page 7 of 28
-
Highway Location Type of WorkEstimatedLength (km)
Tentative Government-Owned Transportation ProjectsNear Completion, Underway or Scheduled
in 2008-2011MAJOR PROVINCIAL HIGHWAY PROJECTS
(Major Construction and Rehabilitation)
11A Hwy 752 - Hwy 11 Preservation/Overlay 2
11A Intersection Improvement @ Hwy 11A Intersection Improvement . Contract for 2008 Construction.
11A Highway 11A Over Highway 2 Interchange, At NW Boundary of Red Deer
Partial Painting .
12 Bentley - W of Hwy 792 Reconstruct/Re-Alignment 9
12 E of Hwy 792 - W of Hwy 2 Preservation/Overlay 5
12 Hwy 12 & Hwy 2 Interchange Upgrades Interchange Upgrading .
12 Structure: Red Willow Cr (01504-01) Stettler Structure Replacement . Contract for 2008 Construction.
12 Stettler Preservation/Overlay 1
13 W of Bittern Lake - E of Hwy 21 Preservation/Overlay 16
13 E of Hwy 56 - Hwy 855 Preservation/Overlay 33Contract for 2008 Construction.
13 Hardisty - E of Hardisty Preservation/Overlay 6
14 E of Hwy 857 - Hwy 36 Preservation/Overlay 18
15 E of Fort Saskatchewan ECL - E of Hwy 830 Twinning - 2nd Stage Paving 6Contract for 2008 Construction.
15 Fort Saskatchewan ECL - Hwy 45 Preservation/Overlay 14Contract for 2007 & 2008 Construction.
16 E of Hinton - W of Obed EBL Preservation/Overlay 10
16 Bench Creek Bridge on Provincial Highway 16 Near Edson
Structure Replacement . Contract for 2008 Construction.
16 Town of Edson (E & WBL) Phase II Preservation/Overlay 3
Monday, April 14, 2008 Page 8 of 28
-
Highway Location Type of WorkEstimatedLength (km)
Tentative Government-Owned Transportation ProjectsNear Completion, Underway or Scheduled
in 2008-2011MAJOR PROVINCIAL HIGHWAY PROJECTS
(Major Construction and Rehabilitation)
16 Edson - E of Edson EBL Preservation/Overlay 4
16 E of Hwy 32 - E of Hwy 753 Selective (EBL/WBL) Preservation/Overlay 38
16 Roadside Turnout: SRA NC-015B (WBL) W of Entwistle
Rest Area/Truck Turnout .
16 Roadside Turnout: SRA NC-016B (EBL) W of Entwistle
Rest Area/Truck Turnout .
16 Hwy 753 - W of Hwy 22(N) E&WBL Sel Preservation/Overlay 17
16 Roadside Turnout, W of Mundare (WB) Rest Area/Truck Turnout .
16 Roadside Turnout, W of Mundare (EB) Rest Area/Truck Turnout .
16 E of Vegreville - Hwy 36 (EBL) Preservation/Overlay 16Contract for 2008 Construction.
16 Hwy 41 - E of Vermilion (EBL) Preservation/Overlay 12Contract for 2008 Construction.
16A Hwy 16 - W of Spruce Grove (WBL & EBL) Preservation/Overlay 24
16A CNR Overpass on Highway 16A, 3 Km E of Spruce Grove (EBL)
Bridge Rehabilitation .
16A CNR Overpass on Highway 16A, 3 Km E of Spruce Grove (WBL)
Bridge Rehabilitation .
16A Vegreville Preservation/Overlay 3
18 Watercourse Bridge on Provincial Highway 18 Near Campsie
Structure Replacement .
18 Westlock ECL - W of Clyde Corner Preservation/Overlay 9Contract for 2008 Construction.
18 Hwy 33 - Freedom Preservation/Overlay 10
Monday, April 14, 2008 Page 9 of 28
-
Highway Location Type of WorkEstimatedLength (km)
Tentative Government-Owned Transportation ProjectsNear Completion, Underway or Scheduled
in 2008-2011MAJOR PROVINCIAL HIGHWAY PROJECTS
(Major Construction and Rehabilitation)
20 Intersection Improvement @ Hwy 12 Intersection Improvement . Contract for 2008 Construction.
20 S of Forshee - Hwy 53 Preservation/Overlay 14
20 N of Hwy 12 - S of Forshee Preservation/Overlay 12
20A N of Hwy 53 - Hwy 20 Preservation/Overlay 1
21 S of Hwy 27(E) - N of Hwy 27(W) (selective) Preservation/Overlay 16
21 Hwy 595 - Hwy 12 Preservation/Overlay 27
21 S of Bashaw - Hwy 53(W) Preservation/Overlay 14
21 Hwy 53(W) - N of Hwy 611 Preservation/Overlay 22
21 S of Hwy 628 - Hwy 16 Interchange @ Hwy 16 & Hwy 21
Twinning - Grade, Base, Stage Paving 9
22 22:14 C1 Highway 8:06 & 22:14 (Construct A Round-About)
Intersection Improvement .
