ECOLLAGES.NET September 2012 page 1 of 11 Project Proposal ECOLLAGES ECO FRIENDLY LIVING IN BIH MITA GROUP D.O.O. Zmaja od Bosne 7-7a Importane Center, I floor www.mita.ba Author Mirela Mišković Designer and project manager Cooperation Sead Huseinović Web Master WDT SEAD Company Zenica Consultants ARCH DESIGN, Sarajevo Alma Džanko, Vedad Čaušević and Senad Alibegović Architects, Sarajevo September 2012

Transcript of Proposal ecop edbr (1)

Page 1: Proposal ecop edbr (1)

ECOLLAGES.NET

September 2012 page 1 of 11

Project Proposal

ECOLLAGES

ECO FRIENDLY LIVING IN BIH

MITA GROUP D.O.O. Zmaja od Bosne 7-7a

Importane Center, I floor www.mita.ba

Author

Mirela Mišković Designer and project manager

Cooperation

Sead Huseinović Web Master

WDT SEAD Company Zenica

Consultants

ARCH DESIGN, Sarajevo Alma Džanko, Vedad Čaušević and Senad Alibegović

Architects, Sarajevo

September 2012

Page 2: Proposal ecop edbr (1)

ECOLLAGES.NET

September 2012 page 2 of 11

Page 3: Proposal ecop edbr (1)

ECOLLAGES.NET

September 2012 page 3 of 11

Contents

Contents .......................................................................................................................... 3

Project Summary ............................................................................................................. 5

Project Name .............................................................................................................. 7

Organisation Details ................................................................................................... 8

Contact Person and Details ........................................................................................ 8

Assisting Organisations/Bureaus ................................................................................ 8

General Project Objective ........................................................................................... 8

Proposed Schedule ..................................................................................................... 8

Chapter 1 The Project ....................................................................................................... 9

Chapter 2 The Aims and Objectives................................................................................. 11

Chapter 3 Intervention area, location and target group ................................................... 13

Paragraph 3.1 The intervention area

Paragraph 3.2 The implementing location area

Paragraph 3.3 The target group

Chapter 4 The Project activities ...................................................................................... 15

Paragraph 4.1 Strategies/methods/activities

Paragraph 4.2 The impact and outcomes

Chapter 5 The Organisational set-up ............................................................................... 16

Chapter 6 Budget ........................................................................................................... 18

Chapter 7 Monitoring & Evaluation ................................................................................ 22

Chapter 8 Sustainability ................................................................................................. 24

Appendix A - Planning Schedule ..................................................................................... 26

Appendix B - Assisting organisations/bureaus ................................................................. 26

Appendix C - Reference lists ........................................................................................... 26

Page 4: Proposal ecop edbr (1)

ECOLLAGES.NET

September 2012 page 4 of 11

Page 5: Proposal ecop edbr (1)

ECOLLAGES.NET

September 2012 page 5 of 11

Project Summary

ECOLLAGES

ECO FRIENDLY LIVING IN BIH

Page 6: Proposal ecop edbr (1)

ECOLLAGES.NET

September 2012 page 6 of 11

Page 7: Proposal ecop edbr (1)

ECOLLAGES.NET

September 2012 page 7 of 11

A Project Proposal

Introduction

„Ecollages BIH“ is a concept that integrates multifunctional aspects of design and

environmental considerations. The design concept we would like to create now and present

as BiH brand is a simple design, affordable, and adapted to local conditions. Our method is

based on design innovation and choice of materials. Our plan is to design products that can

follow new customer requirements. We think if we take care about rational resources and

materials using ultimately eco-design strategies we can bring more sustainable production

and consumption. Therefore, eco-design is an important prevention measure and important

part of environmental pollution prevention strategies. Responsibility for the Ecollages is an

opportunity to focus more closely on eco-living issues here after war destruction and

postwar recovering. From our perspective, it is an exciting time with the current

development of our first Strategic Plan and the people we are going to represent. One focus

we would especially like to pursue in our Strategic Plan is the Ecollages Lab where we will

present our new concepts. Our goals and what we have in mind to promote outcomes in eco

living areas has already provided many opportunities in synergy. For the past year with

Ecollages project organizators and coordinators have been working to establish a develop a

positive sense of sustainable design and architecture. Thus far, our project has been funded

/at first two stages/ by project organizers. Our diversity in terms ages and profiles

contributes to the reality that all efforts are at the heart of our project goals. Our strategies

serve as catalysts for long-term community investment.

