Promaster Partition Installation Instructions€¦ · uol-v|;u -u om Installation Instructions...
Transcript of Promaster Partition Installation Instructions€¦ · uol-v|;u -u om Installation Instructions...
MASTERACK Headquarters2400 Mellon CourtDecatur, GA 30035
800-222-8785
Promaster Partition Installation Instructions
Before starting installation,review this document to ensure thatall parts and hardware are includedin the package. In the event that parts are missing, please contact MASTERACK at 1-800-222-8785 to re-ordermissing parts.
!
MASTERACK.COM
2MASTERACK.COM
Promaster Partition Installation Instructions
!Before starting installation,review this document to ensure thatall parts and hardware are includedin the package. In the event that parts are missing, please contact MASTERACK at 1-800-222-8785 to re-ordermissing parts.
■ Recommended Tools
• 7/16" Air Wrench or Socket Ratchet• 10mm Air Wrench or Socket Ratchet
(only required to replace OEM partition)• 7/16" Box End/Open End Wrench• Torque Wrench• Electric Drill with 3/8" Drill Bit
(drill stop recommended)
2400 Mellon Court, Decatur, GA 30035 Phone: 1-800-222-8785 www.masterack.com
RM470279 Rev 2.2
Page 1 of 11
2400 Mellon Court, Decatur, GA 30035 Phone: 1-800-222-8785 www.masterack.com
RM470279 Rev 2.2
Page 1 of 11
Attention: If replacing an OEM partition or if there are threaded HEX mounting nuts already installed in the B-pillar and Roof Bow, please skip pages 5 & 6 of this installation guide.
3MASTERACK.COM
Promaster Partition Installation Instructions
■ Components
2400 Mellon Court, Decatur, GA 30035 Phone: 1-800-222-8785 www.masterack.com
RM470279 Rev 2.2
Page 2 of 11
Item Part # (Individual) Description1 02H220 PROMASTER PARTITION TOP ATTACHMENT PANEL2 02H221 PROMASTER PARTITION CS ATTACHMENT PANEL3 02H222 PROMASTER PARTITION SS ATTACHMENT PANEL4 02J158 HIGH/MID ROOF SLD PNL TYPE 25 02J159 HIGH/MID ROOF PRF PNL TYPE 26 02J160 HIGH/MID ROOF SLD CS TYPE 27 02J161 HIGH/MID ROOF PRF CS TYPE 28 02J162 HIGH/MID ROOF SLD HGD TYPE 29 02J163 HIGH/MID ROOF PRF HGD TYPE 2
NOT HINGED02J176KP = #4 + #4 + #602J177KP = #4 + #5 + #702J178KP = #5 + #5 + #7
HINGED02J179KP = #4 + #6 + #802J180KP = #4 + #7 + #902J181KP = #5 + #7 + #9
4MASTERACK.COM
Promaster Partition Installation Instructions
■ Hardware
Partition Panels HardwarePart # Description Qty
RM442002 BAG POLY 6X8 3 MIL 1
RM510107 BOLT CARRIAGE 1/4-20X3/4 ZINC 20
RM511458 SCREW 1/4-20X3/4 7/16 HEX WSHR 10
RM511471 SCREW 1/4-20X1-1/4 HEX WHD 4
RM520111 PLUS NUT #S25-PB-280 PRE-BULB 14
RM520112 PLUS NUT TOOL #C500-25 1
RM520312 NUT 1/4-20 E-STOP 20
RM541039 WASHER SPLIT LOCK 1/4 GALV 14
RM541061 WASHER 1/4 USS FLAT ZINC 20
Partition Attachment Panels HardwarePart # Description Qty
RM541039 WASHER LOCK-SPLIT 1/4” ZINC 19
RM511603 SCREW SOCKET HEAD CAP M6X1X18 BLK OX 12.9
15
RM510107 BOLT CARRIAGE 1/4-20X3/4 18
RM520312 NUT ESTOP 1/4-20 18
RM541061 WASHER 1/4” USS FLAT 37
RM520111 PLUS NUT #SRT25PB280 PRE-BULB 19
RM520112 PLUS NUT TOOL #C500-25 1
RM511477 SCREW 1/4-20X1-1/4 HWH G8 1
RM511428 SCREW 1/4-20 X 1” HEX HD G8 19
Cab Divider Door Hardware (Where Applicable)Part # Description Qty
RM580030 PLASTIC LATCH COVER PLATE 2004 1
RM580314 HANDLE #H-17003C INSIDE CHROME
1
RM580365 HANDLE RND FLSH MNT PRTN DOOR
1
5MASTERACK.COM
Promaster Partition Installation Instructions
■ Plusnut Installation
BEFORE DRILLING - CHECK ALL MOUNTING LOCATIONS TO PREVENT PENETRATING GAS LINES, GAS TANKS, BRAKE LINES, WIRING OR ANY OTHER STRUCTURE OF VEHICLE
!
