Protocol Revision Subcommittee Report to ERCOT Technical Advisory Committee May 8-9, 2003.
Protocol Revision Subcommittee
-
Upload
idola-wilkinson -
Category
Documents
-
view
19 -
download
1
description
Transcript of Protocol Revision Subcommittee
Protocol Revision Protocol Revision SubcommitteeSubcommittee
Presentation to the Presentation to the
ERCOT Technical Advisory CommitteeERCOT Technical Advisory Committee
May 6, 2010May 6, 2010
PRS SummaryPRS Summary
0 PRRs for Approval0 PRRs for Approval
4 NPRRs for Approval4 NPRRs for Approval
0 NPRRs for Parking Deck 0 NPRRs for Parking Deck ConsiderationConsideration
1 Rejection1 Rejection
1 Withdrawal1 Withdrawal
Current DiscussionsCurrent Discussions
Items for a VoteItems for a VoteUnanimous RecommendationsUnanimous RecommendationsNoneNoneNon-Unanimous RecommendationsNon-Unanimous RecommendationsNPRR207, Unit Deselection (formerly “Hour Start NPRR207, Unit Deselection (formerly “Hour Start Unit Deselection and Half Hour Start Unit RUC Unit Deselection and Half Hour Start Unit RUC Clawback”)Clawback”)NPRR209, Data Posting Changes to Comply with NPRR209, Data Posting Changes to Comply with P.U.C. SUBST. R. 25.505 P.U.C. SUBST. R. 25.505 NPRR211, Clarify Capacity Obligations of NPRR211, Clarify Capacity Obligations of Energy Trades (formerly “Modify RUC Capacity Energy Trades (formerly “Modify RUC Capacity Short Charge to Use Final Energy Trades”)Short Charge to Use Final Energy Trades”)NPRR214, Wind-powered Generation Resource NPRR214, Wind-powered Generation Resource (WGR) High Sustained Limit (HSL) Update (WGR) High Sustained Limit (HSL) Update Process Process
NPRR207, Unit Deselection NPRR207, Unit Deselection (formerly “Hour Start Unit (formerly “Hour Start Unit
Deselection and Half Hour Start Unit Deselection and Half Hour Start Unit RUC Clawback”) RUC Clawback”)
PurposePurpose
(WMS)(WMS)
This NPRR would provide that ERCOT may deselect units from Reliability Unit Commitment (RUC) processes. The NPRR also creates the term “RUC Notification” to refer to an ERCOT instruction preceding a Resource’s startup time. The NPRR enables the Qualified Scheduling Entity (QSE) to self-commit, a Resource after receiving a RUC Notification but before the Resource’s startup time.
Market ImpactMarket Impact N/AN/A
System ChangeSystem Change YesYes N/AN/A
PRS VotePRS Vote PRS voted to recommend approval of NPRR207 as amended by the 4/22/10 WMS comments and as revised by PRS. There was one abstention from the Consumer Market Segment.
CEO CEO DeterminationDetermination
Not needed for go-live
Effective DateEffective Date Needs parking deck designation
NPRR207, Unit Deselection NPRR207, Unit Deselection (formerly “Hour Start Unit (formerly “Hour Start Unit
Deselection and Half Hour Start Deselection and Half Hour Start Unit RUC Clawback”) Unit RUC Clawback”)
Item ReviewedItem Reviewed DescriptionDescriptionNoNoImpactImpact
Credit Credit Monitoring/Monitoring/LiabilityLiability
BudgetBudget
StaffingStaffing
Computer SystemsComputer Systems
Business FunctionsBusiness Functions
Grid OperationsGrid Operations
ImpactImpact
NPRR209, Data Posting Changes to NPRR209, Data Posting Changes to Comply with P.U.C. SUBST. R. Comply with P.U.C. SUBST. R.
25.50525.505PurposePurpose
(NRG and (NRG and Calpine)Calpine)
This NPRR removes a requirement to post certain State Estimator information that can be used to determine Resource status, which is confidential information as per Public Utility Commission of Texas (PUCT) rules.
Market ImpactMarket Impact N/AN/A
System ChangeSystem Change NoNo N/AN/A
PRS VotePRS Vote PRS voted to recommend approval of NPRR209 as submitted via roll call vote.
