Promenade worthy of it's status. Drawing Notes Regent ... · General Arrangement HIGHWAY SERVICES...

1
DISABLED DISABLED LOADING ONLY DISABLED LOADING ONLY DISABLED Victoria Street ea Terminal Building Regent Street Royal Bank of Scotland Jubilee Buildings Joe Jennings Demolished Sugarland Hotel Post Office Admiral House Claremount Hotel Claremount Hotel Car Park Rev. Client: Ref. Revision Date Chk. By Status infrastructure bun troggalys~shirveishyn raaidey QUO QUE CUN CER IS JE STA BIT Job Title Drawing Title Drawn By Checked By Date Scale Job Ref Drawing No AMENDMENTS Reiltys Ellan Vannin Government Isle of Man Highway Services - Design Ellerslie Depot Crosby Isle of Man IM4 2HA Telephone: (01624) 686681 highway services NOTES Douglas Promenade P102 December 2017 1:500 HW/3523 P.Barnett Regeneration Scheme Sheet 1 of 4 General Arrangement HIGHWAY SERVICES PLANNING K.Podmore 80m 70m 60m 50m 40m 30m 20m 10m 0m DEVELOPMENT INFORMATION - GENERAL The Douglas Promenade Improvement Works have been developed on the basis of restoring both the prominence and prestige to the Promenade as a 'Place' as opposed to solely a highway. This approach will once again give Douglas a Promenade worthy of it's status. Drawing Notes 1. This drawing is to be read in conjunction with all other planning drawings and submission documentation. 2. All dimensions are in metres (m) unless noted otherwise. 3. All level information provided is based on Ordnance GPS Datum (Douglas 02). 4. STREET LIGHTING - GENERAL INFORMATION: Street Lighting design to be provided by Douglas Borough Council. Lighting to be in accordance with BS 5439 Pt1 (2013): Lighting Class CE1; Environmental Zone E4. 5. KERB FACE HEIGHT - GENERAL INFORMATION: Between Victoria Street and Castle Mona Ave Pedestrian Crossings 0 - 6mm (maximum) Bus Stops (Kassel Kerb) 160mm (maximum) All Other Locations 75mm (minimum) 6. SURFACE MATERIAL - GENERAL INFORMATION: Carriageway (mixture of): i. Tarmac; ii. Concrete; iii. Granite composite paving; Footways (mixture of): i. Granite composite paving; ii. Tarmac; iii. Concrete block paving; Cultural Quarter (mixture of): i. Granite paving; ii. Granite composite paving. Tram Corridor i. Concrete; ii. Tarmac (pedestrian crossings). 7. PARKING BAY DIMENSIONS (minimum) i. Echelon 4.35m x 2.4m ii. Parallel 5.5m x 2.5m (minimum) iii. Disabled 6.6m x 2.5m (parallel) iv. Motorcycle 3.0m x 1.2m 8. All vehicular and pedestrian visibility requirements to meet the minimum standards recommended in guidance notes 'Manual for Manx Roads' and 'UK Tram'. SHEET ALLOCATION and LOCATION COLOUR REFERENCE Proposed Finishes Key: Granite Composite Paving (Footways) Tarmac (Footway) Concrete (Tram Corridor) Imprinted Concrete (Carriageway) Disabled Parking Bay Tarmac (Bus Laybys) Tactile Paving Granite Composite Paving (Zebra Crossings) Tarmac (Carriageway/Parking) Bus Shelter / Tram Shelter Location Place Marker (Street Furniture) Location provided for Street Furniture Belisha Beacon Traffic Light Fencing (Street Furniture) Granite Composite Paving (Area Allocated for Street Furniture) Granite Composite Paving (Vehicular Crossings) Lighting Column Lighting Column Granite Composite Paving (Footways) Stone Bench / Planter Completed Phase 1 Work Stone Wall (to match existing) Flywheel Artwork Installation

Transcript of Promenade worthy of it's status. Drawing Notes Regent ... · General Arrangement HIGHWAY SERVICES...

