Proposal & Report Template · Transportation Engineers’ (ITE) Trip Generation Manual, 9th...
Transcript of Proposal & Report Template · Transportation Engineers’ (ITE) Trip Generation Manual, 9th...
Traffic Impact Study | 13201 River Road – Richmond, BC i
MMM Group | October 2016 | 5016236-001
5016236-001-REP-01-Rev1 (TIS)
STANDARD LIMITATIONS
This report was prepared by MMM Group (MMM) for the account of Spire Construction Inc.
(the Client). The disclosure of any information contained in this report is the sole responsibility
of the Client. The material in this report reflects MMM's best judgment in light of the
information available to it at the time of preparation. Any use which a third party makes of this
report, or any reliance on or decisions to be made based on it, are the responsibility of such
third parties. MMM accepts no responsibility for damages, if any, suffered by a third party as a
result of decisions made or actions based on this report.
Prepared by: __________________________
Julian Cheung, EIT
Reviewed by: __________________________
Mark Merlo, M.A.Sc., P.Eng, PTOE
Approved by: __________________________
Floris van Weelderen, P.Eng, PTOE
ii
PROJECT TEAM MEMBER LIST
Project Manager: Mark Merlo, M.A.Sc,. P.Eng, PTOE
Technical Staff: Julian Cheung, EIT
Traffic Impact Study | 13201 River Road – Richmond, BC iii
MMM Group | October 2016 | 5016236-001
5016236-001-REP-01-Rev1 (TIS)
TABLE OF CONTENTS
1. INTRODUCTION .................................................................................. 1
2. SITE CONTEXT ................................................................................... 3
2.1 Proposed Development ........................................................................... 3
3. METHODOLOGY ................................................................................. 5
4. FINDINGS ............................................................................................ 7
4.1 Existing Traffic Conditions ...................................................................... 7
4.1.1 Existing Road Geometry......................................................................... 7
4.1.1 Existing Traffic Volumes ......................................................................... 7
4.1.1 Transit Service ........................................................................................ 9
4.1.2 Pedestrian and Cyclist Facilities and Volumes ...................................... 9
4.2 Future Traffic Conditions ......................................................................... 9
4.2.1 Future Background Traffic ...................................................................... 9
4.2.2 Site-Generated Traffic Volumes ............................................................. 9
4.2.3 Total Future Traffic ............................................................................... 10
4.3 Operational Analysis .............................................................................. 12
4.3.1 Existing (2015) Traffic ........................................................................... 12
4.3.2 Future (2026) Background Traffic (without Development) ................... 12
4.3.3 Future (2026) Total Traffic .................................................................... 13
4.4 Vehicle Parking / On-site Layout Review .............................................. 14
4.4.1 Off-Street Parking Requirements and Provisions ................................ 14
4.4.2 Site Access and Internal Circulation .................................................... 15
5. RECOMMENDATIONS ...................................................................... 16
6. SUMMARY AND CONCLUSIONS .................................................... 16
iv
LIST OF FIGURES
Figure 1.1 – Site Location ............................................................................................................ 2
Figure 2.1 – Proposed Site Plan .................................................................................................. 4
Figure 4.1 – Existing Laning Configuration .................................................................................. 8
LIST OF TABLES
Table 2.1 – Site Description ......................................................................................................... 3
Table 4.1 - Existing Intersection Traffic Control and Geometry .................................................. 7
Table 4.2 – Proposed Development Trip Rates .......................................................................... 9
Table 4.3 – Site-Generated Traffic Volumes ............................................................................. 10
Table 4.4 – Trip Distribution within the Study Area ................................................................... 10
Table 4.5 – Effect of Site-Generated Traffic in 2026 ................................................................. 11
Table 4.6 – Existing (2015) Operational Analysis ..................................................................... 12
Table 4.7 – Future (2026) Background Traffic Operational Analysis ........................................ 13
Table 4.8 – Future (2026) Total Traffic Operational Analysis ................................................... 13
Table 4.9 – On-Site Parking Requirements ............................................................................... 14
APPENDICES
Appendix A – Raw Traffic Count Data
Appendix B – Turning Movement Figures
Appendix C – Synchro Analysis Results
Appendix D – AutoTURN Analysis
Traffic Impact Study | 13201 River Road – Richmond, BC 1
MMM Group | October 2016 | 5016236-001
5016236-001-REP-01-Rev1 (TIS)
1. INTRODUCTION
Spire Construction Inc. proposes to construct a 73,000 sq. ft. distribution warehouse facility with
83 parking stalls and 15 loading bays. The proposed warehouse development is located at
13201 River Road in Richmond, BC. The site is bounded by River Road to the north and
existing industrial development to the east, south and west. Site access would be provided by
one all movement access on River Road with a potential connection / access to the adjacent
property on the east in the future. The site will not be served by rail.
As part of the Project Permit Application, Port Metro Vancouver (Port) has identified the need
for a Traffic Impact Study (TIS) which provides:
An assessment of current site traffic as well as truck and/or rail traffic volumes anticipated,
on site circulation, traffic distribution throughout the day and impacts to adjacent and
nearby roads, access/egress and storage analysis for vehicles and/or rail cars accessing
site as well as parking requirements; and
Includes proposed hours of operation and staffing number and dimensioned site plan,
showing circulation, buildings, new line painting, proposed rail tracks and any other
proposed features.
Consequently, Spire Construction Inc. retained MMM Group to prepare a Traffic Impact Study
which addresses the Port’s requirements.
Situated in Port Metro Vancouver formerly Fraser Richmond Port Lands, Figure 1.1 shows the
location of the proposed site.
2
Figure 1.1 – Site Location
(Source: City of Richmond)
Traffic Impact Study | 13201 River Road – Richmond, BC 3
MMM Group | October 2016 | 5016236-001
5016236-001-REP-01-Rev1 (TIS)
2. SITE CONTEXT
2.1 Proposed Development
Table 2.1 describes the site and Figure 2.1 illustrates the proposed site plan.
Table 2.1 – Site Description
Item Description
Location relevant to existing transportation systems:
The site is bounded by River Road to the north and existing
industrial development to the east, south and west
The site is accessible from Knight Street via Bridgeport Road,
No.5 Road and River Road.
Proposed land uses:
Industrial warehouse – Warehouses are primarily devoted to
the storage of materials, but they may also include office and
maintenance areas.
Proposed development size:
Industrial warehouse with a surface parking lot:
Building – 74,040 sq.ft.
Office – 5,700 sq. ft.
Warehouse – 68,270 sq. ft.
Planned phasing of development: One phase
Proposed access points and type of access: One all-movement vehicle and truck access point on River
Road.
Horizon year(s) for traffic: 2026
4
Figure 2.1 – Proposed Site Plan
(Source: Christopher Bozky Architects Ltd.)
Traffic Impact Study | 13201 River Road – Richmond, BC 5
MMM Group | October 2016 | 5016236-001
5016236-001-REP-01-Rev1 (TIS)
3. METHODOLOGY
In order to address the requirements, MMM Group completed the following work plan:
Reviewed site plans and statistics for the proposed development.
Confirmed Terms of Reference for the Traffic Impact Study with the Port which will highlight key
assumptions to be used.
o Study Area Intersections:
River Road / No.5 Road
River Road / Site Access
o The study scenarios consist of:
Existing (2016) weekday a.m. and p.m. peak hour
Future (2026) weekday a.m. and p.m. peak hour without development
Future (2026) weekday a.m. and p.m. peak hour with development
Conducted a site visit on October 6, 2016. Visited the site and surroundings to clearly
understand the site development in terms of current access, street laning, parking, pedestrian
and cyclist facilities, transit, and traffic control measures.
Conducted a data collection program:
o Conducted turning movement counts at the study area intersections for the weekday
a.m. and p.m. peak periods on September 29, 2016 and October 4, 2016.
Assessed traffic impacts:
o Documented the existing transportation network in terms of pedestrian, cyclist, transit,
vehicle facilities (e.g. road network) and activity (i.e. traffic volumes).
o Assessed impact of committed system improvements during each future scenario.
Identified transportation system improvements that the Port reports as programmed,
committed, or highly likely during the study period. Project probable changes in traffic
patterns.
o Estimated growth in through traffic (background growth). Use recent growth trends in
traffic volumes along River Road to make this projection.
o Identified study area development within horizon years. Identified significant study area
developments that have been approved or are likely to occur during the study period.
Obtain the type of land use to be developed for input into trip generation calculations.
o Estimated trip generation. Based on information in relevant reports (e.g. Institute of
Transportation Engineers’ (ITE) Trip Generation Manual, 9th Edition), estimate the
future trip generation for the site as well as significant study area developments.
o Estimated directional distribution. Use the analogy method to project directional trip
distribution for each of the developments.
o Assigned traffic. Assign the generated and distributed traffic to the anticipated horizon
year study area network.
6
o Estimated total traffic for each study period. Sum the study area and through traffic. The
assigned volumes were checked for logic, considering the conditions that will result if
the forecast traffic volumes are realized.
o Analyzed intersection operating conditions. Used Synchro 9 software to evaluate
operating parameters including level of service (LOS), volume to capacity ratio (v/c ratio)
and queuing patterns (95th percentile queues) at study intersections and site driveways
for each study scenario. Tabulated the operating parameters and highlight the
advantages and disadvantages of each scenario.
o Formulated mitigation alternatives. If the operating parameters identify LOS, v/c ratio, or
queue deficiencies at study area intersections; investigated improvements in access,
geometry, or operations.
Reviewed site access and circulation.
o Reviewed traffic interaction at the point where the development site joins the
transportation network with a view to ensure that the site accesses are safe, efficient,
and adequate for traffic operations along the road network.
o Identified any measures required to ensure adequate and efficient traffic operation on-
site and at the site accesses.
o Identified truck circulation routes and conduct a geometric review of the proposed
loading area using AutoTURN software to test turning maneuvers of Design Vehicle
(e.g. Tractor-Trailer truck (WB-20)).
Analyzed parking requirements. Confirm and compare the parking (vehicle) requirements
against:
o ITE Parking Generation, 4th Edition and BC Ministry of Transportation and Infrastructure
Parking and Trip Generation Rates Manual.
o City of Richmond Off-Street Parking and Loading By-Law.
Traffic Impact Study | 13201 River Road – Richmond, BC 7
MMM Group | October 2016 | 5016236-001
5016236-001-REP-01-Rev1 (TIS)
4. FINDINGS
4.1 Existing Traffic Conditions
4.1.1 Existing Road Geometry
Table 4.1 describes the intersections in the vicinity of the proposed development while Figure
4.1 illustrates the laning configuration of the roadway network adjacent to the site..
Table 4.1 - Existing Intersection Traffic Control and Geometry
Intersection Control Type Direction of
Major Flow Left-turn Lanes
Cyclist
Amenities
Pedestrian
Amenities
River Road /
No.5 Road
Minor Street
Stop Control
Eastbound in Weekday
a.m. peak and Westbound
in weekday p.m. peak
South Approach None Crosswalks on the
south approach
River Road / Site
Access
Minor Street
Stop Control
Eastbound in Weekday
a.m. peak and Westbound
in weekday p.m. peak
None None None
Key findings include:
River Road becomes a private gated road under the Knight Street Bridge, to the east of
the site.
