Providing 4 Improvements · Inform on implications for SCM 3. Intervening, 4 ways: ERP, JIT, TOC...
Transcript of Providing 4 Improvements · Inform on implications for SCM 3. Intervening, 4 ways: ERP, JIT, TOC...
![Page 1: Providing 4 Improvements · Inform on implications for SCM 3. Intervening, 4 ways: ERP, JIT, TOC and TQM 4. Experience 5. Providing 4 improvements Summary (c) (1993 - 2010) mind@work](https://reader034.fdocuments.us/reader034/viewer/2022042214/5eba117305e5822eec09e979/html5/thumbnails/1.jpg)
**Based on course
International Supply Change Management Program
October 2003
Providing 4 Improvements
![Page 2: Providing 4 Improvements · Inform on implications for SCM 3. Intervening, 4 ways: ERP, JIT, TOC and TQM 4. Experience 5. Providing 4 improvements Summary (c) (1993 - 2010) mind@work](https://reader034.fdocuments.us/reader034/viewer/2022042214/5eba117305e5822eec09e979/html5/thumbnails/2.jpg)
Providing 4 Improvements(c) (1993 - 2010) mind@work & LOGISENS [email protected]
There can be no final destination. Neither space nor time ends. But life always moves towards its goals, not as perfection but as the attraction of an ideal.
Peter Tuft Richardson
![Page 3: Providing 4 Improvements · Inform on implications for SCM 3. Intervening, 4 ways: ERP, JIT, TOC and TQM 4. Experience 5. Providing 4 improvements Summary (c) (1993 - 2010) mind@work](https://reader034.fdocuments.us/reader034/viewer/2022042214/5eba117305e5822eec09e979/html5/thumbnails/3.jpg)
Providing 4 Improvements(c) (1993 - 2010) mind@work & LOGISENS [email protected]
Contents
Introductions1. About the four ways of reality2. Inform on implications for SCM3. Intervening, 4 ways: ERP, JIT, TOC
and TQM4. Experience5. Providing 4 improvementsSummary
![Page 4: Providing 4 Improvements · Inform on implications for SCM 3. Intervening, 4 ways: ERP, JIT, TOC and TQM 4. Experience 5. Providing 4 improvements Summary (c) (1993 - 2010) mind@work](https://reader034.fdocuments.us/reader034/viewer/2022042214/5eba117305e5822eec09e979/html5/thumbnails/4.jpg)
Providing 4 Improvements(c) (1993 - 2010) mind@work & LOGISENS [email protected]
My name is nobody, because
nobody is perfect.
Introduction
Drs Jan Lelie CPIM CPFFacilitatorLOGISENSSparring partner in logistical
improvementmind@workGroup decision process support
> 20 years experience
![Page 5: Providing 4 Improvements · Inform on implications for SCM 3. Intervening, 4 ways: ERP, JIT, TOC and TQM 4. Experience 5. Providing 4 improvements Summary (c) (1993 - 2010) mind@work](https://reader034.fdocuments.us/reader034/viewer/2022042214/5eba117305e5822eec09e979/html5/thumbnails/5.jpg)
Providing 4 Improvements(c) (1993 - 2010) mind@work & LOGISENS [email protected]
Please take notes
Please make readable notes for yourself
I’ll pause or ask me to stop for a few moments
We’ll share copies of the notes
![Page 6: Providing 4 Improvements · Inform on implications for SCM 3. Intervening, 4 ways: ERP, JIT, TOC and TQM 4. Experience 5. Providing 4 improvements Summary (c) (1993 - 2010) mind@work](https://reader034.fdocuments.us/reader034/viewer/2022042214/5eba117305e5822eec09e979/html5/thumbnails/6.jpg)
Providing 4 Improvements(c) (1993 - 2010) mind@work & LOGISENS [email protected]
Providing 4 Improvements supplies:
A personal, human being centred, computer application independent,pragmatics*) on intentional logistical improvement
processes*) Logistics practice (ERP, TQM, JIT, TOC);
Management theory;
Experimental Learning;
The emotional, human mind
![Page 7: Providing 4 Improvements · Inform on implications for SCM 3. Intervening, 4 ways: ERP, JIT, TOC and TQM 4. Experience 5. Providing 4 improvements Summary (c) (1993 - 2010) mind@work](https://reader034.fdocuments.us/reader034/viewer/2022042214/5eba117305e5822eec09e979/html5/thumbnails/7.jpg)
Providing 4 Improvements(c) (1993 - 2010) mind@work & LOGISENS [email protected]
1.1 It is your choice!
You have to understand yourself, because you determine:
the presenting problems and issues the possible solutions the methods for change and you generate the conflicts with the
methods and your resolutions of issues!
![Page 8: Providing 4 Improvements · Inform on implications for SCM 3. Intervening, 4 ways: ERP, JIT, TOC and TQM 4. Experience 5. Providing 4 improvements Summary (c) (1993 - 2010) mind@work](https://reader034.fdocuments.us/reader034/viewer/2022042214/5eba117305e5822eec09e979/html5/thumbnails/8.jpg)
Providing 4 Improvements(c) (1993 - 2010) mind@work & LOGISENS [email protected]
1.2 A problem
A problem is the difference between expectations and reality - usually associated with a negative feeling.
People are submerged in problems,…but what is real?
