Project transportation Presentation

15
Project Transportation Working Together for Better Future

Transcript of Project transportation Presentation

Page 1: Project transportation Presentation

Project TransportationWorking Together for Better Future

Page 2: Project transportation Presentation
Page 3: Project transportation Presentation

Service

• Automatic car parking buildings

(space efficient, mechanised car storage technology).

• Multiple car parking buildings

• Tourist attraction.

• Bike / Segway rental

• Specially designed bus

• Transparent glass wall

• E-ticket (like Metro system today)

Page 4: Project transportation Presentation

Automatic Car Parking – Multilevel Building

Page 5: Project transportation Presentation

Automatic Car Parking

Page 6: Project transportation Presentation

Segway.co.nz - for Rent

Page 7: Project transportation Presentation

Electric Car instead of Cars

“We need to ensure a vital city where people can move freely and safely

by whatever mode of transfer they wish to use, including the motor car.”

AA Canterbury/West Coast District Council

Page 8: Project transportation Presentation

Bicycle for Rent

Page 9: Project transportation Presentation

Values of This Project

“Improve the safety, efficiency and sustainability of motoring”

AA Canterbury/West Coast District Council

• Small footprints

• Space efficient

• Convenient

• Christchurch CBD

• Revenue generating

Page 10: Project transportation Presentation

Reasons for This Solution

• Rebuild opportunity

• Green technology

• Wild parking problem

Page 11: Project transportation Presentation

Vision for Future

• Revolution of transport

• Less congested mess

• Sustainable design & wise city planning

• Best city, it can be

Page 12: Project transportation Presentation

Estimate for Cost

Source:

• Rs 1,421,459,181.62 is about $30 to $42 million, for:• Automatic car parking for 952 cars

• 16,000 m2 for Qualideck PU flooring

• About $30 to $42 thousand per car

• Source:Construction Project Management : Theory and Practice by Kumar Neeraj Jha, 2011,Published by Pearson Education India; Table 4.9 Abstract of cost estimate for Multi Level Car Parking Facility Project

Page 13: Project transportation Presentation

Involved Professionals

YOUNG MEMBERS + MENTOR:

• Accounting

• Project management

• Business

• Environmental education & Sustainable development

• Rex Verity (CPIT Environmental Manager)

NETWORK:

• Michael Doig (Ganellen)

• Robert Henderson (Bicycle Ventures Limited)

• Jack Jiang (AECOM –infrastructure company)

• Sam Johnson (Student Volunteer Army)

• Mark Tonks (Pace Project Management)

Page 14: Project transportation Presentation

Contact Us

Project Convenor

• FAY SUN

[email protected]

• Mobile: 022 410 3416

Finance

• KIT NELSON

[email protected]

• Mobile: 027 437 5429

Page 15: Project transportation Presentation

Thank You

District Councillors, AA Canterbury/West Coast District Council

• John Skevington

• Roy Hughes

• Warren Masters

• Brian Palliser

• Alan Turner

• Allan Scott

• Clare Simpson