2400 Mellon Court, Decatur, GA 30035 Phone: 1-800-222-8785 www.masterack.com
Page 12 of 13
RM470447
BEFORE DRILLING CHECK ALL MOUNTING LOCATIONS TO PREVENT PENETRATING
GAS LINES, GAS TANKS, BRAKE LINES, WIRING OR ANY OTHER STRUCTURE OF VEHICLE
CHECK EACH BOLT LOCATION to ensure they are tightened to the specified
torque setting.
TORQUE SETTING:Size – 1/4 GRD 5 = 7- 9.6 Ft.-Lbs.Size – 1/4 GRD 8 = 10- 13.5 Ft.-Lbs.
The Plusnut® is pre-bulbed for easy installation
1
The Plusnut® is pre-assembled with hex cap and hex bolt. Then it is inserted into a pre-drilled hole
2
As the bolt is tightened, the Plusnut® upsets and provides outstanding
blind fastening holding power
3
C-500 tool tightens bolt thru hex head cap into Plusnut® A ratchet, open-end or closed –end wrench can be used.
4
Fully upset Plusnut® provides a reliable nut plate for fastening.
5
USE DRILL STOP TO PREVENT DAMAGING VEHICLE
DRILL CHUCK
DRILL STOP
DRILL BIT
USE DRILL STOP TO PREVENT DAMAGING VEHICLE
2400 Mellon Court, Decatur, GA 30035 Phone: 1-800-222-8785 www.masterack.com
Page 12 of 13
RM470447
BEFORE DRILLING CHECK ALL MOUNTING LOCATIONS TO PREVENT PENETRATING
GAS LINES, GAS TANKS, BRAKE LINES, WIRING OR ANY OTHER STRUCTURE OF VEHICLE
CHECK EACH BOLT LOCATION to ensure they are tightened to the specified
torque setting.
TORQUE SETTING:Size – 1/4 GRD 5 = 7- 9.6 Ft.-Lbs.Size – 1/4 GRD 8 = 10- 13.5 Ft.-Lbs.
The Plusnut® is pre-bulbed for easy installation
1
The Plusnut® is pre-assembled with hex cap and hex bolt. Then it is inserted into a pre-drilled hole
2
As the bolt is tightened, the Plusnut® upsets and provides outstanding
blind fastening holding power
3
C-500 tool tightens bolt thru hex head cap into Plusnut® A ratchet, open-end or closed –end wrench can be used.
4
Fully upset Plusnut® provides a reliable nut plate for fastening.
5
USE DRILL STOP TO PREVENT DAMAGING VEHICLE
DRILL CHUCK
DRILL STOP
DRILL BIT
2400 Mellon Court, Decatur, GA 30035 Phone: 1-800-222-8785 www.masterack.com
Page 12 of 13
RM470447
BEFORE DRILLING CHECK ALL MOUNTING LOCATIONS TO PREVENT PENETRATING
GAS LINES, GAS TANKS, BRAKE LINES, WIRING OR ANY OTHER STRUCTURE OF VEHICLE
CHECK EACH BOLT LOCATION to ensure they are tightened to the specified
torque setting.
TORQUE SETTING:Size – 1/4 GRD 5 = 7- 9.6 Ft.-Lbs.Size – 1/4 GRD 8 = 10- 13.5 Ft.-Lbs.
The Plusnut® is pre-bulbed for easy installation
1
The Plusnut® is pre-assembled with hex cap and hex bolt. Then it is inserted into a pre-drilled hole
2
As the bolt is tightened, the Plusnut® upsets and provides outstanding
blind fastening holding power
3
C-500 tool tightens bolt thru hex head cap into Plusnut® A ratchet, open-end or closed –end wrench can be used.
4
Fully upset Plusnut® provides a reliable nut plate for fastening.
