Proposal Presentation Prepared by: Condor Technology Solutions, Inc. August 24, 2000.

9
Proposal Presentation Prepared by: Condor Technology Solutions, Inc. C ONDOR T ECHNOLOGY S O LU TIO N S CONSULTING AND SOLUTIONS D IVISION 460 Totten Pond Road Waltham, MA 02154 Tel: (781) 890-1003 Fax: (781) 890-3663 August 24, 2000

Transcript of Proposal Presentation Prepared by: Condor Technology Solutions, Inc. August 24, 2000.

Page 1: Proposal Presentation Prepared by: Condor Technology Solutions, Inc. August 24, 2000.

Proposal Presentation

Prepared by:

Condor Technology Solutions, Inc.

C O N D O R T E C H N O L O G Y S O L U T I O N SCONSULTING AND SOLUTIONS DIVISION

460 Totten Pond RoadWaltham, MA 02154Tel: (781) 890-1003

Fax: (781) 890-3663

August 24, 2000

Page 2: Proposal Presentation Prepared by: Condor Technology Solutions, Inc. August 24, 2000.

2

Presentation Overview

Mission Statement

Project Plan

Proposal

Page 3: Proposal Presentation Prepared by: Condor Technology Solutions, Inc. August 24, 2000.

3

Mission Statement

Business Objectives• Assess and become acclimated to the current RFTS

System• Complete Development on the new RFTS System• Compile Technical Documentation• Production Implementation

Critical Success Factors• Preservation of historical data going back to 1985• Maintain connections to “Packages” database• Maintain references and connections to Word documents

Page 4: Proposal Presentation Prepared by: Condor Technology Solutions, Inc. August 24, 2000.

4

Task Overview w/Deliverables

Evaluation of Code & Documentation of Business Rules– System Application Design Document– Business Component Flow Diagram– Business Component Process Definition Document

Technical Documentation & Historical Data Transfer Analysis– Document representing the physical data model– Data Quality Document– Loading Plan for Historical Data

Page 5: Proposal Presentation Prepared by: Condor Technology Solutions, Inc. August 24, 2000.

5

Task Overview (cont.)

Testing– Representative Test Data

– Complete

– Fully Tested System

Data Transfer & Implementation– Completed system running complete with historical

data from old system

Page 6: Proposal Presentation Prepared by: Condor Technology Solutions, Inc. August 24, 2000.

6

Prototype Modules

System Arch Definition

System App Design

Business Component Process Definition

Data Quality

Create Loading Plan

Code/Test SQL

Code & Test Modules

Create UAT Plans

Standards & Procedures

Create DB

System TestUser

Acceptance Test

Part 1: Evaluation of Code and Business Rules

Part 2: Analysis and Data Transfer Prep.

Part 3: Testing

Create Test Data

System Implementa

tion

Post-Implementa

tion

Part 4: Implementation

Transfer Data

System Development Life Cycle

Page 7: Proposal Presentation Prepared by: Condor Technology Solutions, Inc. August 24, 2000.

7

Task Review

Review and Control

Prototype Modules

System Architecture Definition & System Application Design

Test SQL, Code & Test Module

Business Component Process Definition

Standards and Procedures Definition

Data Quality

Create Loading Plan

Documentation

Create Test Data

System and User Acceptance Testing

Data Transfer and Implementation

Page 8: Proposal Presentation Prepared by: Condor Technology Solutions, Inc. August 24, 2000.

8

ID Task Name

1 Review and Control

2 Initialization and Setup

3 Mission Statement

4 Evaluation of Code and Documentation of Business Rules

5 Prototype Module

6 System Architecture Definition Application Design

7 Test SQL, Code & Test Module

8 Business Component Process Definition

9 Technical Documentation and Historical Data Transfer Analysis

10 Standards & Procedures Definition

11 Data Quality

12 Create Loading Plan

13 Documentation

14 Testing

15 Create Test Data

16 System Testing

17 User Acceptance Testing

18 Implementation

19 Data Transfer

20 System Implementation

8/23

8/23

9/1

9/26

10/10

22 25 28 31 3 6 9 12 15 18 21 24 27 30 3 6 9 12 15 18 21 24 27 30 2 5 8September October November

Project Plan

Page 9: Proposal Presentation Prepared by: Condor Technology Solutions, Inc. August 24, 2000.

9

Proposal

Phase I Kick-off: 9/1/00