The Richmond Official Community Plan (OCP) indicates that River Road is planned to be
a future Greenway / Trail and No.5 Road is planned to be a major street bike route.
A grade crossing with STOP sings is located south of River Road on No.5 Road and is
stop controlled.
Parking is allowed on No.5 Road and limited to the gravel shoulders on River Road.
4.1.1 Existing Traffic Volumes
Existing (2016) weekday a.m. and p.m. peak hour traffic volumes at the study locations are
based on turning movement counts conducted by MMM Group in September and October 2016
which are illustrated in Appendix B. Key findings include:
AM peak hour traffic is primarily travelling west on River Road towards the warehouses
west of No.5 Road.
PM peak hour traffic is primarily travelling east on River Road towards No.5 Road.
Traffic at the study area intersection is primarily oriented to/from No.5 Road, with two-way
traffic volumes on No.5 ranging between approximately 370 vehicles in the a.m. peak
hour and 645 vehicles in the p.m. peak hour.
Trucks comprise up to 7% of a.m. and 3% of p.m. of the peak hour traffic.
8
Figure 4.1 – Existing Laning Configuration
Traffic Impact Study | 13201 River Road – Richmond, BC 9
MMM Group | October 2016 | 5016236-001
5016236-001-REP-01-Rev1 (TIS)
4.1.1 Transit Service
The nearest bus stop is provided on Vulcan Way just south of the site which is currently served
by TransLink bus route 407 Bridgeport.
4.1.2 Pedestrian and Cyclist Facilities and Volumes
Sidewalks and pedestrian ramps are provided on both sides of No.5 Road but not on River
Road. Pedestrian and cyclist volumes within the study area are presented in Appendix A.
4.2 Future Traffic Conditions
The following study scenarios were evaluated:
Future (2026) weekday a.m. and p.m. peak hour without development
Future (2026) weekday a.m. and p.m. peak hour with development
4.2.1 Future Background Traffic
Illustrated in Appendix B, the future (2026) background traffic volumes were projected based
on an annual growth rate of 2% within the study area.
4.2.2 Site-Generated Traffic Volumes
Based on the information provided by the client, the prospective tenants are expected to have
approximately 40 employees and +/- 30 truck movements per day. This would suggest that the
heaviest volumes are during the a.m. and p.m. peak hours when employees arrive and leave
the warehouse. This is typical of warehouse developments of this size.
The trip generation rates for the proposed development and site-generated traffic volumes are
presented in Tables 4.2 and 4.3. Note that the trip generation for the warehouse components
has been calculated using the fitted curve equations provided in the Trip Generation Manual,
9th Edition (Washington, DC: ITE, 2008) and are considered conservative, or high. The small
office space uses the average trip rate as the square footage falls outside the cluster data set.
Table 4.2 – Proposed Development Trip Rates
Land Use ITE
Land Use Code
Independent
Variable Time Period
Directional Distribution Trip Rate
(veh trips / unit) Enter Exit
Industrial 150 – Warehousing 1,000 sq. ft.
Weekday
a.m. 79% 21% 0.98
Weekday
p.m. 25% 75% 0.68
Office
175 – Single
Tenant Office
Building
1,000 sq. ft.
Weekday
a.m. 89% 11% 1.80
Weekday
p.m. 15% 85% 1.74
10
Table 4.3 – Site-Generated Traffic Volumes
Time Period Variable Traffic Volume (vph)1
In Out Total
Weekday a.m. Peak
Hour 74 x 1,000 sq.ft. 60 15 75
Weekday p.m. Peak
Hour 74 x 1,000 sq.ft. 15 45 60
Note: 1 – Rounded to the nearest five.
When completed, the proposed development is expected to generate:
About 75 vehicle trips (= 60 entering + 15 exiting) during the weekday a.m. peak hour,
and
About 60 vehicle trips (= 15 entering + 45 exiting) during the weekday p.m. peak hour.
Site-generated traffic was distributed and assigned to the road network based on the expected
travel patterns at the study area intersection. The trip distribution for the proposed development
is summarized in Table 4.4.
Table 4.4 – Trip Distribution within the Study Area
Direction
Weekday a.m. Peak Hour Weekday p.m. Peak Hour
In Out In Out
South 75% 75% 75% 75%
East 0% 0% 0% 0%
West 25% 25% 25% 25%
Total 100% 100% 100% 100%
Based on the estimated trip generation and distribution described above, the assignment of the
site-generated traffic to the roadway network is illustrated in Appendix B.
4.2.3 Total Future Traffic
Future (2026) Total traffic volumes were determined by adding the site-generated traffic
volumes to the 2026 future traffic volumes without the site. Total traffic volumes at build out of
Building 4 are illustrated in Appendix B.
Before undertaking the capacity analysis, it is important to first understand the percentage effect
that the site-generated traffic will have at each of the intersections in the study network. More
specifically, it will provide a perspective for the capacity assessment in order to determine if the
site-generated traffic has a material effect on each of the intersections being considered. Table
4.5 shows the predicted percentage changes in traffic flows at the main intersections within the
study area for the weekday a.m. and p.m. peak periods.
Traffic Impact Study | 13201 River Road – Richmond, BC 11
MMM Group | October 2016 | 5016236-001
5016236-001-REP-01-Rev1 (TIS)
Table 4.5 – Effect of Site-Generated Traffic in 2026
Intersection / Segment
Weekday a.m. Peak Hour Weekday p.m. Peak Hour
Background
Traffic (vph)
Total Traffic
(vph)
Percent
Change
Background
Traffic (vph)
Total Traffic
(vph)
Percent
Change
River Road / No.5 Road 480 555 +16% 840 895 +7%
Notes: Traffic volumes rounded to the nearest five; vph = vehicles per hour
Key findings include:
River Road / No.5 Road - traffic volumes in 2026 are anticipated to increase by 16% due
to site-generated traffic during the a.m. peak hour and 7% during the p.m. peak hour
when compared to the total background traffic.
12
4.3 Operational Analysis
Synchro (Version 9) macroscopic traffic simulation software was used to evaluate performance
of intersections in the study area for the study scenarios. All results are based upon the
Highway Capacity Manual (Washington DC: Transportation Research Board, 2010) intersection
capacity reports generated by the software. Reported measures of traffic performance include
volume to capacity (v/c) ratio, a delay-based traffic Level of Service (LOS) indicator ranging
from LOS A (low delay) to LOS F (long delay) conditions, as well as the 95th percentile queue.
As a target or design parameter, the following is considered appropriate for the study area:
Signalized Intersections – LOS D and v/c < 0.90 for all movements
Non-signalized Intersections – LOS D for individual movements
Operational analyses are conducted for the following scenarios for the weekday a.m. and p.m.
peak hours:
Existing (2016)
Future (2026) without proposed development
Future (2026) with proposed development
The Synchro analysis reports can be found in Appendix C.
4.3.1 Existing (2015) Traffic
Table 4.6 summarizes the results of the operational and queue analyses of the existing (2016)
traffic conditions for the weekday a.m. and p.m. peak hours.
The key finding is that the study intersection is currently operates at acceptable levels of service
and volume to capacity ratios (i.e. LOS B or better and v/c = 0.44 or lower) during the weekday
a.m. and p.m. peak hours.
Table 4.6 – Existing (2015) Operational Analysis
Intersection Movement1
Weekday
a.m. Peak Hour
Weekday
p.m. Peak Hour
LOS2 V/C Delay
(s)
Queue
(m) LOS2 V/C
Delay
(s)
Queue
(m)
River Road / No.5
Road
(Minor Street Stop
Controlled)
EB TR A 0.10 0 0 A 0.21 0 0
WB LT A 0.00 2 1 A 0.03 4 1
NB L B 0.26 11 8 B 0.44 15 17
NB R A 0.01 9 1 A 0.02 9 1
Notes: 1. NB = Northbound, etc., L = Left, T = Through, R = Right
2. LOS for the intersection is based on intersection capacity utilization
4.3.2 Future (2026) Background Traffic (without Development)
Table 4.7 summarizes the results of the operational and queue analyses of the Future 2026
Background Traffic conditions for the weekday a.m. and p.m. peak hours.
Traffic Impact Study | 13201 River Road – Richmond, BC 13
MMM Group | October 2016 | 5016236-001
5016236-001-REP-01-Rev1 (TIS)
In the Future 2026 Background Traffic scenario the key intersection is expected to operate at
acceptable levels of service and volume to capacity ratios (i.e. LOS C or better and v/c = 0.59 or
lower) during the weekday a.m. and p.m. peak hours.
Table 4.7 – Future (2026) Background Traffic Operational Analysis
Intersection Movement1
Weekday
a.m. Peak Hour
Weekday
p.m. Peak Hour
LOS2 V/C Delay
(s)
Queue
(m) LOS2 V/C
Delay
(s)
Queue
(m)
River Road / No.5
Road
(Minor Street Stop
Controlled)
EB TR A 0.12 0 0 A 0.26 0 0
WB LT A 0.00 2 1 A 0.04 5 1
NB L B 0.33 11 11 C 0.59 19 29
NB R A 0.01 9 1 A 0.03 10 1
Notes: 1. NB = Northbound, etc., L = Left, T = Through, R = Right
2. LOS for the intersection is based on intersection capacity utilization
4.3.3 Future (2026) Total Traffic
Table 4.8 summarizes the results of the operation and queue analyses of the Future (2026)
Total traffic conditions (i.e. Future (2026) Background conditions + development traffic) for the
weekday a.m. and p.m. peak hours at the study area intersection and site driveways. Key
findings include:
In the Future 2026 Total Traffic scenario the key intersections are expected to operate at
acceptable levels of service and volume to capacity ratios (i.e. LOS D or better and v/c = 0.69 or
lower) during the weekday a.m. and p.m. peak hours.
Table 4.8 – Future (2026) Total Traffic Operational Analysis
Intersection Movement1
Weekday
a.m. Peak Hour
Weekday
p.m. Peak Hour
LOS2 V/C Delay
(s)
Queue
(m) LOS2 V/C
Delay
(s)
Queue
(m)
River Road / Access
(Minor Street Stop
Controlled)
EB TR A 0.05 0 0 A 0.01 0 0
WB LT A 0.00 0 0 A 0.00 0 0
NB LR A 0.02 9 1 A 0.05 9 1
River Road / No.5
Road
(Minor Street Stop
Controlled)
EB TR A 0.13 0 0 A 0.26 0 0
WB LT A 0.01 4 1 A 0.07 5 2
NB L B 0.36 12 12 D 0.69 26 40
NB R A 0.07 9 2 A 0.04 10 1
Notes: 1. NB = Northbound, etc., L = Left, T = Through, R = Right
2. LOS for the intersection is based on intersection capacity utilization
14
4.4 Vehicle Parking / On-site Layout Review
4.4.1 Off-Street Parking Requirements and Provisions
As summarized in Table 4.9, application of the Port’s parking policy1 results in a minimum
requirement of 52 parking spaces for the proposed development. The proposed parking supply
of 83 stalls meets the Port’s parking policy.