5
USE DRILL STOP TO PREVENT DAMAGING VEHICLE
DRILL CHUCK
DRILL STOP
DRILL BIT
2400 Mellon Court, Decatur, GA 30035 Phone: 1-800-222-8785 www.masterack.com
Page 12 of 13
RM470447
BEFORE DRILLING CHECK ALL MOUNTING LOCATIONS TO PREVENT PENETRATING
GAS LINES, GAS TANKS, BRAKE LINES, WIRING OR ANY OTHER STRUCTURE OF VEHICLE
CHECK EACH BOLT LOCATION to ensure they are tightened to the specified
torque setting.
TORQUE SETTING:Size – 1/4 GRD 5 = 7- 9.6 Ft.-Lbs.Size – 1/4 GRD 8 = 10- 13.5 Ft.-Lbs.
The Plusnut® is pre-bulbed for easy installation
1
The Plusnut® is pre-assembled with hex cap and hex bolt. Then it is inserted into a pre-drilled hole
2
As the bolt is tightened, the Plusnut® upsets and provides outstanding
blind fastening holding power
3
C-500 tool tightens bolt thru hex head cap into Plusnut® A ratchet, open-end or closed –end wrench can be used.
4
Fully upset Plusnut® provides a reliable nut plate for fastening.
5
USE DRILL STOP TO PREVENT DAMAGING VEHICLE
DRILL CHUCK
DRILL STOP
DRILL BIT
2400 Mellon Court, Decatur, GA 30035 Phone: 1-800-222-8785 www.masterack.com
Page 12 of 13
RM470447
BEFORE DRILLING CHECK ALL MOUNTING LOCATIONS TO PREVENT PENETRATING
GAS LINES, GAS TANKS, BRAKE LINES, WIRING OR ANY OTHER STRUCTURE OF VEHICLE
CHECK EACH BOLT LOCATION to ensure they are tightened to the specified
torque setting.
TORQUE SETTING:Size – 1/4 GRD 5 = 7- 9.6 Ft.-Lbs.Size – 1/4 GRD 8 = 10- 13.5 Ft.-Lbs.
The Plusnut® is pre-bulbed for easy installation
1
The Plusnut® is pre-assembled with hex cap and hex bolt. Then it is inserted into a pre-drilled hole
2
As the bolt is tightened, the Plusnut® upsets and provides outstanding
blind fastening holding power
3
C-500 tool tightens bolt thru hex head cap into Plusnut® A ratchet, open-end or closed –end wrench can be used.
4
Fully upset Plusnut® provides a reliable nut plate for fastening.
5
USE DRILL STOP TO PREVENT DAMAGING VEHICLE
DRILL CHUCK
DRILL STOP
DRILL BIT
2400 Mellon Court, Decatur, GA 30035 Phone: 1-800-222-8785 www.masterack.com
Page 12 of 13
RM470447
BEFORE DRILLING CHECK ALL MOUNTING LOCATIONS TO PREVENT PENETRATING
GAS LINES, GAS TANKS, BRAKE LINES, WIRING OR ANY OTHER STRUCTURE OF VEHICLE
CHECK EACH BOLT LOCATION to ensure they are tightened to the specified
torque setting.
TORQUE SETTING:Size – 1/4 GRD 5 = 7- 9.6 Ft.-Lbs.Size – 1/4 GRD 8 = 10- 13.5 Ft.-Lbs.
The Plusnut® is pre-bulbed for easy installation
1
The Plusnut® is pre-assembled with hex cap and hex bolt. Then it is inserted into a pre-drilled hole
2
As the bolt is tightened, the Plusnut® upsets and provides outstanding
blind fastening holding power
3
C-500 tool tightens bolt thru hex head cap into Plusnut® A ratchet, open-end or closed –end wrench can be used.
4
Fully upset Plusnut® provides a reliable nut plate for fastening.
5
USE DRILL STOP TO PREVENT DAMAGING VEHICLE
DRILL CHUCK
DRILL STOP
DRILL BIT
6MASTERACK.COM
Promaster Partition Installation Instructions
■ Installation
2400 Mellon Court, Decatur, GA 30035 Phone: 1-800-222-8785 www.masterack.com
RM470279 Rev 2.2
Page 5 of 11
Cut out a section of the plastic trim on both B-Pillars, locate the OEM hex-holes, and install 10x Plusnuts. Refer to page 4 for Plusnut installation.