CEO CEO DeterminationDetermination
No opinion on necessity prior to go-live
Effective DateEffective Date Upon Texas Nodal Market Implementation
NPRR209, Data Posting Changes to NPRR209, Data Posting Changes to Comply with P.U.C. SUBST. R. Comply with P.U.C. SUBST. R.
25.50525.505
Item ReviewedItem Reviewed DescriptionDescriptionNoNoImpactImpact
Credit Credit Monitoring/Monitoring/LiabilityLiability
BudgetBudget
StaffingStaffing
Computer SystemsComputer Systems
Business FunctionsBusiness Functions
Grid OperationsGrid Operations
ImpactImpact
NPRR211, Clarify Capacity NPRR211, Clarify Capacity Obligations of Energy Trades Obligations of Energy Trades
(formerly “Modify RUC Capacity (formerly “Modify RUC Capacity Short Charge to Use Final Energy Short Charge to Use Final Energy
Trades”) Trades”) PurposePurpose
(J Aron)(J Aron)
This NPRR specifies that Energy Trades representing firm physical products that are entered and confirmed through ERCOT must be submitted by 1430 in the Day-Ahead for the Operating Day, and that Energy Trades representing firm physical products that are executed during the adjustment period and confirmed through ERCOT must be submitted prior to the next Hourly Reliability Unit Commitment (HRUC) execution.
Market ImpactMarket Impact N/AN/A
System ChangeSystem Change NoNo N/AN/A
PRS VotePRS Vote On 3/25/10, PRS unanimously voted to recommended approval of NPRR211 as amended by the 3/25/10 WMS comments. On 4/22/10, PRS voted to endorse and forward the 3/25/10 PRS Report as revised by PRS and Impact Analysis for NPRR211 to TAC. There was one abstention from the Independent Generator Market Segment.
CEO CEO DeterminationDetermination
No opinion on necessity prior to go-live
Effective DateEffective Date Upon Texas Nodal Market Implementation
NPRR211, Clarify Capacity NPRR211, Clarify Capacity Obligations of Energy Trades Obligations of Energy Trades
(formerly “Modify RUC Capacity (formerly “Modify RUC Capacity Short Charge to Use Final Energy Short Charge to Use Final Energy
Trades”) Trades”) Item ReviewedItem Reviewed DescriptionDescriptionNoNo
ImpactImpact
Credit Credit Monitoring/Monitoring/LiabilityLiability
BudgetBudget
StaffingStaffing
Computer SystemsComputer Systems
Business FunctionsBusiness Functions
Grid OperationsGrid Operations
ImpactImpact
NPRR214, Wind-powered Generation NPRR214, Wind-powered Generation Resource (WGR) High Sustained Resource (WGR) High Sustained
Limit (HSL) Update Process Limit (HSL) Update Process
PurposePurpose
(Wind (Wind Coalition)Coalition)
This NPRR establishes the specific timing of the WGR’s HSL update to ERCOT and specifies that, when not curtailed, the WGR’s HSL should equal the WGR’s current meter reading.
Market ImpactMarket Impact None.None.
System ChangeSystem Change None.None. N/AN/A
PRS VotePRS Vote PRS voted to recommend approval of NPRR214 as amended by the 3/16/10 Luminant comments. There was one abstention from the Consumer Market Segment.
