    1. NAME OF ORGANISATION:

    Protect Nature (PRONAT)-Sierra Leone

    2. PROJECT DURATION:

    Five years 2011-2015

    3. VISION:

    To ensure and enhance a better participatory management/governance practice and

    conservation of the Sierra Leonean coastal and marine resources faced with the threat of

    climate change and environmental degradation. Phenomena highlighted in the first, seventh

    and eighth millennium development goals Eradicating extreme poverty and hunger;

    ensuring environmental sustainability; developing a global partnership for development.

    4. MISSION:

    To promote efficient and improved communication and information sharing system on

    sustainable coastal and marine resources with the total use of Participatory Governance

    techniques with stakeholders, partners and line ministries. Also, as its mission, PRONAT-SL

    will lobby and advocate in drafting and implementation of a strategic national action plan for

    sustainable management of marine resources, conservation, drafting of a law on coastal and

    marine activities.

  • 8/2/2019 PRONAT- Sierra Leone Project Proposal-Reviewed

    2/17

    Over the years, the mangrove ecosystem and its resources played a significant role on the

    level of biodiversity and profited both animal species and human beings. It did not only

    provide breeding ground, food and nursery sites for resources such as shrimps, oysters, crabs,snappers, tarpons but also helped in reducing the impact of high sea tide and flooding which

    resulted from the indiscriminate exploitation of this ecosystem. The mangrove ecosystem had

    also provided adequate shelter and breeding grounds for over wintering birds (migrated from

    Europe and America due to bad winter weather and poor food supply) that stopped by to feed

    and breed.

    8. JUSTIFICATION:

    The project when fully implemented would empower the local communities with knowledge

    about the negative impact of their activities on the coastal and marine resources. It would

    also enable the communities to adopt and promote better management practices that would

    ensure the sustainable utilization of coastal and marine resources whilst maintaining their

    potentiality. By providing alternative livelihoods for communities, the project would also

    minimize the direct exploitation of coastal and marine resources thus enhancing the

    restoration of balanced ecosystems. Finally, through the involvement of key stakeholders

    (political leaders, traditional etc) the project would create a legal framework that seeks to

    enhance the formulation of laws and bye-laws that promote the sustainable management and

    conservation of marine and coastal resources.

  • 8/2/2019 PRONAT- Sierra Leone Project Proposal-Reviewed

    3/17

    b. Strengthen the legal and institutional legal framework from PRAIA convention on

    the restoration, conservation and rational use of mangrove ecosystem

    c. Establish structure and better organization of marine product and by-product

    marketing

    d. Support the establish of sustainable funding mechanism, improve communication and

    information sharing on coastal and marine resources conservation and best

    management practice

    11. Project Activities :

    a. Identify project operational areas

    b. Identify and support project partners and focal persons

    c. Conduct baseline survey on empowering mangrove dwellers to improve their

    livelihood quality

    d. Conduct a nationwide sensitization on coastal and marine areas on recommended

    management behavior and conservation practices

    e. Facilitate project structures formation

    f. Support project beneficiaries with alternative livelihood options

  • 8/2/2019 PRONAT- Sierra Leone Project Proposal-Reviewed

    4/17

    10.3 Baseline survey conducted by consultant firm

    10.4.1. 100 beneficiaries, 50 MPs, 40 local representatives sensitized on coastal marine

    areas protection

    10.4.2. 2500 school going pupils and tutors and coastal and marine environmental clubs

    formed

    10.4.3. Two schools, one tertiary institution learning quiz competitions organized

    10.4.4 Five (5) radio panel discussions held, one float parade on coastal and marine areas

    conservation

    10.4.5 Twenty community interaction sensitization programmes to be undertaken

    10.5.1 Four project communities formed

    10.5.2 Four project activity quarterly review meetings held

    10.5.2 Three project steering committees and stakeholders meetings held

    10.5.3 One project inception workshop held10.6.1 2000 coastal and marine beneficiaries trained in alternative income generation

    activities

    10.6.2 Support beneficiaries with startup kits to engage in livelihood options

    10.7.1 Beneficiaries trained in lobbying and advocacy techniques on coastal resource

    management

    10.8.1Laid down laws and principles on marine and coastal resource management

  • 8/2/2019 PRONAT- Sierra Leone Project Proposal-Reviewed

    5/17

    12. Project outcome:

    12.1 Coastal and marine areas and resources are better managed by its inhabitants

    12.2 laws on coastal and marine areas conservation and best management practices adhered to