22 Intersection Improvement: @ River Heights Drive Intersection Improvement .
22 N of Hwy 1 - S of Hwy 1A Preservation/Overlay 10
22 Town of Sundre: Intersection of Hwy 22/584 Intersection Improvement . Contract for 2008 Construction.
22 Structure: N Sask River (74381-23) Drayton Valley (Incl Realignment)
Structure Replacement .
22 Highway 22:30 And 50 Avenue In Drayton Valley Intersection Improvement .
22 S of Paddle River - Hwy 43 Widen And Overlay 11
Monday, April 14, 2008 Page 10 of 28
-
Highway Location Type of WorkEstimatedLength (km)
Tentative Government-Owned Transportation ProjectsNear Completion, Underway or Scheduled
in 2008-2011MAJOR PROVINCIAL HIGHWAY PROJECTS
(Major Construction and Rehabilitation)
23 Hwy 520(W) - Little Bow River Preservation/Overlay 12
23 Little Bow River - N of Champion Preservation/Overlay 22
25 Highway 25 Over Highway 3 Interchange, at NW Boundary of Lethbridge
Bridge Rehabilitation .
27 Intersection Improvement @ Range Road 5-2 Intersection Improvement .
27 Town of Olds To Hwy 2 selective Preservation/Overlay 8
27 Town of Sundre: Intersection of Main Street (Includes Traffic Light Installation)
Intersection Improvement . Contract for 2008 Construction.
27 W of Hwy 836 - W of Hwy 839 Preservation/Overlay 16
27 W of Hwy 839 - W of Hwy 56 Preservation/Overlay 9
28 West Gibbons Access - N of Gibbons Preservation/Overlay 7Contract for 2008 Construction.
28 Sturgeon River Bridge on Highway 28, 6 Km NW of Namao
Bridge Rehabilitation .
28 Various Curve Revisions (3) W of Redwater, Hwy 38,N of Redwater
Reconstruct/Re-Alignment 3
28 Hwy 651 - W of Hwy 827 Preservation/Overlay 16
28A Hwy 643 - Hwy 28 Preservation/Overlay 2Contract for 2008 Construction.
29 Hwy 855 - Hwy 857 Preservation/Overlay 18
29 W of Hwy 646 - S of Hwy 36 Preservation/Overlay 14Contract for 2008 Construction.
29 Duvernay Bridge - W of Hwy 646 Preservation/Overlay 17
Monday, April 14, 2008 Page 11 of 28
-
Highway Location Type of WorkEstimatedLength (km)
Tentative Government-Owned Transportation ProjectsNear Completion, Underway or Scheduled
in 2008-2011MAJOR PROVINCIAL HIGHWAY PROJECTS
(Major Construction and Rehabilitation)
32 S of Freeman River - Hwy 33 Preservation/Overlay 27
32 Roadside Turnout: SRA P-025 A (SBL) S of Swan Hills (E-013)
Rest Area/Truck Turnout .
33 E of Ft. Assiniboine - W of Ft. Assiniboine Preservation/Overlay 29
33 Hwy 18 - W of Hwy 18 Preservation/Overlay 2
33 Athabasca River Bridge on Highway 33, 2 Km S of Fort Assiniboine (Bearing Replacement)
Miscellaneous . Contract for 2007 & 2008 Construction.
33 W of Ft Assiniboine - Swan Hills Preservation/Overlay 34
35 Intersection Improvement @ North Star Access Intersection Improvement .
35 Structure: Watercourse (74992-02) Paddle Prairie Structure Replacement . Contract for 2007 & 2008 Construction.
35 S of Hwy 697 - Metis Settlement North Boundary Preservation/Overlay 13Contract for 2008 Construction.
35 N of Metis Settlement - S of Hwy 58 Preservation/Overlay 27Contract for 2007 & 2008 Construction.
35 N of Hutch Lake Access - S of Meander River Preservation/Overlay 22Contract for 2007 & 2008 Construction.
35 S of Meander River - N of Meander River Preservation/Overlay 21
35 S of Indian Cabins - NWT Border Preservation/Overlay 25Contract for 2007 & 2008 Construction.
36 Intersection Improvements Throughout Vauxhall (Primary Project Is The Municipal (Grantham Rd.) Intersection.
Intersection Improvement .
36 Tributary to Iron Creek Bridge on Highway 36, 7 Km S of Killam
Structure Replacement .
36 S of Hwy 26 - Hwy 14 Preservation/Overlay 19Contract for 2008 Construction.
Monday, April 14, 2008 Page 12 of 28
-
Highway Location Type of WorkEstimatedLength (km)
Tentative Government-Owned Transportation ProjectsNear Completion, Underway or Scheduled
in 2008-2011MAJOR PROVINCIAL HIGHWAY PROJECTS
(Major Construction and Rehabilitation)
36 9 Km S of Hwy 26 - 6 Km S of Hwy 26 Preservation/Overlay 3
36 Hwy 13 - N of Town of Killam Preservation/Overlay 16
36 N of Hwy 55 To Hwy 881 Preservation/Overlay 19
39 Hwy 39 Climbing Lanes: EBL (km 6.26 & km 15.07) & WBL (km11.76)
Passing/Climbing Lane . Contract for 2007 & 2008 Construction.