7MASTERACK.COM
Promaster Partition Installation Instructions
■ Roof Bow Plusnut Installation
Locate the OEM hex-holes along the front roof bow (marked with a star in the image below), and install 5x Plusnuts*. Refer to page 4 for Plusnut installation.Hardware: (5x) Plusnuts
2400 Mellon Court, Decatur, GA 30035 Phone: 1-800-222-8785 www.masterack.com
RM470279 Rev 2.2
Page 6 of 11
2400 Mellon Court, Decatur, GA 30035 Phone: 1-800-222-8785 www.masterack.com
RM470279 Rev 2.2
Page 6 of 11
8MASTERACK.COM
Promaster Partition Installation Instructions
■ Floor Plusnut Installation
Drill 3/8” holes at the four locations (specified in the image below) on the floor of the vehicle, and install 4x Plusnuts*. Refer to page 4 for Plusnut installation.Hardware: (4x) Plusnuts
2400 Mellon Court, Decatur, GA 30035 Phone: 1-800-222-8785 www.masterack.com
RM470279 Rev 2.2
Page 7 of 11
2400 Mellon Court, Decatur, GA 30035 Phone: 1-800-222-8785 www.masterack.com
RM470279 Rev 2.2
Page 7 of 11
9MASTERACK.COM
Promaster Partition Installation Instructions
■ Partition Assembly Installation2400 Mellon Court, Decatur, GA 30035
Phone: 1-800-222-8785 www.masterack.com
RM470279 Rev 2.2
Page 8 of 11
TORQUE SETTING: 1/4-20 Grade 5 = 7 – 9.6 Ft. Lbs.
10MASTERACK.COM
Promaster Partition Installation Instructions
■ Hinged Door Handle Assembly
2400 Mellon Court, Decatur, GA 30035 Phone: 1-800-222-8785 www.masterack.com
RM470279 Rev 2.2
Page 10 of 11
TORQUE SETTING: 1/4-20 Grade 8 = 10 – 13.5 Ft. Lbs. M6 Grade 10.9 = 10.9 – 11 N-m
11MASTERACK.COM
Promaster Partition Installation Instructions
■ Attaching Partition
BEFORE DRILLING - CHECK ALL MOUNTING LOCATIONS TO PREVENT PENETRATING GAS LINES, GAS TANKS, BRAKE LINES, WIRING OR ANY OTHER STRUCTURE OF VEHICLE
!
RM470066 Rev. 2.2
8
Properly align partition using a straight edge and square. Mark through the slots in the bottom flange onto the floor, and Left and Right Panels [2, 4] onto B-Pillars.STRAIGHT
EDGE
SQUARE
SLOT LOCATIONS
ALWAYS CHECK BEFORE DRILLING ANY HOLES TO MAKE SURE NO WIRING OR FUEL LINES WILL BE DAMAGED.
SERIOUS INJURY CAN RESULT
12MASTERACK.COM
Promaster Partition Installation Instructions
■ Attaching Partition
BEFORE DRILLING - CHECK ALL MOUNTING LOCATIONS TO PREVENT PENETRATING GAS LINES, GAS TANKS, BRAKE LINES, WIRING OR ANY OTHER STRUCTURE OF VEHICLE
!
RM470066 Rev. 2.2
9
With partition properly aligned and positioned, using a 17/64drill bit, drill out existing hole in B-pillar and secure with (12) 1/4 Monobolts
With partition properly aligned and positioned, drill(7) 17/64 holes, and secure with (7) 1/4 Mono Bolts
ALWAYS CHECK BEFORE DRILLING ANY HOLES TO MAKE SURE NO WIRING OR FUEL LINES WILL BE DAMAGED.
SERIOUS INJURY CAN RESULT
NOTE: 1/4-20 Plusnuts and 1/4-20 Screws have been included as an alternative installation option.
1/4-20 x 1-1/4Hex WHD
1/4-20Flat washer
1/4-20Lock washer
Plusnut
RM470066 Rev. 2.2
9
With partition properly aligned and positioned, using a 17/64drill bit, drill out existing hole in B-pillar and secure with (12) 1/4 Monobolts
With partition properly aligned and positioned, drill(7) 17/64 holes, and secure with (7) 1/4 Mono Bolts
ALWAYS CHECK BEFORE DRILLING ANY HOLES TO MAKE SURE NO WIRING OR FUEL LINES WILL BE DAMAGED.