The project will serve three goals: 1) Make new concepts of design and architecture 2) Build and rebuild devastated placed and towns 3) Create a working space for talents /Ecollages Lab, website and schools/.

The Project

Beginning of June 2011, the entire community became aware of the new project www.ecollages.net on the internet. Through this site we have created, all innovative students would have an opportunity to ask questions and volunteer to play an integral part in the all building process. The 2012 year we have worked more on different and interesting pieces as parts of this project. The newsletter and site gave us opportunity to publicly represent our best practices and people, thank to our donors, community leaders, and organizations for their help in developing and producing a new place where we can show our best of designs and plans.

Page 8: Proposal ecop edbr (1)

ECOLLAGES.NET

September 2012 page 8 of 11

Partnership with You and request for funding

This project is very important and unique. We need a support to make it possible. We are requesting financial grant /support of 10.000 BAM for two years period /our first year founded by organizers and for the future years we searching for financial support/ .

I am more than happy to meet with you at your earliest convenience to discuss the project, and the possibility of partnership in future.

Organisation Details

Name : EJUB KUČUK MITA GROUP d.o.o. Address : Sarajevo Telephone : 033 278 500 Fax : 033 278 510 Web : www.mita.ba Name : MIRELA MIŠKOVIĆ Project manager and coordinator Ecollages.net Address : Sarajevo Telephone : 063 708 316 Fax : - Email : [email protected] [email protected]

Cooperation: Persons and Details

Name : SEAD HUSEINOVIĆ, Web Master, WDT SEAD, Zenica Telephone : 061 450 873 Email : [email protected] Name : ARCH DESIGN firma, Sarajevo Name : ALMA DŽANKO, Architect, Sarajevo Name : Senad Alibegović, Student of Architecture, Sarajevo Name : Vedad Čaušević, MA in Architecture, London

Assisting Organisations/Bureaus

Name : Dr Valery Perry Contact : 061 227 793 Address : Sarajevo

General Project Objective

• Developing new concepts – eco friendly products, interiors, green houses, eco-native gardens, etc.,

• Researching new technologies and materials – organic and non toxic,

• Advise on product design and development,

• To create a team of specialists that includes design engineers, product designers, business, marketing and other advisors,

• Link to a worldwide network of universities and research organizations.

Proposed Schedule: Start date - 01.12.2012, End date - 01.12.2013

Page 9: Proposal ecop edbr (1)

ECOLLAGES.NET

September 2012 page 9 of 11

THE PROJECT

Page 10: Proposal ecop edbr (1)

ECOLLAGES.NET

September 2012 page 10 of 11

P R O J E C T S U M M A R Y

Eco-design project incorporates environmental factors at every phase of product development and reduces negative environmental impacts throughout the product life cycle. Ultimately, eco-design can bring more sustainable production and consumption. Eco-design is not a specific method or tool, but a way to think and analyze; it is not a separate action, but part of the whole product design process. We endeavour to provide the solution for product-related environmental issues at the design phase, the beginning part. Thus negative environmental impacts will be reduced or prevented by improving product design or redesigning. Therefore, eco-design is an important prevention measure and important part of environmental pollution prevention strategies. From a wider perspective, eco-design includes technology design as well as product planning and management, which covers related process of suppliers and supply chain management. Eco-design procedure includes the following aspects:

• to analyze related legal requirements & standards and relationship among investment, production, consumption and utilization;

• to analyze and differentiate important environmental factors and relative other factors throughout the products’ life cycle;

• to design and develop in terms of quantitatively or qualitatively;

• to retrospect and finish the evaluation. B A C K G R O U N D

Increased industrialization in BiH has brought a significant positive and negative apsects in the building construction. In one hand local customs, skills and information for safe and natural materials often are inadequate. Lack of familiarity with sustainable designs and architecture means that local populations behave inappropriately in case of protection of healthy living, environment in general, future expanding and growing in this field. Consequently, the risk of wrong or poor planning during the project preparations has also increased in both industrialized and developing areas in country. „Mass destruction and post war reconstruction” that happen in longer period of time - from 1991-2005 - created very bad demographic and urban picture of BiH cities with very much destroyed natural environment. In sake of protection and better planned living so people are not to be seen as “easy” targets for new companies that would like to buld houses with less quality and standards in designs and style; this project offer a base spot for the future better understanding of healthier living.

