Project Proposal
ECOLLAGES
ECO FRIENDLY LIVING IN BIH
MITA GROUP D.O.O. Zmaja od Bosne 7-7a
Importane Center, I floor www.mita.ba
Author
Mirela Mišković Designer and project manager
Cooperation
Sead Huseinović Web Master
WDT SEAD Company Zenica
Consultants
ARCH DESIGN, Sarajevo Alma Džanko, Vedad Čaušević and Senad Alibegović
Architects, Sarajevo
September 2012
ECOLLAGES.NET
September 2012 page 2 of 11
ECOLLAGES.NET
September 2012 page 3 of 11
Contents
Contents .......................................................................................................................... 3
Project Summary ............................................................................................................. 5
Project Name .............................................................................................................. 7
Organisation Details ................................................................................................... 8
Contact Person and Details ........................................................................................ 8
Assisting Organisations/Bureaus ................................................................................ 8
General Project Objective ........................................................................................... 8
Proposed Schedule ..................................................................................................... 8
Chapter 1 The Project ....................................................................................................... 9
Chapter 2 The Aims and Objectives................................................................................. 11
Chapter 3 Intervention area, location and target group ................................................... 13
Paragraph 3.1 The intervention area
Paragraph 3.2 The implementing location area
Paragraph 3.3 The target group
Chapter 4 The Project activities ...................................................................................... 15
Paragraph 4.1 Strategies/methods/activities
Paragraph 4.2 The impact and outcomes
Chapter 5 The Organisational set-up ............................................................................... 16
Chapter 6 Budget ........................................................................................................... 18
Chapter 7 Monitoring & Evaluation ................................................................................ 22
Chapter 8 Sustainability ................................................................................................. 24
Appendix A - Planning Schedule ..................................................................................... 26
Appendix B - Assisting organisations/bureaus ................................................................. 26
Appendix C - Reference lists ........................................................................................... 26
ECOLLAGES.NET
September 2012 page 4 of 11
ECOLLAGES.NET
September 2012 page 5 of 11
Project Summary
ECOLLAGES
ECO FRIENDLY LIVING IN BIH
ECOLLAGES.NET
September 2012 page 6 of 11
ECOLLAGES.NET
September 2012 page 7 of 11
A Project Proposal
Introduction
„Ecollages BIH“ is a concept that integrates multifunctional aspects of design and
environmental considerations. The design concept we would like to create now and present
as BiH brand is a simple design, affordable, and adapted to local conditions. Our method is
based on design innovation and choice of materials. Our plan is to design products that can
follow new customer requirements. We think if we take care about rational resources and
materials using ultimately eco-design strategies we can bring more sustainable production
and consumption. Therefore, eco-design is an important prevention measure and important
part of environmental pollution prevention strategies. Responsibility for the Ecollages is an
opportunity to focus more closely on eco-living issues here after war destruction and
postwar recovering. From our perspective, it is an exciting time with the current
development of our first Strategic Plan and the people we are going to represent. One focus
we would especially like to pursue in our Strategic Plan is the Ecollages Lab where we will
present our new concepts. Our goals and what we have in mind to promote outcomes in eco
living areas has already provided many opportunities in synergy. For the past year with
Ecollages project organizators and coordinators have been working to establish a develop a
positive sense of sustainable design and architecture. Thus far, our project has been funded
/at first two stages/ by project organizers. Our diversity in terms ages and profiles
contributes to the reality that all efforts are at the heart of our project goals. Our strategies
serve as catalysts for long-term community investment.
The project will serve three goals: 1) Make new concepts of design and architecture 2) Build and rebuild devastated placed and towns 3) Create a working space for talents /Ecollages Lab, website and schools/.
The Project
Beginning of June 2011, the entire community became aware of the new project www.ecollages.net on the internet. Through this site we have created, all innovative students would have an opportunity to ask questions and volunteer to play an integral part in the all building process. The 2012 year we have worked more on different and interesting pieces as parts of this project. The newsletter and site gave us opportunity to publicly represent our best practices and people, thank to our donors, community leaders, and organizations for their help in developing and producing a new place where we can show our best of designs and plans.
