Proposed Predictability, Dynamics & Ensemble Forecasting Expert Team

13
Proposed Predictability, Dynamics & Ensemble Forecasting Expert Team Richard Swinbank Masayuki Kyouda GIFS-TIGGE WG, Exeter, June 2013

description

Proposed Predictability, Dynamics & Ensemble Forecasting Expert Team. Richard Swinbank Masayuki Kyouda. GIFS-TIGGE WG, Exeter, June 2013. Contents. Post-THORPEX plans Evolution of GIFS-TIGGE Proposed expert team Discussion…. WWRP structure. 3. 3. Legacy THORPEX. PCPI. MJO TF. WGSIP. - PowerPoint PPT Presentation

Transcript of Proposed Predictability, Dynamics & Ensemble Forecasting Expert Team

Page 1: Proposed Predictability, Dynamics & Ensemble Forecasting Expert Team

Proposed Predictability, Dynamics & Ensemble Forecasting Expert Team

Richard SwinbankMasayuki Kyouda

GIFS-TIGGE WG, Exeter, June 2013

Page 2: Proposed Predictability, Dynamics & Ensemble Forecasting Expert Team

Contents

Post-THORPEX plansEvolution of GIFS-TIGGEProposed expert teamDiscussion…

Page 3: Proposed Predictability, Dynamics & Ensemble Forecasting Expert Team

33

WWRP structure

Page 4: Proposed Predictability, Dynamics & Ensemble Forecasting Expert Team

4

Legacy THORPEX

4

Subseasonal to Seasonal Prediction

Project

Polar Prediction

Project

High Impact Weather Project

JWGFVRWGNR

/MFR

WGTMRWGSERA

PCPI

WGSIP

WGNE

SWFDP

MJO TF

WGDAOS WGPDP

Page 5: Proposed Predictability, Dynamics & Ensemble Forecasting Expert Team

5

WWRP structure and links to WCRP

5

Page 6: Proposed Predictability, Dynamics & Ensemble Forecasting Expert Team

TIGGE – Research focus

The TIGGE project (& GIFS-TIGGE working group) was originally focused on the technical work enabling the establishment of the TIGGE archive dataset. The main scientific aspects of THORPEX were covered by Predictability & Dynamical Processes WG, and also Data Assimilation & Observing Systems WG(s).Following the successful establishment of the TIGGE dataset, the focus of the GIFS-TIGGE working group has shifted towards research on ensemble forecasting. Particular topics of interest include:

a posteriori calibration of ensemble forecasts; combination of ensembles produced by multiple models; research on and development of probabilistic forecast products.

More recently, we have broadened our range of interest to cover improvement of EPSs, including:

representing uncertainties in initial conditions stochastic physics & other techniques to account for model error

Page 7: Proposed Predictability, Dynamics & Ensemble Forecasting Expert Team

Virtuous Circle

Develop,Improve

Evaluate,Diagnose

Ensemble Forecasts

To improve EPSs we need to develop a virtuous circle – best with a single group with focus on ensemble prediction

Page 8: Proposed Predictability, Dynamics & Ensemble Forecasting Expert Team

TIGGE development

Calibration, combination, products

EPS improvement

Time

Evolution of TIGGE & GIFS

GIFS-TIGGE should also be a forum to focus on R&D directed at improving our EPS systems, to help us develop a “virtuous circle”.

We introduced a section of the WG meeting for discussing ensemble initial conditions, stochastic physics & other aspects of improving our EPSs.

We also need to maintain an interest in ensemble verification & links with convective-scale EPS and the new sub-seasonal to seasonal group.

Page 9: Proposed Predictability, Dynamics & Ensemble Forecasting Expert Team

Looking forward -A proposed new working group

The logical evolution of an increased focus on research would be the creation of a Predictability Dynamics & Ensemble Forecasting working group, combining much of the current GIFS-TIGGE and PDP groups.

This new group would provide a centre of scientific expertise on dynamics, predictability and ensemble forecasting that is currently lacking in the core WWRP programme.

Page 10: Proposed Predictability, Dynamics & Ensemble Forecasting Expert Team

Scope

A centre of scientific expertise on dynamics, predictability and ensemble forecasting

Bridge between academic & operational communities Promote use of TIGGE and TIGGE-LAM Scientific issues include

Growth & evolution of errors Stochastic representation of unresolved processes

Short- to medium-range forecast timescales (potentially longer)

Page 11: Proposed Predictability, Dynamics & Ensemble Forecasting Expert Team

Relationship with other teams / groups

Clear linkages with WGNE and other WWRP expert teams

Numerical modelling, ensembles, data assimilation, stochastic parameterization & evaluation all closely linked on weather forecast & climate timescales.

Too big for a single expert team – need a set of more specialised teams.

Providing expert support to WWRP projects (S2S, PPP, HIW, RDPs & FDPs)

Page 12: Proposed Predictability, Dynamics & Ensemble Forecasting Expert Team

Other issues

Development of severe weather products Would fit well into scope of proposed HIW project

Technical management of data archives Ongoing management could be done by a liaison group of

archive centres & some or all data providers. Could report to PDEF team (or HIW project)? Representative

of technical group on ET.

Transition arrangements Work towards merger of GIFS-TIGGE and PDP groups at end

of 2014 New members of both groups chosen for role in new team.

Page 13: Proposed Predictability, Dynamics & Ensemble Forecasting Expert Team

Next Steps

Discuss here and at joint THORPEX/ICSC and WWRP/JSC meeting.

What is the process for approving the new group?