![Page 9: Providing 4 Improvements · Inform on implications for SCM 3. Intervening, 4 ways: ERP, JIT, TOC and TQM 4. Experience 5. Providing 4 improvements Summary (c) (1993 - 2010) mind@work](https://reader034.fdocuments.us/reader034/viewer/2022042214/5eba117305e5822eec09e979/html5/thumbnails/9.jpg)
Providing 4 Improvements(c) (1993 - 2010) mind@work & LOGISENS [email protected]
1.3 But what is real, reality?
What is real for you? Emotions? Feelings? What matters? Meaning? Visions? Creations? Truths? Policies? Theories? Facts? Actions? Material things?
Let’s make a map.
![Page 10: Providing 4 Improvements · Inform on implications for SCM 3. Intervening, 4 ways: ERP, JIT, TOC and TQM 4. Experience 5. Providing 4 improvements Summary (c) (1993 - 2010) mind@work](https://reader034.fdocuments.us/reader034/viewer/2022042214/5eba117305e5822eec09e979/html5/thumbnails/10.jpg)
Providing 4 Improvements(c) (1993 - 2010) mind@work & LOGISENS [email protected]
Rationalthinking
Ideascreating
Concretedoing
Socialbehaving
Rules Visions
Facts Feelings
1.4 Description using a map
concrete
abstract
action reflection
![Page 11: Providing 4 Improvements · Inform on implications for SCM 3. Intervening, 4 ways: ERP, JIT, TOC and TQM 4. Experience 5. Providing 4 improvements Summary (c) (1993 - 2010) mind@work](https://reader034.fdocuments.us/reader034/viewer/2022042214/5eba117305e5822eec09e979/html5/thumbnails/11.jpg)
Providing 4 Improvements(c) (1993 - 2010) mind@work & LOGISENS [email protected]
Sensory
Unitary Mythical
socialBased on “Creating Paths or Change” (1993) by W. McWhinney
1.5 Map of realities
concrete
abstract
action reflection
![Page 12: Providing 4 Improvements · Inform on implications for SCM 3. Intervening, 4 ways: ERP, JIT, TOC and TQM 4. Experience 5. Providing 4 improvements Summary (c) (1993 - 2010) mind@work](https://reader034.fdocuments.us/reader034/viewer/2022042214/5eba117305e5822eec09e979/html5/thumbnails/12.jpg)
Providing 4 Improvements(c) (1993 - 2010) mind@work & LOGISENS [email protected]
Sensory
Unitary
Analytic Planning
social
Persuasive
Converting
Mythical Assertive Inspiring
1.6 Always combinations
![Page 13: Providing 4 Improvements · Inform on implications for SCM 3. Intervening, 4 ways: ERP, JIT, TOC and TQM 4. Experience 5. Providing 4 improvements Summary (c) (1993 - 2010) mind@work](https://reader034.fdocuments.us/reader034/viewer/2022042214/5eba117305e5822eec09e979/html5/thumbnails/13.jpg)
Providing 4 Improvements(c) (1993 - 2010) mind@work & LOGISENS [email protected]
Facilitating Evoking
Improving
Entrepreneurial
Evaluating Participating
1.6 Always combinations
Sensory
Unitary
social
Mythical
![Page 14: Providing 4 Improvements · Inform on implications for SCM 3. Intervening, 4 ways: ERP, JIT, TOC and TQM 4. Experience 5. Providing 4 improvements Summary (c) (1993 - 2010) mind@work](https://reader034.fdocuments.us/reader034/viewer/2022042214/5eba117305e5822eec09e979/html5/thumbnails/14.jpg)
Providing 4 Improvements(c) (1993 - 2010) mind@work & LOGISENS [email protected]
Sensory
Unitary Mythical
social
Administrator Buyer
Guru Marketeer
Sales man
Middle manager
Engineer
Developer
Top manager Consultant
Worker, foreman Scheduler, planner
1.6 Roles in Supply Chain Management
![Page 15: Providing 4 Improvements · Inform on implications for SCM 3. Intervening, 4 ways: ERP, JIT, TOC and TQM 4. Experience 5. Providing 4 improvements Summary (c) (1993 - 2010) mind@work](https://reader034.fdocuments.us/reader034/viewer/2022042214/5eba117305e5822eec09e979/html5/thumbnails/15.jpg)
Providing 4 Improvements(c) (1993 - 2010) mind@work & LOGISENS [email protected]
“Explain rules and principles”
“Cause and effects”
“Only if I want it”
“accepting each other”
1.7 Four views on change ...
![Page 16: Providing 4 Improvements · Inform on implications for SCM 3. Intervening, 4 ways: ERP, JIT, TOC and TQM 4. Experience 5. Providing 4 improvements Summary (c) (1993 - 2010) mind@work](https://reader034.fdocuments.us/reader034/viewer/2022042214/5eba117305e5822eec09e979/html5/thumbnails/16.jpg)
Providing 4 Improvements(c) (1993 - 2010) mind@work & LOGISENS [email protected]
“Strategy”
“Mission”
“Vision”
“Values”
1.8 Views expresses preferences for:
![Page 17: Providing 4 Improvements · Inform on implications for SCM 3. Intervening, 4 ways: ERP, JIT, TOC and TQM 4. Experience 5. Providing 4 improvements Summary (c) (1993 - 2010) mind@work](https://reader034.fdocuments.us/reader034/viewer/2022042214/5eba117305e5822eec09e979/html5/thumbnails/17.jpg)
Providing 4 Improvements(c) (1993 - 2010) mind@work & LOGISENS [email protected]
Contents
Introductions1. About the four ways of reality2. Inform on implications for SCM3. Intervening, 4 ways: ERP, JIT, TOC and
TQM4. Experience5. Providing 4 improvementsSummary
![Page 18: Providing 4 Improvements · Inform on implications for SCM 3. Intervening, 4 ways: ERP, JIT, TOC and TQM 4. Experience 5. Providing 4 improvements Summary (c) (1993 - 2010) mind@work](https://reader034.fdocuments.us/reader034/viewer/2022042214/5eba117305e5822eec09e979/html5/thumbnails/18.jpg)
Providing 4 Improvements(c) (1993 - 2010) mind@work & LOGISENS [email protected]
2. Inform on implications for SCM
We need more than one map if we are going to imagine solutions.
