Transcript of Projects
architecture of extreme environments
1arctic research facilitydate completed:2010thesis: sci arc
all rights reserved c john stone
Summer_Season_Complete_Facility
Winter_Season_Complete_Facility
Effeciency_Systems_Module_Development
Facility_Layout
Quadrant_Analysis
Q_1_Dock_Analysis
Connective_Module_Analysis
AF
A
F
AF
AB
STRUCTURAL_FRAMEMODULE_1.0
Structural_Frame_Module_Type
Shell_Membrane_Analysis
Thermal_Passive_System_Analysis
Wall_Section_Module_Detail
North_Elevation_Facility
South_Elevation_Facility
Section_View_East
Oblique_Section_Facility
architecture of extreme environments
2space habitationvirgin galactic date completed:2010
all rights reserved c john stone
Concourse_Matrix_System
Concourse_Analysis
Concourse_Variation
Interlocking_Concourse
Compressed_Concourse_Formation
Zone_Seperations
FULL_STRUCTURAL_SYSTEM
Concourse_Occupied_Space
Torus_Formations
Full_Torus_Formations
Progmatic_System_Levels
HOTEL_CORE
RESEARCH_CORE
CORE_BREAKDOWN
Level_Systems
First_Level_Facility
Second_Level_Facility
Top_Level_Facility
Cross_Section_Lower
Cross_Section_Two
Cross_Section_Top
Full_Facility_Low_Earth_Orbit
9’-9”
4 Rock 10 Ride Vehicle Ride_Specs
Exterior Shell/ material, carbon composite for lig
3D Digital Screen, and Protective Shield
6’-0”
8’-0” 9’-9”
Universal Creative 5
ght weight movements and protective shields
FIRE_FLY_RIDE_VEHICLE
6 Rock 10 Ride Vehicle Ride_Rotation
50 40 30 20 10 0
90
90
50 40 30 20 10 0
180
17
0
160
1
50
140
13
0
90
FIRE_FLY_ROTATION_ANALYSIS
Rotational Degrees for Optimal Track Performance
Universal Creative 7
LAUNCH
READY
PUSH TO
0
3
6 9 12
15
90
270
90
90
0
18
LOCK
WATER SEAL
JETT TOWER
CONTL
LONGITUDINAL
ROLL
YAWACCELERATION
OFF
ONCEL
ABORT
0 180
270
3
6
9 12
15C A B I NP R E S S U R E
90
PITCH
PSIA
50
100 150
200
C A B I N
TIME
HRS MIN SEC
FROM LAUNCH
+ F
0 0 0 3 93
HHHCCNNNUUUAAALLMMMMOOORRFRFF
FIRE_FLY_INSIDE RENDERS
8 Rock 10 Ride Vehicle Ride_Renders
1
2
Inside the Fire_Fly
Inside the Fire_Fly
Outside the Fire_Fly
Fire_Fly_ y
y
yyyyyyy
BACK
FRONTO
C
e lyl
FIRE_FLY_CONE_OF_VISION
Universal Creative 9
3
1
2
3
10 Rock 10 Ride Enclosure
1
2
5
4
3
STRUCTURAL TRUSSING
Allows maximum structural effi ciency, and for its futuristic outlook onto its architectural presence.
Allows for porosity to exist whitin its scripted digital fabric, allowing playful amounts of light and spectacle inside and outside the facility.
Prior to the entrance into the facility, the passengers enters into a launching zone, where they experience the launching process of a shuttle.
Its a light weight carbon fi bric that also has a digital scripting process which allows light and special eff ects to exist outside and inside the facility.
Mission Failed_ The capsule fi nds itself on a new planet. Exit zone.
