IABSE SYMPOSIUM ENGINEERING THE FUTURE SEPTEMBER 21-23, 2017 PROOF LOAD TESTING OF VIADUCT DE BEEK Eva Lantsoght, Rutger Koekkoek, Yuguang Yang, Cor van der Veen, Dick Hordijk, Ane de Boer

Transcript of Proof load testing of the viaduct De Beek

Page 1: Proof load testing of the viaduct De Beek

IABSE SYMPOSIUM ENGINEERING THE FUTURE SEPTEMBER 21-23, 2017

PROOF LOAD TESTING OF VIADUCT DE BEEK

Eva Lantsoght, Rutger Koekkoek, Yuguang Yang, Cor van der Veen, Dick Hordijk, Ane de Boer

Page 2: Proof load testing of the viaduct De Beek

OVERVIEW

• Introduction: load testing

• Viaduct De Beek: description

• Preparation of proof load test

• Execution of proof load test

• Assessment of viaduct De

Beek Testing of Ruytenschildt Bridge

Page 3: Proof load testing of the viaduct De Beek

IABSE SYMPOSIUM ENGINEERING THE FUTURE SEPTEMBER 21-23, 2017

WHY LOAD TESTING? (1)

Bridges from 60s and 70s

The Hague in 1959

Increased live loads

common heavy and long truck (600 kN)

End of service life + larger loads

Page 4: Proof load testing of the viaduct De Beek

PROOF LOAD TESTING OF BRIDGES

• Apply predetermined load

to bridge

• Information lacking

• Damage due to ASR, …

• Proof load testing

• Immediate approval of

bridge

• Recalculate updated β

Page 5: Proof load testing of the viaduct De Beek

VIADUCT DE BEEK (1)

• RC slab bridge of 4 spans

• Built in 1963

• Parabolic change in height

• Proof load test at shear- and

flexure-critical position in first

span

Page 6: Proof load testing of the viaduct De Beek

VIADUCT DE BEEK (2)

• Core drilling: fck = 44.5 MPa &

fcd = 30 MPa

• QR 24 steel (plain bars), fyk =

252 MPa

• Insufficient flexural capacity

• Reduction of 2 lanes to 1 lane

• Lowest capacity: span 2

• But: span 2 over highway =>

testing not allowed for safety

Page 7: Proof load testing of the viaduct De Beek

PREPARATION OF LOAD TEST – TARGET PROOF LOAD

Reliability level β Pb

[kN]

Ps

[kN]EC ULS 4.3 1656 1525RBK Design 4.3 1649 1516RBK Reconstruction 3.6 1427 1311RBK Usage 3.3 1373 1262RBK Disapproval 3.1 1369 1257EC SLS 1.5 1070 976

• Find target proof load that results in same sectional moment or

shear as load combination of code

• With LFEA

• Load combination with load factors depending on safety level

• Exception γDL = 1.10

Page 8: Proof load testing of the viaduct De Beek

PREPARATION OF LOAD TEST – SENSOR PLAN

• Deflections in longitudinal and

transverse direction

• Vertical deflections at support

• Strain on bottom of concrete

• Opening of existing cracks

• Cracking activity with acoustic

emission sensors

• Load cells for applied loads

Page 9: Proof load testing of the viaduct De Beek

EXECUTION OF PROOF LOAD TEST – LOADING PROTOCOL

• Test for bending moment and test for

shear

• Cyclic loading protocol

• Four load levels:

• Low load to check response of all

sensors

• Serviceability Limit State

• RBK Usage Level: maximum required

for assessment

• Eurocode Ultimate Limit State + 6%

(bending test) / + 2% (shear test)

Page 10: Proof load testing of the viaduct De Beek

EXECUTION OF PROOF LOAD TEST – LOAD APPLICATION

• Load application:

counterweights on steel

spreader beam; load

transferred to bridge via jacks

• Controlled method for cyclic

loading

• Avoid collapse when large

deformations occur

Page 11: Proof load testing of the viaduct De Beek

EXECUTION OF PROOF LOAD TEST – VERIFICATION OF MEASUREMENTS

• Load-displacement diagram: check

for nonlinear behavior

• Maximum stiffness reduction:

• Bending moment test 16%

• Shear test 10%

• Residual deflection / maximum

deflection

• Bending moment test: 15%

• Shear test: 8%

• Limit ACI: 25%

• Limit DAfStB: 10%

Page 12: Proof load testing of the viaduct De Beek

ASSESSMENT OF VIADUCT DE BEEK – SPAN 1

• Proof load test shows immediately that span fulfils

requirements of code

• No signs of distress observed from measurements

• Conclusion: UC ≤ 1.0

Page 13: Proof load testing of the viaduct De Beek

ASSESSMENT OF VIADUCT DE BEEK – SPAN 2

• How to extrapolate results from Span 1 to Span 2?

• Assessment with plastic redistribution

• Plastic hinge develops in span 2

• Use 6.7% of plastic redistribution

• UC in span = 1.0

• UC over support 0.94

Page 14: Proof load testing of the viaduct De Beek

ASSESSMENT OF VIADUCT DE BEEK -RECOMMENDATIONS

• Verify reinforcement in

Span 2 with scanner

and/or by removing cover

• Check for signs of

corrosion

• Reopen for two lanes of

traffic

Page 15: Proof load testing of the viaduct De Beek

IABSE SYMPOSIUM ENGINEERING THE FUTURE SEPTEMBER 21-23, 2017

SUMMARY• Proof load testing to approve existing bridges

• Case study: Viaduct De Beek

• Preparation of load test:

• Target proof load

• Sensor plan

• Execution of load test

• Cyclic loading protocol

• Jacks and steel spreader beam

• Real-time evaluation of measurements

• Analysis of load test

• Assessment of viaduct

• Reporting all results