ECOLLAGES.NET
September 2012 page 8 of 11
Partnership with You and request for funding
This project is very important and unique. We need a support to make it possible. We are requesting financial grant /support of 10.000 BAM for two years period /our first year founded by organizers and for the future years we searching for financial support/ .
I am more than happy to meet with you at your earliest convenience to discuss the project, and the possibility of partnership in future.
Organisation Details
Name : EJUB KUČUK MITA GROUP d.o.o. Address : Sarajevo Telephone : 033 278 500 Fax : 033 278 510 Web : www.mita.ba Name : MIRELA MIŠKOVIĆ Project manager and coordinator Ecollages.net Address : Sarajevo Telephone : 063 708 316 Fax : - Email : [email protected] [email protected]
Cooperation: Persons and Details
Name : SEAD HUSEINOVIĆ, Web Master, WDT SEAD, Zenica Telephone : 061 450 873 Email : [email protected] Name : ARCH DESIGN firma, Sarajevo Name : ALMA DŽANKO, Architect, Sarajevo Name : Senad Alibegović, Student of Architecture, Sarajevo Name : Vedad Čaušević, MA in Architecture, London
Assisting Organisations/Bureaus
Name : Dr Valery Perry Contact : 061 227 793 Address : Sarajevo
General Project Objective
• Developing new concepts – eco friendly products, interiors, green houses, eco-native gardens, etc.,
• Researching new technologies and materials – organic and non toxic,
• Advise on product design and development,
• To create a team of specialists that includes design engineers, product designers, business, marketing and other advisors,
• Link to a worldwide network of universities and research organizations.
Proposed Schedule: Start date - 01.12.2012, End date - 01.12.2013
ECOLLAGES.NET
September 2012 page 9 of 11
THE PROJECT
ECOLLAGES.NET
September 2012 page 10 of 11
P R O J E C T S U M M A R Y
Eco-design project incorporates environmental factors at every phase of product development and reduces negative environmental impacts throughout the product life cycle. Ultimately, eco-design can bring more sustainable production and consumption. Eco-design is not a specific method or tool, but a way to think and analyze; it is not a separate action, but part of the whole product design process. We endeavour to provide the solution for product-related environmental issues at the design phase, the beginning part. Thus negative environmental impacts will be reduced or prevented by improving product design or redesigning. Therefore, eco-design is an important prevention measure and important part of environmental pollution prevention strategies. From a wider perspective, eco-design includes technology design as well as product planning and management, which covers related process of suppliers and supply chain management. Eco-design procedure includes the following aspects:
• to analyze related legal requirements & standards and relationship among investment, production, consumption and utilization;
• to analyze and differentiate important environmental factors and relative other factors throughout the products’ life cycle;
• to design and develop in terms of quantitatively or qualitatively;
• to retrospect and finish the evaluation. B A C K G R O U N D
Increased industrialization in BiH has brought a significant positive and negative apsects in the building construction. In one hand local customs, skills and information for safe and natural materials often are inadequate. Lack of familiarity with sustainable designs and architecture means that local populations behave inappropriately in case of protection of healthy living, environment in general, future expanding and growing in this field. Consequently, the risk of wrong or poor planning during the project preparations has also increased in both industrialized and developing areas in country. „Mass destruction and post war reconstruction” that happen in longer period of time - from 1991-2005 - created very bad demographic and urban picture of BiH cities with very much destroyed natural environment. In sake of protection and better planned living so people are not to be seen as “easy” targets for new companies that would like to buld houses with less quality and standards in designs and style; this project offer a base spot for the future better understanding of healthier living.
This proposal has already been discussed with the USAID project managers, and it might be in a good position to share its experiences in the the country.
This project will be built on the expertise drawn from designs and architects from BiH or some developed countries that have advanced in this area such as Switzerland, Canada, United States and the Netherlands.