39 Watercourse Culvert on Provincial Highway 39, Near Carnwood
Structure Replacement . Contract for 2008 Construction.
40 Mcleod River Bridge on Highway 40, 12 Km NE of Cadomin
Bridge Rehabilitation .
40 S of Muskeg River - Muskeg Cabins (BF 76661 & 82251)
Widen And Overlay 13
40 Kakwa River Bridge on Highway 40, 93 Km S of Grande Prairie
Bridge Rehabilitation .
40 Structure: Wapiti River (74228) Near Grande Prairie Bridge Rehabilitation . Contract for 2007 & 2008 Construction.
40 Highway 40:42 And Highway 668:02 Intersection Improvement .
41 Red Deer River - Acadia Valley (selective overlay) Preservation/Overlay 29
41 S of Vermilion - Hwy 16 Preservation/Overlay 17
41 Hwy 16 - N of Hwy 16 (includes interchange ramps) Preservation/Overlay 2Contract for 2008 Construction.
41 Highway 41:24 And 54 Avenue In Bonnyville (Inc. Traffic Signals)
Intersection Improvement .
42 Penhold - Hwy 816(N) Preservation/Overlay 26
Monday, April 14, 2008 Page 13 of 28
-
Highway Location Type of WorkEstimatedLength (km)
Tentative Government-Owned Transportation ProjectsNear Completion, Underway or Scheduled
in 2008-2011MAJOR PROVINCIAL HIGHWAY PROJECTS
(Major Construction and Rehabilitation)
43 Hwy 723 - Hwy 724 (inc BF74295, 86016, 86165, 66 & 67)
Twinning - Grade, Base, Stage Paving 14
43 City of Grande Prairie E&WBL Preservation/Overlay 17Contract for 2008 Construction.
43 City of Grande Prairie - Hwy 2 Preservation/Overlay 3
43 Roadside Turnout: SRA P-026 A (WBL) W of Debolt Rest Area/Truck Turnout 1
43 Structure: CNR Tracks N of Grande Prairie (82262E)
Interchange - Bridge Structure .
43 Interchange @ Hwy 2 and 43: Service Roads Interchange Upgrading .
43 Structure: Interchange EBL N of Grande Prairie (82261E)
Interchange - Bridge Structure . Contract for 2008 Construction.
43 E of Crooked Cr - E Boundary Sturgeon Lake IR (inc. 11 bridge structures)
Twinning - Grade, Base, Stage Paving 37
43 Roadside Turnout: SRA P-027 A (EBL) W of Debolt Rest Area/Truck Turnout 1
43 Little Smoky River Bridge on Provincial Highway 43, At NW Boundary of Little Smoky
Partial Painting .
43 S of Asplund Cr - S of Twp Rd 662 Twinning - 2nd Stage Paving 21
43 Little Smoky River Bridge on Provincial Highway 43, At NW Boundary of Little Smoky
Bridge Rehabilitation .
43 E of Green Court - W of Sangudo Twinning - 2nd Stage Paving 18
43 Paddle River Bridge on Provincial Highway 43, 2 Km SE of Rochfort Bridge
Bridge Rehabilitation . Contract for 2008 Construction.
43 E of Sangudo - W of Hwy 764(EBL) Preservation/Overlay 7
Monday, April 14, 2008 Page 14 of 28
-
Highway Location Type of WorkEstimatedLength (km)
Tentative Government-Owned Transportation ProjectsNear Completion, Underway or Scheduled
in 2008-2011MAJOR PROVINCIAL HIGHWAY PROJECTS
(Major Construction and Rehabilitation)
43 Pembina River Bridge on Highway 43, At N Boundary of Sangudo
Bridge Rehabilitation .
43 Wetland Restoration: SE 9-56-5-5 & NW 32-55-4-5 Miscellaneous . Contract for 2008 Construction.
43 S of Onoway - Hwy 16 (NBL) Widen And Overlay 12
43X Structure: Hermit Lake (86139-01) Grande Prairie ByPass
Twinning - Structure .
43X Structure: Bear River Grande Prairie ByPass (E&WBL) (86138E,86138W,& 07301)
Twinning - Structure .
43X 116 Street (RR63) - Hwy 2 and 43 N of Grande Prairie
Grading, Base, Full Paving .
44 Dapp Creek Bridge on Highway 44, 16 Km N of Westlock
Bridge Rehabilitation .
44 Flatbush Access - S of Chisholm Preservation/Overlay 22
47 Sundance Creek Culvert on Provincial Highway 47 Near Edson
Structure Replacement .
49 Watercourse Culvert on Provincial Highway 49 Near Rycroft
Structure Replacement .