    12.3 Diversify environmental friendly income generating activities taken place

    12.4 Transformation in beneficiaries earning power due to alternative livelihood skills

    activities in the coastal and marine ecology

  • 8/2/2019 PRONAT- Sierra Leone Project Proposal-Reviewed

    6/17

    13. Action plan:

    12 Action Plan

    ACTIVITY person responsible Time frame1 Year 2Year 3year

    1 2 3 4 1 2 3 4 1 2 3 4

    1 Identify stakeholders, target beneficiaries,

    operational areas,

    PRONAT

    2 Conduct baseline survey on empowering

    mangrove dwellers improve their livelihoodquality

    PRONAT AND Consultants

    3 Conduct a nationwide sensitization on

    coastal and marine areas on recommendedmanagement behaviour and conservationpractices

    PRONAT

    4 Facilitate project structures formation PRONAT

    5 Support 200 project beneficiaries withalternative livelihood options

    PRONAT

    6 Support 200 project beneficiaries and key

    project partners with lobbying and advocacy

    skills

    PRONAT

    7 Promote the formation of legal frameworkon sustainable management and

    conservation of coastal and marine areas

    PRONAT, Project partners,Beneficiaries, Political leaders

    8 Training on Lobbying and advocacy Community leaders and otherstakeholders

    9 Strategic national action plan on coastal andmarine resource

    PRONAT, Parliament

    6

  • 8/2/2019 PRONAT- Sierra Leone Project Proposal-Reviewed

    7/17

    10 Undergraduate internships PRONAT, Universities/ college

    11 Conduct post intervention surveys PRONAT

    7

  • 8/2/2019 PRONAT- Sierra Leone Project Proposal-Reviewed

    8/17

    14. Country Profile:

    Sierra Leone is located in the western coast of Africa bounded by the Guinea republic on its N/E,

    Liberia on the S/E and the Atlantic Ocean on its N/W with growth of mangrove vegetation

    stretches along the estuaries of the Scarcies, Rokel, Sherbro River and Yawri bay. This mangrove

    ecology survive at the tropical latitude and at temperature of 16 degree centigrade with

    beautification of ridge of the peninsula forest overlooking the coastal areas and beaches far

    stretched especially in the western area . It is known to have a total surface area of 28,000 sq. miles

    with soil types which range from clay, sand, loamy, gravel and silt that influence the range of

    activities prone to the marine ecology

    The country has a population of about 5million from the recent national projections by Statistics

    Sierra Leone, the institution responsible for population studies, with a heterogeneous population

    which includes; Mende, Themne, Limba, Fullah, Loko, Sherbro, Kissy, Vai, Kurankoh, etc. who practice a wide range of livelihood activities on a day to day basis and practice multiparty

    democratic governance system and a devolved local government of recent time.

    15 Target group Profile

    PRONAT Salone, among others, will engage groups of beneficiaries including the following thus;

    learning institutions, legal and state actors, Parliamentarians, Councilors, Mayors, Local

    community leaders, Naval security, and Media practitioners

  • 8/2/2019 PRONAT- Sierra Leone Project Proposal-Reviewed

    9/17

    It will further engage actors, key ministries and institutions on transit and field work on coastal and

    marine endangered ecosystem in a bid to come up with possible suggestions on a better and

    sustainable management practices.

    In addition to the said approaches, PRONAT-SL/ will support identified emerging beneficiaries

    with after skills training startup packages to engage in alternative income livelihood generation

    option to improve household income.

    Rallies, radio discussions and float parades will form part of the campaign in a bid to enact laid

    down policies laws and protocols.

    PRONAT will also train community and stakeholders on lobbying and advocacy and its

    importance in attaining conserved coastal and marine areas resources.

    17 Project Indicators:

    The project indicators in order to achieve a result driven outcome will include the following:

    Stake holders discuss issues sustainable best management behavior of coastal and marine

    ecology in development policies and agendas

    Community habitant Management practice better coastal and marine area conservation and

    management

  • 8/2/2019 PRONAT- Sierra Leone Project Proposal-Reviewed

    10/17

    18. Project Monitoring and Evaluation

    The monitoring of activities implemented over the project life cycle in the strategic coastal and

    marine areas will include a list of interventions such as, supervisory monitoring of visible project

    activity respective project committees structures, line ministries, parliamentarians , sister countries

    networking members/ representatives, Youths, women groups, navy sector and other partners.