SERIOUS INJURY CAN RESULT
NOTE: 1/4-20 Plusnuts and 1/4-20 Screws have been included as an alternative installation option.
1/4-20 x 1-1/4Hex WHD
1/4-20Flat washer
1/4-20Lock washer
Plusnut
13MASTERACK.COM
Promaster Partition Installation Instructions
■ Attaching PartitionRM470066
Rev. 2.2
10
Attach Left and Right Panels [2, 4] to floor as shown here.
5/16-18 x 1 1/4HEX HEAD GRD 5
BOLT
5/16-18FLAT WASHER
FLOOR MAT
FLOORMOUNTING
WASHER
FENDERWASHER
5/16-18PREVAILINGTORQUE NUT
3/8HOLE
14MASTERACK.COM
Promaster Partition Installation Instructions
■ Attaching PartitionRM470066
Rev. 2.2
11
Using a 1-1/8 Hole saw made for mat cutting, and hole saw out
hole in the composite floor
At this location, drill a 1/2 hole using a drill stop to prevent penetrating the fuel tank.
Assemble 1/4 Plusnut, using1/4 x 1-1/4 Hex Head Grd 5 screw
and (1) 1/4 Flat washer
Insert Plusnut assembly into hole, holding the Plusnut Tool with a wrench, tighten screw with a wrench or a
ratchet until screw is tight. While still holding the Plusnut Tool securely, remove the screw.
5/16-18 x 1 1/4HEX HEAD GRD 5
BOLT
5/16-18FLAT WASHER
1/2 SPACER
Plusnut
Fully Set Plusnut
RM470066 Rev. 2.2
11
Using a 1-1/8 Hole saw made for mat cutting, and hole saw out
hole in the composite floor
At this location, drill a 1/2 hole using a drill stop to prevent penetrating the fuel tank.
Assemble 1/4 Plusnut, using1/4 x 1-1/4 Hex Head Grd 5 screw
and (1) 1/4 Flat washer
Insert Plusnut assembly into hole, holding the Plusnut Tool with a wrench, tighten screw with a wrench or a
ratchet until screw is tight. While still holding the Plusnut Tool securely, remove the screw.
5/16-18 x 1 1/4HEX HEAD GRD 5
BOLT
5/16-18FLAT WASHER
1/2 SPACER
Plusnut
Fully Set Plusnut
15MASTERACK.COM
Promaster Partition Installation Instructions
■ Attaching Partition - Hinged Center Door Panel
RM470066 Rev. 2.2
12
Make sure the handle is in the Locked position and insert it, cam first into the octagonal hole in the front of the door as shown. Slide the cam through the slot in the side of the door and snap handle into place.The cam will rotate up to disengage, otherwise the handle has been assembled in the open position and will need to be removed and locked to repeat this step.
Remove backing from tape on the latch cover plate and assemble as shown. Place latch handle over square shaft and secure with the set screw provided.
FOR PARTITIONS WITH HINGED CENTER DOOR PANEL
16MASTERACK.COM
Promaster Partition Installation Instructions
■ Plusnut Installation
BEFORE DRILLING - CHECK ALL MOUNTING LOCATIONS TO PREVENT PENETRATING GAS LINES, GAS TANKS, BRAKE LINES, WIRING OR ANY OTHER STRUCTURE OF VEHICLE
!
2400 Mellon Court, Decatur, GA 30035 Phone: 1-800-222-8785 www.masterack.com
Page 12 of 13
RM470447
BEFORE DRILLING CHECK ALL MOUNTING LOCATIONS TO PREVENT PENETRATING
GAS LINES, GAS TANKS, BRAKE LINES, WIRING OR ANY OTHER STRUCTURE OF VEHICLE
CHECK EACH BOLT LOCATION to ensure they are tightened to the specified
torque setting.
TORQUE SETTING:Size – 1/4 GRD 5 = 7- 9.6 Ft.-Lbs.Size – 1/4 GRD 8 = 10- 13.5 Ft.-Lbs.
The Plusnut® is pre-bulbed for easy installation
1
The Plusnut® is pre-assembled with hex cap and hex bolt. Then it is inserted into a pre-drilled hole
2
As the bolt is tightened, the Plusnut® upsets and provides outstanding
blind fastening holding power
3
C-500 tool tightens bolt thru hex head cap into Plusnut® A ratchet, open-end or closed –end wrench can be used.
