projects 2
-
Upload
thilinaabhayarathne -
Category
Documents
-
view
8 -
download
0
description
Transcript of projects 2
![Page 1: projects 2](https://reader036.fdocuments.us/reader036/viewer/2022081806/563dba30550346aa9aa37239/html5/thumbnails/1.jpg)
12 0 A Tool For Easy Estimation Of Garment Cost
Ms.Vijitha Ratnayake
Dr.T.S.S.Jayawardana
13 0 Productivity Improovement Through Wastage Minimisation
Ms.Vijitha Ratnayake
14 0 Job Shop Scheduling Ms.Vijitha Ratnayake
Dr.T.S.S.Jayawardana
15 0 Proper Utilisation Of Fabrics In The Garment Industry
Ms.Vijitha Ratnayake
Dr.T.S.S.Jayawardana
16 1986 Suggestion To Upgrade Operator Performance While Reducing Cost By Introducing New Payment Scheme
17 1993 Dyeing Behaviour Of Open-End And Ring Spun Yarn
Mr.N.G.H De Silva Mr.L.K.Lenaduwa
18 1994 Productivity Through Total Quality Management
Prof.Lakdas D.Fernando
Dr.Nirmali Perera
19 1994 A Study Of Two Production Lines Of A Garments Factory with A View To Improve The Quality Control System
Dr.Nirmali Perera
20 1994 Evaluvation Of Re-Cut Costing In Garment Industry
Mr.N.L.Wanigatunga Mr.L.K.Lenaduwa