49 E of Hwy 739 - Watino Bridge Preservation/Overlay 14
49 Structure: Smoky River (70241-03) Watino Structure Replacement . Contract for 2007, 2008, & 2009 Construction.
53 Hwy 766 - Hwy 20 Preservation/Overlay 7
53 E of Hwy 2 - Town of Ponoka Preservation/Overlay 5
53 Hwy 21 - Bashaw Preservation/Overlay 0.40
Monday, April 14, 2008 Page 15 of 28
-
Highway Location Type of WorkEstimatedLength (km)
Tentative Government-Owned Transportation ProjectsNear Completion, Underway or Scheduled
in 2008-2011MAJOR PROVINCIAL HIGHWAY PROJECTS
(Major Construction and Rehabilitation)
54 W of Hwy 766 - E of Spruceview Widen And Overlay 13
54 E of Spruceview - W of Red Deer R BF01647,07959 Widen And Overlay 13
54 W of Red Deer R - N of Innisfail BF77778 & 00272 Widen And Overlay 9Contract for 2007 & 2008 Construction.
54 N of Innisfail - S Innisfail Intch. (BY-PASS) BF81273,81266
Grading, Base, Stage Paving 5
55 Pine Creek 3 Bridge on Provincial Highway 55 Near Donatville
Structure Replacement .
55 Jct Hwy 28 - Sask Boundary Preservation/Overlay 14
58 Structure: Chinchaga Riv.(76425-04) High Level Structure Replacement . Contract for 2008 & 2009 Construction.
58 East Sousa River Bridge - E of Chinchaga River Widen And Overlay 20Contract for 2007 & 2008 Construction.
58 Rainbow Lake - E of Rainbow Lake BF77925,26,27,28
Widen And Overlay 17Contract for 2007 & 2008 Construction.
58 E of Chinchaga River - Sixth Meridian Widen And Overlay 14
58 Walkway, Bushe River - High Level Miscellaneous .
58 Watercourse Culvert on Provincial Highway 58 Near John D'or Prairie
Structure Replacement . Contract for 2008 Construction.
59 Hwy 43 - LaGlace Preservation/Overlay 36Contract for 2008 Construction.
61 S of Skiff - W of Foremost Widen And Overlay 16
63 Stony Creek Culvert on Provincial Highway 63 Near Donatville
Structure Replacement .
Monday, April 14, 2008 Page 16 of 28
-
Highway Location Type of WorkEstimatedLength (km)
Tentative Government-Owned Transportation ProjectsNear Completion, Underway or Scheduled
in 2008-2011MAJOR PROVINCIAL HIGHWAY PROJECTS
(Major Construction and Rehabilitation)
63 Passing Lanes: South Bound LanesHwy 55 - N of Wandering River
Passing/Climbing Lane 5Contract for 2007 & 2008 Construction.
63 Hwy 55 - Wandering River Clearing 55
63 Hwy 55 - N of Lyle Creek Preservation/Overlay 71Contract for 2007 & 2008 Construction.
63 S of House River - N of Marianna Lake Clearing 57
63 Wandering River - S of House River Clearing 42
63 Wandering River - S of May Tower (BF 77637 & 75731)
Twinning - Grading 18
63 Safety Rest/Truck Staging Area S of Stony Mountain Road (stage2)
Rest Area/Truck Turnout . Contract for 2007 & 2008 Construction.
63 S of Hwy 881 - S of Hwy 69 BF76002,3,4,79624,25 Twinning - Grade, Base, Stage Paving 15Contract for 2007 & 2008 Construction.
63 Safety Rest/Truck Staging Area N of Hwy 881 (NB) Rest Area/Truck Turnout .
63 Structure: Franklin Tunnel Phase 1 Fort McMurray (75217SE3)
Structure Replacement . Contract for 2008, 2009, & 2010 Construction.
63 Structure: Athabasca River Fort McMurray BF 78041N
Bridge Structure . Contract for 2008, 2009, & 2010 Construction.
63 Interchange @ Thickwood Boulevard Fort McMurray Interchange - Grade, Base, Paving .
63 S of Hwy 69 - N of Beacon Hill Dr NB & SBL Preservation/Overlay 10Contract for 2007 & 2008 Construction.
63 Interchange @ Confederation Way Fort McMurray Interchange - Grade, Base, Paving .
63 Syncrude Access - Mildred Lake (SBL) Widen And Overlay 1Contract for 2008 Construction.
Monday, April 14, 2008 Page 17 of 28
-
Highway Location Type of WorkEstimatedLength (km)
Tentative Government-Owned Transportation ProjectsNear Completion, Underway or Scheduled
in 2008-2011MAJOR PROVINCIAL HIGHWAY PROJECTS
(Major Construction and Rehabilitation)
63 Intersection Improvement: Grading Fort Mackay Access Road
Intersection Improvement .
63 Suncor Acc - N of Mildred Lake(NBL) (Incl Cross Mine & Lower Camp Road)
Twinning - Grade, Base, Stage Paving 6Contract for 2007 & 2008 Construction.
63 N of Suncor Access - Syncrude Access(SBL) Preservation/Overlay 15Contract for 2008 Construction.
64 E of Hwy 717 - W of Cleardale Preservation/Overlay 17Contract for 2008 Construction.
64 Roadside Turnout SRA P-057 (WBL) East of Clear River Valley
Rest Area/Truck Turnout 0.10Contract for 2007 & 2008 Construction.
64 Clear River East Hill (slide repair & other work) Miscellaneous 1
64 Roadside Turnout SRA P-058 (EBL) West of Clear River Valley
Rest Area/Truck Turnout 0.10Contract for 2007 & 2008 Construction.