Table 4.9 – On-Site Parking Requirements
Source Variable Parking Ratio
Parking
Requirement
(Spaces)
Note
Fraser River Port Authority
parking policy1
5,770 sq.ft. 1.0 space per 1,000 sq.ft. for office space 6 1
68,270 sq.ft. 1.0 space per 1,500 sq.ft. for industrial
floor space 46 1
Total 52
ITE Parking Demand
5,770 sq.ft. 2.47 spaces per 1,000 sq. ft. of office
space 14 2
68,270 sq.ft. 0.51 spaces per 1,000 sq. ft. of
warehouse space 35 2
Total 49
City of Richmond
530 m2 3.0 spaces per 100 m2 of office storage 16 3
6,342 m2 1.0 spaces per 100 m2 of commercial
storage 64 3
Total 80
Notes: GFA – Gross Floor Area; GLA – Gross Leasable Area
1. Fraser Richmond Development Traffic Impact Assessment (Burnaby, BC: Delcan, October 2005).
2. ITE Parking Generation, 4th Edition Land Use: 150 Warehousing and 701 Office Building
3. City of Richmond’s Parking and Loading bylaw: General and Heavy Industrial; and Office
Using the ITE parking supply ratio, the proposed development (73,986 sq.ft.) would need to
provide at least 49 vehicle parking stalls. The proposed parking supply of 83 vehicle stalls
exceeds ITE’s estimated parking demand of 49 parking spaces which is based on multiple site
studies to account for the generally accepted principle in parking supply / demand analysis that
a supply of parking operates at optimum efficiency when occupancy is between 85% and 95%
of the available supply. The excess spaces provide a “cushion” to allow for the dynamics of
vehicles moving in and out of parking stalls and to reduce the time required to search for the
last few available spaces.
Applying the City of Richmond’s Parking and Loading bylaw, the proposed development would
need to provide at least 80 parking stalls.
Traffic Impact Study | 13201 River Road – Richmond, BC 15
MMM Group | October 2016 | 5016236-001
5016236-001-REP-01-Rev1 (TIS)
4.4.2 Site Access and Internal Circulation
It is expected that semi-trailer trucks would use the major arterial roads such as No.5 Road and
Bridgeport Road to access Hwy 99 (Oak Street Bridge) and the Knight Street Bridge. During the
field review semi-trailer trucks appear to have difficulty maneuvering at the intersection of River
Road and No.5 Road. Semi-trailer trucks making an eastbound right would encroach onto the
oncoming northbound lane. Due to the low volumes and industrial neighbourhood, passenger
vehicles and semi-trailer trucks would yield to one another to create sufficient space.
A geometric review of vehicle and truck movements of the proposed development on the
adjacent road network using AutoTURN software can be found in Appendix C. The following
design vehicles are used for the analysis:
WB-17 (total length = 19.5 m) representing semi-trailer trucks.
Note that 46 foot trailers are the largest expect to service this site, as indicated
in the drawings provided by the client.
Key findings of the site access and circulation review include:
The largest vehicles that can service the site are WB-17s based on site circulation.
Concurrent entry and exit at the truck access appears to be limited by the width of the
driveway.
Where possible, the traveled way is typically widened in conflict zones to
accommodate the concurrent movement of two trucks traveling in opposite
directions. This involves converting / removing some parking /storage spaces,
modifying structural elements, and adjusting landscaped areas adjacent to the
River Road (see sheets 1 and 2). Given truck drivers typically yield to one
another and concurrent movement is limited, the 9.0 m driveway appears to be
sufficiently wide enough to serve the site.
Stopping and parking should be restricted on the adjacent road to better facilitate semi-
trailer truck movement on River Road.
The City of Richmond did not indicate any truck limitations on River Road; however, very
limited semi-trailer trucks were observed on River Road east of No.5 Road. Many of the
warehouse sites along River Road have access on Vulcan Way. The approximate road width
along River Road varies but is approximately 4.5 to 5.5 metres wide. This is likely due, in part,
to the fact that the road is on a dyke. Given the width of a standard truck is 2.6 m it would be
difficult for two trucks to pass each other along the road. It is recommended that potential
mitigation measures be reviewed and implemented.
16
5. RECOMMENDATIONS
In light of the findings, the following recommendations are forwarded for consideration:
1. River Road is narrow and located on a dyke. Given the width of a standard truck is 2.6 m
it would be difficult for two trucks to pass each other along the road. It is recommended
that potential mitigation measures be reviewed and implemented to accommodate trucks
on River Road. At the site access, given truck drivers typically yield to one another and
concurrent movement is limited, the driveway appears to be sufficiently wide enough to
serve the site.
2. Signage should be provided on River Road to restrict stopping / parking adjacent to the
site in order to facilitate better semi-trailer truck movement on River Road.
6. SUMMARY AND CONCLUSIONS
Spire Construction Inc. proposes to construct a 73,000 sq. ft. distribution warehouse facility
with 83 parking stalls and 15 loading bays. The proposed warehouse development is located at
13201 River Road in Richmond, BC. The site is bounded by River Road to the north and
existing industrial development to the east, south and west. Site access would be provided by
one all movement access on River Road with a potential connection / access to the adjacent
property on the east. The site will not be served by rail.
Traffic at the study area intersection is primarily oriented to/from No.5 Road, with two-way
traffic volumes on No.5 ranging between approximately 370 vehicles in the a.m. peak
hour and 645 vehicles in the p.m. peak hour.
Trucks comprise up to 7% (a.m.) and 3% (p.m.) of the peak hour traffic.
When completed, the proposed development is expected to generate about 75 vehicle
trips (= 60 entering + 15 exiting) during the weekday a.m. peak hour, and about 60
vehicle trips (= 15 entering + 45 exiting) during the weekday p.m. peak hour.
No.5 Road / River Road
Traffic volumes in 2026 are anticipated to increase by 16% due to site-generated traffic
during the a.m. peak hour and 7% during the p.m. peak hour when compared to the total
background traffic.
The study intersection is currently operates at acceptable levels of service and volume to
capacity ratios (i.e. LOS B or better and v/c = 0.44 or lower) during the weekday a.m. and
p.m. peak hours.
In the Future 2026 Background Traffic scenario the key intersection is expected to
operate at acceptable levels of service and volume to capacity ratios (i.e. LOS C or better
and v/c = 0.59 or lower) during the weekday a.m. and p.m. peak hours.
In the Future 2026 Total Traffic scenario the key intersections are expected to operate at
acceptable levels of service and volume to capacity ratios (i.e. LOS D or better and v/c =
0.69 or lower) during the weekday a.m. and p.m. peak hours.
Traffic Impact Study | 13201 River Road – Richmond, BC 17
MMM Group | October 2016 | 5016236-001
5016236-001-REP-01-Rev1 (TIS)
Applying the City of Richmond’s Parking and Loading bylaw results in a minimum
requirement of 80 parking spaces for the proposed development. The proposed parking
supply of 83 stalls meets the City’s parking policy.
Applying the Port’s parking policy results in a minimum requirement of 52 parking spaces
for the proposed development. The proposed parking supply of 83 stalls meets the Port’s parking policy.
Recommendations to mitigate operational issues attributed to the proposed development
are included in the report.
18
This page intentionally left blank
Transportation Impact Study | 13201 River Road – Richmond, BC A-1
MMM Group | October 2016 | 5016236-001
5016236-001-REP-01-Rev1 (TIS)
AP
PE
ND
IX A
— R
aw
Tra
ffic C
ou
nt D
ata
Appendix A – Raw Traffic Count Data
A-2
This page intentionally left blank.
Major Route: No.5 Road
Minor Route: River Road
Municipality: Richmond
Filename:
Date:
Day-of-week: Thursday
Speed Limit Major Rte: 50 km/hr
Speed Limit Minor Rte: 50 km/hr
East/West Route: River Road
Intersection Type:
Signalized (y/n?): n
Weather: Clear
Lanes Bus
TLR R (ch) TR T TL L Grade Near Far Bay
North Approach
South Approach 1
West Approach 1
East Approach 1
note: (ch) - channelized A: parallel lane B: taper
Start Duration
A.M. Shift 7:00 2.00
Noon Shift 13:30 0.00
P.M. Shift 16:00 2.00
Total 4.00
Comments:
Notes: North Approach - vehicles approaching intersection from the north
15x4 - 15 min volume (from max 15 minute period [+] in peak hour period [*]) x 4
Pedestrians - N indicates pedestrians crossing north approach (east/west)
Bikes - treat same way as cars (N = bikes approaching from the north)
Page 1
3-leg south approach
Bus Stop
VEHICLE TURNING MOVEMENT SURVEY
29-Sep-16
Jul-19-2007-03
5016236-001-TCS-01-Rev0 (River Rd. & No.5 Rd.)
AM Peak Period Location: No.5 Road @ River Road
Date:
Notes: Bikes and peds not included in following data
Time NORTH Approach SOUTH Approach WEST Approach EAST Approach Total
Period Left Thru Right Left Thru Right Left Thru Right Left Thru Right Volume N S W E N S W E
7:00 27 4 1 15 0 3 50 0 0 0 0 0 4 2 0
7:15 25 4 0 15 3 1 48 0 0 0 0 0 1 2 0
7:30 37 3 3 25 1 0 69 0 0 0 0 0 0 4 0
7:45 43 1 2 29 2 2 79 0 0 0 0 0 1 2 0
8:00 44 2 2 31 0 2 81 0 0 0 0 0 1 1 0
8:15 45 2 4 34 2 2 89 0 0 0 0 0 1 2 0
8:30 46 6 5 38 1 1 97 0 0 0 0 0 0 5 0
8:45 80 1 4 36 1 5 127 0 1 0 1 0 1 5 0
Total 347 23 21 223 10 16 640 0 1 0 1 0 9 23 0
Pk Hr 215 11 15 139 4 10 394 0 1 0 1 0 3 13 0
15x4 320 4 20 152 4 20
Avg Hr 174 12 11 112 5 8 320 0 1 0 1 0 5 12 0
Peak Hour 8:00
Peak 15min 8:45
North approach PHF Not Applicable
South approach PHF 0.70
West approach PHF 0.90
East approach PHF 0.58
AM Peak Hour Volumes
Bikes 0
HV% ######
0
- - -
- HV% Bikes
225 10 14 7.1% 0
4
Bikes HV% -
13 5.8% 154 15 26
139
215 - 11
143 226
HV% 4.9%
Bikes 3
Page 2
0
1
1
September 29, 2016
Pedestrians Bikes
0
N
Jul-19-2007-03
5016236-001-TCS-01-Rev0 (River Rd. & No.5 Rd.)
