Attachment 2 to U-602025 . .- LS-88-042 - . Page 1 of 7 , TABLE 3. 3. 7.1-1 (Continued] RADIATION MONITORING INSTRUMENTATION TABLE NOTATIONS * When irradiated fuel is being handled 'n the secondary containment. ** Alarm only. # With fuel in the new fuel storage vault. ## With irradiated fuel in the spent fuel storage pool. (a) A channel may be placed in an inoperable status for up to 6 hours for re- quired surveillance without placing the trip system in the tripped condi- tion provided at least one other F:'ABLE channel in the same trip system is monitoring that parameter. ACTION gy . ACTION 70 - a. With one of the requireri monitors inoperable, place the _gr inoperable channel in the tripped condition withir Q E J Q restore the inopersble channel to OPER/.BLE status withTir 7 days, or, within the next 5 hours, initiate and maintain operation of the control room emergency filtration system in the high radiation mode of operation, b. With both of the required monitors inoperable, initiate and maintain operatioit of the control room emergency filtration system in the high radiation mode of operation within 1 hour. ACTION 71 - With the required monitor inoperable, perform area surveys of the monitored area with portable monitoring instrumantation at least once per 24 hours. CtJNTON - UNIT 1 3/4 3-72 Amendment No. 40 9208240163 920017 PDR ADOCK 0500 1 P

Transcript of Proposed tech specs 3/4.3.7.1 'Radiation Monitoring ...

Page 1: Proposed tech specs 3/4.3.7.1 'Radiation Monitoring ...

Attachment 2to U-602025

. .- LS-88-042- .

Page 1 of 7

, TABLE 3. 3. 7.1-1 (Continued]

RADIATION MONITORING INSTRUMENTATION

TABLE NOTATIONS

*

When irradiated fuel is being handled 'n the secondary containment.** Alarm only.

# With fuel in the new fuel storage vault.

## With irradiated fuel in the spent fuel storage pool.

(a) A channel may be placed in an inoperable status for up to 6 hours for re-quired surveillance without placing the trip system in the tripped condi-tion provided at least one other F:'ABLE channel in the same trip systemis monitoring that parameter.

ACTION gy .

ACTION 70 - a. With one of the requireri monitors inoperable, place the _grinoperable channel in the tripped condition withir Q E J Qrestore the inopersble channel to OPER/.BLE status withTir7 days, or, within the next 5 hours, initiate and maintainoperation of the control room emergency filtration systemin the high radiation mode of operation,

b. With both of the required monitors inoperable, initiate andmaintain operatioit of the control room emergency filtrationsystem in the high radiation mode of operation within 1 hour.

ACTION 71 - With the required monitor inoperable, perform area surveys ofthe monitored area with portable monitoring instrumantation atleast once per 24 hours.

CtJNTON - UNIT 1 3/4 3-72 Amendment No. 40

9208240163 920017PDR ADOCK 0500 1

P

Page 2: Proposed tech specs 3/4.3.7.1 'Radiation Monitoring ...

y , .. . ..

. . . .-- . .

t? 5O j

bg In TABLE 4.3.7.1-1

f RADIATION MONITORING INSTRUMENTATION SURVEILLANCE REQUIREMEt<TS ]kz & O -JQ3.

c: CilAt4NEL *

*CHANNEL FUNCTIONAL . CHANNEL

"INSTRUMENTATION _ CHECK TEST CALIB..ATION APPLICABILITY p1. Main Control Roon Air 5 -ft- Q R 1, 2, 3, 5, and *

| Intake Radiation EMonitor U

2. Area Monitors#

a. New Fuel Storage S H R

Vault##

t' b. Spent Fuel Sterace S H R l* Pool'

TU c. Cor. trol Room Direct S H R At all times

Radiation Monitor

?l

&2 sGER" % ac;E m?ae'

o RS!""SE

|" ". ~

O

_ _ _ _

~ 1 < * - |

Page 3: Proposed tech specs 3/4.3.7.1 'Radiation Monitoring ...

- - _ - - _ - _ _ . .

Attachment 2. -

,to U-602025*

( LS-88-042.

| Page 3 of 7| .

| ItGTRUMENTATION -

3/4.3.9 PLANT SYSTEMS ACTUATION INSTRt: MENTATION

LIMI_ TING CONDITION _FOR OPERATION

3.3.9.