64A Hwy 64 - Hwy 2 Preservation/Overlay 7
68 Rocky Mtn Forest Rsrve Bndy - Hwy 1 Base, Staged Paving 12
88 S of 754 - N of 20th Baseline Preservation/Overlay 21Contract for 2008 Construction.
88 Access To Boreal Center For Bird Conservation (Work To Be Done By Community Development)
Intersection Improvement .
88 Intersection Improvement @ Devonshire, N of Slave Lake
Intersection Improvement . Contract for 2008 Construction.
88 Loon River Bridge on Highway 88, 6 Km N of Red Earth Creek
Bridge Rehabilitation . Contract for 2008 Construction.
88 N of Lafond Creek - S of Wabasca River (S) (BF01862, 01729, 01775)
Grading 20Contract for 2007 & 2008 Construction.
Monday, April 14, 2008 Page 18 of 28
-
Highway Location Type of WorkEstimatedLength (km)
Tentative Government-Owned Transportation ProjectsNear Completion, Underway or Scheduled
in 2008-2011MAJOR PROVINCIAL HIGHWAY PROJECTS
(Major Construction and Rehabilitation)
88 Watercourse Culvert on Provincial Highway 88 Near High Level
Structure Replacement .
201 CALGARY NORTH EAST RING ROAD (P3 Initiative) Grading, Base, Full Paving 21
201 Structure: Sarcee Trail Interchange Interchange - Bridge Structure . Contract for 2007 & 2008 Construction.
201 Tuscany/Scenic Acres Interchange CALGARY STONEY TRAIL NW
Interchange - Grade, Base, Paving .
201 Crowchild Trail Interchange (Phase 2) Interchange - Grade, Base, Paving .
201 Country Hills Bvd - Deerfoot Trail (Incl Beddington Trail Interchange)
Twinning - Base, Stage Paving 14Contract for 2007 & 2008 Construction.
201 Structure: Beddington Trail Intch EBL Ramp,West Nose Ck(BF 80400E-01)
Interchange - Bridge Structure . Contract for 2007 & 2008 Construction.
201 Structure: Beddington Trail Intch WBL Ramp,West Nose Cr(BF 82400W-01)
Interchange - Bridge Structure . Contract for 2007 & 2008 Construction.
201 Structure: Nose Creek(E&WBL) BF 82414E, 82414W Twinning - Structure . Contract for 2007 & 2008 Construction.
201 Structure: Beddington Trail Interchange (BF 82409-01)
Interchange - Bridge Structure . Contract for 2007 & 2008 Construction.
201 Structure: Crowchild Trail Intch EBL & WBL (BF 82405E & BF82405W) Calgary Stoney Trail NW
Interchange - Bridge Structure . Contract for 2007 & 2008 Construction.
216 EDMONTON NORTH WEST RING ROAD (Hwy 16 West to Manning Drive)
Grading, Base, Full Paving 22
509 S of Hwy 3 - Hwy 3 Preservation/Overlay 22
524 Hwy 875(S) - Hwy 879 2nd Stage Paving 24Contract for 2008 Construction.
526 Structure: BRID (77176-02) E of Enchant Structure Replacement . Contract for 2007 & 2008 Construction.
Monday, April 14, 2008 Page 19 of 28
-
Highway Location Type of WorkEstimatedLength (km)
Tentative Government-Owned Transportation ProjectsNear Completion, Underway or Scheduled
in 2008-2011MAJOR PROVINCIAL HIGHWAY PROJECTS
(Major Construction and Rehabilitation)
