PROPOSED DRAINAGE - naga.gov.phnaga.gov.ph/wp-content/uploads/2017/12/7_005839-2017-01P.pdf ·...
Transcript of PROPOSED DRAINAGE - naga.gov.phnaga.gov.ph/wp-content/uploads/2017/12/7_005839-2017-01P.pdf ·...
PROJECT TITLE PREPARED BY: RECOMMENDED BY:
SHEET
NO.
O
Y
T
I
C
A
G
A
N
F
O
F
F
I
C
I
AL
S
E
A
L
1
9 4
8
ASSISTANT CITY ENGINEER
JOHN G. BONGAT
1
5
7
5
REPUBLIC OF THE PHILIPPINES
OFFICE OF THE CITY ENGINEER
CITY OF NAGA
1
5
7
3
GAUDENCIO A. ASIS JR.
APPROVED BY:
CITY ENGINEER CITY MAYOR
LEON B. PALMIANO IV
CONCURRED BY:
CHRISTOPHER B. ARCEENGINEER I
LOCATION: NAGA CITY SCHOOL OF ARTS & TRADES,
SABANG, NAGA CITY
CHECKED BY:
PROPOSED DRAINAGE
EMMEL M. ADAQUEENGINEER II
LOCATION MAP
PROPOSED DRAINAGELOCATION: NAGA CITY SCHOOL OF ARTS & TRADES, SABANG, NAGA CITY
PROJECT ID.NO : 005839-2017-01
THIS SITE
PROJECT TITLE PREPARED BY: RECOMMENDED BY:
SHEET
NO.
O
Y
T
I
C
A
G
A
N
F
O
F
F
I
C
I
AL
S
E
A
L
1
9 4
8
ASSISTANT CITY ENGINEER
JOHN G. BONGAT
1
5
7
5
REPUBLIC OF THE PHILIPPINES
OFFICE OF THE CITY ENGINEER
CITY OF NAGA
1
5
7
3
GAUDENCIO A. ASIS JR.
APPROVED BY:
CITY ENGINEER CITY MAYOR
LEON B. PALMIANO IV
CONCURRED BY:
CHRISTOPHER B. ARCEENGINEER I
LOCATION: NAGA CITY SCHOOL OF ARTS & TRADES,
SABANG, NAGA CITY
CHECKED BY:
PROPOSED DRAINAGE
EMMEL M. ADAQUEENGINEER II
PLAN VIEWSCALE 1:1000m
A L I G N M E N T - 2
A
L
I G
N
M
E
N
T
- 3
A L I G
N
M
E
N
T
- 4
ELE
M
EN
TA
R
Y
SC
H
O
O
L
A
D
E
H
I
J
K
M
N
L
O
B
C
FG
FLOOD GATE
(SEE DETAIL)
PROJECT TITLE PREPARED BY: RECOMMENDED BY:
SHEET
NO.
O
Y
T
I
C
A
G
A
N
F
O
F
F
I
C
I
AL
S
E
A
L
1
9 4
8
ASSISTANT CITY ENGINEER
JOHN G. BONGAT
1
5
7
5
REPUBLIC OF THE PHILIPPINES
OFFICE OF THE CITY ENGINEER
CITY OF NAGA
1
5
7
3
GAUDENCIO A. ASIS JR.
APPROVED BY:
CITY ENGINEER CITY MAYOR
LEON B. PALMIANO IV
CONCURRED BY:
CHRISTOPHER B. ARCEENGINEER I
LOCATION: NAGA CITY SCHOOL OF ARTS & TRADES,
SABANG, NAGA CITY
CHECKED BY:
PROPOSED DRAINAGE
EMMEL M. ADAQUEENGINEER II
0+000
10
.8
6
8.8
14
0+020
10
.7
7
8.8
62
0+040
10
.5
7
8.9
09
0+060
10
.1
2
8.9
57
0+080
10
.0
0
9.0
05
0+100
9.8
3
9.0
52
0+120
9.1
00
0+142.50
10
.0
0
9.1
48
0.24%
TOP OF PAVEMENT
PROPOSED INVERT ELEVATION
REINFORCED CONCRETE BOX CULVERT DRAINAGE
38.34 M.
MAIN ROAD
13.48 M.
Alignment - (2) PROFILE
8
10
12
8
10
12
0+000
10
.1
5
9.0
00
0+020
9.7
3
9.0
60
0+040
9.7
3
9.1
20
0+060
9.7
2
9.1
80
0.30%
Alignment - (1) PROFILE
0+072.65
Alignment - (3) PROFILE
8
10
8
10
0+000
9.7
5
9.0
51
0+020
9.8
1
9.1
13
0+040
9.7
6
9.1
75
0+060
0.31%
PROPOSED INVERT ELEVATION
PROPOSED INVERT ELEVATION
TOP OF PAVEMENT
TOP OF PAVEMENT
2.0
5
1.9
1
1.6
6
1.1
6
1.0
0
0.7
8
0.9
0
0.8
5
1.1
5
0.6
7
0.6
1
0.5
4
0.5
1
0.7
0
0.7
0
0.5
9
0.5
7
8
10
12
8
10
12
ABD CEHIJK
LNOH
MN
FG
9.7
3
9.2
2
10
.0
0
9.7
8
9.2
1
0.10
CONCRETE CURB
SMOOTH CEMENT FIN.