This proposal has already been discussed with the USAID project managers, and it might be in a good position to share its experiences in the the country.

This project will be built on the expertise drawn from designs and architects from BiH or some developed countries that have advanced in this area such as Switzerland, Canada, United States and the Netherlands.

Page 11: Proposal ecop edbr (1)

ECOLLAGES.NET

September 2012 page 11 of 11

THE AIMS AND OBJECTIVES

Page 12: Proposal ecop edbr (1)

ECOLLAGES.NET

September 2012 page 12 of 11

P R O P O S A L

This project aims to improve the ability to deal with risks arising from the materials and housing that destroy natural environment. To do so, the following is needed: • To build capacity of relevant number of designers and architects to improve their knowledge and effective use of prevention and preparedness procedures to manage the risks arising the existing materials and projects that use dangerous items /materials and ----- for building houses and moles, linking this project to the all joint initiatives in the region; see website www.ecollages.net • To undertake demonstration project to allow local companies to also build capacity and be trained on how to manage sustainability in all aspects of living – housing, better interior and exterior designs, products made of natural materials...etc.

O B J E C T I V E S

• Reduction of non-sustainable housing and design related to future best practices in countries; • Local level demonstration of the applicability and usage of best frameworks; • Increased capacity of local companies to deal with the prevention, preparedness and response to eco-sustainable living.

R E S U L T S

• Increase public awareness of overall positive aspects of eco-sustainable designs and architecture in BiH; • Enhance management of all designs that brings helthier living places and styles by national institutions of the selected countries; • Enhance government and local orgs /companies/ schools and academies to reduce overall all materials and designs that are not well produced or not healthy for the population or environment.

Page 13: Proposal ecop edbr (1)

ECOLLAGES.NET

September 2012 page 13 of 11

THE INTERVENTION AREA,

LOCATION AND TARGET GROUP

Page 14: Proposal ecop edbr (1)

ECOLLAGES.NET

September 2012 page 14 of 11

O U T P U T S

• Effective delivery of training about sustainable living and all good aspects of the same. • Development and dissemination of procedural guidelines for inovative projects and adaptation by other national or institutional partners. • Establishment of multiplication strategy for local inovators and capacity building for safe housing and sustainable building.

Page 15: Proposal ecop edbr (1)

ECOLLAGES.NET

September 2012 page 15 of 11

THE PROJECT ACTIVITIES

Page 16: Proposal ecop edbr (1)

ECOLLAGES.NET

September 2012 page 16 of 11

A C T I V I T I E S

Initial phase /established in 2011-2012/:

1. Set up a steering committee for the project; /Project Manual: Formulation, Approval, Monitoring and Evaluation/ 2. Developed a detailed project plan of action with specific activities, specific budget, timeline and responsibilities; 3. Developed project performance criteria and indicators to evaluate whether the actions proposed are leading to improvements in eco sustainability and in improving preparedness – future implementation; 4. Identified a focal point in each areas of the country that are the best solutions for implementations of the project; 5. Assessed in each tool and practices related to the project, and existing good practices will be the basis for suggestions and recommendations together with expert consultations; 6. Develop a training package to train local designers and architects /students; 7. Undertake national awareness raising activities and trainings in all stages; 8. Hold the project progress review meetings /inter-regional or inter-country consultations/ where implementers will take place to discuss the lessons learned, best approaches, and a flexible framework to follow.

Page 17: Proposal ecop edbr (1)

ECOLLAGES.NET

September 2012 page 17 of 11

THE ORGANISATION SET-UP

Page 18: Proposal ecop edbr (1)

ECOLLAGES.NET

September 2012 page 18 of 11

I M P L E M E N T A T I O N P H A S E

Demonstration

1. Identify the focal point, a “hot spot” in country for sustainable design and architecture to demonstrate the project (through undertaking project implementation); 2. Form in each hot spot local committees to participate in the demonstration project implementation; 3. Train local designers /architects with the same training package developed in the initial phase; 4. Implement the project processess and this phase will last two years and will involve four visits to each selected hot spot plus one full scale drill; 5. Collect project indicators; 6. Promote public awareness campaigns to communicate with a larger regional community the findings and changes implemented during the project and how this project can possibly have a good impact on life in general and environment; 7. Prepare a national meeting to show overall project results and propose a multiplication strategy in the country; 8. Document all project-related documentation, methodologies and reports both in English and the national language so that after completion the whole initiative can be multiplied in all regions we see as potential.

