PROPOSED TUITION BLOCK ITE M DESCRIPTION QTY UNIT RATE AMOUNT A B C D E F G H I J K L M N O ELEMENT NO.1 Substructures (ALL PROVISIONAL) Site Clearance Clear site of all grass and small trees not exceeding 600mm girth and cart away or burn arisings Excavate oversite to remove top vegetable soil average 250mm deep and spread as directed on site Destroy termite nests within the site of works, take out and destroy queens, impregnate holes and tunnels with insecticides and fill voids with approved material. Excavate in red soil including maintaining and supporting and keeping free from water mud and fallen objects Excavate to reduce levels not exceeding 1.50m deep from the stripped level Ditto over 1.50m but not exceeding 3.00m deep ditto Ditto over 3.00m but not exceeding 4.50m deep ditto Ditto over 4.50 but not exceeding 6.00m deep ditto Excavate for strip footing commencing from reduced level not exceeding 1.50m deep Ditto for foundation commencing at reduced level not exceeding 1.50m deep ditto for column bases Extra over excavating for excavating in soft rock not exceeding 1 .50m from reduced level Extra over for excavating in hard black trap rock not exceeding 1.50m deep from the stripped level. Ditto over 1.50m but not exceeding 3.00m deep ditto Ditto over 3.00m but not exceeding 4.50m deep ditto 810 810 810 422 795 795 54 210 149 1008 533 985 1005 1204 210 SM SM SM CM CM CM CM CM CM CM CM CM CM CM CM 60 60 150 150 150 450 600 150 150 800 1500 2000 3000 4500 1500 48,600 48,600 121,500 63,300 116,650 357,750 32,400 31,5400 22,350 806,400 799,500 1,970,000 3,015,000 5,418,000 315000

Transcript of Proposed Tuition Block

Page 1: Proposed Tuition Block

PROPOSED TUITION BLOCK

ITEM

DESCRIPTION QTY UNIT RATE AMOUNT

A

B

C

D

E

F

G

H

I

J

K

L

M

N

O

PQ

R

ELEMENT NO.1Substructures(ALL PROVISIONAL)

Site ClearanceClear site of all grass and small trees not exceeding 600mm girth and cart away or burn arisings

Excavate oversite to remove top vegetable soil average 250mm deep and spread as directed on site

Destroy termite nests within the site of works, take out and destroy queens, impregnate holes and tunnels with insecticides and fill voids with approved material.

Excavate in red soil including maintaining and supporting and keeping free from water mud and fallen objects

Excavate to reduce levels not exceeding 1.50m deep from the stripped level

Ditto over 1.50m but not exceeding 3.00m deep ditto

Ditto over 3.00m but not exceeding 4.50m deep ditto

Ditto over 4.50 but not exceeding 6.00m deep ditto

Excavate for strip footing commencing from reduced level not exceeding 1.50m deep

Ditto for foundation commencing at reduced level not exceeding 1.50m deep ditto for column bases

Extra over excavating for excavating in soft rock not exceeding 1 .50m from reduced level

Extra over for excavating in hard black trap rock not exceeding 1.50m deep from the stripped level.

Ditto over 1.50m but not exceeding 3.00m deep ditto

Ditto over 3.00m but not exceeding 4.50m deep ditto

Ditto over 4.50m but not exceeding 6.00m deep ditto

Ditto for strip footing not exceeding 1.50m deep from the reduced levels

Ditto for column bases ditto Trim and level bottom of excavation

DISPOSALBackfilling around foundation

810

810

810

422

795

795

54

210

149

1008

533

985

1005

1204

210

1491873

237

SM

SM

SM

CM

CM

CM

CM

CM

CM

CM

CM

CM

CM

CM

CM

CMSM

CM

60

60

150

150

150

450

600

150

150

800

1500

2000

3000

4500

1500

1500100

100

48,600

48,600

121,500

63,300

116,650

357,750

32,400

31,5400

22,350

806,400

799,500

1,970,000

3,015,000

5,418,000

315000

223500187300

23700

15,099,810/=