SHY-1 NGL Pipeline, Loop N0. 1, 2 &3. Diameter of 30"Length of 585 KM
Pre-Commissioning (Drying, Purging andPacking 500 PSI)
Pre-commissioning (Scrapping, Dewatering &Flushing)
Pre-Commissioning (Drying, Purging andPacking 500 PSI)
Pre-Commissioning (Purging and Packing to50 PSI)
Pre-Commissioning (Purging and Packing to50 PSI)
SHAYBAH NGL Pipeline, Diameter of 36"Length of 633 km
SHAYBAH NGL Pipeline, Diameter of 36"Length of 633 km
RTDB-2 Re�ned Products Pipeline, Diameter of 30”Length of 106 KM
DR-2 Re�ned Products Pipeline, Diameter of 30”Length of 135 KM
Exploration Drilling
N2 Purging for Train B
Trail Test Nitrogen Unit.
Nitrogen Well Lifting Services and Purging
Emergency N2 Purging for Train B at SNGL-III
Trial test to determine the capability and limitation ofa new Nitrogen Generation Unit
Saudi AramcoAbqaiq
Saudi AramcoSGPED
Saudi AramcoPipelines andCommunicationsProjects
May, 2014
February, 2015
April, 2015
January, 2014
January, 2014
March, 2011
Exploration Drilling Nitrogen Well Lifting Services and PurgingSaudi AramcoO�shore/OnshoreExploration Department
Saudi AramcoO�shore/OnshoreExploration Department
October, 2012
January,2012
October, 2011
Offshore T/A of MHRH-50 Water Flushing & ILI Run & Nitrogen Purging andLeak Test
Saudi Aramco O�shoreProjects Department June, 2016
Saudi Aramco Projects
Projects Name Scope of WorkProponent Project Date
Aramco Hawyah Day Light
Aramco Shadgham GOSP
Aramco Day Light Project Contract
Aramco Wasit Project Contract
Aramco Manifa Project Contract
Aramco Berri Power Plant
Aramco Ain Dar Plant
Onshore Maintain Potential Program-Southern Zone
Pre-Commissioning (Purging & Drying)
Pre-Commissioning (Purging & Drying)
Pre-Commissioning (Pressure Testing, Drying& Purging)
Pre-Commissioning (Pressure Testing, Drying& Purging)
Pre-Commissioning (Pressure Testing, Drying& Purging)
Re-Validation (Purging)
Re-Validation (Drying & Purging)
Re-Validation (Drying & Purging)
July, 2015
August, 2015
February, 2016
January, 2016
March, 2016
March, 2016
October, 2016
May, 2016
Saudi Aramco PMT
Saudi KAD Projects
SEPCOIII Mechanicaldept.
Ras Al-KHair Industrial City, New Power Plant. Pre-Commissioning (Purge and Pressurize) Block No.1,2,3,4, and 5
May, 2013
Saudi Aramco
Projects Name Scope of WorkProponent Project Date
Nitrogen Pigging Services for Yasref Pipelines Nitrogen Pigging Services May, 2016
Projects Name Scope of WorkProponent Project Date
Projects Name Scope of WorkProponent Project Date
Saudi AramcoBerri Gas Plant Shut Down Pre-Commissioning (Purging & Leak Testing) December, 2014
Saudi AramcoHawyeh Power Plant Shut Down Pre-Commissioning (Drying and Packing) November, 2015
DAYIM PUNJI LLOYD Projects
SEPCO Projects
RISAL Projects
Saudi Aramco
Saudi Aramco
Purging & Drying Royal Commission Pipeline in Jubail Pre-Commissioning (Drying and Packing) May, 2015