0.10
150mmTHK CHB
SIDE ELEVATION
2"x2"x
1
4
" Angle Bar Frame
CONCRETE CURB
SMOOTH CEMENT FIN.
150mmTHK CHB
12-1X
1
4
" FLAT BAR
sp. @ 1.5" O.C.
2"x2"x
1
4
" Angle Bar Frame
0.50m
FRONT ELEVATION
0.50 to 0.60
0.1
0
0.05 0.40 0.05
.15 0.20
0.06 0.06
3-12mmØ CUT BARS
SPACED EQUALLY
BOTHWAYS
12mmØ BAR HANDLE
.15
4.0
0cm
DRAINAGE COVER DETAIL
DRAINAGE INLET DETAIL
12-1X
1
4
" FLAT BAR
sp. @ 1.5" O.C.
1.00
0.10 1.00
0.10
Pavement line
G R
O
U
N
D
0.10
VERIFY
0.10
1.00
0.10
0.10
PLA
IN
S
MO
OT
H F
IN
IS
H
0.10m
thk G
UT
TE
R
ground line
0.30
0.10
0.60
0.60
LengthWidth Depth LocationDesignation
58.31 m 1.00 m 1.15mE-F & G-I
CHBD 1
CHB BOX TYPE DRAINAGE 1 CROSS-SECTION
PROJECT TITLE PREPARED BY: RECOMMENDED BY:
SHEET
NO.
O
Y
T
I
C
A
G
A
N
F
O
F
F
I
C
I
AL
S
E
A
L
1
9 4
8
ASSISTANT CITY ENGINEER
JOHN G. BONGAT
1
5
7
5
REPUBLIC OF THE PHILIPPINES
OFFICE OF THE CITY ENGINEER
CITY OF NAGA
1
5
7
3
GAUDENCIO A. ASIS JR.
APPROVED BY:
CITY ENGINEER CITY MAYOR
LEON B. PALMIANO IV
CONCURRED BY:
CHRISTOPHER B. ARCEENGINEER I
LOCATION: NAGA CITY SCHOOL OF ARTS & TRADES,
SABANG, NAGA CITY
CHECKED BY:
PROPOSED DRAINAGE
EMMEL M. ADAQUEENGINEER II
0.80
1.00
0.10
0.80
0.10 0.60 0.10
0.10
0.40
0.20
0.10
VERIFY
0.10
ground line
G R
O
U
N
D
G R
O
U
N
D
ground line
CHB BOX TYPE DRAINAGE 2 CROSS-SECTION
LengthWidth Depth LocationDesignation
26.00 m 0.80 m 0.88m A-B & C-D
CHBD 2
0.50
PROJECT TITLE PREPARED BY: RECOMMENDED BY:
SHEET
NO.
O
Y
T
I
C
A
G
A
N
F
O
F
F
I
C
I
AL
S
E
A
L
1
9 4
8
ASSISTANT CITY ENGINEER
JOHN G. BONGAT
1
5
7
5
REPUBLIC OF THE PHILIPPINES
OFFICE OF THE CITY ENGINEER
CITY OF NAGA
1
5
7
3
GAUDENCIO A. ASIS JR.
APPROVED BY:
CITY ENGINEER CITY MAYOR
LEON B. PALMIANO IV
CONCURRED BY:
CHRISTOPHER B. ARCEENGINEER I
LOCATION: NAGA CITY SCHOOL OF ARTS & TRADES,
SABANG, NAGA CITY
CHECKED BY:
PROPOSED DRAINAGE
EMMEL M. ADAQUEENGINEER II
0.80
0.80
0.10
0.60
0.10
0.40
0.20
0.10
VERIFY
0.10
ground line
corridor line
G R
O
U
N
D
C O
R
R
I D
O
R
1.00
0.10
0.10
CHB BOX TYPE DRAINAGE 3 & 4 CROSS-SECTION
LengthWidth Depth LocationDesignation
68.14 m 0.80 m 0.58m L - O
CHBD 3
52.09 m 0.80 m 0.64m M - N
CHBD 4
PROJECT TITLE PREPARED BY: RECOMMENDED BY:
SHEET
NO.
O
Y
T
I
C
A
G
A
N
F
O
F
F
I
C
I
AL
S
E
A
L
1
9 4
8
ASSISTANT CITY ENGINEER
JOHN G. BONGAT
1
5
7
5
REPUBLIC OF THE PHILIPPINES
OFFICE OF THE CITY ENGINEER
CITY OF NAGA
1
5
7
3
GAUDENCIO A. ASIS JR.
APPROVED BY:
CITY ENGINEER CITY MAYOR
LEON B. PALMIANO IV
CONCURRED BY:
CHRISTOPHER B. ARCEENGINEER I
LOCATION: NAGA CITY SCHOOL OF ARTS & TRADES,
SABANG, NAGA CITY
CHECKED BY:
PROPOSED DRAINAGE
EMMEL M. ADAQUEENGINEER II
12mm HORIZONTAL RSB
SP. @ 200mm O.C.