LIGHT WEIGHT PANNELING SYSTEM
ENTRY_TAKE OFF ZONE ROOFING CANAPY
ROCK 10_ CRASH ZONE
ENCLOSURE_MATERIALS
Universal Creative 11
ENCLOSURE_SYSTEM_ROCK_10
ROCK 10PERSPECTIVE1- 0= 20 -0
77 -1045%
60%82 -8
30- 0
15%
FIRS
T T
UN
NEL
(1
)
SECO
ND
TU
NN
EL (
2) 82
%
GO
ING
DO
WN
45%
G
OIN
G U
P
FIRST GLIMPSE OF THE EARTH
EARTH 3D
MOON 3D
DOWN
15%
UP 10%
THIRD TUNNEL (3 )
EQUIPMENT STORAGE
FRICTION/LANDING
0% FLOATING
0 GR
AVIT
ATIO
N
10%80 -0
235-0
ROCK 10SITE PLAN
1- 0= 20 -0
12 Rock 10 Ride Site Plan
SITE PLAN_ROCK_10
3D ROOMROCK 10_The New Planet
BOARDINGROOM
60 -010%
UNLOADING
LOADING
ENTRANC E
ROTATION PLATFORM
VERTICAL LIFTLAUNC H
312’-0
92’-0
ROCK 10EAST ELE VATION
1- 0= 20 -0
ROCK 10SOUTH ELE VATION
1- 0= 20 -0
Universal Creative 13
ELEVATIONS_ROCK_10
65’-0”
Preparing for LaunchWarming Up the
EngineLaunching the Capsule
Landing on the New Planet
0 Gravitation
HRS MIN SEC00 00 00
HRS MIN SEC00 00 10
Gaining High Speed
HRS MIN SEC00 00 40
HRS MIN SEC00 04 40
HRS MIN SEC00 01 15
14 Rock 10 Ride Section_Diagram
4
5
LEGEND_ZONES
1 APPOLO 9h / BOARDING 2 LOADING PASSENGERS3 UNLOADING PASSENGERS4 ROLLERCOASTER TRACKS5 EQUIPMENT STORAGE6 LANDING ON THE NEW PLANET
Boarding Passengers
HRS MIN SEC00 00 00
Universal Creative 15
LEGEND_ZONES
1 APPOLO 9h / BOARDING 2 LOADING PASSENGERS3 UNLOADING PASSENGERS4 ROLLERCOASTER TRACKS5 EQUIPMENT STORAGE6
285’ - 0”
2
3
6
1
LANDING LAUNCHING
16 Rock 10 Ride Enclosure_Render
Universal Creative 17
EXTERIOR_RENDER_ROCK_10
CRICC
18 Micro_Drone_The Leaf Ride
NENE
Universal Creative 19
20 Micro_Drone_The Leaf Journey Vehicle_Specs
14’-0”
6’-0”
3’-10”
14’-0”
6’-0”
Universal Creative 21
MUSHROOM LAND WATERFALL CAVE LANDDEAD FOREST RAINFOREST
LOCATION_PLAN
ENTRANCE
EXIT
UNLOADING
LOADING
BOARDING ROOM
MUSHROOM LANDWATERFALLRAINFORESTDEAD FORESTCAVE LAND
MICRO DRONE_The Leaf JourneySITE PLAN
1’-0”= 20’-0”
22 Micro_Drone_The Leaf Journey Site Plan
MICRO DRONE_The Leaf JourneyWEST ELEVATION
1’-0”= 20’-0”
MICRO DRONE_The Leaf JourneySOUTH ELEVATION
1’-0”= 20’-0”
WE
MICRO DRONE_ThSOU
Universal Creative 23
LEGEND_PROGRAMS
1 MICRO DRONE_The Leaf Journey/ BOARDING 2 LOADING PASSENGERS3 UNLOADING PASSENGERS4 ROLLER-COASTER TRACKS5 EQUIPMENT STORAGE
24 Micro_Drone_The Leaf Journey Section
BOARDING
2
3
4
MICRO DRONE_The Leaf JourneyROOF PLAN1’-0”= 20’-0”
A
A
Universal Creative 25
26 Micro_Drone_The Leaf Journey Render_Cave
LEAF RIDE VEHICLE
Universal Creative 27