ECOLLAGES.NET
September 2012 page 11 of 11
THE AIMS AND OBJECTIVES
ECOLLAGES.NET
September 2012 page 12 of 11
P R O P O S A L
This project aims to improve the ability to deal with risks arising from the materials and housing that destroy natural environment. To do so, the following is needed: • To build capacity of relevant number of designers and architects to improve their knowledge and effective use of prevention and preparedness procedures to manage the risks arising the existing materials and projects that use dangerous items /materials and ----- for building houses and moles, linking this project to the all joint initiatives in the region; see website www.ecollages.net • To undertake demonstration project to allow local companies to also build capacity and be trained on how to manage sustainability in all aspects of living – housing, better interior and exterior designs, products made of natural materials...etc.
O B J E C T I V E S
• Reduction of non-sustainable housing and design related to future best practices in countries; • Local level demonstration of the applicability and usage of best frameworks; • Increased capacity of local companies to deal with the prevention, preparedness and response to eco-sustainable living.
R E S U L T S
• Increase public awareness of overall positive aspects of eco-sustainable designs and architecture in BiH; • Enhance management of all designs that brings helthier living places and styles by national institutions of the selected countries; • Enhance government and local orgs /companies/ schools and academies to reduce overall all materials and designs that are not well produced or not healthy for the population or environment.
ECOLLAGES.NET
September 2012 page 13 of 11
THE INTERVENTION AREA,
LOCATION AND TARGET GROUP
ECOLLAGES.NET
September 2012 page 14 of 11
O U T P U T S
• Effective delivery of training about sustainable living and all good aspects of the same. • Development and dissemination of procedural guidelines for inovative projects and adaptation by other national or institutional partners. • Establishment of multiplication strategy for local inovators and capacity building for safe housing and sustainable building.
ECOLLAGES.NET
September 2012 page 15 of 11
THE PROJECT ACTIVITIES
ECOLLAGES.NET
September 2012 page 16 of 11
A C T I V I T I E S
Initial phase /established in 2011-2012/:
1. Set up a steering committee for the project; /Project Manual: Formulation, Approval, Monitoring and Evaluation/ 2. Developed a detailed project plan of action with specific activities, specific budget, timeline and responsibilities; 3. Developed project performance criteria and indicators to evaluate whether the actions proposed are leading to improvements in eco sustainability and in improving preparedness – future implementation; 4. Identified a focal point in each areas of the country that are the best solutions for implementations of the project; 5. Assessed in each tool and practices related to the project, and existing good practices will be the basis for suggestions and recommendations together with expert consultations; 6. Develop a training package to train local designers and architects /students; 7. Undertake national awareness raising activities and trainings in all stages; 8. Hold the project progress review meetings /inter-regional or inter-country consultations/ where implementers will take place to discuss the lessons learned, best approaches, and a flexible framework to follow.
ECOLLAGES.NET
September 2012 page 17 of 11
THE ORGANISATION SET-UP
ECOLLAGES.NET
September 2012 page 18 of 11
I M P L E M E N T A T I O N P H A S E
Demonstration
1. Identify the focal point, a “hot spot” in country for sustainable design and architecture to demonstrate the project (through undertaking project implementation); 2. Form in each hot spot local committees to participate in the demonstration project implementation; 3. Train local designers /architects with the same training package developed in the initial phase; 4. Implement the project processess and this phase will last two years and will involve four visits to each selected hot spot plus one full scale drill; 5. Collect project indicators; 6. Promote public awareness campaigns to communicate with a larger regional community the findings and changes implemented during the project and how this project can possibly have a good impact on life in general and environment; 7. Prepare a national meeting to show overall project results and propose a multiplication strategy in the country; 8. Document all project-related documentation, methodologies and reports both in English and the national language so that after completion the whole initiative can be multiplied in all regions we see as potential.