4
Fully upset Plusnut® provides a reliable nut plate for fastening.
5
USE DRILL STOP TO PREVENT DAMAGING VEHICLE
DRILL CHUCK
DRILL STOP
DRILL BIT
USE DRILL STOP TO PREVENT DAMAGING VEHICLE
2400 Mellon Court, Decatur, GA 30035 Phone: 1-800-222-8785 www.masterack.com
Page 12 of 13
RM470447
BEFORE DRILLING CHECK ALL MOUNTING LOCATIONS TO PREVENT PENETRATING
GAS LINES, GAS TANKS, BRAKE LINES, WIRING OR ANY OTHER STRUCTURE OF VEHICLE
CHECK EACH BOLT LOCATION to ensure they are tightened to the specified
torque setting.
TORQUE SETTING:Size – 1/4 GRD 5 = 7- 9.6 Ft.-Lbs.Size – 1/4 GRD 8 = 10- 13.5 Ft.-Lbs.
The Plusnut® is pre-bulbed for easy installation
1
The Plusnut® is pre-assembled with hex cap and hex bolt. Then it is inserted into a pre-drilled hole
2
As the bolt is tightened, the Plusnut® upsets and provides outstanding
blind fastening holding power
3
C-500 tool tightens bolt thru hex head cap into Plusnut® A ratchet, open-end or closed –end wrench can be used.
4
Fully upset Plusnut® provides a reliable nut plate for fastening.
5
USE DRILL STOP TO PREVENT DAMAGING VEHICLE
DRILL CHUCK
DRILL STOP
DRILL BIT
2400 Mellon Court, Decatur, GA 30035 Phone: 1-800-222-8785 www.masterack.com
Page 12 of 13
RM470447
BEFORE DRILLING CHECK ALL MOUNTING LOCATIONS TO PREVENT PENETRATING
GAS LINES, GAS TANKS, BRAKE LINES, WIRING OR ANY OTHER STRUCTURE OF VEHICLE
CHECK EACH BOLT LOCATION to ensure they are tightened to the specified
torque setting.
TORQUE SETTING:Size – 1/4 GRD 5 = 7- 9.6 Ft.-Lbs.Size – 1/4 GRD 8 = 10- 13.5 Ft.-Lbs.
The Plusnut® is pre-bulbed for easy installation
1
The Plusnut® is pre-assembled with hex cap and hex bolt. Then it is inserted into a pre-drilled hole
2
As the bolt is tightened, the Plusnut® upsets and provides outstanding
blind fastening holding power
3
C-500 tool tightens bolt thru hex head cap into Plusnut® A ratchet, open-end or closed –end wrench can be used.
4
Fully upset Plusnut® provides a reliable nut plate for fastening.
5
USE DRILL STOP TO PREVENT DAMAGING VEHICLE
DRILL CHUCK
DRILL STOP
DRILL BIT
2400 Mellon Court, Decatur, GA 30035 Phone: 1-800-222-8785 www.masterack.com
Page 12 of 13
RM470447
BEFORE DRILLING CHECK ALL MOUNTING LOCATIONS TO PREVENT PENETRATING
GAS LINES, GAS TANKS, BRAKE LINES, WIRING OR ANY OTHER STRUCTURE OF VEHICLE
CHECK EACH BOLT LOCATION to ensure they are tightened to the specified
torque setting.
TORQUE SETTING:Size – 1/4 GRD 5 = 7- 9.6 Ft.-Lbs.Size – 1/4 GRD 8 = 10- 13.5 Ft.-Lbs.
The Plusnut® is pre-bulbed for easy installation
1
The Plusnut® is pre-assembled with hex cap and hex bolt. Then it is inserted into a pre-drilled hole
2
As the bolt is tightened, the Plusnut® upsets and provides outstanding
blind fastening holding power
3
C-500 tool tightens bolt thru hex head cap into Plusnut® A ratchet, open-end or closed –end wrench can be used.
4
Fully upset Plusnut® provides a reliable nut plate for fastening.