529 Hwy 2 - E of Hwy 2 Preservation/Overlay 11Contract for 2008 Construction.
529 E of Little Bow River - Hwy 23 Preservation/Overlay 16
530 Hwy 36 - Hwy 875 Preservation/Overlay 20Contract for 2008 Construction.
533 Hwy 22 - MD Bdry 2nd Stage Paving 10Contract for 2008 Construction.
533 W of Nanton - Hwy 2 Preservation/Overlay 10Contract for 2007 & 2008 Construction.
534 Hwy 804 - Vulcan Preservation/Overlay 18Contract for 2008 Construction.
552 E of Highwood River - Hwy 799 Preservation/Overlay 13Contract for 2008 Construction.
560 Calgary ECL - Hwy 797 Preservation/Overlay 16Contract for 2007 & 2008 Construction.
564 Calgary ECL - E of Hwy 791 Preservation/Overlay 11Contract for 2008 Construction.
587 E of Little Red Deer River - W of Hwy 2A(selective) Preservation/Overlay 9Contract for 2008 Construction.
590 E of Hwy 805 - Hwy 816 Preservation/Overlay 8Contract for 2008 Construction.
590 Big Valley - Hwy 56 Preservation/Overlay 3
592 N of Markerville - Hwy 781 Preservation/Overlay 5
600 E of Hwy 41 - E of Cadogan Preservation/Overlay 15
602 Hwy 36 - Alliance Preservation/Overlay 3
604 W of RR 272 - Hwy 2A Grading, Base, Full Paving 11
607 Hwy 761 - W of Hwy 20 Grading 12
608 Hwy 36 - Hwy 872 2nd Stage Paving 28Contract for 2008 Construction.
Monday, April 14, 2008 Page 20 of 28
-
Highway Location Type of WorkEstimatedLength (km)
Tentative Government-Owned Transportation ProjectsNear Completion, Underway or Scheduled
in 2008-2011MAJOR PROVINCIAL HIGHWAY PROJECTS
(Major Construction and Rehabilitation)
610 Hwy 894 - Hwy 899 Preservation/Overlay 15
611 Hwy 2 - W of Hwy 2A Preservation/Overlay 11
611 Hwy 2A - Hwy 822(S) Preservation/Overlay 20Contract for 2008 Construction.
616 E of Mulhurst - Hwy 795 Preservation/Overlay 11Contract for 2008 Construction.
619 Viking Preservation/Overlay 1
619 Hwy 897 - Hwy 17 2nd Stage Paving 21Contract for 2007 & 2008 Construction.
625 Sparrow Drive - 9th Street (Nisku) Reconstruct/Re-Alignment 3
633 Villeneuve Airport Access - St. Albert Preservation/Overlay 11Contract for 2008 Construction.
641 Hwy 897 To Saskatchewan Boundary Preservation/Overlay 23
651 E of Hwy 33 - Busby Preservation/Overlay 29
658 N of Corbett Creek - Goose Lake Preservation/Overlay 15
658 Blue Ridge - N of Athabasca River Preservation/Overlay 5
658 Bull Creek Culvert on Provincial Highway 658 Near Blue Ridge
Structure Replacement .
659 E of Hwy 28 - Hwy 892 Preservation/Overlay 16
661 Rochester - W of Cty Bdy (RR225) (70308 & 70852) 2nd Stage Paving 15Contract for 2008 Construction.
661 W of Hwy 63 - Hwy 831 selective Preservation/Overlay 9
663 Needle Creek Culvert on Provincial Highway 663 Near Lac La Biche
Structure Replacement .
Monday, April 14, 2008 Page 21 of 28
-
Highway Location Type of WorkEstimatedLength (km)
Tentative Government-Owned Transportation ProjectsNear Completion, Underway or Scheduled
in 2008-2011MAJOR PROVINCIAL HIGHWAY PROJECTS
(Major Construction and Rehabilitation)
665 Golf Course Acc - Hutterite Corner Preservation/Overlay 11Contract for 2008 Construction.
667 Beaverlodge River Bridge on Highway 667, 4 Km S of Beaverlodge
Bridge Rehabilitation .
671 E of BC Border - W of Goodfare 2nd Stage Paving 10Contract for 2008 Construction.
671 W of Goodfare - Hwy 43 Preservation/Overlay 18Contract for 2008 Construction.
672 Valhalla Creek Bridge on Provincial Highway 672 Near Hythe
Structure Replacement .
676 Little Puskw Culvert on Provincial Highway 676 Near Debolt
Structure Replacement .
677 Structure: Watercourse (71975-01) Woking Bridge Replacement .
677 Structure: Watercourse (72114-01) Woking Bridge Replacement .
677 Structure: Watercourse (71976-01) Woking Bridge Replacement .
682 Watercourse Culvert on Provincial Highway 682 Near Fairview
Structure Replacement .
685 E of Hwy 737 - Grimshaw WCL Preservation/Overlay 16Contract for 2007 & 2008 Construction.
691 Watercourse Culvert on Hwy 691 Near Manning BF 86151
Structure Replacement .
691 Watercourse Culvert on Hwy 691 Near Manning BF 86150
Structure Replacement .
695 Watercourse Culvert on Hwy 695 In MD of Northern Lights
Structure Replacement .
697 Intersection Improvement: @ Blumenort Road(Hill Crest School)
Intersection Improvement . Municipal Contract for 2008 Construction.
Monday, April 14, 2008 Page 22 of 28
-
Highway Location Type of WorkEstimatedLength (km)
Tentative Government-Owned Transportation ProjectsNear Completion, Underway or Scheduled
in 2008-2011MAJOR PROVINCIAL HIGHWAY PROJECTS
(Major Construction and Rehabilitation)
719 Structure: Henderson Cr (73982-02) Bonanza Structure Replacement . Contract for 2007 & 2008 Construction.
722 S of Hwy 43 - Hwy 43 (Beaverlodge) Grading, Base, Full Paving 2Contract for 2008 Construction.
727 Structure: Howard Creek (86141-01) Spirit River Bridge Replacement .
727 Structure: Ksituan River (86142-01) NW of Spirit River
Bridge Replacement .
727 Structure: Watercourse (74083-02) NW of Spirit River
Bridge Replacement .
727 Structure: Watercourse (82142-01) NW of Spirit River
Bridge Replacement .
727 Hwy 49 - S of Hwy 680 Grading 12
730 Hwy 64 - Eureka River Base, Paving 12
731 Saddle Burnt River Bridge on Highway 731, 5 Km W of Woking
Bridge Rehabilitation .
731 Watercourse Culvert on Provincial Highway 731 Near Woking
Structure Replacement .
