Proposed EmKey Resources Pipeline — Color Version
-
Upload
andy-leahy -
Category
Documents
-
view
11.372 -
download
0
description
Transcript of Proposed EmKey Resources Pipeline — Color Version
OCTOBER 2012
Outline• Preliminary Meeting to review EmKey’s potential pipeline project• Pipeline Utilization
– Transport natural gas from newly developed Shale exploration– Allow access to local municipalities and end users
• Route– Anticipated route from Morrisville to Windsor
• Estimated length of 75 mile– Plan to utilize ROW acquired from Norse– Incorporate route/approval previously received from PSC
• 16” steel pipeline Case 09-T-0499– Currently reviewing ROW
• Type of Pipeline– Currently Engineering for Utilization– Steel Pipeline
• Coated steel from 16” to 24”• Pressure rating of approximately 1400 psi
• Type of PSC Filing– Article 7 Filing– PSC to be lead agency
Outline• List of necessary approving agencies
– PSC• Environmental and Safety
– Army Corps of Engineers• River crossings & wetlands
– NYS Office of Parks Recreation and Historic Preservation• Archeological studies
– Federal and NYSDEC Wetlands• Open and wooded wetland crossings
– NYSDOT• Road use and crossings
– County • Road use and crossings• Soil and water
– Townships• Road use and crossings
– NYS Agriculture and Markets• Active fields/crop land• Conservation districts
– NYSDEC Soil & Water• SWPPP• SPDES permitting
• Taps– Dominion, Tennessee and Millennium– End user taps as feasible
• Compression – Currently under evaluation
Outline• Time Line
– Review existing ROW• Currently finalizing
– Notification to ROW land owners• End of month
– Flag and survey route• Possibly start end of month
– Select areas– Visual Inspection
• Possibly end of month– Prepare PSC application
• First or second quarter of 2013– Installation dependent on permitting and approval of SGEIS
• Additional Meetings– PSC will require additional public meetings as part of the application process– Town/County meeting as needed
• Comments and Questions