Noon Peak Period Location: No.5 Road @ River Road
Date:
Notes: Bikes and peds not included in following data
Time NORTH Approach SOUTH Approach WEST Approach EAST Approach Total
Period Left Thru Right Left Thru Right Left Thru Right Left Thru Right Volume N S W E N S W E
Total
Pk Hr
15x4
Avg Hr
Peak Hour Not Applicable
Peak 15min Not Applicable
North Leg PHF Not Applicable
South Leg PHF Not Applicable
West Leg PHF Not Applicable
East Leg PHF Not Applicable
Noon Peak Hour Volumes
Bikes
HV% ######
0
- - -
- HV% Bikes
0 - 0 ######
-
Bikes HV% -
###### 0 - 0
-
- - -
0 0
HV% ######
Bikes
Page 3
September 29, 2016
Pedestrians Bikes
N
Jul-19-2007-03
5016236-001-TCS-01-Rev0 (River Rd. & No.5 Rd.)
PM Peak Period Location: No.5 Road @ River Road
Date:
Notes: Bikes and peds not included in following data
Time NORTH Approach SOUTH Approach WEST Approach EAST Approach Total
Period Left Thru Right Left Thru Right Left Thru Right Left Thru Right Volume N S W E N S W E
16:00 83 5 5 81 7 9 190 0 0 0 0 0 2 1 0
16:15 58 4 1 103 9 9 184 0 0 0 0 0 3 0 1
16:30 64 7 2 78 15 12 178 0 0 0 0 0 4 3 0
16:45 66 1 2 57 4 0 130 0 0 0 0 0 2 5 0
17:00 84 5 5 84 7 11 196 0 0 0 0 0 6 4 0
17:15 58 5 5 72 2 1 143 0 0 0 0 0 3 3 0
17:30 66 2 4 61 5 6 144 0 0 0 0 0 5 1 0
17:45 41 1 2 58 5 4 111 0 0 0 0 0 6 0 0
Total 520 30 26 594 54 52 1276 0 0 0 0 0 31 17 1
Pk Hr 272 17 10 322 35 32 688 0 0 0 0 0 15 12 1
15x4 336 20 4 412 60 48
Avg Hr 260 15 13 297 27 26 638 0 0 0 0 0 16 9 1
Peak Hour 16:15
Peak 15min 17:00
North Leg PHF Not Applicable
South Leg PHF 0.81
West Leg PHF 0.80
East Leg PHF 0.62
PM Peak Hour Volumes
Bikes 0
HV% ######
0
- - -
- HV% Bikes
304 32 67 0.0% 1
35
Bikes HV% -
12 2.7% 332 10 27
322
272 - 17
357 289
HV% 1.7%
Bikes 15
Page 4
0
0 0
0
September 29, 2016
Pedestrians Bikes
N
Jul-19-2007-03
5016236-001-TCS-01-Rev0 (River Rd. & No.5 Rd.)
Average Hour Period Location: No.5 Road @ River Road
NORTH Approach SOUTH Approach WEST Approach EAST Approach Total Pedestrians
Left Thru Right Left Thru Right Left Thru Right Left Thru Right Volume N S W E N S W E
Survey
Total 867 53 47 817 64 68 1916 1 1 40 40 1
Hours 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4
Avg Hr 217 14 12 205 16 17 479 1 1 10 10 1
AM Period
Total 347 23 21 223 10 16 640 0 1 0 1 0 9 23 0
Hours 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2
Avg Hr 174 12 11 112 5 8 320 0 1 0 1 0 5 12 0
Noon Period
Total
Hours 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
Avg Hr
PM Period
Total 520 30 26 594 54 52 1276 0 0 0 0 0 31 17 1
Hours 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2
Avg Hr 260 15 13 297 27 26 638 0 0 0 0 0 16 9 1
Average Hour Volumes
AM - - -
Noon - - -
PM - - -
Total - - -
AM Noon PM Total
- - - -
8 - 26 17
AM Noon PM Total 5 - 27 16
- - - -
11 - 13 12
112 - 297 205
AM 174 - 12
Noon - - -
PM 260 - 15
Total 217 - 14
Page 5
September 29, 2016
Bikes
Jul-19-2007-03
5016236-001-TCS-01-Rev0 (River Rd. & No.5 Rd.)
Major Route: No.5 Road
Minor Route: Access
Municipality: Richmond
Filename:
Date:
Day-of-week: Tuesday
Speed Limit Major Rte: 50 km/hr
Speed Limit Minor Rte: 50 km/hr
East/West Route: River Road
Intersection Type:
Signalized (y/n?): n
Weather: Clear
Lanes Bus
TLR R (ch) TR T TL L Grade Near Far Bay
North Approach
South Approach 1
West Approach 1
East Approach 1
note: (ch) - channelized A: parallel lane B: taper
Start Duration
A.M. Shift 7:00 2.00
Noon Shift 13:30 0.00
P.M. Shift 16:00 2.00
Total 4.00
Comments:
Notes: North Approach - vehicles approaching intersection from the north
15x4 - 15 min volume (from max 15 minute period [+] in peak hour period [*]) x 4
Pedestrians - N indicates pedestrians crossing north approach (east/west)
Bikes - treat same way as cars (N = bikes approaching from the north)
Page 1
VEHICLE TURNING MOVEMENT SURVEY
4-Oct-16
3-leg south approach
Bus Stop
Jul-19-2007-03
5016236-001-TCS-02-Rev0 (River Rd. & Access)
AM Peak Period Location: No.5 Road @ Access
Date:
Notes: Bikes and peds not included in following data
Time NORTH Approach SOUTH Approach WEST Approach EAST Approach Total
Period Left Thru Right Left Thru Right Left Thru Right Left Thru Right Volume N S W E N S W E
7:00 0 0 1 0 0 0 1 0 0 0 0 0 0 0 0
7:15 0 0 1 0 0 1 2 0 0 0 0 0 0 0 0
7:30 0 0 2 0 0 2 4 0 0 0 0 0 0 0 0
7:45 0 0 3 0 0 0 3 0 0 0 0 0 0 0 0
8:00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
8:15 0 0 2 0 0 0 2 0 0 0 0 0 0 0 0
8:30 0 0 1 0 0 0 1 0 0 0 0 0 0 0 0
8:45 0 0 2 0 0 2 4 0 0 0 0 0 0 0 0
Total 0 0 12 0 0 5 17 0 0 0 0 0 0 0 0
Pk Hr 0 0 7 0 0 3 10 0 0 0 0 0 0 0 0
15x4 0 0 12 0 0 8
Avg Hr 0 0 6 0 0 3 9 0 0 0 0 0 0 0 0
Peak Hour 7:00
Peak 15min 7:30
North approach PHF Not Applicable
South approach PHF #####
West approach PHF 0.58
East approach PHF 0.38
AM Peak Hour Volumes
Bikes 0
HV% ######
0
- - -
- HV% Bikes
3 3 3 0.0% 0
0
Bikes HV% -
0 0.0% 7 7 7
0
0 - 0
0 0
HV% ######
Bikes 0
Page 2
Pedestrians Bikes
0
0
0
0
October 4, 2016
N
Jul-19-2007-03
5016236-001-TCS-02-Rev0 (River Rd. & Access)
Noon Peak Period Location: No.5 Road @ Access
Date:
Notes: Bikes and peds not included in following data
Time NORTH Approach SOUTH Approach WEST Approach EAST Approach Total
Period Left Thru Right Left Thru Right Left Thru Right Left Thru Right Volume N S W E N S W E
Total
Pk Hr
15x4
Avg Hr
Peak Hour Not Applicable
Peak 15min Not Applicable
North Leg PHF Not Applicable
South Leg PHF Not Applicable
West Leg PHF Not Applicable
East Leg PHF Not Applicable
Noon Peak Hour Volumes
Bikes
HV% ######
0
- - -
- HV% Bikes
0 - 0 ######
-
Bikes HV% -
###### 0 - 0
-
- - -
0 0
HV% ######
Bikes
Page 3
Pedestrians Bikes
October 4, 2016
N
Jul-19-2007-03
5016236-001-TCS-02-Rev0 (River Rd. & Access)
PM Peak Period Location: No.5 Road @ Access
Date:
Notes: Bikes and peds not included in following data
Time NORTH Approach SOUTH Approach WEST Approach EAST Approach Total
Period Left Thru Right Left Thru Right Left Thru Right Left Thru Right Volume N S W E N S W E
16:00 0 0 2 0 0 2 4 0 0 0 0 0 0 1 1
16:15 0 0 2 0 0 3 5 0 0 0 0 0 0 0 0
16:30 0 0 3 0 0 10 13 0 0 0 0 0 0 0 0
16:45 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
17:00 0 0 1 0 0 1 2 0 0 0 0 0 0 1 0
17:15 0 0 0 0 0 2 2 0 0 0 0 0 0 0 0
17:30 0 0 1 0 0 0 1 0 0 0 0 0 0 0 0
17:45 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
Total 0 0 9 0 0 18 27 0 0 0 0 0 0 2 1
Pk Hr 0 0 7 0 0 15 22 0 0 0 0 0 0 1 1
15x4 0 0 12 0 0 40
Avg Hr 0 0 5 0 0 9 14 0 0 0 0 0 0 1 1
Peak Hour 16:00
Peak 15min 16:30
North Leg PHF Not Applicable
South Leg PHF #####
West Leg PHF 0.58
East Leg PHF 0.38
PM Peak Hour Volumes
Bikes 0
HV% ######
0
- - -
- HV% Bikes
15 15 15 0.0% 1
0
Bikes HV% -
1 0.0% 7 7 7
0
0 - 0
0 0
HV% ######
Bikes 0
Page 4
Pedestrians Bikes
October 4, 2016
0
0 0
0
N
Jul-19-2007-03
5016236-001-TCS-02-Rev0 (River Rd. & Access)
Average Hour Period Location: No.5 Road @ Access
NORTH Approach SOUTH Approach WEST Approach EAST Approach Total Pedestrians
Left Thru Right Left Thru Right Left Thru Right Left Thru Right Volume N S W E N S W E
Survey
Total 21 23 44 2 1
Hours 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4
Avg Hr 6 6 11 1 1
AM Period
Total 0 0 12 0 0 5 17 0 0 0 0 0 0 0 0
Hours 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2
Avg Hr 0 0 6 0 0 3 9 0 0 0 0 0 0 0 0
Noon Period
Total
Hours 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
Avg Hr
PM Period
Total 0 0 9 0 0 18 27 0 0 0 0 0 0 2 1
Hours 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2
Avg Hr 0 0 5 0 0 9 14 0 0 0 0 0 0 1 1
Average Hour Volumes
AM - - -
Noon - - -
PM - - -
Total - - -
AM Noon PM Total
- - - -
3 - 9 6
AM Noon PM Total 0 - 0 -
- - - -
6 - 5 6
0 - 0 -
AM 0 - 0
Noon - - -
PM 0 - 0
Total - - -
Page 5
Bikes
October 4, 2016
Jul-19-2007-03
5016236-001-TCS-02-Rev0 (River Rd. & Access)
Transportation Impact Study | 13201 River Road – Richmond, BC B-1
MMM Group | October 2016 | 5016236-001
5016236-001-REP-01-Rev1 (TIS)
AP
PE
ND
IX B
— T
urn
ing
Mo
ve
me
nt F
igu
res
Appendix B – Turning Movement Figures
B-2
This page intentionally left blank
Transportation Impact Study | 13201 River Road – Richmond, BC B-3
MMM Group | October 2016 | 5016236-001
5016236-001-REP-01-Rev1 (TIS)
Figure B.1 – Existing (2016) Traffic Volumes
B-4
Figure B.2 – Future (2026) Background Traffic Volumes
Transportation Impact Study | 13201 River Road – Richmond, BC B-5
MMM Group | October 2016 | 5016236-001
5016236-001-REP-01-Rev1 (TIS)
Figure B.3 – Site-Generated Trip Assignment
B-6
Figure B.4 – Future (2026) Total Traffic Volumes
Transportation Impact Study | Hopewell Distribution Centre, Building 4 – Richmond, BC C-1
MMM Group | October 2015 | 5015217-001
5016236-001-REP-01-Rev1 (TIS)
AP
PE
ND
IX C
— S
yn
ch
ro A
na
lys
is R
es
ults
Appendix C – Synchro Analysis Results
C-2
This page intentionally left blank.