Barbara Katz RothmanGenetic Maps and Human Imagination
![Page 19: Providing 4 Improvements · Inform on implications for SCM 3. Intervening, 4 ways: ERP, JIT, TOC and TQM 4. Experience 5. Providing 4 improvements Summary (c) (1993 - 2010) mind@work](https://reader034.fdocuments.us/reader034/viewer/2022042214/5eba117305e5822eec09e979/html5/thumbnails/19.jpg)
Providing 4 Improvements(c) (1993 - 2010) mind@work & LOGISENS [email protected]
2.2 Supply Chain Management concerns itself with two questions
1. When is the delivery due? (promised, scheduled, expected)
2. When to start? (procuring, producing, assembling, shipping or delivering)
![Page 20: Providing 4 Improvements · Inform on implications for SCM 3. Intervening, 4 ways: ERP, JIT, TOC and TQM 4. Experience 5. Providing 4 improvements Summary (c) (1993 - 2010) mind@work](https://reader034.fdocuments.us/reader034/viewer/2022042214/5eba117305e5822eec09e979/html5/thumbnails/20.jpg)
Providing 4 Improvements(c) (1993 - 2010) mind@work & LOGISENS [email protected]
2.3 Answering these questions requires
Making commitments on expectationsRequirements, wants, problems, needs
Communicating agreementsFunctions, design, prices and due date
Confiding in rules and principlesPlanning, people, resources, laws
Co-operating to reach mutual goalsMaterial products, actions,
rescheduling
![Page 21: Providing 4 Improvements · Inform on implications for SCM 3. Intervening, 4 ways: ERP, JIT, TOC and TQM 4. Experience 5. Providing 4 improvements Summary (c) (1993 - 2010) mind@work](https://reader034.fdocuments.us/reader034/viewer/2022042214/5eba117305e5822eec09e979/html5/thumbnails/21.jpg)
Providing 4 Improvements(c) (1993 - 2010) mind@work & LOGISENS [email protected]
confiding in rules
co-operatingtowards goals
communicatingagreementscommitting
expectations
2.4 A circular process
![Page 22: Providing 4 Improvements · Inform on implications for SCM 3. Intervening, 4 ways: ERP, JIT, TOC and TQM 4. Experience 5. Providing 4 improvements Summary (c) (1993 - 2010) mind@work](https://reader034.fdocuments.us/reader034/viewer/2022042214/5eba117305e5822eec09e979/html5/thumbnails/22.jpg)
Providing 4 Improvements(c) (1993 - 2010) mind@work & LOGISENS [email protected]
2.5 What is logistical problem?
A problem is the difference between expectations and reality - usually associated with a negative feeling.
Too early? Too much? Too many? Too good? No problemo!
Too late? Too little? Not enough? Quality lacking?
![Page 23: Providing 4 Improvements · Inform on implications for SCM 3. Intervening, 4 ways: ERP, JIT, TOC and TQM 4. Experience 5. Providing 4 improvements Summary (c) (1993 - 2010) mind@work](https://reader034.fdocuments.us/reader034/viewer/2022042214/5eba117305e5822eec09e979/html5/thumbnails/23.jpg)
Providing 4 Improvements(c) (1993 - 2010) mind@work & LOGISENS [email protected]
Time,money Innovation,creativity
Capacity, people
Acceptance,targets
2.6.1 What causes the problem?
![Page 24: Providing 4 Improvements · Inform on implications for SCM 3. Intervening, 4 ways: ERP, JIT, TOC and TQM 4. Experience 5. Providing 4 improvements Summary (c) (1993 - 2010) mind@work](https://reader034.fdocuments.us/reader034/viewer/2022042214/5eba117305e5822eec09e979/html5/thumbnails/24.jpg)
Providing 4 Improvements(c) (1993 - 2010) mind@work & LOGISENS [email protected]
Increaselead time More people
2.6.2 First reaction to problems:
Morecapacity
More under-standing
![Page 25: Providing 4 Improvements · Inform on implications for SCM 3. Intervening, 4 ways: ERP, JIT, TOC and TQM 4. Experience 5. Providing 4 improvements Summary (c) (1993 - 2010) mind@work](https://reader034.fdocuments.us/reader034/viewer/2022042214/5eba117305e5822eec09e979/html5/thumbnails/25.jpg)
Providing 4 Improvements(c) (1993 - 2010) mind@work & LOGISENS [email protected]
Moreinventory
Uncleartasks
2.6.3 which creates:
Worse prioritisation
Acceptanceof poor quality
![Page 26: Providing 4 Improvements · Inform on implications for SCM 3. Intervening, 4 ways: ERP, JIT, TOC and TQM 4. Experience 5. Providing 4 improvements Summary (c) (1993 - 2010) mind@work](https://reader034.fdocuments.us/reader034/viewer/2022042214/5eba117305e5822eec09e979/html5/thumbnails/26.jpg)
Providing 4 Improvements(c) (1993 - 2010) mind@work & LOGISENS [email protected]
Lessconfidence
Worsecommunicating
2.6.4 and leads to:
Worse cooperating
Less com-mitment
![Page 27: Providing 4 Improvements · Inform on implications for SCM 3. Intervening, 4 ways: ERP, JIT, TOC and TQM 4. Experience 5. Providing 4 improvements Summary (c) (1993 - 2010) mind@work](https://reader034.fdocuments.us/reader034/viewer/2022042214/5eba117305e5822eec09e979/html5/thumbnails/27.jpg)
Providing 4 Improvements(c) (1993 - 2010) mind@work & LOGISENS [email protected]
2.6.5 and reinforces the problem.