CEO CEO DeterminationDetermination
No opinion on necessity prior to go-live
Effective DateEffective Date Upon Texas Nodal Market Implementation
NPRR214, Wind-powered NPRR214, Wind-powered Generation Resource (WGR) High Generation Resource (WGR) High
Sustained Limit (HSL) Update Sustained Limit (HSL) Update Process Process
Item ReviewedItem Reviewed DescriptionDescriptionNoNoImpactImpact
Credit Credit Monitoring/Monitoring/LiabilityLiability
BudgetBudget
StaffingStaffing
Computer SystemsComputer Systems
Business FunctionsBusiness Functions
Grid OperationsGrid Operations
ImpactImpact
Withdrawals and Withdrawals and RejectionsRejections
NPRR215, Resolution of Alignment NPRR215, Resolution of Alignment Item A151 - Removal of Posting Item A151 - Removal of Posting Requirement for RMR Services - Requirement for RMR Services - Withdrawn Withdrawn
PRR848, Allow ERCOT Option to PRR848, Allow ERCOT Option to Cancel RPRS Capacity Commitments - Cancel RPRS Capacity Commitments - RejectedRejected
PRR/NPRR SummaryPRR/NPRR SummaryRevision Requests Unanimously Recommended for Approval Revision Requests Unanimously Recommended for Approval with No Impactswith No ImpactsNoneNone
Revision Requests Not Unanimously Recommended for Revision Requests Not Unanimously Recommended for Approval with No ImpactsApproval with No ImpactsNPRR209, Data Posting Changes to Comply with P.U.C. SUBST. R. NPRR209, Data Posting Changes to Comply with P.U.C. SUBST. R. 25.50525.505NPRR211, Clarify Capacity Obligations of Energy Trades (formerly NPRR211, Clarify Capacity Obligations of Energy Trades (formerly “Modify RUC Capacity Short Charge to Use Final Energy Trades”) “Modify RUC Capacity Short Charge to Use Final Energy Trades”) NPRR214, Wind-powered Generation Resource (WGR) High NPRR214, Wind-powered Generation Resource (WGR) High Sustained Limit (HSL) Update Process Sustained Limit (HSL) Update Process
Revision Requests Unanimously Recommended for Approval Revision Requests Unanimously Recommended for Approval with Impactswith ImpactsNoneNone
Revision Requests Not Unanimously Recommended for Revision Requests Not Unanimously Recommended for Approval with ImpactsApproval with ImpactsNPRR207, Unit Deselection (formerly “Hour Start Unit NPRR207, Unit Deselection (formerly “Hour Start Unit Deselection and Half Hour Start Unit RUC Clawback”) Deselection and Half Hour Start Unit RUC Clawback”)
2010 PRR Approval Cycle 2010 PRR Approval Cycle – Normal Timeline– Normal Timeline
PRR Posting
Deadline
PRSConsideration
PRSCBA/IAReview
TACConsideration
BoardConsideration
EffectiveDate
23-Dec 21-Jan 18-Feb 4-Mar 23-Mar 4/1/10
22-Jan 18-Feb 25-Mar 8-Apr 18-May 6/1/10
26-Feb 25-Mar 22-Apr 6-May 15-Jun 7/1/10
26-Mar 22-Apr 20-May 3-Jun 20-Jul 8/1/10
23-Apr 20-May 17-Jun 1-Jul 20-Jul 8/1/10
21-May 17-Jun 22-Jul 5-Aug 21-Sep 10/1/10
25-Jun 22-Jul 19-Aug 2-Sep 21-Sep 10/1/10
23-Jul 19-Aug 23-Sep 7-Oct 16-Nov 12/1/10
Nodal Parking Deck - Approved by ERCOT
BoardSource Source DocumDocum
ententTitleTitle PrioritPriorit
yyCurrent StatusCurrent Status
NPRR131 Ancillary Service Trades with ERCOT HighBoard Approved
1/19/10
NPRR181 FIP Definition Revision HighBoard Approved
1/19/10
NPRR153Generation Resource Fixed Quantity Block Offer
MediumBoard Approved
1/19/10
NPRR164Resubmitting Ancillary Service offers in SASM
MediumBoard Approved
1/19/10
SCR755 ERCOT.com Website Enhancements MediumBoard approved
2/16/10
Nodal Parking Deck – Pending Approval
Source Source DocumentDocument TitleTitle Suggested Suggested
PriorityPriority Current StatusCurrent Status
NPRR146ICCP Telemetry Information Submittals
TBDTabled at TACPRS approved
2/19/09
NPRR207Unit Deselection (formerly “Hour Start Unit Deselection and Half Hour Start Unit RUC Clawback”).
TBDPending at TACPRS approved
4/22/10
NPRR222Half-Hour Start Unit RUC Clawback (Companion to NPRR207).
TBDPending at PRSPRS approved
4/22/10
SCR756Enhancements to the MarkeTrack Application
TBD Tabled at RMS