5016236-001: 13201 River Road, Richmond, BC 3: No.5 Road & River Road
Lanes, Volumes, Timings Existing (2016) AM
P:\50-16000TR5\5016236-001 - 13201 River Road\Calculations\Synchro\5016236-001-SYN-01-Rev0 (Existing 2016 AM).syn
MMM Group 10/14/2016
Lane Group EBT EBR WBL WBT NBL NBR
Lane Configurations
Traffic Volume (vph) 15 139 4 10 215 11
Future Volume (vph) 15 139 4 10 215 11
Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900
Storage Length (m) 0.0 0.0 0.0 25.0
Storage Lanes 0 0 1 0
Taper Length (m) 2.5 2.5
Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00
Frt 0.878 0.850
Flt Protected 0.987 0.950
Satd. Flow (prot) 1654 0 0 1859 1789 1601
Flt Permitted 0.987 0.950
Satd. Flow (perm) 1654 0 0 1859 1789 1601
Link Speed (k/h) 50 50 48
Link Distance (m) 107.6 341.7 283.8
Travel Time (s) 7.7 24.6 21.3
Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92
Adj. Flow (vph) 16 151 4 11 234 12
Shared Lane Traffic (%)
Lane Group Flow (vph) 167 0 0 15 234 12
Enter Blocked Intersection No No No No No No
Lane Alignment Left Right Left Left Left Right
Median Width(m) 0.0 0.0 3.7
Link Offset(m) 0.0 0.0 0.0
Crosswalk Width(m) 1.6 1.6 1.6
Two way Left Turn Lane
Headway Factor 0.99 0.99 0.99 0.99 0.99 0.99
Turning Speed (k/h) 14 24 24 14
Sign Control Free Free Stop
Intersection Summary
Area Type: Other
Control Type: Unsignalized
Intersection Capacity Utilization 28.0% ICU Level of Service A
Analysis Period (min) 15
5016236-001: 13201 River Road, Richmond, BC 3: No.5 Road & River Road
HCM Unsignalized Intersection Capacity Analysis Existing (2016) AM
P:\50-16000TR5\5016236-001 - 13201 River Road\Calculations\Synchro\5016236-001-SYN-01-Rev0 (Existing 2016 AM).syn
MMM Group 10/14/2016
Movement EBT EBR WBL WBT NBL NBR
Lane Configurations
Traffic Volume (veh/h) 15 139 4 10 215 11
Future Volume (Veh/h) 15 139 4 10 215 11
Sign Control Free Free Stop
Grade 0% 0% 0%
Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92
Hourly flow rate (vph) 16 151 4 11 234 12
Pedestrians
Lane Width (m)
Walking Speed (m/s)
Percent Blockage
Right turn flare (veh)
Median type None None
Median storage veh)
Upstream signal (m)
pX, platoon unblocked
vC, conflicting volume 167 110 92
vC1, stage 1 conf vol
vC2, stage 2 conf vol
vCu, unblocked vol 167 110 92
tC, single (s) 4.1 6.4 6.2
tC, 2 stage (s)
tF (s) 2.2 3.5 3.3
p0 queue free % 100 74 99
cM capacity (veh/h) 1411 884 966
Direction, Lane # EB 1 WB 1 NB 1 NB 2
Volume Total 167 15 234 12
Volume Left 0 4 234 0
Volume Right 151 0 0 12
cSH 1700 1411 884 966
Volume to Capacity 0.10 0.00 0.26 0.01
Queue Length 95th (m) 0.0 0.1 8.1 0.3
Control Delay (s) 0.0 2.0 10.5 8.8
Lane LOS A B A
Approach Delay (s) 0.0 2.0 10.4
Approach LOS B
Intersection Summary
Average Delay 6.1
Intersection Capacity Utilization 28.0% ICU Level of Service A
Analysis Period (min) 15
5016236-001: 13201 River Road, Richmond, BC 6: Access & River Road
Lanes, Volumes, Timings Existing (2016) AM
P:\50-16000TR5\5016236-001 - 13201 River Road\Calculations\Synchro\5016236-001-SYN-01-Rev0 (Existing 2016 AM).syn
MMM Group 10/14/2016
Lane Group EBT EBR WBL WBT NBL NBR
Lane Configurations
Traffic Volume (vph) 7 0 0 3 0 0
Future Volume (vph) 7 0 0 3 0 0
Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900
Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00
Frt
Flt Protected
Satd. Flow (prot) 1883 0 0 1883 1883 0
Flt Permitted
Satd. Flow (perm) 1883 0 0 1883 1883 0
Link Speed (k/h) 50 50 48
Link Distance (m) 128.0 199.8 42.8
Travel Time (s) 9.2 14.4 3.2
Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92
Adj. Flow (vph) 8 0 0 3 0 0
Shared Lane Traffic (%)
Lane Group Flow (vph) 8 0 0 3 0 0
Enter Blocked Intersection No No No No No No
Lane Alignment Left Right Left Left Left Right
Median Width(m) 0.0 0.0 3.7
Link Offset(m) 0.0 0.0 0.0
Crosswalk Width(m) 1.6 1.6 1.6
Two way Left Turn Lane
Headway Factor 0.99 0.99 0.99 0.99 0.99 0.99
Turning Speed (k/h) 14 24 24 14
Sign Control Free Free Stop
Intersection Summary
Area Type: Other
Control Type: Unsignalized
Intersection Capacity Utilization 6.7% ICU Level of Service A
Analysis Period (min) 15
5016236-001: 13201 River Road, Richmond, BC 6: Access & River Road
HCM Unsignalized Intersection Capacity Analysis Existing (2016) AM
P:\50-16000TR5\5016236-001 - 13201 River Road\Calculations\Synchro\5016236-001-SYN-01-Rev0 (Existing 2016 AM).syn
MMM Group 10/14/2016
Movement EBT EBR WBL WBT NBL NBR
Lane Configurations
Traffic Volume (veh/h) 7 0 0 3 0 0
Future Volume (Veh/h) 7 0 0 3 0 0
Sign Control Free Free Stop
Grade 0% 0% 0%
Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92
Hourly flow rate (vph) 8 0 0 3 0 0
Pedestrians
Lane Width (m)
Walking Speed (m/s)
Percent Blockage
Right turn flare (veh)
Median type None None
Median storage veh)
Upstream signal (m)
pX, platoon unblocked
vC, conflicting volume 8 11 8
vC1, stage 1 conf vol
vC2, stage 2 conf vol
vCu, unblocked vol 8 11 8
tC, single (s) 4.1 6.4 6.2
tC, 2 stage (s)
tF (s) 2.2 3.5 3.3
p0 queue free % 100 100 100
cM capacity (veh/h) 1612 1009 1074
Direction, Lane # EB 1 WB 1 NB 1
Volume Total 8 3 0
Volume Left 0 0 0
Volume Right 0 0 0
cSH 1700 1612 1700
Volume to Capacity 0.00 0.00 0.00
Queue Length 95th (m) 0.0 0.0 0.0
Control Delay (s) 0.0 0.0 0.0
Lane LOS A
Approach Delay (s) 0.0 0.0 0.0
Approach LOS A
Intersection Summary
Average Delay 0.0
Intersection Capacity Utilization 6.7% ICU Level of Service A
Analysis Period (min) 15
5016236-001: 13201 River Road, Richmond, BC 3: No.5 Road & River Road
Lanes, Volumes, Timings Existing (2016) PM
P:\50-16000TR5\5016236-001 - 13201 River Road\Calculations\Synchro\5016236-001-SYN-01-Rev0 (Existing 2016 PM).syn
MMM Group 10/14/2016
Lane Group EBT EBR WBL WBT NBL NBR
Lane Configurations
Traffic Volume (vph) 10 322 35 32 272 17
Future Volume (vph) 10 322 35 32 272 17
Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900
Storage Length (m) 0.0 0.0 0.0 25.0
Storage Lanes 0 0 1 0
Taper Length (m) 2.5 2.5
Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00
Frt 0.869 0.850
Flt Protected 0.975 0.950
Satd. Flow (prot) 1637 0 0 1836 1789 1601
Flt Permitted 0.975 0.950
Satd. Flow (perm) 1637 0 0 1836 1789 1601
Link Speed (k/h) 50 50 48
Link Distance (m) 107.6 341.7 283.8
Travel Time (s) 7.7 24.6 21.3
Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92
Adj. Flow (vph) 11 350 38 35 296 18
Shared Lane Traffic (%)
Lane Group Flow (vph) 361 0 0 73 296 18
Enter Blocked Intersection No No No No No No
Lane Alignment Left Right Left Left Left Right
Median Width(m) 0.0 0.0 3.7
Link Offset(m) 0.0 0.0 0.0
Crosswalk Width(m) 1.6 1.6 1.6
Two way Left Turn Lane
Headway Factor 0.99 0.99 0.99 0.99 0.99 0.99
Turning Speed (k/h) 14 24 24 14
Sign Control Free Free Stop
Intersection Summary
Area Type: Other
Control Type: Unsignalized
Intersection Capacity Utilization 49.1% ICU Level of Service A
Analysis Period (min) 15
5016236-001: 13201 River Road, Richmond, BC 3: No.5 Road & River Road
HCM Unsignalized Intersection Capacity Analysis Existing (2016) PM
P:\50-16000TR5\5016236-001 - 13201 River Road\Calculations\Synchro\5016236-001-SYN-01-Rev0 (Existing 2016 PM).syn
MMM Group 10/14/2016
Movement EBT EBR WBL WBT NBL NBR
Lane Configurations
Traffic Volume (veh/h) 10 322 35 32 272 17
Future Volume (Veh/h) 10 322 35 32 272 17
Sign Control Free Free Stop
Grade 0% 0% 0%
Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92
Hourly flow rate (vph) 11 350 38 35 296 18
Pedestrians
Lane Width (m)
Walking Speed (m/s)
Percent Blockage
Right turn flare (veh)
Median type None None
Median storage veh)
Upstream signal (m)
pX, platoon unblocked
vC, conflicting volume 361 297 186
vC1, stage 1 conf vol
vC2, stage 2 conf vol
vCu, unblocked vol 361 297 186
tC, single (s) 4.1 6.4 6.2
tC, 2 stage (s)
tF (s) 2.2 3.5 3.3
p0 queue free % 97 56 98
cM capacity (veh/h) 1198 672 856
Direction, Lane # EB 1 WB 1 NB 1 NB 2
Volume Total 361 73 296 18
Volume Left 0 38 296 0
Volume Right 350 0 0 18
cSH 1700 1198 672 856
Volume to Capacity 0.21 0.03 0.44 0.02
Queue Length 95th (m) 0.0 0.7 17.1 0.5
Control Delay (s) 0.0 4.3 14.5 9.3
Lane LOS A B A
Approach Delay (s) 0.0 4.3 14.2
Approach LOS B
Intersection Summary
Average Delay 6.4
Intersection Capacity Utilization 49.1% ICU Level of Service A
