Military Munitions Response Program
Utah National Guard
Project Update
Nov 6, 2014
Robert PriceUtah National Guard
Environmental Resources Management
Utah National Guard MMRP Camp Williams, Utah
PRESENTATION TOPICS
• Brief Camp Williams History Lesson• Artillery Impact Area Buffer Zone (AIABZ) MRS Field Work• AIABZ Future Requirements• Wood Hollow MRS Field Work Status• Wood Hollow Future Work
Utah National Guard MMRP Camp Williams, Utah
CAMP WILLIAMS LAND HISTORYFederal lands withdrawn in 1914 by President Woodrow Wilson via Executive Order No. 1922:
Utah National Guard MMRP Camp Williams, Utah
CAMP WILLIAMS LAND EXCHANGEPublic Law 101-628, Camp Williams Land Exchange Act of 1990
Utah National Guard MMRP Camp Williams, Utah
• Rights-of-Entry (ROE’s) – 100% of ROE’s were obtained for approximately 660 acres in 144 parcels from 86 owners.
• Results – 100% of the acreage was searched and no MEC was found within the MRS boundary. Three (3) illumination casings were found on Bluffs of Herriman property.
• No vegetation removal was required. • Camp Williams installed boundary fence along the MRS
boundary and Parsons cleared to the fence line. • All survey stakes and materials used by Parsons have been
removed from the MRS.
AIABZ Field Work
Utah National Guard MMRP Camp Williams, Utah
AIABZ Future• Remedial Action Report will be submitted to UDEQ seeking concurrence with Remedial Action Complete status. • No deed notices will be required.• Utah National Guard will mail result summary letters to all landowners. • Educational awareness program: presentations, educational materials, posting signs at installation boundary. • Five-year reviews.
Utah National Guard MMRP Camp Williams, Utah
WOOD HOLLOW PROJECT STATUS• Remedial Action at Wood Hollow is not complete and Parsons has demobilized for the season. • The DGM instrument for the project was changed from the EM-61 to the Minelabs F3-UXO-DGM. Result is better discrimination from magnetic rock and more metallic anomalies to be dug. • The MEC/MD distribution at the site is more extensive and more dense than anticipated. MD/MEC have been found to current boundary. • Staker-Parsons mine personnel have indicated the presence of 75mm casings on adjacent parcels.• Result is the site is not fully characterized and the MRS boundaries will expand.• Work Plan and contract modifications are underway to address the additional extent of MEC/MD as well as the changes resulting from using the F3-UXO-DGM.