    19. Means of verification

    The project will be verified through the series of criteria such as:

    Beneficiaries list

    Stakeholders list

    Memorandum of understanding and signatories

    Meetings, workshop and interaction sessions attendance

  • 8/2/2019 PRONAT- Sierra Leone Project Proposal-Reviewed

    11/17

    Draft bill on coastal and marine resources management

    Survey reports

  • 8/2/2019 PRONAT- Sierra Leone Project Proposal-Reviewed

    12/17

    20. ACTIVITY PLAN /WORKPLAN:

    ACTIVITY

    person

    responsible

    Time frame

    1 Year 2Year 3year

    1 2 3 4 1 2 3 4 1 2 3

    1 Identify 15 coastal and marine areas PRONAT

    2 Identify 7 project partners

    3 Formation of project structures

    4 Conduct baseline survey

    5 Sensitisation of stakeholders

    6

    Formation of coastal and marine environmental

    clubs in schools (2500 pupils and teachers)

    7 Hold project inception workshop

    8 Formation of four project communities9 Training of beneficiaries in alternative livelihoods

    10 Support beneficairies with start-up kits

    11

    Training of beneficiaries in lobbying andadvocacy techniques

    12 Student internship attachment 13 Conduct radio panel discussions 14 Organise Float parade 15

    Legislation of laws & bye-laws on marine and

    coastal resource management 16 Conduct 4 Post intervention surveys

    12

  • 8/2/2019 PRONAT- Sierra Leone Project Proposal-Reviewed

    13/17

    21. Risks and Assumptions:

    Governing agencies and partners provide financial support for the implementation of project

    activities

    Current regional alliance of parliamentarians and local elected representatives network on

    climate and coastal marine ecosystem management lobby and advocate for implementation of

    draft policies and bills

    Peoples behavior towards sustainable climate and environmental best practices are replicated

    Beneficiaries employed sustainable household and commerce energy sources

    Replanting of adaptable mangrove tree species along coastal and marine intervention areas

    Increase in environmental friendly house hold income earning sources

    Health and sanitation condition of coastal and marine ecosystem improved

    Drastic reduction in mangrove wood use as fuel by communities along mangrove areas

    22. Sustainability.

    PRONAT-SL will be sustained with the employment of the following guidelines criteria and

    regulation through the development of a national strategic action plan; legal framework and

  • 8/2/2019 PRONAT- Sierra Leone Project Proposal-Reviewed

    14/17

    23. Project Budget.

    No COST CATEGORIES UNIT QTY PERIOD

    UNITCOST

    (Le)

    TOTAL

    COST (Le)

    1 PERSONNEL COST

    Director/Admin/Finance 1 60months 2,000,000/00 120,000,000/00Field Coordinator 1 60months 1,500,000/00 90,000,000/00

    Secretary/typist 1 60months 7,000,000/00 420,000,000/00

    Field assistants 2 60months 1,000,000/00 60,000,000/00

    Driver 1 60months 600,000/00 36,000,000/00

    Office cleaner/aide 1 60months 400,000/00 24,000,000/00

    Total Personnel cost 7 Le 750,000,000/00

    2 DIRECT PROGRAMME COST

    Supplies ?

    Materials ?

    Quiz 3 3days 5,000,000/00 15,000,000/00

    Radio discussions 5 5days 3,000,000/00 15,000,000/00

    Float parade 1 1day 10,000,000/00 10,000,000/00

    Training 100 6months 5,000,000/00 30,000,000/00

    S ki 200 3 000 000/00 600 000 000/00

  • 8/2/2019 PRONAT- Sierra Leone Project Proposal-Reviewed

    15/17

    Desktop computers 2 3,000,000/00 6,000,000/00

    Photocopier 1 5,000,000/00 5,000,000/00

    Scanner 1 2,000,000/00 2,000,000/00

    Printer 1 5,000,000/00 5,000,000/00

    Office equipment(assorted)

    1 10,000,000/00 10,000,000/00

    Slide projector 1 4,000,000/00 4,000,000/00

    Digital camera 1 2,000,000/00 2,000,000/00Office furniture (assorted)

    15,000,000/00 15,000,000/00

    Vehicles 1 36months 100,000,000/0 100,000,000/00

    Motor bikes 3 36months 10,000.000/00 30,000,000/00

    Office space 1 36months 2,000,000/00 72,000,000/00

    Generator 1 36months 5,000,000/00 5,000,000/00

    Others

    Total capital cost Le 266,000,000/00

    4 PROGRAMME SUPPORT COST

    Lubricants litres 450 36months 10,000/00 4,500,000/00

    Fuel Gals 3,600 36months 16,500/00 59,400,000/00Bills 36months 15,000,000/00

    Licences and insurance 36months 12,000,000/00

  • 8/2/2019 PRONAT- Sierra Leone Project Proposal-Reviewed

    16/17

    GRAND TOTAL Le 3,312,500,000/00