Page 1: Promenade worthy of it's status. Drawing Notes Regent ... · General Arrangement HIGHWAY SERVICES PLANNING K.Podmore 0m 10m 20m 30m 40m 50m 60m 70m 80m DEVELOPMENT INFORMATION - GENERAL

D

ISA

B

LE

D

D

IS

A

B

L

E

D

LOAD

ING

ON

LY

D

IS

A

B

L

E

D

LOADING O

NLY

D

IS

A

B

LE

D

V

i

c

t

o

r

i

a

S

t

r

e

e

t

Sea Term

inal Buildin

g

R

e

g

e

n

t S

tre

e

t

Royal Bank

of Scotla

nd

J

u

b

i

l

e

e

B

u

i

l

d

i

n

g

s

Joe Jennin

gs

D

em

olished

Sugarla

nd

H

otel

Post O

ffic

e

Adm

iral

H

ouse

Cla

rem

ount

H

otel

C

la

r

e

m

o

u

n

t

H

o

t

e

l

C

a

r P

a

rk

Rev.

Client:

Ref. Revision Date Chk.By

Status

infrastructurebun troggalys~shirveishyn raaidey

Q

U

O

QU

E

C

U

N

CERIS

J

E

S

T

A

B

I

T

Job Title

Drawing Title

Drawn By

Checked By

Date

Scale

Job Ref Drawing No

AMENDMENTS

Reiltys Ellan VanninGovernment

Isle of Man

Highway Services - Design

Ellerslie Depot

Crosby

Isle of Man

IM4 2HA

Telephone: (01624) 686681

highway services

NOTES

Douglas Promenade

P102

December 2017

1:500

HW/3523

P.Barnett

Regeneration Scheme

Sheet 1 of 4

General Arrangement

HIGHWAY SERVICES

PLANNING

K.Podmore

80m70m60m50m40m30m20m10m0m

DEVELOPMENT INFORMATION - GENERAL

The Douglas Promenade Improvement Works have been

developed on the basis of restoring both the prominence and

prestige to the Promenade as a 'Place' as opposed to solely a

highway. This approach will once again give Douglas a

Promenade worthy of it's status.

Drawing Notes

1. This drawing is to be read in conjunction with all other

planning drawings and submission documentation.

2. All dimensions are in metres (m) unless noted otherwise.

3. All level information provided is based on Ordnance GPS

Datum (Douglas 02).

4. STREET LIGHTING - GENERAL INFORMATION:

Street Lighting design to be provided by Douglas Borough

Council. Lighting to be in accordance with BS 5439 Pt1

(2013): Lighting Class CE1; Environmental Zone E4.

5. KERB FACE HEIGHT - GENERAL INFORMATION:

Between Victoria Street and Castle Mona Ave

Pedestrian Crossings 0 - 6mm (maximum)

Bus Stops (Kassel Kerb) 160mm (maximum)

All Other Locations 75mm (minimum)

6. SURFACE MATERIAL - GENERAL INFORMATION:

Carriageway (mixture of):

i. Tarmac;

ii. Concrete;

iii. Granite composite paving;

Footways (mixture of):

i. Granite composite paving;

ii. Tarmac;

iii. Concrete block paving;

Cultural Quarter (mixture of):

i. Granite paving;

ii. Granite composite paving.

Tram Corridor

i. Concrete;

ii. Tarmac (pedestrian crossings).

7. PARKING BAY DIMENSIONS (minimum)

i. Echelon 4.35m x 2.4m

ii. Parallel 5.5m x 2.5m (minimum)

iii. Disabled 6.6m x 2.5m (parallel)

iv. Motorcycle 3.0m x 1.2m

8. All vehicular and pedestrian visibility requirements to meet

the minimum standards recommended in guidance notes

'Manual for Manx Roads' and 'UK Tram'.

SHEETALLOCATION

andLOCATIONCOLOUR

REFERENCE

Proposed Finishes Key:

Granite Composite Paving (Footways)

Tarmac (Footway)

Concrete (Tram Corridor)

Imprinted Concrete (Carriageway)

Disabled Parking Bay

Tarmac (Bus Laybys)

Tactile Paving

Granite Composite Paving (Zebra Crossings)

Tarmac (Carriageway/Parking)

Bus Shelter / Tram Shelter Location

Place Marker (Street Furniture)

Location provided for Street Furniture

Belisha Beacon

Traffic Light

Fencing (Street Furniture)

Granite Composite Paving (Area Allocated for Street Furniture)

Granite Composite Paving (Vehicular Crossings)

Lighting Column

Lighting Column

Granite Composite Paving (Footways)

Stone Bench / Planter

Completed Phase 1 Work

Stone Wall (to match existing)

Flywheel Artwork Installation