Too late Not enough
Too little Lesser quality
![Page 28: Providing 4 Improvements · Inform on implications for SCM 3. Intervening, 4 ways: ERP, JIT, TOC and TQM 4. Experience 5. Providing 4 improvements Summary (c) (1993 - 2010) mind@work](https://reader034.fdocuments.us/reader034/viewer/2022042214/5eba117305e5822eec09e979/html5/thumbnails/28.jpg)
Providing 4 Improvements(c) (1993 - 2010) mind@work & LOGISENS [email protected]
2.7 Providing 4 improvements
Problem solving is inherently paradoxical as we frame
problems consistent with our own reality solutions consistent with the problem methods consistent with the solutionand can no longer consistently improve We’re going to look into it more closely
![Page 29: Providing 4 Improvements · Inform on implications for SCM 3. Intervening, 4 ways: ERP, JIT, TOC and TQM 4. Experience 5. Providing 4 improvements Summary (c) (1993 - 2010) mind@work](https://reader034.fdocuments.us/reader034/viewer/2022042214/5eba117305e5822eec09e979/html5/thumbnails/29.jpg)
Providing 4 Improvements(c) (1993 - 2010) mind@work & LOGISENS [email protected]
Contents
Introductions1. About the four ways of reality2. Inform on implications for SCM3. Intervening, 4 ways: ERP, JIT, TOC and
TQM4. Experience5. Providing 4 improvementsSummary
![Page 30: Providing 4 Improvements · Inform on implications for SCM 3. Intervening, 4 ways: ERP, JIT, TOC and TQM 4. Experience 5. Providing 4 improvements Summary (c) (1993 - 2010) mind@work](https://reader034.fdocuments.us/reader034/viewer/2022042214/5eba117305e5822eec09e979/html5/thumbnails/30.jpg)
Providing 4 Improvements(c) (1993 - 2010) mind@work & LOGISENS [email protected]
3.1 Learning Logistics
Solutions and problems are one, dynamical system
Improving means shifting the whole system
Solving problems through one method creates problems that cannot be solved by the same method
![Page 31: Providing 4 Improvements · Inform on implications for SCM 3. Intervening, 4 ways: ERP, JIT, TOC and TQM 4. Experience 5. Providing 4 improvements Summary (c) (1993 - 2010) mind@work](https://reader034.fdocuments.us/reader034/viewer/2022042214/5eba117305e5822eec09e979/html5/thumbnails/31.jpg)
Providing 4 Improvements(c) (1993 - 2010) mind@work & LOGISENS [email protected]
communicatingconfiding ++
3.2 Reïnforcing loops
+ = positively coupled: up and up or down and down More communication stimulates growth of trust Less communication reduces levels of trust (or
confidence and commitment and co-operation)
++
![Page 32: Providing 4 Improvements · Inform on implications for SCM 3. Intervening, 4 ways: ERP, JIT, TOC and TQM 4. Experience 5. Providing 4 improvements Summary (c) (1993 - 2010) mind@work](https://reader034.fdocuments.us/reader034/viewer/2022042214/5eba117305e5822eec09e979/html5/thumbnails/32.jpg)
Providing 4 Improvements(c) (1993 - 2010) mind@work & LOGISENS [email protected]
co-operating
++
communicating
committing++
++
confiding ++
3.2 4-C model - kernel
![Page 33: Providing 4 Improvements · Inform on implications for SCM 3. Intervening, 4 ways: ERP, JIT, TOC and TQM 4. Experience 5. Providing 4 improvements Summary (c) (1993 - 2010) mind@work](https://reader034.fdocuments.us/reader034/viewer/2022042214/5eba117305e5822eec09e979/html5/thumbnails/33.jpg)
Providing 4 Improvements(c) (1993 - 2010) mind@work & LOGISENS [email protected]© (1996) LOGISENS, alleen te gebruiken with toestemming +31 (0)70 3243475 [email protected]
InventoryLead times
-
+
-committing
++ co-operating
++
confiding communicating
++
++More trust allows for shorter
lead timesShorter lead times brings
inventoryLess inventory brings, ....