The plant systems actuation instrumentation channels shown inI Table 3.3.9-1 shall be OPERABLE witn their trip setpoints set consistent with

tM values shown in thi Trip Sctpoin; column of Table 3.3.9-2.

APPLICABILITY: As shown in Table 3.3.9-1.

ACTION:

With a plant system actuation instrumentation channel trip setpoint lessa.

conservative than the value shown in the Allowable 1' c 'r f

-

"

y:;.g_J3-%,._dec,larethechannelinoperable ad c Q." - 'occ .hc-e-g _ n g . c. g.. MSO3nti ne c anne i s restored

a,_

swI ~t r'erdccicrcshccac(cutcu;ystcm/locpincpccabm.iLipeg r;on:L slegt withfba,g i

_

ITrip setpoint valu e

% e -

~ _. - - - I

._

b-- Po, the usate!6 cat 5 pray systc:.

1. "i th the numbe cf ' OPERA %E--ehennc h ic33 thcn .equ. cd by ihu-

E .imur OPECASLE Channi pcr ccatcin: cat spicy icop ccquirc cat foi:-

. ore cent?!" cent :prcy !cep, pbcc ct kc:t cac 'ncpcrchk channci inthe tripped ccaditkr withi , I hcur cr declerc thc ancciatcd loca

.

-incp e ra b i c.-)*

.

,.. m , . m. . . . . , . _ _ .. .is,... ,_.,u.. _ . m. . s -. . . . . . . . . . v. .. ....w % - ,s.,,, .. i

-H+Mr.r. OPERACLE Chancch pcr ccatainccat sprcy lecp requircacnt fce%33 .wu wj .

-be %-4e:p:, dcc h rc the an ec h ted !cep ' cper dic.->

h-Fes tSc---feed.: ter cyctes/scin turbine t-ip ty,-tes, -c.

I

h1. '''th th; numbcr of OPERASLC channel: kn than rcqu; red by thcca:"ir' um CPEP' ELE Chernc!: requirc= rt, ntere t5: 'n:pe-9'^ ch c' 4m. n n e n. a e , r . , . , . . . , e. m , m ,

v. . .v w w -u < . -j,-u, m,.

,i, - - v1 .,s

. o i.... e n.o r. n n :. m.e w,. ~s

..,

.%

..so.v w ..v.. fr."*-

2. "ith the number of OPERf.SLE cncacch tu: Icn th a rcquircd tj thc. ~

Mftism OPERACLE C,hanac's rcquircmcat, rcstcrc at Iccat cac cf thcp: . . .. a , . a--. . ~ n-enn,e _ .. _ . c: _-.,c. .. w .

..__-,s.r ev p w a wvs% w r iu 6.s . w I .a sw vs wiuswww 4wwwwa n i bs t i is # ( InVut w v4 WL L6

-h_ _ i r,+ n n ee t ,n .,.,At.._. . ._..& -.t__

wit rus , um i v m mm - .. .

d. .?cr the :upprenica poc! :&up ;y:te- (SP45) ith tbc r ber cf " r m!:, \-cnc icz 'han the ^' mum ""ERfSLE C',rncl' ":quirc-^,t ^f Til^ '.3.E 1 -.... .<. .. o _ _ _ . . ,. .n. ..

3

|.2 u ym,_ , _,.

, - .._ . m m ,7 . _ . -

\ b' Wh one or more, pknt systems ocMon iM##CMnneb in opem.b\e k k e. We AcTioM recg4(ed % D C 3'Eq *3 .

_ _ - _ _ - - - -_ - - ~

LLINTON - UNIT 1 3/4 3-97 ' Amendment No. 40{1

_ _ _ _ - _ _ _ _ -

Page 4: Proposed tech specs 3/4.3.7.1 'Radiation Monitoring ...

_ _ - - _ _ - _ _ _ _ _ _ - _ _ - _ .

y , , , , ,. +,_

| % & h$fEO & Y A & & $2?25h*gf pq)

LS-88-042,

% Page 4 of 7.

INSTRUMENTATION

PLANT SYSTEM 3 ACTUATION INSTRUMENTATION

SURVEILLANCE REQUIREMENTS

4.3.9.1 Each plant system actuation instrumentation channel shall be demon-strated OPERABLE by the performance of the CHAMEL CICCK, CHANNEL FUNCTIONALTEST and CHANNEL CALIBRATION operations for the OPERATIONAt CONDITIONS and atthe frequencies shown in Table 4.3.9.1-1.