733 Watercourse Culvert on Provincial Highway 733 Near Wanham
Structure Replacement . Contract for 2008 Construction.
736 DeBolt - S of Puskwaskau Creek Preservation/Overlay 20Contract for 2008 Construction.
743 Whitemud River Bridge on Highway 743, 27 Km SE of Deadwood
Structure Replacement .
743 Watercourse Culvert on Provincial Highway 743 Near Peace River
Structure Replacement .
Monday, April 14, 2008 Page 23 of 28
-
Highway Location Type of WorkEstimatedLength (km)
Tentative Government-Owned Transportation ProjectsNear Completion, Underway or Scheduled
in 2008-2011MAJOR PROVINCIAL HIGHWAY PROJECTS
(Major Construction and Rehabilitation)
743 Tributary To Whitemud River Culvert on Highway 743, 48 Km NW of Peace River
Structure Replacement .
743 Structure: Watercourse (77233-01) Peace River Structure Replacement .
744 Peace River SCL - Hwy 2 Preservation/Overlay 2
744 Intersection Improvement @: 96th Ave, Peace River Intersection Improvement .
750 Utikoomak Lake IR - Hwy 88 2nd Stage Paving 22Contract for 2007 & 2008 Construction.
751 Watercourse Culvert on Provincial Highway 751 Near Hattonford
Structure Replacement .
752 Clearwater River Bridge on Highway 752, 2 Km S of Rocky Mountain House (Lateral Post-Tensioning, Misc.)
Miscellaneous . Contract for 2008 Construction.
753 Bigoray River - Hwy 16 Preservation/Overlay 12Contract for 2008 Construction.
754 Roadside Turnout: SRA P-037 (WBL) E of Hwy 88 Rest Area/Truck Turnout . Contract for 2008 Construction.
754 Sandy Creek (Willow River ) Culvert on Highway 754, 66 Km NE of Slave Lake
Structure Replacement .
761 Hwy 11 - Leslieville Preservation/Overlay 8Contract for 2008 Construction.
764 S of Hwy 654(W) - Hwy 18 Preservation/Overlay 12Contract for 2008 Construction.
766 Twp Road 324 - Twp Road 340 Preservation/Overlay 13Contract for 2008 Construction.
766 S of Hwy 587 - Hwy 587 Sealed Base 3Contract for 2008 Construction.
766 Hwy 12 - Hwy 53 Preservation/Overlay 19
771 Hwy 20 - County Boundary 2nd Stage Paving 12Contract for 2008 Construction.
Monday, April 14, 2008 Page 24 of 28
-
Highway Location Type of WorkEstimatedLength (km)
Tentative Government-Owned Transportation ProjectsNear Completion, Underway or Scheduled
in 2008-2011MAJOR PROVINCIAL HIGHWAY PROJECTS
(Major Construction and Rehabilitation)
779 57th Ave - S of Hwy 16A Town of Stony Plain Widen And Overlay 3
779 Hwy 628 - 57th Ave (Stony Plain) Reconstruct/Re-Alignment 1
779 Hwy 16 - MD Boundary BF 70344 Widen And Overlay 7
780 Hwy 13 - Hwy 616 Preservation/Overlay 9Contract for 2008 Construction.
791 N of Hwy 581 - S of Hwy 27 (BF 06767-01) Preservation/Overlay 17Contract for 2008 Construction.
791 S of Hwy 575 - N of Hwy 581 Base, Stage Paving 14Contract for 2008 Construction.
791 S of Hwy 587 - Hwy 590 Base, Stage Paving 15
806 Hwy 9 - Hwy 575 Preservation/Overlay 13Contract for 2008 Construction.
812 W of Hwy 2 - Hwy 2 Preservation/Overlay 1
813 Rock Island Lake Road - Sandy Lake 2nd Stage Paving 32Contract for 2007 & 2008 Construction.
813 Sandy Lake - E of South Wabasca Lake 2nd Stage Paving 21Contract for 2008 Construction.
815 S of Hwy 12 - N of Hwy 12 Preservation/Overlay 8
816 Hwy 590 - Hwy 42 Preservation/Overlay 10Contract for 2008 Construction.
816 N of Hwy 42 - Hwy 595 Preservation/Overlay 7Contract for 2008 Construction.
817 Strathmore Preservation/Overlay 2
821 N of Hwy 12 - S of Hwy 605 Preservation/Overlay 6
822 Hwy 611 - N of Hwy 611 Preservation/Overlay 5Contract for 2008 Construction.
830 Hwy 630 - Hwy 16 (Cold Mix rehabilitation). Miscellaneous 6
Monday, April 14, 2008 Page 25 of 28
-
Highway Location Type of WorkEstimatedLength (km)
Tentative Government-Owned Transportation ProjectsNear Completion, Underway or Scheduled
in 2008-2011MAJOR PROVINCIAL HIGHWAY PROJECTS
(Major Construction and Rehabilitation)
830 Hwy 15 - Hwy 38 Preservation/Overlay 13Contract for 2008 Construction.
840 N of Hwy 564 - Hwy 9 Preservation/Overlay 22Contract for 2008 Construction.
855 N of Dowling Lake to Hwy 589 (Grade stabilization & oil).
Oil Treatment 18
855 Hwy 29 - Hwy 45 Preservation/Overlay 13Contract for 2008 Construction.
856 Village of Forestburg: Hwy 53 - Railway Crossing Preservation/Overlay 1Contract for 2008 Construction.
856 Forestburg - Hwy 13 Base, Stage Paving 25Contract for 2008 Construction.
857 Hwy 16 - Vegreville Preservation/Overlay 2Contract for 2008 Construction.
857 Hwy 16A - Town of Vegreville Preservation/Overlay 1
857 North Saskatchewan River Bridge on Highway 857, 16 Km N of Willingdon
Bridge Rehabilitation .