after some time (/ /).... more confidence
3.3.2 4-C Model - Confiding
![Page 34: Providing 4 Improvements · Inform on implications for SCM 3. Intervening, 4 ways: ERP, JIT, TOC and TQM 4. Experience 5. Providing 4 improvements Summary (c) (1993 - 2010) mind@work](https://reader034.fdocuments.us/reader034/viewer/2022042214/5eba117305e5822eec09e979/html5/thumbnails/34.jpg)
Providing 4 Improvements(c) (1993 - 2010) mind@work & LOGISENS [email protected]
3.4.1 Learning Logistics: 4C-model
Based on system archetypes (not treated in this presentation)
Summary model, based on confiding, communicating, co-operating and committing
4C´s = Confiding, Communicating, Co-operating, Committing
![Page 35: Providing 4 Improvements · Inform on implications for SCM 3. Intervening, 4 ways: ERP, JIT, TOC and TQM 4. Experience 5. Providing 4 improvements Summary (c) (1993 - 2010) mind@work](https://reader034.fdocuments.us/reader034/viewer/2022042214/5eba117305e5822eec09e979/html5/thumbnails/35.jpg)
Providing 4 Improvements(c) (1993 - 2010) mind@work & LOGISENS [email protected]
3.4.2 Legend
Confiding = Lead time =
Inventory =
process, so a verb system variable, is a
parameter, but not a … system observable, objectively
measurableIndirect (/+/ or /-/) effects
explained with system archetypes
-
![Page 36: Providing 4 Improvements · Inform on implications for SCM 3. Intervening, 4 ways: ERP, JIT, TOC and TQM 4. Experience 5. Providing 4 improvements Summary (c) (1993 - 2010) mind@work](https://reader034.fdocuments.us/reader034/viewer/2022042214/5eba117305e5822eec09e979/html5/thumbnails/36.jpg)
Providing 4 Improvements(c) (1993 - 2010) mind@work & LOGISENS [email protected]
Note: parameter versus observable
Parameter Inside Used explaining system Used in info system Can be chosen or varied Based on assumptions Examples: lead times,
agreements
Observable Outside Concrete, measurable
even when no knowledge of system
Varies on choice of parameters
Examples: inventory, delivery reliability
![Page 37: Providing 4 Improvements · Inform on implications for SCM 3. Intervening, 4 ways: ERP, JIT, TOC and TQM 4. Experience 5. Providing 4 improvements Summary (c) (1993 - 2010) mind@work](https://reader034.fdocuments.us/reader034/viewer/2022042214/5eba117305e5822eec09e979/html5/thumbnails/37.jpg)
committing++ co-operating
++
confiding communicating
++
++
© 1994 LOGISENS, reproduction without written consent prohibited
AgreementsDeliveryreliability
+
+ +
3.5.1 4c-model - committingmore commitment allows for
better agreementsbetter agreements brings
higher reliabilityHigher reliability leads to, ....
after some time .... more commitment
![Page 38: Providing 4 Improvements · Inform on implications for SCM 3. Intervening, 4 ways: ERP, JIT, TOC and TQM 4. Experience 5. Providing 4 improvements Summary (c) (1993 - 2010) mind@work](https://reader034.fdocuments.us/reader034/viewer/2022042214/5eba117305e5822eec09e979/html5/thumbnails/38.jpg)
committing++ co-operating
++
confiding communicating
++
++
+
Resources
+
Throughput
+© 1994 LOGISENS, reproduction without written consent prohibited
3.5.2 4c-model - communicating
Better communicating is about bottleneck capacity
bottleneck management leads to higher throughput
Higher throughput brings, .... after some time .... better communicating
![Page 39: Providing 4 Improvements · Inform on implications for SCM 3. Intervening, 4 ways: ERP, JIT, TOC and TQM 4. Experience 5. Providing 4 improvements Summary (c) (1993 - 2010) mind@work](https://reader034.fdocuments.us/reader034/viewer/2022042214/5eba117305e5822eec09e979/html5/thumbnails/39.jpg)
committing++ co-operating
++
confiding communicating
++
++
-Expenses
Tasks+
-
3.5.3 4C-model co-operatingBetter co-opereating means
better allocation of tasksbetter task allocation leads to
less expensesLess expenses improves, ....
after some time .... Co-operating
![Page 40: Providing 4 Improvements · Inform on implications for SCM 3. Intervening, 4 ways: ERP, JIT, TOC and TQM 4. Experience 5. Providing 4 improvements Summary (c) (1993 - 2010) mind@work](https://reader034.fdocuments.us/reader034/viewer/2022042214/5eba117305e5822eec09e979/html5/thumbnails/40.jpg)
Myrphy*
Parkinson
Peters
Hofstadter
committing++ co-operating
++
confiding communicating
++
++
InventoryLead times
-
+
-
* I know, it is a joke on Murphy
-Expenses
Tasks+
-+
Resources
+
Throughput
+
AgreementsDeliveryreliability
+
+ +
3.5.4 4C-model and laws
![Page 41: Providing 4 Improvements · Inform on implications for SCM 3. Intervening, 4 ways: ERP, JIT, TOC and TQM 4. Experience 5. Providing 4 improvements Summary (c) (1993 - 2010) mind@work](https://reader034.fdocuments.us/reader034/viewer/2022042214/5eba117305e5822eec09e979/html5/thumbnails/41.jpg)
JIT-cycle
MRP-cycle
TQM-cycle
TOC-cycle
committing++ co-operating
++
confiding communicating
++
++
Inventorylead times
-
+
-
© 1994 LOGISENS, reproduction without written consent prohibited
-Expenses
Tasks+
-+
Resources
+
Throughput
+
AgreementsDeliveryreliability
+
+ +
3.5.4 4C-model and interventions
![Page 42: Providing 4 Improvements · Inform on implications for SCM 3. Intervening, 4 ways: ERP, JIT, TOC and TQM 4. Experience 5. Providing 4 improvements Summary (c) (1993 - 2010) mind@work](https://reader034.fdocuments.us/reader034/viewer/2022042214/5eba117305e5822eec09e979/html5/thumbnails/42.jpg)
Providing 4 Improvements(c) (1993 - 2010) mind@work & LOGISENS [email protected]