4.3.9.2 LOGIC SYSTEM FUNCTIONAL TESIS shall be perforced at letst once per18 months. Each trip system or division of the plant system actuation logicassociated with the Nuclear System Protection System shall be manually testedindeotadent of the SELF TEST SYSTEM during separate refueling outages suchth,at all di ions and all trip functions are tested at least once every fourfuel cycle "

-

. . . .,

. . - -

*::eome! W.a.n3 Tv. L: vi sut:s b.n; W cific.tica '.2.2 2 I: n:t4. emi ev mr; V.ccd mod ! ;f;c, L ucan during tn. "r:t r:Gulzb' ::50dul:d " '20!';"LCut r. _

_ . _ __

CLINTON - UNIT 1 3/4 3-98 Amendment No. 40

_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ - _ _ _ _ _ _ - _ _ _ _ -

Page 5: Proposed tech specs 3/4.3.7.1 'Radiation Monitoring ...

'

. . >" R[a4 n.

~, ?ga8w,

aw"d * u o- ~

.

No . , .

772 333l

T ' 59 "C 5G5 65 5 06 0 11 tA '

5R2>55S

uoh ntiLi

- EASLNN wl

t BOO een

mAII 333 33 3 333333 cnCTT nar IAI , , , , , , , ,,,, ah

wLRD 222 22 ? 222222 l cPEN lPPO , , , , , , , , ,.,, iEAOC 111 11 1 1 111111 eL

vBM rAE uRT sES ?

wY dbS e

r rP i eE E EI uhL L LR qtN B B BT eoO A A A rRR R RR eI.

T EET E EE rnn A PPNP P PP oo

mT G EO *** O * O * * * fN SMO 222 11 1 3 S 222121 tE MLNL M ML ssM UEI U UE rae U MNAY M MN ue

i. R I NTA N olI I

v T NANR N NA 1

HOPS I I I H t1 N MCCS M HC a- I

9 d3. N t eO 1 1 da . I pi3 T l l uv

v A e e oE U v v rro L T e e op

B C L l f r,a A A 8 neT , , sot

mS w l w ui eM o e o tt mE L M v L w aiau T E e o tdrS w T L wL sna

%Y o S o opS L ) Y , L w

s S h o lec tT w e g wL bdaN o t) P i o- r aehA L us I H Ll e rptL - nd R - - em e epP l i n T l l vi v pi g

he mo e M eeT orni

gv c E v E vL s ntiie 0e N e T e p s i rHL 1 s I L S L runi en

h - ( B Y h eeom nhtger 0 R r S grtki r atiM i re B9 U e eaat e ni

E Hut ( T t P HtWMaP nno_ T - sa p n a U - a i iim l~_

S esW oy o N W E l

Y re ol i I |eWl

@ith er o oi c d s nS url L n t A _l 9 ul oont e n. a M e M sePPI i csP e ,o

i / s ss w a k=fm. Y s sA et s AB t M s L esnnl S l ,

lCe_ R rne i E e G reooa p tP P eV pp n T V O PViiue sS m oo I S P ssnd - e. @ y

l nr oo Y r l rssao

- b_Qp

sT li os LL l S o N oeeMMl

N eat r a t O et rr yE wt ce u R c I w c p pS S a

m )) n E a S y a p pM M mi

N M y n a.i rO N ro 12 a T e S reuuPP htI I DCRT (( M A h E DRSSSS l t

_ T A W R e e_ C T D P rgmi

_ N N E P nnaU O . . . . . E . U . . . . . . aisF C abcd e F a S abcdcf hc

caeP l h

A ptI

R . . . *T 1 2 3

gBjima[F gnh$* ' EZ ~ gY t

Page 6: Proposed tech specs 3/4.3.7.1 'Radiation Monitoring ...

Attachment 2to U-602025.

LS-88-042-

' Page 6 of 7

4

TABLE 3.3.9-1(Continued]

PLANT SYSTEMS ACTUATION INSTRUMENTATION

ACTIO:;

ACTION 50 - With the number of OPERABLE channels less than required bythe Minimum OPERABLE Channels per Trip System requirement:

rW.+h one cunnena. A for 1 trip a:ter e inoperable channe ^ ) nd/;;-t

_tb:_t _trp ut: in the tripped condition witMe-e S2%ebr declare PMS inoperable and take th. 20t x o = -Specification 3.6.3.4 ACMN

h +% m Wen ole cCIfnMopb-th trip :ytt , eclare The 5FMS inoperable andb.~

ake t taction pecification 3.6.3.4.Acmn

ACTION 51 - With the number o PERABLE channels less than required bythe Minimum OPERABLE channels per Trip System re uirement.

declare the $PMS system inoperable and take th~ M;; of |cct

Specification 3.6.3.4.. -_-

M 10t4 5 b r b ,c_ LI h E nt Ipr y': M " ' N ---

.