5
USE DRILL STOP TO PREVENT DAMAGING VEHICLE
DRILL CHUCK
DRILL STOP
DRILL BIT
2400 Mellon Court, Decatur, GA 30035 Phone: 1-800-222-8785 www.masterack.com
Page 12 of 13
RM470447
BEFORE DRILLING CHECK ALL MOUNTING LOCATIONS TO PREVENT PENETRATING
GAS LINES, GAS TANKS, BRAKE LINES, WIRING OR ANY OTHER STRUCTURE OF VEHICLE
CHECK EACH BOLT LOCATION to ensure they are tightened to the specified
torque setting.
TORQUE SETTING:Size – 1/4 GRD 5 = 7- 9.6 Ft.-Lbs.Size – 1/4 GRD 8 = 10- 13.5 Ft.-Lbs.
The Plusnut® is pre-bulbed for easy installation
1
The Plusnut® is pre-assembled with hex cap and hex bolt. Then it is inserted into a pre-drilled hole
2
As the bolt is tightened, the Plusnut® upsets and provides outstanding
blind fastening holding power
3
C-500 tool tightens bolt thru hex head cap into Plusnut® A ratchet, open-end or closed –end wrench can be used.
4
Fully upset Plusnut® provides a reliable nut plate for fastening.
5
USE DRILL STOP TO PREVENT DAMAGING VEHICLE
DRILL CHUCK
DRILL STOP
DRILL BIT
2400 Mellon Court, Decatur, GA 30035 Phone: 1-800-222-8785 www.masterack.com
Page 12 of 13
RM470447
BEFORE DRILLING CHECK ALL MOUNTING LOCATIONS TO PREVENT PENETRATING
GAS LINES, GAS TANKS, BRAKE LINES, WIRING OR ANY OTHER STRUCTURE OF VEHICLE
CHECK EACH BOLT LOCATION to ensure they are tightened to the specified
torque setting.
TORQUE SETTING:Size – 1/4 GRD 5 = 7- 9.6 Ft.-Lbs.Size – 1/4 GRD 8 = 10- 13.5 Ft.-Lbs.
The Plusnut® is pre-bulbed for easy installation
1
The Plusnut® is pre-assembled with hex cap and hex bolt. Then it is inserted into a pre-drilled hole
2
As the bolt is tightened, the Plusnut® upsets and provides outstanding
blind fastening holding power
3
C-500 tool tightens bolt thru hex head cap into Plusnut® A ratchet, open-end or closed –end wrench can be used.
4
Fully upset Plusnut® provides a reliable nut plate for fastening.
5
USE DRILL STOP TO PREVENT DAMAGING VEHICLE
DRILL CHUCK
DRILL STOP
DRILL BIT
17MASTERACK.COM
Promaster Partition Installation Instructions
■ Securing Top Panel
Replace assembled partition and secure using:(4) 1/4-20 x 3/4 HWH Screws(4) 1/4 Split Lock Washers
Page 13 of 17
RM470028 Rev 3.2
2400 Mellon Court, Decatur, GA 30035 Phone: 1-800-222-8785 www.masterack.com
SECURING TOP PANEL Replace assembled partition and secure using:(4) 1/4-20 x 3/4 HWH Screws(4) 1/4 Split Lock Washers
INSTALLEDPLUSNUTS
18MASTERACK.COM
Promaster Partition Installation Instructions
■ Securing To Floor
Replace assembled partition and secure using: (4) 1/4-20 x 1-1/4 HWH Screws Grd 8(4) 1/4 Split Lock Washers
Page 14 of 17
RM470028 Rev 3.2
2400 Mellon Court, Decatur, GA 30035 Phone: 1-800-222-8785 www.masterack.com
SECURING @ FLOOR Replace assembled partition and secure using:(4) 1/4-20 x 1-1/4 HWH Screws Grd 8(4) 1/4 Split Lock Washers
INSTALLEDPLUSNUTS
INSTALLEDPLUSNUTS
19MASTERACK.COM
Promaster Partition Installation Instructions
■ Securing B-Pillars
Replace assembled partition and secure using: (6) 1/4-20 x 1-1/4 HWH Screws Grd 8(6) 1/4 Split Lock Washers
Page 15 of 17
RM470028 Rev 3.2
2400 Mellon Court, Decatur, GA 30035 Phone: 1-800-222-8785 www.masterack.com
SECURING @ B-PILLARS Replace assembled partition and secure using:(6) 1/4-20 x 1-1/4 HWH Screws Grd 8(6) 1/4 Split Lock Washers
RIGHT PANEL (PASSENGER’S SIDE)
INSTALLEDPLUSNUTS
INSTALLEDPLUSNUTS
LEFT PANEL (DRIVER’S SIDE)
Page 15 of 17
RM470028 Rev 3.2