Shy 023 Re-Validation (Purging and Packing) December, 2014
Saudi AramcoShaybah Pipeline Project Re-validation (Dewatering) December, 2015
SadaraSupply Of Nitrogen Services For Drying Activities Pre-Commissioning (Draying and Layup) August, 2016
Projects Name Scope of WorkProponent Project Date
Projects Name Scope of WorkProponent Project Date
Projects Name Scope of WorkProponent Project Date
NSH Projects
DIALOG Projects
The C.A.T Group Projects
Saudi AramcoSHEDGUM/JUAYMAH 56” Pipeline (UBTG-4) Gas Displacement February, 2016
Project DateProjects Name Scope of WorkProponent
Saudi Aramco
Saudi Aramco
Projects Name Scope of WorkProponent Project Date
Hawiyah Power Plant
Fuel gas system`s Re-Validation (Purging andLeak test)
Fuel gas system`s Re-Validation (Purging andLeak test)
December, 2015
March, 2016
Abd El-Rahman El-Badr Establishment Projects
SAMSUNG Engineering Projects
Saudi AramcoPipeline De-Cruding, Nitrogen Displacement & PurgingUA-6 P/L from Km-138 & KM-90 - Udailyah
De-Cruding & Re-validation activities July, 2016
Pipeline Scope of Work N2 (M3) N2 (US GAL) Length DiameterID
212 M3
3,493 M3
227 M3
0 M3
1,217 M3
De-Cruding, Nitrogen Displacement &Purging
KM-109.935
KM-102.643
KM-127.30
KM-113.624
KM-129.250
1
2
3
4
5
80.3 Gal
1,323 Gal
86 Gal
0 Gal
461 Gal
50 m
300 m
10 m
100 m
50 m
24”
24”
24”
24”
24”
1,409 M3KM-94.106 534 Gal 100 m 24”
Projects Name Scope of WorkProponent Project Date
AL ROBAYA HOLDING CO. Group Projects
Saudi Aramco
Saudi Aramco
Saudi Aramco
Saudi Aramco
Quraiah Power Plant Pre-Commissioning (Purging and PressureTesting)
February, 2016
Projects Name Scope of WorkProponent Project Date
Hawyeh Gas Plant
Abqaiq Plant
Ras Tanura Re�nery
Fuel Gas Systems Purging and Leak Test
Fuel Gas Systems Purging and Leak Test
Fuel Gas Systems Purging and Leak Test
December, 2015
June, 2016
August, 2016
Project DateProjects Name Scope of WorkProponent
South Ghawar AramcoProducing Dpt.
Re-Validation Program for 130 Flow lines Re-Validation (Dewatering, Purging andPacking)
October, 2015
Project DateProjects Name Scope of WorkProponent
GSP( Engineered Industrial Services) Projects
ULTIMATE Trading Est. Projects
SISCO Projects
Well Name Scope of Work N2 (M3) N2 (GAL) Pipe Length Pipe SizeID1 MDRK-1 340 M3
765 M3
3,002 M3
793 M3
1,133 M3
510 M3
2,294 M3
2,124 M3
425 M3
1,359 M3
319 M3
1,580 M3
340 M3
1,359 M3
810 M3
178 M3
700 M3
1,274 M3
480 M3
637 M3
375 M3
4,948 M3
1,600 M3
Dewatering, Purging & Packing
Dewatering, Purging & Packing
Dewatering, Purging & Packing
Dewatering, Purging & Packing
Dewatering, Purging & Packing
Dewatering, Purging & Packing
Dewatering, Purging & Packing
Dewatering, Purging & Packing
Dewatering, Purging & Packing
Dewatering, Purging & Packing
Dewatering, Purging & Packing
Dewatering, Purging & Packing