Page 19: Proposal ecop edbr (1)

ECOLLAGES.NET

September 2012 page 19 of 11

THE BUDGET

Page 20: Proposal ecop edbr (1)

ECOLLAGES.NET

September 2012 page 20 of 11

Project Budget Outline BAM

Support Other Sources

(if any)

10 Project Personnel *

10.00 Consultant(s)

10.01 Consultant 1 400BAM/month 400

10.02 Consultant 2 400BAM/month 400

11.00 Administrative Support

11.01 Financial officer 450BAM 450

11.02 Administrator 400BAM 400

12.00 Official Travel

12.01 Travel 1000BAM 1000

Component Total 2650

20 Training**

20.00 In-service Training

20.01 Rent of the workshop facilities 100BAM*4workshops 400

20.02 Handout preparation 50BAM*4workshops 200

20.03 Refreshments 100BAM*4workshops 400

20.04 Coordination fee for the presentations 50BAM 50

20.05 Stationeries 50BAM*4workshops 200

20.06 Transportation for the workshop 50BAM*4workshops 200

20.07 Per diem/Accommodation 80BAM*4workshops*2people 640

20.08 Info sheets 200BAM*2 (500copies each) 400

Component Total 2290

30 Equipment***

30.00 Expendable Equipment

30.01 Toner/Printer cartridge 100BAM/month*8months 800

30.02 Stationeries 50BAM/month*8month 320

31.00 Non-Expendable Equipment

31.01PC Computer&Printer 1500BAM 1500

Component Total 2620

Page 21: Proposal ecop edbr (1)

ECOLLAGES.NET

September 2012 page 21 of 11

40 Miscellaneous

40.00 Operation, Maintenance website 40BAM/month*10months 420

40.01 Publications of the tool keet 2BAM/copy*1000copies 2000

40.02TVR Presentations and communications 80BAM/month*10months 900

Component Total 3320

Grand Total 9980

Narrative to budget line items:

* Project Personnel - the project will require two consultants to implement the workshops and financial officers to

manage the logistics

** Training - the project objectives will be met by undertaking 4 workshops on capacity building and will include the

above costs

***Equipment - the organization would require the following equipment in order to prepare for the workshops, etc.

Page 22: Proposal ecop edbr (1)

ECOLLAGES.NET

September 2012 page 22 of 11

Page 23: Proposal ecop edbr (1)

ECOLLAGES.NET

September 2012 page 23 of 11

THE MONITORING AND EVALUATION

Page 24: Proposal ecop edbr (1)

ECOLLAGES.NET

September 2012 page 24 of 11

Implementation and organization in 2011-2012:

• The ECOLLAGES Project– Eco-friendly living in BIH, from September 2011: - Project created and directed marketing and business development, services and tools

for the firm and its practice groups, legal recruiting, pro bono and diversity functions, served as an internal consultant to firm leadership and partners.

- Established and implemented project branding and communications standards.

Created marketing docs/communications products including practice brochures, qualification documents, ads, proposals and pro bono marketing materials.

- Launched the firm's website, http://www.ecollages.net/ including development of

new architecture, protocols and content for all areas of the firm. - Targeted associations, publications and speaking opportunities to increase the

visibility of the partners and practices. Built and maintained excellent relationships with general media.

- Created marketing alliances and strategic partnerships with key legal and business

organizations, publishers and other professional services firms.

- Established and managed initiatives including the Ecollages Lab. Project part My Organic Fair is to be realized in future period. Developed Women's Beauty Eco-chic Day idea as same as websites ideas like is the Green Goddess.

- Developed client satisfaction program including measurement tools and training for

improving client relationship management.

Page 25: Proposal ecop edbr (1)

ECOLLAGES.NET

September 2012 page 25 of 11

THE SUSTAINABILITY

Page 26: Proposal ecop edbr (1)

ECOLLAGES.NET

September 2012 page 26 of 11

Sustainable management in design, architecture and economy requires much more

efficient measures for strengthening the productive function, maintenance and promotion of generally useful functions of all materials, resources and plans, natural protected, regeneration of degraded areas, monitoring, scientific and research work, education of human resources about a project and details as we are presenting here.