Analysis Period (min) 15
5016236-001: 13201 River Road, Richmond, BC 6: Access & River Road
Lanes, Volumes, Timings Existing (2016) PM
P:\50-16000TR5\5016236-001 - 13201 River Road\Calculations\Synchro\5016236-001-SYN-01-Rev0 (Existing 2016 PM).syn
MMM Group 10/14/2016
Lane Group EBT EBR WBL WBT NBL NBR
Lane Configurations
Traffic Volume (vph) 7 0 0 15 0 0
Future Volume (vph) 7 0 0 15 0 0
Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900
Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00
Frt
Flt Protected
Satd. Flow (prot) 1883 0 0 1883 1883 0
Flt Permitted
Satd. Flow (perm) 1883 0 0 1883 1883 0
Link Speed (k/h) 50 50 48
Link Distance (m) 128.0 199.8 42.8
Travel Time (s) 9.2 14.4 3.2
Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92
Adj. Flow (vph) 8 0 0 16 0 0
Shared Lane Traffic (%)
Lane Group Flow (vph) 8 0 0 16 0 0
Enter Blocked Intersection No No No No No No
Lane Alignment Left Right Left Left Left Right
Median Width(m) 0.0 0.0 3.7
Link Offset(m) 0.0 0.0 0.0
Crosswalk Width(m) 1.6 1.6 1.6
Two way Left Turn Lane
Headway Factor 0.99 0.99 0.99 0.99 0.99 0.99
Turning Speed (k/h) 14 24 24 14
Sign Control Free Free Stop
Intersection Summary
Area Type: Other
Control Type: Unsignalized
Intersection Capacity Utilization 6.7% ICU Level of Service A
Analysis Period (min) 15
5016236-001: 13201 River Road, Richmond, BC 6: Access & River Road
HCM Unsignalized Intersection Capacity Analysis Existing (2016) PM
P:\50-16000TR5\5016236-001 - 13201 River Road\Calculations\Synchro\5016236-001-SYN-01-Rev0 (Existing 2016 PM).syn
MMM Group 10/14/2016
Movement EBT EBR WBL WBT NBL NBR
Lane Configurations
Traffic Volume (veh/h) 7 0 0 15 0 0
Future Volume (Veh/h) 7 0 0 15 0 0
Sign Control Free Free Stop
Grade 0% 0% 0%
Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92
Hourly flow rate (vph) 8 0 0 16 0 0
Pedestrians
Lane Width (m)
Walking Speed (m/s)
Percent Blockage
Right turn flare (veh)
Median type None None
Median storage veh)
Upstream signal (m)
pX, platoon unblocked
vC, conflicting volume 8 24 8
vC1, stage 1 conf vol
vC2, stage 2 conf vol
vCu, unblocked vol 8 24 8
tC, single (s) 4.1 6.4 6.2
tC, 2 stage (s)
tF (s) 2.2 3.5 3.3
p0 queue free % 100 100 100
cM capacity (veh/h) 1612 992 1074
Direction, Lane # EB 1 WB 1 NB 1
Volume Total 8 16 0
Volume Left 0 0 0
Volume Right 0 0 0
cSH 1700 1612 1700
Volume to Capacity 0.00 0.00 0.00
Queue Length 95th (m) 0.0 0.0 0.0
Control Delay (s) 0.0 0.0 0.0
Lane LOS A
Approach Delay (s) 0.0 0.0 0.0
Approach LOS A
Intersection Summary
Average Delay 0.0
Intersection Capacity Utilization 6.7% ICU Level of Service A
Analysis Period (min) 15
5016236-001: 13201 River Road, Richmond, BC 3: No.5 Road & River Road
Lanes, Volumes, Timings Future Background (2026) AM
P:\50-16000TR5\5016236-001 - 13201 River Road\Calculations\Synchro\5016236-001-SYN-02-Rev0 (FB 2026 AM).syn
MMM Group 10/14/2016
Lane Group EBT EBR WBL WBT NBL NBR
Lane Configurations
Traffic Volume (vph) 18 169 5 12 262 13
Future Volume (vph) 18 169 5 12 262 13
Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900
Storage Length (m) 0.0 0.0 0.0 25.0
Storage Lanes 0 0 1 0
Taper Length (m) 2.5 2.5
Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00
Frt 0.878 0.850
Flt Protected 0.986 0.950
Satd. Flow (prot) 1654 0 0 1857 1789 1601
Flt Permitted 0.986 0.950
Satd. Flow (perm) 1654 0 0 1857 1789 1601
Link Speed (k/h) 50 50 48
Link Distance (m) 107.6 341.7 283.8
Travel Time (s) 7.7 24.6 21.3
Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92
Adj. Flow (vph) 20 184 5 13 285 14
Shared Lane Traffic (%)
Lane Group Flow (vph) 204 0 0 18 285 14
Enter Blocked Intersection No No No No No No
Lane Alignment Left Right Left Left Left Right
Median Width(m) 0.0 0.0 3.7
Link Offset(m) 0.0 0.0 0.0
Crosswalk Width(m) 1.6 1.6 1.6
Two way Left Turn Lane
Headway Factor 0.99 0.99 0.99 0.99 0.99 0.99
Turning Speed (k/h) 14 24 24 14
Sign Control Free Free Stop
Intersection Summary
Area Type: Other
Control Type: Unsignalized
Intersection Capacity Utilization 32.6% ICU Level of Service A
Analysis Period (min) 15
5016236-001: 13201 River Road, Richmond, BC 3: No.5 Road & River Road
HCM Unsignalized Intersection Capacity Analysis Future Background (2026) AM
P:\50-16000TR5\5016236-001 - 13201 River Road\Calculations\Synchro\5016236-001-SYN-02-Rev0 (FB 2026 AM).syn
MMM Group 10/14/2016
Movement EBT EBR WBL WBT NBL NBR
Lane Configurations
Traffic Volume (veh/h) 18 169 5 12 262 13
Future Volume (Veh/h) 18 169 5 12 262 13
Sign Control Free Free Stop
Grade 0% 0% 0%
Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92
Hourly flow rate (vph) 20 184 5 13 285 14
Pedestrians
Lane Width (m)
Walking Speed (m/s)
Percent Blockage
Right turn flare (veh)
Median type None None
Median storage veh)
Upstream signal (m)
pX, platoon unblocked
vC, conflicting volume 204 135 112
vC1, stage 1 conf vol
vC2, stage 2 conf vol
vCu, unblocked vol 204 135 112
tC, single (s) 4.1 6.4 6.2
tC, 2 stage (s)
tF (s) 2.2 3.5 3.3
p0 queue free % 100 67 99
cM capacity (veh/h) 1368 855 941
Direction, Lane # EB 1 WB 1 NB 1 NB 2
Volume Total 204 18 285 14
Volume Left 0 5 285 0
Volume Right 184 0 0 14
cSH 1700 1368 855 941
Volume to Capacity 0.12 0.00 0.33 0.01
Queue Length 95th (m) 0.0 0.1 11.2 0.3
Control Delay (s) 0.0 2.1 11.3 8.9
Lane LOS A B A
Approach Delay (s) 0.0 2.1 11.2
Approach LOS B
Intersection Summary
Average Delay 6.5
Intersection Capacity Utilization 32.6% ICU Level of Service A
Analysis Period (min) 15
5016236-001: 13201 River Road, Richmond, BC 6: Access & River Road
Lanes, Volumes, Timings Future Background (2026) AM
P:\50-16000TR5\5016236-001 - 13201 River Road\Calculations\Synchro\5016236-001-SYN-02-Rev0 (FB 2026 AM).syn
MMM Group 10/14/2016
Lane Group EBT EBR WBL WBT NBL NBR
Lane Configurations
Traffic Volume (vph) 9 0 0 4 0 0
Future Volume (vph) 9 0 0 4 0 0
Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900
Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00
Frt
Flt Protected
Satd. Flow (prot) 1883 0 0 1883 1883 0
Flt Permitted
Satd. Flow (perm) 1883 0 0 1883 1883 0
Link Speed (k/h) 50 50 48
Link Distance (m) 128.0 199.8 42.8
Travel Time (s) 9.2 14.4 3.2
Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92
Adj. Flow (vph) 10 0 0 4 0 0
Shared Lane Traffic (%)
Lane Group Flow (vph) 10 0 0 4 0 0
Enter Blocked Intersection No No No No No No
Lane Alignment Left Right Left Left Left Right
Median Width(m) 0.0 0.0 3.7
Link Offset(m) 0.0 0.0 0.0
Crosswalk Width(m) 1.6 1.6 1.6
Two way Left Turn Lane
Headway Factor 0.99 0.99 0.99 0.99 0.99 0.99
Turning Speed (k/h) 14 24 24 14
Sign Control Free Free Stop
Intersection Summary
Area Type: Other
Control Type: Unsignalized
Intersection Capacity Utilization 6.7% ICU Level of Service A
Analysis Period (min) 15
5016236-001: 13201 River Road, Richmond, BC 6: Access & River Road
HCM Unsignalized Intersection Capacity Analysis Future Background (2026) AM
P:\50-16000TR5\5016236-001 - 13201 River Road\Calculations\Synchro\5016236-001-SYN-02-Rev0 (FB 2026 AM).syn
MMM Group 10/14/2016
Movement EBT EBR WBL WBT NBL NBR
Lane Configurations
Traffic Volume (veh/h) 9 0 0 4 0 0
Future Volume (Veh/h) 9 0 0 4 0 0
Sign Control Free Free Stop
Grade 0% 0% 0%
Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92
Hourly flow rate (vph) 10 0 0 4 0 0
Pedestrians
Lane Width (m)
Walking Speed (m/s)
Percent Blockage
Right turn flare (veh)
Median type None None
Median storage veh)
Upstream signal (m)
pX, platoon unblocked
vC, conflicting volume 10 14 10
vC1, stage 1 conf vol
vC2, stage 2 conf vol
vCu, unblocked vol 10 14 10
tC, single (s) 4.1 6.4 6.2
tC, 2 stage (s)
tF (s) 2.2 3.5 3.3
p0 queue free % 100 100 100
cM capacity (veh/h) 1610 1005 1071
Direction, Lane # EB 1 WB 1 NB 1
Volume Total 10 4 0
Volume Left 0 0 0
Volume Right 0 0 0
cSH 1700 1610 1700
Volume to Capacity 0.01 0.00 0.00
Queue Length 95th (m) 0.0 0.0 0.0
Control Delay (s) 0.0 0.0 0.0
Lane LOS A
Approach Delay (s) 0.0 0.0 0.0
Approach LOS A
Intersection Summary
Average Delay 0.0
Intersection Capacity Utilization 6.7% ICU Level of Service A
Analysis Period (min) 15
5016236-001: 13201 River Road, Richmond, BC 3: No.5 Road & River Road
Lanes, Volumes, Timings Future Background (2026) PM
