Project Title: Engineering Servicing Report PC17193
Transcript of Project Title: Engineering Servicing Report PC17193
Report Name: Lot 52 and Lot 2979 Illareen Road, Katanning
Proposal for Rural Subdivision
Project Title: Engineering Servicing Report
Project No: PC17193
Engineering Servicing Report Revision: A
Page 2 of 19 Project Number:PC17193
Revision Description Author Checked Approved Date
A Issued for Review HW OO EBF 10/01//2017
Recipients are responsible for eliminating all superseded documents in their possession.
Peritas Group Pty Ltd ABN: 56 165 417 407 41 Stuart Street PERTH WA 6000
PO Box 143, Northbridge WA 6865
Telephone: +61 8 9388 2666
Facsimile: +61 8 9328 3515 Internet: www.peritasgroup.com.au
RELIANCE, USES and LIMITATIONS
This report is copyright and is to be used only for its intended purpose by the intended recipient, and is not to be copied or used in any other way. The report may be relied upon for its intended purpose within the limits of the following disclaimer.
This study, report and analyses have been based on the information available to Peritas Group at the time of preparation. Peritas Group accepts responsibility for the report and its conclusions to the extent that the information was sufficient and accurate at the time of preparation. Peritas Group does not take responsibility for errors and omissions due to incorrect information or information not available to Peritas Group at the time of preparation of the study, report or analyses.
Prepared by: Hendrik Wijaya Approved by: Enzo Biagioni-Froudist
Position: Senior Civil Engineer Position: Principal, Civil
Signed:
Signed:
Date: 10/01//2017 Date: 10/01//2017
Engineering Servicing Report Revision: A
Page 3 of 19 Project Number:PC17193
TABLE OF CONTENTS
1. INTRODUCTION ............................................................................................................................................ 4
Planning Context ................................................................................................................................................ 4
Summary ............................................................................................................................................................ 4
NATURAL FEATURES .......................................................................................................................................... 5
Topography ........................................................................................................................................................ 5
Geology .............................................................................................................................................................. 5
Surface Water ..................................................................................................................................................... 5
Groundwater ....................................................................................................................................................... 5
INFRASTRUCTURE AND SERVICING.................................................................................................................. 6
Road Network ..................................................................................................................................................... 6
1.1.1 Kojonup – Katanning Road ........................................................................................................... 6
1.1.2 Prosser Street and Illareen Road .................................................................................................. 6
Bulk Earthworks & Drainage ............................................................................................................................... 7
Water Supply ...................................................................................................................................................... 7
1.1.3 Groundwater ................................................................................................................................. 7
1.1.4 Rainwater Tanks ........................................................................................................................... 7
1.1.5 Scheme Water .............................................................................................................................. 8
Wastewater ......................................................................................................................................................... 8
Power 9
Telecommunication............................................................................................................................................. 9
Gas Supply ......................................................................................................................................................... 9
REFERENCES ..................................................................................................................................................... 10
APPENDIX A – LOCALITY PLAN ....................................................................................................................... 11
APPENDIX B – SUBDIVISION LAYOUT ............................................................................................................. 12
APPENDIX C – LPS5 ZONING ............................................................................................................................ 13
APPENDIX D – TOPOGRAPHY ........................................................................................................................... 14
APPENDIX E – GEOLOGY .................................................................................................................................. 15
APPENDIX F – 1% AEP FLOOD ......................................................................................................................... 16
APPENDIX G – WATER CORPORATION WATER MAINS ................................................................................ 17
APPENDIX H – WESTERN POWER NETWORK CAPACITY MAPPING ........................................................... 18
APPENDIX I – TELSTRA TELECOMMUNICATION SERVICE ........................................................................... 19
Engineering Servicing Report Revision: A
Page 4 of 19 Project Number:PC17193
1. INTRODUCTION
Peritas Group was commissioned by Elberton Property Group (Elberton) to review the Engineering constraints and servicing
requirements associated with subdivision of Lot 52 and Lot 2979 Illareen Road, Kattaning (Site).
The Site occupies an approximately 215ha land area, consisting of cleared grassland. There are a number of agricultural
drains, dams and two seasonal water courses on the property.
North of the Site are lots 50 and 51 which fronts the Kojonup-Katanning Rd, a sealed road linking Katanning and Kojonup.
The site is bounded to the west by unsealed Illareen road and a sealed Prosser Street to the east, refer to Appendix A.
Elberton proposes for the site to be subdivided into 77 rural properties, ranging in size from 1-4ha developed over 5 stages
(Appendix B).
Planning Context
The Site is currently zoned as Special Rural area under the Shire of Katanning Town Planning Scheme 4 (TPS4). The Shire
have in recent times prepared a Local Planning Scheme 5 (LPS5) noting the Site to be zoned Rural Residential, refer to
Appendix C.