The intensive exploitation of natural resources, highly polluting technologies that resulting degradation of environment did not offer chances for balanced development and did not open the prospects for sustainable development of Bosnia and Herzegovina. There are many cases of excessive construction of housing and business facilities, roads and other infrastructure, petrol stations, power plants, telecommunications, electric power, or water supply. There is no exchange of professional and expert information (advice and instructions), management, strategy, policy of support in form of guaranteed prices and uniform business sector policy. Likewise, information system, educational, scientific and professional institutions, legislation, and standardised plans and programmes are also lacking. The BiH villages have virtually disappeared, this deflating the motive of refugees and displaced persons to return to their farming estates. The most significant jobs for domestic contractors were and are those in the area of building facilities (devastated or new). Most of the domestically produced constructions are even today less cost-efficient buildings and dissipate a lot of energy. The imperative drive is to find a good solution for as little money as possible. Solutions we have here give us only illusive and short-term effects - cheaper construction, which subsequently requires far more expensive maintenance and are below the minimum European standards. This project could subsequently become economically self-sustainable, if we keep 50% of the savings we invested into the continuing stages of its implementation. This project could prove significant from the point of view of new job openings if people are willing to learn more, and its effects would be soon felt. The long-term economic and social results, development of domestic manufacturers of building materials and especially insulation materials would be seen very soon and is very much advisable from the environmental perspective, too. Those forms of passive heating (solar energy) are recommended and do not need large investment. The housing and construction schemes (and tax policies as well) should support and stimulate the use of domestic materials and materials that are not harmful for health and environment.

Sustainable development and combating poverty

Sustainable development of a country represents a set of measures that have for their aim

the improvement of the material and social position of the population. It is to be achieved through legislative, educational, stimulating and the appropriate strategy /programme for setting sustainable development in motion.

The Dayton Accords helped in establishment of a new BIH system, initiated the activities on the normalization of life and opened up a process of transition, democratization of life and institutional structures of the system of governance. The notion of transition implies changes in the field of social relations, legislative, political and economic system. The causes of the current poor financial standing of great many people in Bosnia and Herzegovina, who live in poverty or on the edge of poverty, are very complex, as has been shown by many analyses. Under such conditions, both problems are very important: economic and the environmental. It seems that is not difficult to show that the causes of poverty and the causes of environmental degradation are the same, at least in part – like excessive utilization of resources. New and fresh ideas that will save/prevail and create much higher standards of human living and in general human surviving are needed more then ever.

Page 27: Proposal ecop edbr (1)

ECOLLAGES.NET

September 2012 page 27 of 11

Recommendations for the Eco housing and positive impact

Find a building contractor, who will follow our Ecollages Project and

• Locate a "green building" professional through our Green Building Council

Directory.

• Access the Sustainable Building Ecollages BIH Sourcebook and/or Green Building

Concepts for information about building an environmentally - friendly home

/houses we will suggest/. Peruse links for books on building green.

• New Home Location: In case of consideration of building a new home, seek out a

location around towns-cities in BIH with the best structure.

• Energy Efficient Mortgages: Create loans options and contracts with banks so

people can borrow extra money to pay for energy efficient upgrades to current

home or a new or old home that you plan to buy or redesign.

• Building Materials: Building material ideas /see straw bale, true (natural) linoleum,

previously used wood, cob for Cob Cottage, and EcoBusiness-Cob Building,

composite decking, etc./.

If you are looking to buy or sell a green home, check out our future Ecollages List.

Page 28: Proposal ecop edbr (1)

ECOLLAGES.NET

September 2012 page 28 of 11

APPENDIX A

Planning schedule

1. First phase – Sept 2011-April 2012

/project preparation, analysis, drawings,

planning and media presentations/

2. Second phase – April 2012 – Oct 2012

/designers-architects implementation group organizing,

website and researches/

3. Oct 2012 – May 2013

/first project samples, designs and arch. plans

website finalization and books-guidelines/

4. May 2013 – Dec 2013

/presentations,

network – schools and universities,

and cooperation – companies/

APPENDIX B

Assisting orgs/ bureaus Dr Valery Perry, PLIPG

APPENDIX C

Reference Lists Alma Mirvić, OSCE Mission to BiH

USAID-Firma project