P:\50-16000TR5\5016236-001 - 13201 River Road\Calculations\Synchro\5016236-001-SYN-02-Rev0 (FB 2026 PM).syn
MMM Group 10/14/2016
Lane Group EBT EBR WBL WBT NBL NBR
Lane Configurations
Traffic Volume (vph) 12 392 43 39 332 21
Future Volume (vph) 12 392 43 39 332 21
Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900
Storage Length (m) 0.0 0.0 0.0 25.0
Storage Lanes 0 0 1 0
Taper Length (m) 2.5 2.5
Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00
Frt 0.869 0.850
Flt Protected 0.974 0.950
Satd. Flow (prot) 1637 0 0 1834 1789 1601
Flt Permitted 0.974 0.950
Satd. Flow (perm) 1637 0 0 1834 1789 1601
Link Speed (k/h) 50 50 48
Link Distance (m) 107.6 341.7 283.8
Travel Time (s) 7.7 24.6 21.3
Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92
Adj. Flow (vph) 13 426 47 42 361 23
Shared Lane Traffic (%)
Lane Group Flow (vph) 439 0 0 89 361 23
Enter Blocked Intersection No No No No No No
Lane Alignment Left Right Left Left Left Right
Median Width(m) 0.0 0.0 3.7
Link Offset(m) 0.0 0.0 0.0
Crosswalk Width(m) 1.6 1.6 1.6
Two way Left Turn Lane
Headway Factor 0.99 0.99 0.99 0.99 0.99 0.99
Turning Speed (k/h) 14 24 24 14
Sign Control Free Free Stop
Intersection Summary
Area Type: Other
Control Type: Unsignalized
Intersection Capacity Utilization 57.7% ICU Level of Service B
Analysis Period (min) 15
5016236-001: 13201 River Road, Richmond, BC 3: No.5 Road & River Road
HCM Unsignalized Intersection Capacity Analysis Future Background (2026) PM
P:\50-16000TR5\5016236-001 - 13201 River Road\Calculations\Synchro\5016236-001-SYN-02-Rev0 (FB 2026 PM).syn
MMM Group 10/14/2016
Movement EBT EBR WBL WBT NBL NBR
Lane Configurations
Traffic Volume (veh/h) 12 392 43 39 332 21
Future Volume (Veh/h) 12 392 43 39 332 21
Sign Control Free Free Stop
Grade 0% 0% 0%
Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92
Hourly flow rate (vph) 13 426 47 42 361 23
Pedestrians
Lane Width (m)
Walking Speed (m/s)
Percent Blockage
Right turn flare (veh)
Median type None None
Median storage veh)
Upstream signal (m)
pX, platoon unblocked
vC, conflicting volume 439 362 226
vC1, stage 1 conf vol
vC2, stage 2 conf vol
vCu, unblocked vol 439 362 226
tC, single (s) 4.1 6.4 6.2
tC, 2 stage (s)
tF (s) 2.2 3.5 3.3
p0 queue free % 96 41 97
cM capacity (veh/h) 1121 610 813
Direction, Lane # EB 1 WB 1 NB 1 NB 2
Volume Total 439 89 361 23
Volume Left 0 47 361 0
Volume Right 426 0 0 23
cSH 1700 1121 610 813
Volume to Capacity 0.26 0.04 0.59 0.03
Queue Length 95th (m) 0.0 1.0 29.4 0.7
Control Delay (s) 0.0 4.6 19.1 9.6
Lane LOS A C A
Approach Delay (s) 0.0 4.6 18.5
Approach LOS C
Intersection Summary
Average Delay 8.2
Intersection Capacity Utilization 57.7% ICU Level of Service B
Analysis Period (min) 15
5016236-001: 13201 River Road, Richmond, BC 6: Access & River Road
Lanes, Volumes, Timings Future Background (2026) PM
P:\50-16000TR5\5016236-001 - 13201 River Road\Calculations\Synchro\5016236-001-SYN-02-Rev0 (FB 2026 PM).syn
MMM Group 10/14/2016
Lane Group EBT EBR WBL WBT NBL NBR
Lane Configurations
Traffic Volume (vph) 9 0 0 18 0 0
Future Volume (vph) 9 0 0 18 0 0
Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900
Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00
Frt
Flt Protected
Satd. Flow (prot) 1883 0 0 1883 1883 0
Flt Permitted
Satd. Flow (perm) 1883 0 0 1883 1883 0
Link Speed (k/h) 50 50 48
Link Distance (m) 128.0 199.8 42.8
Travel Time (s) 9.2 14.4 3.2
Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92
Adj. Flow (vph) 10 0 0 20 0 0
Shared Lane Traffic (%)
Lane Group Flow (vph) 10 0 0 20 0 0
Enter Blocked Intersection No No No No No No
Lane Alignment Left Right Left Left Left Right
Median Width(m) 0.0 0.0 3.7
Link Offset(m) 0.0 0.0 0.0
Crosswalk Width(m) 1.6 1.6 1.6
Two way Left Turn Lane
Headway Factor 0.99 0.99 0.99 0.99 0.99 0.99
Turning Speed (k/h) 14 24 24 14
Sign Control Free Free Stop
Intersection Summary
Area Type: Other
Control Type: Unsignalized
Intersection Capacity Utilization 6.7% ICU Level of Service A
Analysis Period (min) 15
5016236-001: 13201 River Road, Richmond, BC 6: Access & River Road
HCM Unsignalized Intersection Capacity Analysis Future Background (2026) PM
P:\50-16000TR5\5016236-001 - 13201 River Road\Calculations\Synchro\5016236-001-SYN-02-Rev0 (FB 2026 PM).syn
MMM Group 10/14/2016
Movement EBT EBR WBL WBT NBL NBR
Lane Configurations
Traffic Volume (veh/h) 9 0 0 18 0 0
Future Volume (Veh/h) 9 0 0 18 0 0
Sign Control Free Free Stop
Grade 0% 0% 0%
Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92
Hourly flow rate (vph) 10 0 0 20 0 0
Pedestrians
Lane Width (m)
Walking Speed (m/s)
Percent Blockage
Right turn flare (veh)
Median type None None
Median storage veh)
Upstream signal (m)
pX, platoon unblocked
vC, conflicting volume 10 30 10
vC1, stage 1 conf vol
vC2, stage 2 conf vol
vCu, unblocked vol 10 30 10
tC, single (s) 4.1 6.4 6.2
tC, 2 stage (s)
tF (s) 2.2 3.5 3.3
p0 queue free % 100 100 100
cM capacity (veh/h) 1610 984 1071
Direction, Lane # EB 1 WB 1 NB 1
Volume Total 10 20 0
Volume Left 0 0 0
Volume Right 0 0 0
cSH 1700 1610 1700
Volume to Capacity 0.01 0.00 0.00
Queue Length 95th (m) 0.0 0.0 0.0
Control Delay (s) 0.0 0.0 0.0
Lane LOS A
Approach Delay (s) 0.0 0.0 0.0
Approach LOS A
Intersection Summary
Average Delay 0.0
Intersection Capacity Utilization 6.7% ICU Level of Service A
Analysis Period (min) 15
5016236-001: 13201 River Road, Richmond, BC 3: No.5 Road & River Road
Lanes, Volumes, Timings Future Total (2026) AM
P:\50-16000TR5\5016236-001 - 13201 River Road\Calculations\Synchro\5016236-001-SYN-03-Rev0 (FT 2026 AM).syn
MMM Group 10/14/2016
Lane Group EBT EBR WBL WBT NBL NBR
Lane Configurations
Traffic Volume (vph) 34 169 16 16 262 60
Future Volume (vph) 34 169 16 16 262 60
Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900
Storage Length (m) 0.0 0.0 0.0 25.0
Storage Lanes 0 0 1 0
Taper Length (m) 2.5 2.5
Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00
Frt 0.888 0.850
Flt Protected 0.976 0.950
Satd. Flow (prot) 1672 0 0 1838 1789 1601
Flt Permitted 0.976 0.950
Satd. Flow (perm) 1672 0 0 1838 1789 1601
Link Speed (k/h) 50 50 48
Link Distance (m) 107.6 341.7 283.8
Travel Time (s) 7.7 24.6 21.3
Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92
Adj. Flow (vph) 37 184 17 17 285 65
Shared Lane Traffic (%)
Lane Group Flow (vph) 221 0 0 34 285 65
Enter Blocked Intersection No No No No No No
Lane Alignment Left Right Left Left Left Right
Median Width(m) 0.0 0.0 3.7
Link Offset(m) 0.0 0.0 0.0
Crosswalk Width(m) 1.6 1.6 1.6
Two way Left Turn Lane
Headway Factor 0.99 0.99 0.99 0.99 0.99 0.99
Turning Speed (k/h) 14 24 24 14
Sign Control Free Free Stop
Intersection Summary
Area Type: Other
Control Type: Unsignalized
Intersection Capacity Utilization 36.3% ICU Level of Service A
Analysis Period (min) 15
5016236-001: 13201 River Road, Richmond, BC 3: No.5 Road & River Road
HCM Unsignalized Intersection Capacity Analysis Future Total (2026) AM
P:\50-16000TR5\5016236-001 - 13201 River Road\Calculations\Synchro\5016236-001-SYN-03-Rev0 (FT 2026 AM).syn
MMM Group 10/14/2016
Movement EBT EBR WBL WBT NBL NBR
Lane Configurations
Traffic Volume (veh/h) 34 169 16 16 262 60
Future Volume (Veh/h) 34 169 16 16 262 60
Sign Control Free Free Stop
Grade 0% 0% 0%
Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92
Hourly flow rate (vph) 37 184 17 17 285 65
Pedestrians
Lane Width (m)
Walking Speed (m/s)
Percent Blockage
Right turn flare (veh)
Median type None None
Median storage veh)
Upstream signal (m)
pX, platoon unblocked
vC, conflicting volume 221 180 129
vC1, stage 1 conf vol
vC2, stage 2 conf vol
vCu, unblocked vol 221 180 129
tC, single (s) 4.1 6.4 6.2
tC, 2 stage (s)
tF (s) 2.2 3.5 3.3
p0 queue free % 99 64 93
cM capacity (veh/h) 1348 799 921
Direction, Lane # EB 1 WB 1 NB 1 NB 2
Volume Total 221 34 285 65
Volume Left 0 17 285 0
Volume Right 184 0 0 65
cSH 1700 1348 799 921
Volume to Capacity 0.13 0.01 0.36 0.07
Queue Length 95th (m) 0.0 0.3 12.3 1.7
Control Delay (s) 0.0 3.9 12.0 9.2
Lane LOS A B A
Approach Delay (s) 0.0 3.9 11.5
Approach LOS B
Intersection Summary
Average Delay 6.9
Intersection Capacity Utilization 36.3% ICU Level of Service A
Analysis Period (min) 15
5016236-001: 13201 River Road, Richmond, BC 6: Access & River Road
Lanes, Volumes, Timings Future Total (2026) AM