2400 Mellon Court, Decatur, GA 30035 Phone: 1-800-222-8785 www.masterack.com
SECURING @ B-PILLARS Replace assembled partition and secure using:(6) 1/4-20 x 1-1/4 HWH Screws Grd 8(6) 1/4 Split Lock Washers
RIGHT PANEL (PASSENGER’S SIDE)
INSTALLEDPLUSNUTS
INSTALLEDPLUSNUTS
LEFT PANEL (DRIVER’S SIDE)
Right Panel (Passenger’s Side) Left Panel (Driver’s Side)
20MASTERACK.COM
Promaster Partition Installation Instructions
■ B-Pillar Trim
Passenger B-Pillar (Shown with Trim) Driver’s B-Pillar (Shown with Trim)
Page 16 of 17
RM470028 Rev 3.2
2400 Mellon Court, Decatur, GA 30035 Phone: 1-800-222-8785 www.masterack.com
@ PASSENGER’S B-PILLAR (SHOWN WITH TRIM)
@ DRIVER’S B-PILLAR (SHOWN WITH TRIM)
NOTE: IT WILL BE NESSARY TO CUT TRIM IN THIS AREA
B-PILLAR TRIM
Page 16 of 17
RM470028 Rev 3.2
2400 Mellon Court, Decatur, GA 30035 Phone: 1-800-222-8785 www.masterack.com
@ PASSENGER’S B-PILLAR (SHOWN WITH TRIM)
@ DRIVER’S B-PILLAR (SHOWN WITH TRIM)
NOTE: IT WILL BE NESSARY TO CUT TRIM IN THIS AREA
B-PILLAR TRIM
21MASTERACK.COM
Promaster Partition Installation Instructions
MASTERACK® 3 Year / 36,000 Mile Limited Warranty
MASTERACK® commercial van and pickup equipment is warranted to be from defects in material and workmanship, under normal use and service for a period of one (1) year from date of purchase. Factory installations, and products installed in new vehicles by an authorized MASTERACK® installer are warranted for (3) years or 36,000 miles (60,000KM), whichever comes first. This warranty covers only repairs, or at MASTERACKS’ discretion, replacement to correct any defects related to materials and workmanship.
This warranty does not apply to:
• Additions, alterations, or installations made by persons including dealers,other than MASTERACK® and it’s authorized distributors, made in accordance with MASTERACK® specifications and / or instructions, nor to defects arising out of attribute to such additions, alterations or installations.
• Defects attributable to abuse or misuse of the product, misapplication, negligent accident, modification or tampering.
• Damage resulting from failure to promptly notify and comply with the instructions of the dealer or manufacturer about defects when noted.
• Any incidental or consequential damages connected with a defect, either while under warranty or afterward, including the cost of a rental truck and / or loss or revenue.
THE WARRANTY IS THE ONLY WARRANTY APPLICABLE TO A MASTERACK PRODUCT PURCHASE. ALL OTHER WARRANTIES, EXPRESSED OR IMPLIED, INCLUDING BUT NOT LIMITED TO, THE IMPLIED WARRANTIES OR MERCHANTABILITY AND FITNESS FOR A
PARTICULAR PURPOSE ARE DISCLAIMED. MASTERACK® AND ITS SUBSIDIARIES, SHALL NOT BE LIABLE FOR ANY INCIDENTAL OR CONSEQUENTIAL DAMAGES ARISING OUR OF
ANY BREACH OF THIS WARRANTY, NOR SHALL THE DAMAGES EXCEED THE RETURN AMOUNT OF THE PURCHASE PRICE PAID BY THE ORIGINAL PURCHASER.
Warranty claims must be submitted to either your sales representative or a customer service representative at 816-455-0218. The vehicle must be delivered to the original MASTERACK® authorized dealer for inspection and any warranty service. Any warranty service to be performed by a source other than MASTERACK® location or an approved MASTERACK® distributor must be authorized in advance of the repairs by the MASTERACK® Warranty Administrator and a purchase order issued by MASTERACK®
in advance or repairs for the authorized repairs.
PROMASTER_PARTITION_INSTALL_REV1212020