ECOLLAGES.NET
September 2012 page 19 of 11
THE BUDGET
ECOLLAGES.NET
September 2012 page 20 of 11
Project Budget Outline BAM
Support Other Sources
(if any)
10 Project Personnel *
10.00 Consultant(s)
10.01 Consultant 1 400BAM/month 400
10.02 Consultant 2 400BAM/month 400
11.00 Administrative Support
11.01 Financial officer 450BAM 450
11.02 Administrator 400BAM 400
12.00 Official Travel
12.01 Travel 1000BAM 1000
Component Total 2650
20 Training**
20.00 In-service Training
20.01 Rent of the workshop facilities 100BAM*4workshops 400
20.02 Handout preparation 50BAM*4workshops 200
20.03 Refreshments 100BAM*4workshops 400
20.04 Coordination fee for the presentations 50BAM 50
20.05 Stationeries 50BAM*4workshops 200
20.06 Transportation for the workshop 50BAM*4workshops 200
20.07 Per diem/Accommodation 80BAM*4workshops*2people 640
20.08 Info sheets 200BAM*2 (500copies each) 400
Component Total 2290
30 Equipment***
30.00 Expendable Equipment
30.01 Toner/Printer cartridge 100BAM/month*8months 800
30.02 Stationeries 50BAM/month*8month 320
31.00 Non-Expendable Equipment
31.01PC Computer&Printer 1500BAM 1500
Component Total 2620
ECOLLAGES.NET
September 2012 page 21 of 11
40 Miscellaneous
40.00 Operation, Maintenance website 40BAM/month*10months 420
40.01 Publications of the tool keet 2BAM/copy*1000copies 2000
40.02TVR Presentations and communications 80BAM/month*10months 900
Component Total 3320
Grand Total 9980
Narrative to budget line items:
* Project Personnel - the project will require two consultants to implement the workshops and financial officers to
manage the logistics
** Training - the project objectives will be met by undertaking 4 workshops on capacity building and will include the
above costs
***Equipment - the organization would require the following equipment in order to prepare for the workshops, etc.
ECOLLAGES.NET
September 2012 page 22 of 11
ECOLLAGES.NET
September 2012 page 23 of 11
THE MONITORING AND EVALUATION
ECOLLAGES.NET
September 2012 page 24 of 11
Implementation and organization in 2011-2012:
• The ECOLLAGES Project– Eco-friendly living in BIH, from September 2011: - Project created and directed marketing and business development, services and tools
for the firm and its practice groups, legal recruiting, pro bono and diversity functions, served as an internal consultant to firm leadership and partners.
- Established and implemented project branding and communications standards.
Created marketing docs/communications products including practice brochures, qualification documents, ads, proposals and pro bono marketing materials.
- Launched the firm's website, http://www.ecollages.net/ including development of
new architecture, protocols and content for all areas of the firm. - Targeted associations, publications and speaking opportunities to increase the
visibility of the partners and practices. Built and maintained excellent relationships with general media.
- Created marketing alliances and strategic partnerships with key legal and business
organizations, publishers and other professional services firms.
- Established and managed initiatives including the Ecollages Lab. Project part My Organic Fair is to be realized in future period. Developed Women's Beauty Eco-chic Day idea as same as websites ideas like is the Green Goddess.
- Developed client satisfaction program including measurement tools and training for
improving client relationship management.
ECOLLAGES.NET
September 2012 page 25 of 11
THE SUSTAINABILITY
ECOLLAGES.NET
September 2012 page 26 of 11
Sustainable management in design, architecture and economy requires much more
efficient measures for strengthening the productive function, maintenance and promotion of generally useful functions of all materials, resources and plans, natural protected, regeneration of degraded areas, monitoring, scientific and research work, education of human resources about a project and details as we are presenting here.