Dewatering, Purging & Packing
Dewatering, Purging & Packing
Dewatering, Purging & Packing
Dewatering, Purging & Packing
Dewatering, Purging & Packing
Dewatering, Purging & Packing
Dewatering, Purging & Packing
Dewatering, Purging & Packing
Dewatering, Purging & Packing
Dewatering, Purging & Packing
Dewatering, Purging & Packing
Dewatering, Purging & Packing
NJYN-35
MDRK-20
MDRK-31
TINAT-12
HRD-910
HRD-939
HRD-971
TINAT-32
NJYN-34
MDRK-3
TINAT-31
TINAT-16
MDRK-16
TINAT-27
TINAT-6
TINAT-27
NJYN-4
NJYN-4
HRD-679
TINAT-46
HRD-621
TINAT-29
2
3
4
5
6
7
8
9
10
11
12
13
14
15
17
16
19
20
21
22
23
24
18
129.0 Gal
290.0 Gal
1,137.0 Gal
300.0 Gal
429.0 Gal
193.0 Gal
869.0 Gal
805.0 Gal
161.0 Gal
515.0 Gal
121.0 Gal
598.0 Gal
128.8 Gal
514.8 Gal
306.8 Gal
67.4 Gal
265.0 Gal
483.0 Gal
182.0 Gal
241.0 Gal
142.0 Gal
1,874.0 Gal
606.1 Gal
600 m
5 Km
6 Km
4 Km
9 Km
1 Km
4 Km
4 Km
1.5 Km
3 Km
4 Km
6 Km
4 Km
5 Km
800 m
2 Km
5 Km
5 Km
5 Km
4 Km
3 Km
5 Km
4 Km
8''
8''
8''
8''
8''
8''
8''
8''
8''
8''
8''
8''
8''
8''
8''
8''
8''
8''
8''
8''
8''
8''
8''
TINAT-33 2,266 M3 858.3 Gal 4 Km 8''
FLOW LINES TRACK RECORD
Well Name Scope of Work N2 (M3) N2 (GAL) Pipe Length Pipe SizeID2,825 M3
991 M3
297 M3
2,492 M3
2,265 M3
3,060 M3
1,439 M3
1,973 M3
2,620 M3
3,568 M3
396 M3
363 M3
1,813 M3
1,532 M3
2,260 M3
1,791 M3
1,592 M3
1,359 M3
1,246 M3
1,388 M3
4,094 M3
1,076 M3
1,133 M3
Dewatering, Purging & Packing
Dewatering, Purging & Packing
Dewatering, Purging & Packing
Dewatering, Purging & Packing
Dewatering, Purging & Packing
Dewatering, Purging & Packing
Dewatering, Purging & Packing
Dewatering, Purging & Packing
Dewatering, Purging & Packing
Dewatering, Purging & Packing
Dewatering, Purging & Packing
Dewatering, Purging & Packing
Dewatering, Purging & Packing
Dewatering, Purging & Packing
Dewatering, Purging & Packing
Dewatering, Purging & Packing
Dewatering, Purging & Packing
Dewatering, Purging & Packing
Dewatering, Purging & Packing
Dewatering, Purging & Packing
Dewatering, Purging & Packing
Dewatering, Purging & Packing
Dewatering, Purging & Packing
HRD 1033
NJYN 22
HRD 1112
TINAT-34
NJYN 15
HRD 691
HRD 1046
MDRK 35
NJYN 25
N-HRD 632
WDHY J/O
N-HRD 1101
S-HRD W 680
Tinat 27
Tinat 28
Tinat 18
HRD 19
HRD 44
Njyn 14
Ghzal 24
RJH-1
HRD-1077
C-HRD 913
26
27
28
29
30
31
32
33
34
35
36
37
38
39
41
40
43
44
45
46
47
42
1,070 Gal
375.3 Gal
112.5 Gal
943.9 Gal
858 Gal
1,159 Gal
545 Gal
748 Gal
992 Gal
1,352 Gal
150 Gal
138 Gal
687 Gal
580 Gal
856 Gal
678.4 Gal
603 Gal
515 Gal
471.96 Gal
525.75 Gal
1,550.75 Gal
407.57 Gal
429.16 Gal
6.7 Km
1.7 Km
1Km
4 Km
2 Km
6.8 Km
1.5 Km
2.5 Km
3.5 Km
4 Km
900 m
900 m
4 Km
4 Km
6 Km
3.5 Km
3 Km
2.5 Km
1.8 Km
4.5 Km
8 Km
2 Km
3.3 Km
8''
8''
8''
8''
8''
8''
8''
8''
8''
8''
8''
8''
8''
8''
8''
8''
8''
8''
8''
8''
8''
8''
8''
25
FLOW LINES TRACK RECORD