3.5.2 4 Improvement methods
ERP (MRP-II) = PlanningInventory management through lead times
JIT (Just In Time) = Execution Manage agreements for delivery reliability
TOC (Theory of Constraints) = SchedulingCapacity management through bottle necks
TQM (Total Quality) = PeopleProcess management for results
![Page 43: Providing 4 Improvements · Inform on implications for SCM 3. Intervening, 4 ways: ERP, JIT, TOC and TQM 4. Experience 5. Providing 4 improvements Summary (c) (1993 - 2010) mind@work](https://reader034.fdocuments.us/reader034/viewer/2022042214/5eba117305e5822eec09e979/html5/thumbnails/43.jpg)
Providing 4 Improvements(c) (1993 - 2010) mind@work & LOGISENS [email protected]
3.6 Learning Logistics learns:
Base performance indicators for improvements on logistical observables (in this order:) Delivery reliability (CLIP) Inventory turns (TOR = T/I) Expenses and efficiency (E/I) Return On Investments (ROI = (T-E)/I) Innovation speed (T(new)/T)
![Page 44: Providing 4 Improvements · Inform on implications for SCM 3. Intervening, 4 ways: ERP, JIT, TOC and TQM 4. Experience 5. Providing 4 improvements Summary (c) (1993 - 2010) mind@work](https://reader034.fdocuments.us/reader034/viewer/2022042214/5eba117305e5822eec09e979/html5/thumbnails/44.jpg)
Providing 4 Improvements(c) (1993 - 2010) mind@work & LOGISENS [email protected]
Contents
Introductions1. About the four ways of reality2. Inform on implications for SCM3. Intervening, 4 ways: ERP, JIT, TOC and
TQM4. Experience5. Providing 4 improvementsSummary
![Page 45: Providing 4 Improvements · Inform on implications for SCM 3. Intervening, 4 ways: ERP, JIT, TOC and TQM 4. Experience 5. Providing 4 improvements Summary (c) (1993 - 2010) mind@work](https://reader034.fdocuments.us/reader034/viewer/2022042214/5eba117305e5822eec09e979/html5/thumbnails/45.jpg)
Providing 4 Improvements(c) (1993 - 2010) mind@work & LOGISENS [email protected]
4.1 Case
High-tech electronics' product; engineer on order/sub-assemble on forecast; Throughput 200 - 300 million guilders a year
Long lead times, high inventory levels, capacity problems, rapid innovation, high investments, IT-problems, motivation low
![Page 46: Providing 4 Improvements · Inform on implications for SCM 3. Intervening, 4 ways: ERP, JIT, TOC and TQM 4. Experience 5. Providing 4 improvements Summary (c) (1993 - 2010) mind@work](https://reader034.fdocuments.us/reader034/viewer/2022042214/5eba117305e5822eec09e979/html5/thumbnails/46.jpg)
Providing 4 Improvements(c) (1993 - 2010) mind@work & LOGISENS [email protected]
4.2 Interventions
after crisis control Re-implementation MRP-II system JIT for continuos improvement OPT (TOC) critical capacities TQM to increase yield
![Page 47: Providing 4 Improvements · Inform on implications for SCM 3. Intervening, 4 ways: ERP, JIT, TOC and TQM 4. Experience 5. Providing 4 improvements Summary (c) (1993 - 2010) mind@work](https://reader034.fdocuments.us/reader034/viewer/2022042214/5eba117305e5822eec09e979/html5/thumbnails/47.jpg)
Providing 4 Improvements(c) (1993 - 2010) mind@work & LOGISENS [email protected]
4.3 Facilitative intervention techniques
Meetings brainstorming with cards Gaming Training and education Visits Modelling and experimenting proposed
solutions Consulting “on the floor”
![Page 48: Providing 4 Improvements · Inform on implications for SCM 3. Intervening, 4 ways: ERP, JIT, TOC and TQM 4. Experience 5. Providing 4 improvements Summary (c) (1993 - 2010) mind@work](https://reader034.fdocuments.us/reader034/viewer/2022042214/5eba117305e5822eec09e979/html5/thumbnails/48.jpg)
Providing 4 Improvements(c) (1993 - 2010) mind@work & LOGISENS [email protected]
4.4 MRP-II or ERP
Eliminate slack from ERP system Information orientation (browser)
replaces transaction orientation (menu-driven)
Non-standard solutions on basis of standard modules
Daily scheduling via “sequencing” (see next
slide) central
![Page 49: Providing 4 Improvements · Inform on implications for SCM 3. Intervening, 4 ways: ERP, JIT, TOC and TQM 4. Experience 5. Providing 4 improvements Summary (c) (1993 - 2010) mind@work](https://reader034.fdocuments.us/reader034/viewer/2022042214/5eba117305e5822eec09e979/html5/thumbnails/49.jpg)
Providing 4 Improvements(c) (1993 - 2010) mind@work & LOGISENS [email protected]
4.4.2 ERP: Sequencing
Planning: planner: sequences highest mix of order lines (!) for
a day in order of expected release release order line as late as possible always reschedule not released order lines
Production: factory floor accepts actively process oldest released order line first 1 list, actualised with remarks
![Page 50: Providing 4 Improvements · Inform on implications for SCM 3. Intervening, 4 ways: ERP, JIT, TOC and TQM 4. Experience 5. Providing 4 improvements Summary (c) (1993 - 2010) mind@work](https://reader034.fdocuments.us/reader034/viewer/2022042214/5eba117305e5822eec09e979/html5/thumbnails/50.jpg)
Providing 4 Improvements(c) (1993 - 2010) mind@work & LOGISENS [email protected]
4.5 Just in Time
Kanban size = 1: used in timing release of customer order line
Order line as late as possible Priorities in execution: oldest released
order line first (not on due date!) New production lay outs Delivery reliability: 95%, later 100%