-b With the number of ' OPERABLE channels less than required by theMinimum OPERABLE Channels per containment n ray loop requirement: W -

|ca; cent;!, ;.,t ;pr q l up, p';c ct ':;;t en :nopcichls ch.a d inth: trip;;d c:ndit!:r i th ' 1 '=r ---4::1;r: th :::::ict:d '::p,

j incpcr;bic-h (L WMb one chnnet 'inopexane p%ce we . nope <A\e chance \ inM }3

M ped CondWon wl%in '2A Nas or decAaye 4he, cWsociedeclP s

Icop inoperMe and %ke me Acno9 e4 Spec;f:<. Hen 3,e,.3.7. ,

L b. W+h rnere 4%n one. cbnne\ in6ps.cae , dedan Sne hM5ocia.ked icep toeper,Aie, osnd tnke he Action of spec;E:c. Mon gG.3.2.. g _-_-_- - - -

-

. _j-. : n-,

N ~ -4, With the num6er of 0PERABLE channels less than required by the~Minimui OPERABLE Channels per containment spray loop requirement-fee-

%u lvve , declare the associated loop inoperable ana + axe we.s^

Acriota of Sped 9;cm+-ton '3.G 3 ~Z --

,=p__ pg - _.-w-

- '

__ =---

'" ~

ACT)ota 54For the feedwater system / main turbine trip systemi

1. With the number of OPERABLE channels one less than required by theMinimum OPERABLE P'annels requirement, restore the inoperable channelto OPERABLE status within 7 days or be in at least STARTUP within thenext 6 hours.

2. With tha number of OPERABLE channels two less than required by the.

Minimum OPERABLE Channels requirement, rest]re at least one of theinoperable channels to OPERABLE status within 72 hours or be in atleast STARTUP within the next 6 hours.

CLINTON - UNIT 1 3/4 3-100 Amendment No.4C1

1

I_ _ _ _ _

I

Page 7: Proposed tech specs 3/4.3.7.1 'Radiation Monitoring ...

._ _ _ - _ _ _ _ . - ---- - --

[[g

n . TABLE 4.3.9.1-1 bha PLANT SYSTEMS ACTUATION INSTRUMENTATION SURVEILLANCE REQUIREMENTS-

od*- .

' 14 >*

~qE Cl!ANNEL OPERATIONAL

CilANNEL FUNCTIONAL CHANNEL CONDITIONS IN WICH Oj:-

Z TRIP FUNCTION CHECK TEST CALIBRATION SURVEILLANCE REQUIRED T1. CONTAINMENT SPRAY SYSTEM .. A '

da. Dryw 11 Pressure-High 5 -H-k R 1,2,3 gA ] ,b. Containment Pressure-High Sc. Reactor Vessel Water Level-Low (c -H- Q , R 1, 2, 3

Low Low, Level-1 S L -ft Q R(a),

1,2,3d. Timers NA 44 R 1, 2, 3e. Manual Initiation NA NA 1,2,3

$ 2. FEEDWATER SYSTEM / MAIN TURBINE TRIP SYSTEM

T a. Reactor Vessel Water Level-High,y Level 8 5 -H- Q R. 1' SUPPRESSION POOL MAY,EUP

a. 'Drywell Pressure-High 5 -ft- Q , R(3) 1, 2, 3a

b. Reactor Vessel Water Level - ILow Low Low, level 1 S -H-Qh R(a) 1, 2, 3

c. Suppression Pool Water Leve Flow Low S 45-Q R(b) 1, 2, 3

E d. Suppression Pool Hakeup Tiner NA -H- Q Q 1, 2, 3,

e. SPMS Manual Initiation NA R NA 1, 2, 3 '

[ f. SPMS Mode Switch Permissive NA R NA 1,2,3?

EC"N 'a

(a)Calibra.te the anatap tri module at least once ever days. ||?g i

oa no*

(b) Calibrate the anaiag ompar+ tor unit at least once everyf-3t days. o 1: 3 gn m :r

0- % *"gg~ v,

,i

?

-

- . _