861 Town of Castor: Preservation/Overlay 1
866 N of Hwy 28 - S of Beaver River 2nd Stage Paving 22Contract for 2008 Construction.
870 Hwy 14 - N of Jct Hwy 14 Grading 22Contract for 2007 & 2008 Construction.
873 S of Town of Brooks SCL - Town of Brooks SCL Preservation/Overlay 3Contract for 2008 Construction.
881 Hardisty Preservation/Overlay 2Contract for 2008 Construction.
881 North Saskatchewan River Bridge on Highway 881, 10 Km N of Myrnam
Partial Painting .
881 N of Hwy 660 - Hwy 55 Preservation/Overlay 19Contract for 2008 Construction.
Monday, April 14, 2008 Page 26 of 28
-
Highway Location Type of WorkEstimatedLength (km)
Tentative Government-Owned Transportation ProjectsNear Completion, Underway or Scheduled
in 2008-2011MAJOR PROVINCIAL HIGHWAY PROJECTS
(Major Construction and Rehabilitation)
881 S of Anzac - Provincial Park Sideslope Improvement 13
882 Glendon - Hwy 660 Preservation/Overlay 2Contract for 2008 Construction.
884 Veteran - Hwy 599 Preservation/Overlay 26Contract for 2008 Construction.
892 Beaver River Bridge on Highway 892, 11 Km N of Ardmore
Bridge Rehabilitation .
893 Structure: N Saskatchewan River Heinsburg (75315-17)
Bridge Rehabilitation . Contract for 2007 & 2008 Construction.
897 S of Paradise Valley - Hwy 16 Preservation/Overlay 35Contract for 2008 Construction.
897 Battle River Bridge on Highway 897, 13 Km SW of Paradise Valley
Bridge Rehabilitation . Contract for 2008 Construction.
899 S of Hwy 12 - Hwy 12 Base, Stage Paving 10Contract for 2008 Construction.
899 Altario - S of Bodo 2nd Stage Paving 27Contract for 2008 Construction.
947 Athabasca River - Hwy 43 Grading, Base, Full Paving 20Contract for 2007 & 2008 Construction.
986 Lubicon Lake - Hwy 88 2nd Stage Paving 44Contract for 2008 Construction.
UAR 154 Hwy 41 To 4.95 Km E of Hwy 41 (Hilda) Preservation/Overlay 5
UAR 125 Hwy 2 - Kinuso Preservation/Overlay 1
UAR 113 Hwy 27 - Village of Morrin Preservation/Overlay 1
UAR 206 Hwy 21 - Bashaw Preservation/Overlay 0.40
BOW RIVER WEIR
Calgary Bow River Weir Modifications Miscellaneous .
Monday, April 14, 2008 Page 27 of 28
-
Highway Location Type of WorkEstimatedLength (km)
Tentative Government-Owned Transportation ProjectsNear Completion, Underway or Scheduled
in 2008-2011MAJOR PROVINCIAL HIGHWAY PROJECTS
(Major Construction and Rehabilitation)
LOCAL ROAD Broadmoor Boulevard Over Highway 16 Interchange, At E Boundary of Edmonton (Cloverbar Structure 7)
Bridge Rehabilitation .
LOCAL ROAD Structure: Nose Creek - Yankee Valley Boulevard, Airdrie
Structure Replacement .
LOCAL ROAD Watercourse Bridge on Local Road Near Wabasca Structure Replacement .
LOCAL ROAD CNR Overpass on Local Road, 27 Km NE of Hinton Bridge Rehabilitation .
LOCAL ROAD 50 Ave, Valleyview Preservation/Overlay .
LOCAL ROAD Garden River Road: Wentzel River - Wood Buffalo Park
Grading .
LR IR149 IR 149 - Cold Lake, Re-work subgrade & drainage improvements
Gravel Surfacing .
LR IR149 IR149-Cold Lake, Rework subgrade & stabilize (near 28:20 and 897:12)
Gravel Surfacing .
LR IR 149 Mission Road Base, Paving . Contract for 2008 Construction.
VARIOUS Provincial Centerline Rumble Strip Program Miscellaneous .
VARIOUS Provincial Black Spot Program Miscellaneous .
VARIOUS Provincial Shoulder Rumble Strip Program Miscellaneous .
VARIOUS Rehabilitation of Oiled Roadways in the Special Areas
Oil Treatment .
Monday, April 14, 2008 Page 28 of 28