![Page 51: Providing 4 Improvements · Inform on implications for SCM 3. Intervening, 4 ways: ERP, JIT, TOC and TQM 4. Experience 5. Providing 4 improvements Summary (c) (1993 - 2010) mind@work](https://reader034.fdocuments.us/reader034/viewer/2022042214/5eba117305e5822eec09e979/html5/thumbnails/51.jpg)
Providing 4 Improvements(c) (1993 - 2010) mind@work & LOGISENS [email protected]
4.6 Theory or Constraints
“Mixed model”-production line (1 line replaced 4 parallel production lines)
Everything produced on customer order only, including 20.000 different cables
Release high mix of orders Priorities with problems: oldest released
order line first Throughput/inventory increased (5 -10 times)
![Page 52: Providing 4 Improvements · Inform on implications for SCM 3. Intervening, 4 ways: ERP, JIT, TOC and TQM 4. Experience 5. Providing 4 improvements Summary (c) (1993 - 2010) mind@work](https://reader034.fdocuments.us/reader034/viewer/2022042214/5eba117305e5822eec09e979/html5/thumbnails/52.jpg)
Providing 4 Improvements(c) (1993 - 2010) mind@work & LOGISENS [email protected]
4.7 Total Quality Management
Reduce expenses Reduce “sigma”: zero defects New skills, cross-training Teams: buyer, engineering, production, store
room, planning Extensive training in co-operating, gaming Integrated quality function on factory floor
![Page 53: Providing 4 Improvements · Inform on implications for SCM 3. Intervening, 4 ways: ERP, JIT, TOC and TQM 4. Experience 5. Providing 4 improvements Summary (c) (1993 - 2010) mind@work](https://reader034.fdocuments.us/reader034/viewer/2022042214/5eba117305e5822eec09e979/html5/thumbnails/53.jpg)
Providing 4 Improvements(c) (1993 - 2010) mind@work & LOGISENS [email protected]
4.8 Results
Accurate data, reliable system Delivery reliability 100% Inventory Turns: 0,8 2 5 10 No bottle necks in production Mixed Model production lines Reduction of inventory, floor space,
expenses Cross trained people
![Page 54: Providing 4 Improvements · Inform on implications for SCM 3. Intervening, 4 ways: ERP, JIT, TOC and TQM 4. Experience 5. Providing 4 improvements Summary (c) (1993 - 2010) mind@work](https://reader034.fdocuments.us/reader034/viewer/2022042214/5eba117305e5822eec09e979/html5/thumbnails/54.jpg)
Providing 4 Improvements(c) (1993 - 2010) mind@work & LOGISENS [email protected]
4.9 Continuous improvement
Learning Logistics Cross training, quality integrated Production shifted to other factories by
work force Mentality to deliver service Shift production to low wage countries
by factory people Rapid innovations, short time to market Searching for new markets
![Page 55: Providing 4 Improvements · Inform on implications for SCM 3. Intervening, 4 ways: ERP, JIT, TOC and TQM 4. Experience 5. Providing 4 improvements Summary (c) (1993 - 2010) mind@work](https://reader034.fdocuments.us/reader034/viewer/2022042214/5eba117305e5822eec09e979/html5/thumbnails/55.jpg)
Providing 4 Improvements(c) (1993 - 2010) mind@work & LOGISENS [email protected]
4.10 In the end ...
Inventory costs no longer part of factory cost price
m2 - prices higher Change over costs out of cost price No reduction quoted lead times No new markets Reorganisation First factory to be closed down
![Page 56: Providing 4 Improvements · Inform on implications for SCM 3. Intervening, 4 ways: ERP, JIT, TOC and TQM 4. Experience 5. Providing 4 improvements Summary (c) (1993 - 2010) mind@work](https://reader034.fdocuments.us/reader034/viewer/2022042214/5eba117305e5822eec09e979/html5/thumbnails/56.jpg)
Providing 4 Improvements(c) (1993 - 2010) mind@work & LOGISENS [email protected]
4.12 Conclusions
Use ERP, TQM, JIT and TOC for logistical improvement
Do not use longer lead times, more capacity, more people or less quality to solve problems.
100% delivery reliability, then lower stocks, less expenses and finally the bottle neck: higher throughput.
Paradox: success will bring problems
![Page 57: Providing 4 Improvements · Inform on implications for SCM 3. Intervening, 4 ways: ERP, JIT, TOC and TQM 4. Experience 5. Providing 4 improvements Summary (c) (1993 - 2010) mind@work](https://reader034.fdocuments.us/reader034/viewer/2022042214/5eba117305e5822eec09e979/html5/thumbnails/57.jpg)
Providing 4 Improvements(c) (1993 - 2010) mind@work & LOGISENS [email protected]
Contents
Introductions1. About the four ways of reality2. Inform on implications for SCM3. Intervening, 4 ways: ERP, JIT, TOC and
TQM4. Experience5. Providing 4 improvementsSummary
![Page 58: Providing 4 Improvements · Inform on implications for SCM 3. Intervening, 4 ways: ERP, JIT, TOC and TQM 4. Experience 5. Providing 4 improvements Summary (c) (1993 - 2010) mind@work](https://reader034.fdocuments.us/reader034/viewer/2022042214/5eba117305e5822eec09e979/html5/thumbnails/58.jpg)
Providing 4 Improvements(c) (1993 - 2010) mind@work & LOGISENS [email protected]
5.1 Provisions for improvements
“Nobody will talk about Christmas with the turkey”
ipse dicit
![Page 59: Providing 4 Improvements · Inform on implications for SCM 3. Intervening, 4 ways: ERP, JIT, TOC and TQM 4. Experience 5. Providing 4 improvements Summary (c) (1993 - 2010) mind@work](https://reader034.fdocuments.us/reader034/viewer/2022042214/5eba117305e5822eec09e979/html5/thumbnails/59.jpg)
Providing 4 Improvements(c) (1993 - 2010) mind@work & LOGISENS [email protected]
5.2 Asbhy’s law
Law of the requisite variety “The law of Requisite Variety says that R’s
capacity as a regulator cannot exceed R’s capacity as a channel of communication.”.
