PROPOSED TUITION BLOCK
ITEM
DESCRIPTION QTY UNIT RATE AMOUNT
A
B
C
D
E
F
G
H
I
J
K
L
M
N
O
PQ
R
ELEMENT NO.1Substructures(ALL PROVISIONAL)
Site ClearanceClear site of all grass and small trees not exceeding 600mm girth and cart away or burn arisings
Excavate oversite to remove top vegetable soil average 250mm deep and spread as directed on site
Destroy termite nests within the site of works, take out and destroy queens, impregnate holes and tunnels with insecticides and fill voids with approved material.
Excavate in red soil including maintaining and supporting and keeping free from water mud and fallen objects
Excavate to reduce levels not exceeding 1.50m deep from the stripped level
Ditto over 1.50m but not exceeding 3.00m deep ditto
Ditto over 3.00m but not exceeding 4.50m deep ditto
Ditto over 4.50 but not exceeding 6.00m deep ditto
Excavate for strip footing commencing from reduced level not exceeding 1.50m deep
Ditto for foundation commencing at reduced level not exceeding 1.50m deep ditto for column bases
Extra over excavating for excavating in soft rock not exceeding 1 .50m from reduced level
Extra over for excavating in hard black trap rock not exceeding 1.50m deep from the stripped level.
Ditto over 1.50m but not exceeding 3.00m deep ditto
Ditto over 3.00m but not exceeding 4.50m deep ditto
Ditto over 4.50m but not exceeding 6.00m deep ditto
Ditto for strip footing not exceeding 1.50m deep from the reduced levels
Ditto for column bases ditto Trim and level bottom of excavation
DISPOSALBackfilling around foundation
810
810
810
422
795
795
54
210
149
1008
533
985
1005
1204
210
1491873
237
SM
SM
SM
CM
CM
CM
CM
CM
CM
CM
CM
CM
CM
CM
CM
CMSM
CM
60
60
150
150
150
450
600
150
150
800
1500
2000
3000
4500
1500
1500100
100
48,600
48,600
121,500
63,300
116,650
357,750
32,400
31,5400
22,350
806,400
799,500
1,970,000
3,015,000
5,418,000
315000
223500187300
23700
15,099,810/=