The intensive exploitation of natural resources, highly polluting technologies that resulting degradation of environment did not offer chances for balanced development and did not open the prospects for sustainable development of Bosnia and Herzegovina. There are many cases of excessive construction of housing and business facilities, roads and other infrastructure, petrol stations, power plants, telecommunications, electric power, or water supply. There is no exchange of professional and expert information (advice and instructions), management, strategy, policy of support in form of guaranteed prices and uniform business sector policy. Likewise, information system, educational, scientific and professional institutions, legislation, and standardised plans and programmes are also lacking. The BiH villages have virtually disappeared, this deflating the motive of refugees and displaced persons to return to their farming estates. The most significant jobs for domestic contractors were and are those in the area of building facilities (devastated or new). Most of the domestically produced constructions are even today less cost-efficient buildings and dissipate a lot of energy. The imperative drive is to find a good solution for as little money as possible. Solutions we have here give us only illusive and short-term effects - cheaper construction, which subsequently requires far more expensive maintenance and are below the minimum European standards. This project could subsequently become economically self-sustainable, if we keep 50% of the savings we invested into the continuing stages of its implementation. This project could prove significant from the point of view of new job openings if people are willing to learn more, and its effects would be soon felt. The long-term economic and social results, development of domestic manufacturers of building materials and especially insulation materials would be seen very soon and is very much advisable from the environmental perspective, too. Those forms of passive heating (solar energy) are recommended and do not need large investment. The housing and construction schemes (and tax policies as well) should support and stimulate the use of domestic materials and materials that are not harmful for health and environment.
Sustainable development and combating poverty
Sustainable development of a country represents a set of measures that have for their aim
the improvement of the material and social position of the population. It is to be achieved through legislative, educational, stimulating and the appropriate strategy /programme for setting sustainable development in motion.
The Dayton Accords helped in establishment of a new BIH system, initiated the activities on the normalization of life and opened up a process of transition, democratization of life and institutional structures of the system of governance. The notion of transition implies changes in the field of social relations, legislative, political and economic system. The causes of the current poor financial standing of great many people in Bosnia and Herzegovina, who live in poverty or on the edge of poverty, are very complex, as has been shown by many analyses. Under such conditions, both problems are very important: economic and the environmental. It seems that is not difficult to show that the causes of poverty and the causes of environmental degradation are the same, at least in part – like excessive utilization of resources. New and fresh ideas that will save/prevail and create much higher standards of human living and in general human surviving are needed more then ever.
ECOLLAGES.NET
September 2012 page 27 of 11
Recommendations for the Eco housing and positive impact
Find a building contractor, who will follow our Ecollages Project and
• Locate a "green building" professional through our Green Building Council
Directory.
• Access the Sustainable Building Ecollages BIH Sourcebook and/or Green Building
Concepts for information about building an environmentally - friendly home
/houses we will suggest/. Peruse links for books on building green.
• New Home Location: In case of consideration of building a new home, seek out a
location around towns-cities in BIH with the best structure.
• Energy Efficient Mortgages: Create loans options and contracts with banks so
people can borrow extra money to pay for energy efficient upgrades to current
home or a new or old home that you plan to buy or redesign.
• Building Materials: Building material ideas /see straw bale, true (natural) linoleum,
previously used wood, cob for Cob Cottage, and EcoBusiness-Cob Building,
composite decking, etc./.
If you are looking to buy or sell a green home, check out our future Ecollages List.
ECOLLAGES.NET
September 2012 page 28 of 11
APPENDIX A
Planning schedule
1. First phase – Sept 2011-April 2012
/project preparation, analysis, drawings,
planning and media presentations/
2. Second phase – April 2012 – Oct 2012
/designers-architects implementation group organizing,
website and researches/
3. Oct 2012 – May 2013
/first project samples, designs and arch. plans
website finalization and books-guidelines/
4. May 2013 – Dec 2013
/presentations,
network – schools and universities,
and cooperation – companies/
APPENDIX B
Assisting orgs/ bureaus Dr Valery Perry, PLIPG
APPENDIX C
Reference Lists Alma Mirvić, OSCE Mission to BiH
USAID-Firma project
Architects