W. Ross Ashby, An Introduction to Cybernetics,Chapman & Hall, London, 1956. Internet (1999):
http://pcp.vub.ac.be/books/IntroCyb.pdf
![Page 60: Providing 4 Improvements · Inform on implications for SCM 3. Intervening, 4 ways: ERP, JIT, TOC and TQM 4. Experience 5. Providing 4 improvements Summary (c) (1993 - 2010) mind@work](https://reader034.fdocuments.us/reader034/viewer/2022042214/5eba117305e5822eec09e979/html5/thumbnails/60.jpg)
Providing 4 Improvements(c) (1993 - 2010) mind@work & LOGISENS [email protected]
Pressure
Action plan
Vision
Care
5.3 4 Requisites for improvement
![Page 61: Providing 4 Improvements · Inform on implications for SCM 3. Intervening, 4 ways: ERP, JIT, TOC and TQM 4. Experience 5. Providing 4 improvements Summary (c) (1993 - 2010) mind@work](https://reader034.fdocuments.us/reader034/viewer/2022042214/5eba117305e5822eec09e979/html5/thumbnails/61.jpg)
Providing 4 Improvements(c) (1993 - 2010) mind@work & LOGISENS [email protected]
Pressure
Results lacking or stay behindMore of the same doesn’t workThe boss wants itFaster information exchangePressure from colleagues, suppliers,
customersERP provides pressure
5.4.1 What must ..?
![Page 62: Providing 4 Improvements · Inform on implications for SCM 3. Intervening, 4 ways: ERP, JIT, TOC and TQM 4. Experience 5. Providing 4 improvements Summary (c) (1993 - 2010) mind@work](https://reader034.fdocuments.us/reader034/viewer/2022042214/5eba117305e5822eec09e979/html5/thumbnails/62.jpg)
Providing 4 Improvements(c) (1993 - 2010) mind@work & LOGISENS [email protected]
Pressure Vision
Orientation on futureNew ideas, possibilitiesVision creates images of futureLooking aheadNew systems availableTOC provides vision
5.4.2 Why will ….?
![Page 63: Providing 4 Improvements · Inform on implications for SCM 3. Intervening, 4 ways: ERP, JIT, TOC and TQM 4. Experience 5. Providing 4 improvements Summary (c) (1993 - 2010) mind@work](https://reader034.fdocuments.us/reader034/viewer/2022042214/5eba117305e5822eec09e979/html5/thumbnails/63.jpg)
Providing 4 Improvements(c) (1993 - 2010) mind@work & LOGISENS [email protected]
5.4.3 How can …?Pressure Vision Action plan
Actions on short time goals, improvements and successes
Action programs for implementationDoing things Management and control of results Technical infrastructureJust In Time provides actions
![Page 64: Providing 4 Improvements · Inform on implications for SCM 3. Intervening, 4 ways: ERP, JIT, TOC and TQM 4. Experience 5. Providing 4 improvements Summary (c) (1993 - 2010) mind@work](https://reader034.fdocuments.us/reader034/viewer/2022042214/5eba117305e5822eec09e979/html5/thumbnails/64.jpg)
Providing 4 Improvements(c) (1993 - 2010) mind@work & LOGISENS [email protected]
Pressure Vision Actionplans
Care
Accepting changes, taking careIntentionsInvolvement of participantsEmpathy for the effects of improvements
on othersQuality improvement provides care
5.4.4 Who may..?
![Page 65: Providing 4 Improvements · Inform on implications for SCM 3. Intervening, 4 ways: ERP, JIT, TOC and TQM 4. Experience 5. Providing 4 improvements Summary (c) (1993 - 2010) mind@work](https://reader034.fdocuments.us/reader034/viewer/2022042214/5eba117305e5822eec09e979/html5/thumbnails/65.jpg)
Providing 4 Improvements(c) (1993 - 2010) mind@work & LOGISENS [email protected]
Angst,frustration
False starts, chaos
Confusion,quick sands
In the drawer
5.4.5 If unprovided for ...
Pressure
Action plan
Vision
Care
![Page 66: Providing 4 Improvements · Inform on implications for SCM 3. Intervening, 4 ways: ERP, JIT, TOC and TQM 4. Experience 5. Providing 4 improvements Summary (c) (1993 - 2010) mind@work](https://reader034.fdocuments.us/reader034/viewer/2022042214/5eba117305e5822eec09e979/html5/thumbnails/66.jpg)
Providing 4 Improvements(c) (1993 - 2010) mind@work & LOGISENS [email protected]
Summary
Four different expressions of self ==> four different approaches to improvement
Reflected in ERP, TOC, JIT and TQMFour different measurable goalsProviding for effective, intentional
improvements requires attention to these four:
Care, vision, pressure and action.