P:\50-16000TR5\5016236-001 - 13201 River Road\Calculations\Synchro\5016236-001-SYN-03-Rev0 (FT 2026 AM).syn
MMM Group 10/14/2016
Lane Group EBT EBR WBL WBT NBL NBR
Lane Configurations
Traffic Volume (vph) 9 62 0 4 15 0
Future Volume (vph) 9 62 0 4 15 0
Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900
Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00
Frt 0.883
Flt Protected 0.950
Satd. Flow (prot) 1663 0 0 1883 1789 0
Flt Permitted 0.950
Satd. Flow (perm) 1663 0 0 1883 1789 0
Link Speed (k/h) 50 50 48
Link Distance (m) 128.0 199.8 42.8
Travel Time (s) 9.2 14.4 3.2
Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92
Adj. Flow (vph) 10 67 0 4 16 0
Shared Lane Traffic (%)
Lane Group Flow (vph) 77 0 0 4 16 0
Enter Blocked Intersection No No No No No No
Lane Alignment Left Right Left Left Left Right
Median Width(m) 0.0 0.0 3.7
Link Offset(m) 0.0 0.0 0.0
Crosswalk Width(m) 1.6 1.6 1.6
Two way Left Turn Lane
Headway Factor 0.99 0.99 0.99 0.99 0.99 0.99
Turning Speed (k/h) 14 24 24 14
Sign Control Free Free Stop
Intersection Summary
Area Type: Other
Control Type: Unsignalized
Intersection Capacity Utilization 14.3% ICU Level of Service A
Analysis Period (min) 15
5016236-001: 13201 River Road, Richmond, BC 6: Access & River Road
HCM Unsignalized Intersection Capacity Analysis Future Total (2026) AM
P:\50-16000TR5\5016236-001 - 13201 River Road\Calculations\Synchro\5016236-001-SYN-03-Rev0 (FT 2026 AM).syn
MMM Group 10/14/2016
Movement EBT EBR WBL WBT NBL NBR
Lane Configurations
Traffic Volume (veh/h) 9 62 0 4 15 0
Future Volume (Veh/h) 9 62 0 4 15 0
Sign Control Free Free Stop
Grade 0% 0% 0%
Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92
Hourly flow rate (vph) 10 67 0 4 16 0
Pedestrians
Lane Width (m)
Walking Speed (m/s)
Percent Blockage
Right turn flare (veh)
Median type None None
Median storage veh)
Upstream signal (m)
pX, platoon unblocked
vC, conflicting volume 77 48 44
vC1, stage 1 conf vol
vC2, stage 2 conf vol
vCu, unblocked vol 77 48 44
tC, single (s) 4.1 6.4 6.2
tC, 2 stage (s)
tF (s) 2.2 3.5 3.3
p0 queue free % 100 98 100
cM capacity (veh/h) 1522 962 1027
Direction, Lane # EB 1 WB 1 NB 1
Volume Total 77 4 16
Volume Left 0 0 16
Volume Right 67 0 0
cSH 1700 1522 962
Volume to Capacity 0.05 0.00 0.02
Queue Length 95th (m) 0.0 0.0 0.4
Control Delay (s) 0.0 0.0 8.8
Lane LOS A
Approach Delay (s) 0.0 0.0 8.8
Approach LOS A
Intersection Summary
Average Delay 1.5
Intersection Capacity Utilization 14.3% ICU Level of Service A
Analysis Period (min) 15
5016236-001: 13201 River Road, Richmond, BC 3: No.5 Road & River Road
Lanes, Volumes, Timings Future Total (2026) PM
P:\50-16000TR5\5016236-001 - 13201 River Road\Calculations\Synchro\5016236-001-SYN-03-Rev0 (FT 2026 PM).syn
MMM Group 10/14/2016
Lane Group EBT EBR WBL WBT NBL NBR
Lane Configurations
Traffic Volume (vph) 16 393 76 50 332 31
Future Volume (vph) 16 393 76 50 332 31
Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900
Storage Length (m) 0.0 0.0 0.0 25.0
Storage Lanes 0 0 1 0
Taper Length (m) 2.5 2.5
Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00
Frt 0.870 0.850
Flt Protected 0.971 0.950
Satd. Flow (prot) 1639 0 0 1829 1789 1601
Flt Permitted 0.971 0.950
Satd. Flow (perm) 1639 0 0 1829 1789 1601
Link Speed (k/h) 50 50 48
Link Distance (m) 107.6 341.7 283.8
Travel Time (s) 7.7 24.6 21.3
Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92
Adj. Flow (vph) 17 427 83 54 361 34
Shared Lane Traffic (%)
Lane Group Flow (vph) 444 0 0 137 361 34
Enter Blocked Intersection No No No No No No
Lane Alignment Left Right Left Left Left Right
Median Width(m) 0.0 0.0 3.7
Link Offset(m) 0.0 0.0 0.0
Crosswalk Width(m) 1.6 1.6 1.6
Two way Left Turn Lane
Headway Factor 0.99 0.99 0.99 0.99 0.99 0.99
Turning Speed (k/h) 14 24 24 14
Sign Control Free Free Stop
Intersection Summary
Area Type: Other
Control Type: Unsignalized
Intersection Capacity Utilization 60.4% ICU Level of Service B
Analysis Period (min) 15
5016236-001: 13201 River Road, Richmond, BC 3: No.5 Road & River Road
HCM Unsignalized Intersection Capacity Analysis Future Total (2026) PM
P:\50-16000TR5\5016236-001 - 13201 River Road\Calculations\Synchro\5016236-001-SYN-03-Rev0 (FT 2026 PM).syn
MMM Group 10/14/2016
Movement EBT EBR WBL WBT NBL NBR
Lane Configurations
Traffic Volume (veh/h) 16 393 76 50 332 31
Future Volume (Veh/h) 16 393 76 50 332 31
Sign Control Free Free Stop
Grade 0% 0% 0%
Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92
Hourly flow rate (vph) 17 427 83 54 361 34
Pedestrians
Lane Width (m)
Walking Speed (m/s)
Percent Blockage
Right turn flare (veh)
Median type None None
Median storage veh)
Upstream signal (m)
pX, platoon unblocked
vC, conflicting volume 444 450 230
vC1, stage 1 conf vol
vC2, stage 2 conf vol
vCu, unblocked vol 444 450 230
tC, single (s) 4.1 6.4 6.2
tC, 2 stage (s)
tF (s) 2.2 3.5 3.3
p0 queue free % 93 31 96
cM capacity (veh/h) 1116 524 809
Direction, Lane # EB 1 WB 1 NB 1 NB 2
Volume Total 444 137 361 34
Volume Left 0 83 361 0
Volume Right 427 0 0 34
cSH 1700 1116 524 809
Volume to Capacity 0.26 0.07 0.69 0.04
Queue Length 95th (m) 0.0 1.8 40.0 1.0
Control Delay (s) 0.0 5.4 25.7 9.6
Lane LOS A D A
Approach Delay (s) 0.0 5.4 24.3
Approach LOS C
Intersection Summary
Average Delay 10.6
Intersection Capacity Utilization 60.4% ICU Level of Service B
Analysis Period (min) 15
5016236-001: 13201 River Road, Richmond, BC 6: Access & River Road
Lanes, Volumes, Timings Future Total (2026) PM
P:\50-16000TR5\5016236-001 - 13201 River Road\Calculations\Synchro\5016236-001-SYN-03-Rev0 (FT 2026 PM).syn
MMM Group 10/14/2016
Lane Group EBT EBR WBL WBT NBL NBR
Lane Configurations
Traffic Volume (vph) 9 14 0 18 44 0
Future Volume (vph) 9 14 0 18 44 0
Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900
Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00
Frt 0.919
Flt Protected 0.950
Satd. Flow (prot) 1731 0 0 1883 1789 0
Flt Permitted 0.950
Satd. Flow (perm) 1731 0 0 1883 1789 0
Link Speed (k/h) 50 50 48
Link Distance (m) 128.0 199.8 42.8
Travel Time (s) 9.2 14.4 3.2
Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92
Adj. Flow (vph) 10 15 0 20 48 0
Shared Lane Traffic (%)
Lane Group Flow (vph) 25 0 0 20 48 0
Enter Blocked Intersection No No No No No No
Lane Alignment Left Right Left Left Left Right
Median Width(m) 0.0 0.0 3.7
Link Offset(m) 0.0 0.0 0.0
Crosswalk Width(m) 1.6 1.6 1.6
Two way Left Turn Lane
Headway Factor 0.99 0.99 0.99 0.99 0.99 0.99
Turning Speed (k/h) 14 24 24 14
Sign Control Free Free Stop
Intersection Summary
Area Type: Other
Control Type: Unsignalized
Intersection Capacity Utilization 13.3% ICU Level of Service A
Analysis Period (min) 15
5016236-001: 13201 River Road, Richmond, BC 6: Access & River Road
HCM Unsignalized Intersection Capacity Analysis Future Total (2026) PM
P:\50-16000TR5\5016236-001 - 13201 River Road\Calculations\Synchro\5016236-001-SYN-03-Rev0 (FT 2026 PM).syn
MMM Group 10/14/2016
Movement EBT EBR WBL WBT NBL NBR
Lane Configurations
Traffic Volume (veh/h) 9 14 0 18 44 0
Future Volume (Veh/h) 9 14 0 18 44 0
Sign Control Free Free Stop
Grade 0% 0% 0%
Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92
Hourly flow rate (vph) 10 15 0 20 48 0
Pedestrians
Lane Width (m)
Walking Speed (m/s)
Percent Blockage
Right turn flare (veh)
Median type None None
Median storage veh)
Upstream signal (m)
pX, platoon unblocked
vC, conflicting volume 25 38 18
vC1, stage 1 conf vol
vC2, stage 2 conf vol
vCu, unblocked vol 25 38 18
tC, single (s) 4.1 6.4 6.2
tC, 2 stage (s)
tF (s) 2.2 3.5 3.3
p0 queue free % 100 95 100
cM capacity (veh/h) 1589 975 1061
Direction, Lane # EB 1 WB 1 NB 1
Volume Total 25 20 48
Volume Left 0 0 48
Volume Right 15 0 0
cSH 1700 1589 975
Volume to Capacity 0.01 0.00 0.05
Queue Length 95th (m) 0.0 0.0 1.2
Control Delay (s) 0.0 0.0 8.9
Lane LOS A
Approach Delay (s) 0.0 0.0 8.9
Approach LOS A
Intersection Summary
Average Delay 4.6
Intersection Capacity Utilization 13.3% ICU Level of Service A
Analysis Period (min) 15
Transportation Impact Study | 13201 River Road – Richmond, BC D-1
MMM Group | October 2016 | 5016236-001
5016236-001-REP-01-Rev1 (TIS)
AP
PE
ND
IX D
— A
uto
TU
RN
An
aly
sis
Appendix D – AutoTURN Analysis
D-2
This page intentionally left blank