ALTERNATELY LAID
16mm VERTICAL
RSB EXTERIOR U-BARS
SP. @ 200mm O.C.
ALTERNATELY WITH
INTERIOR U-BARS
16mm VERTICAL
RSB INTERIOR U-BARS
SP. @ 200mm O.C.
ALTERNATELY WITH
EXTERIOR U-BARS12mm RSB EXTRA BAR
SP. @ 200mm O.C.
16mm RSB BENT BAR
SP. @ 200mm O.C.
12mm RSB EXTRA BAR
SP. @ 200mm O.C.
16mm RSB BENT BAR
SP. @ 200mm O.C.
0.20
VERIFY
0.20
WIDTH
0.20 WIDTH - 0.40 0.20
LengthWidth Depth
Location
7.00 m
5.00 m 1.00 m 1.15mO - H
D - E1.00 m 0.80m
Designation
RCBC 3
RCBC 4
38.34 m1.20 m 1.87mI - K
RCBC 1
AVE. DEPTH
RCBC DRAINAGE 1,2,3 & 4 CROSS-SECTION
7.00 mF - G1.00 m 1.00m
RCBC 2
12mm HORIZONTAL RSB
SP. @ 200mm O.C.
16mm VERTICAL
RSB U-BARS
SP. @ 200mm O.C.
0.15
VERIFY
0.15
WIDTH
0.15 WIDTH-0.30 0.15
pavement linepavement line
5- 12mm HORIZONTAL RSB
EQUALLY SPACED O.C.
5- 12mm HORIZONTAL RSB
EQUALLY SPACED O.C.
Ave. Depth
LengthWidth Depth
LocationDesignation
B - C6.00 m 0.80 m 0.90m
RCBC 5
RCBC 5 DRAINAGE CROSS-SECTION
SLAB REINFORCEMENT LAYOUT
Z
Z/4 Z/4Z/2
Z/3
BOTTOM SLAB
TOP SLAB
12mm HORIZONTAL RSB
SP. @ 200mm O.C.
ALTERNATELY LAID
16mm RSB BENT UP BAR
SP. @ 200mm O.C.
ALTERNATELY LAID
W/ TOP BAR
16mm RSB
TOP BAR
SP. @ 200mm O.C.
12mm RSB EXTRA BAR
AT THE BOTTOM OF TOP BAR
SP. @ 200mm O.C.
12mm HORIZONTAL RSB
SP. @ 200mm O.C.
ALTERNATELY LAID
16mm RSB BENT DOWN BAR
SP. @ 200mm O.C.
ALTERNATELY LAID
W/ TOP BAR
16mm RSB
BOTTOM BAR
SP. @ 200mm O.C.
12mm RSB EXTRA BAR
AT THE TOP OF BOTTOM BAR
SP. @ 200mm O.C.
0.20
0.10
0.10
PROJECT TITLE PREPARED BY: RECOMMENDED BY:
SHEET
NO.
O
Y
T
I
C
A
G
A
N
F
O
F
F
I
C
I
AL
S
E
A
L
1
9 4
8
ASSISTANT CITY ENGINEER
JOHN G. BONGAT
1
5
7
5
REPUBLIC OF THE PHILIPPINES
OFFICE OF THE CITY ENGINEER
CITY OF NAGA
1
5
7
3
GAUDENCIO A. ASIS JR.
APPROVED BY:
CITY ENGINEER CITY MAYOR
LEON B. PALMIANO IV
CONCURRED BY:
CHRISTOPHER B. ARCEENGINEER I
LOCATION: NAGA CITY SCHOOL OF ARTS & TRADES,
SABANG, NAGA CITY
CHECKED BY:
PROPOSED DRAINAGE
EMMEL M. ADAQUEENGINEER II
A A
2.9
5
1.5
01
.4
5
1.3
5
0.1
5
1.5
0
1.2
00
.3
0
3.0
0
1.3
0
3" x3" x
1
4
" angle bar
frame
1.5" dia Nut
Handle
1.5" dia shaft
lifting mechanism
6m thk
Steel plate Gate
Flood Gate Elevation Detail
1.00
0.70 0.150.15
0.65 0.100.10
0.0
8
3" x3" x
1
4
" angle bar frame
12mm dia
Bolts & nuts
sp. @ 0.30m O.C.
3" x 3" x
1
4
"
Angle Bar
Frame
1.5" x 1.5" x 3/16" Angle Bar
guide
1
4
" thk stopper
6" thk CHB
Flood Gate Section A-A
1.5" dia handle
3" x 3" x
1
4
"
Angle Bar
Frame
0.50
Flood Gate Handle
1
4
" thk stopper
3" x3" x
1
4
" angle bar frame3" x3" x
1
4
" angle bar frame
1.5" x1.5" x 3/16"
angle bar stiffener
6m thk
Steel plate Gate
Rubber Gasket
1.5
0
0.85
1.5 dia shaft
Flood Gate Steel Plate Detail