When Gazetted, the LPS5 will supersede the TPS4. However, the LPS 5 is currently a draft in its final stages of adoption.
The Shire of Katanning have advised that TPS4 will continue to apply and that “due regard” must be given to LPS5.
The TPS4 and LPS5 both support the rural subdivision. Preliminary advice from the Shire of Katanning noted the
requirements for a Structure Plan and Local Water Management Strategy to be formalised.
Summary
In summary this report highlights:
The subject land is capable of sustaining the increased density of Rural Residential lots.
The land is capable of being serviced with water, power and telecommunications services.
Wastewater management will be by means of on-site disposal either by septic tanks, Aerobic Treatment Unit
(ATU) or Alternative Treatment System (ATS).
Retention of vegetation and rural landscape is required for Rural Residential lots. Accordingly, earthworks will only
be undertaken to provide internal road network and for drainage purposes.
The following additional studies & site works are recommended:
Geotechnical Investigation.
Feature Survey.
Bore pump test and water quality test (if bore water is the intended primary water source).
Formal Submission of LSP to enable Water Corporation to consider the development in their upcoming water
supply planning.
Engineering Servicing Report Revision: A
Page 5 of 19 Project Number:PC17193
NATURAL FEATURES
Topography
Appendix D shows elevation data from Landgate, Nearmap and Google earth. The contours on the plan are sourced from
Landgate and the profile is obtained from Nearmap & Google. Although there are variations to the levels, the general trend
is similar for all three data sets.
There is a substantial level variation in the north south direction, ranging from 320m AHD to 330m AHD. The slope of the
land is approximately 5-10%. The centre of the Site appears to be on a ridge, grading down towards seasonal water courses
to the north and south of the Site. The contour lines run parallel to the east west lot boundary for the bulk of the site,
identifying a lesser degree of elevation variation.
Nearmap elevation data identified a 18% gradient, which could potentially be incorrect. The data presented is obtained from
aerial photography which will also picks up features such as trees, rock outcrops, etc. and hence accuracy of ground surface
levels can be affected.
National Elevation Data Audit 2011 by Geoscience Australia advised a vertical accuracy between 1-5m of error for Landgate
contours. Feature survey will be required prior to detail design phase to enable road and drainage design.
Geology
The Geological Survey of Western Australia 1:250,000 map indicated that 50% of the Site consisted of colluvium and minor
alluvium (silt sand and gravel). The balance of the Site consisted of biotite granite (refer to Appendix E).
The above would suggest an underlying rock formation and therefore it is unlikely for the Site to be suited for on-site water
disposal.
Geotechnical investigation will be required to be undertaken prior to detail design phase of the development.
Surface Water
The Site has a number of cut-off agricultural drains and dams. According to aerial imagery, the bulk of the drains are used to
direct water into the dams and are localised to the Site. There are two exceptions, which are the seasonal water courses
located north and south of the site.
Opus undertook a flood assessment report in 2014 and identified that seasonal water courses are subject to flooding. The
Shire of Katanning provided the 1:100yr ARI (1% AEP) flood mapping, attached in Appendix F.
Groundwater
The Department of Water and Environmental Regulation (DWER) manages a database of groundwater data across Western
Australia. Peritas have corresponded with DWER who supplied a list of monitoring bores surrounding Katanning. However,
there appears to be no information available for both water level and water quality at the Site and in its immediate vicinity.
No records of groundwater extraction license can be found for the Site and properties in the immediate vicinity.
Engineering Servicing Report Revision: A
Page 6 of 19 Project Number:PC17193
INFRASTRUCTURE AND SERVICING
Road Network
Access to the first few stages of the site will be via Kojonup-Katanning road and Prosser Street. As the development
proceeds, internal roads will be constructed to ensure each lot has a road frontage. In the ultimate development, the
internal road network will link Prosser Street and Illareen Road (refer to Appendix B).
1.1.1 Kojonup – Katanning Road
The Kojonup-Katanning Road is a Main Roads Western Australia (MRWA) Primary Distributor. The road has a
single carriageway, has a 110km/hr speed limit and is designed to allow inter regional movements.
Traffic count information is available approximately 13km west of the Site as shown on Table 1. The latest data
recorded was in 2014/15, noting a traffic volume of 460 vehicles per day (vpd). This is a very low traffic count
considering that an Access Street is designed for 3000vpd. There is a general increase of traffic trend of
approximately 3-4% per year.
The subdivision will potentially increase the traffic volume moving towards Kojonup. However, there is a large
degree of spare capacity on Kojonup-Katanning Road that the development is unlikely to be an issue.
Table 1 Kojonup-Katanning Road Traffic Count
1.1.2 Prosser Street and Illareen Road
Prosser Street and Illareen Roads are both Shire of Katanning’s access roads. Prosser Street is currently sealed
and hence making it the most suitable entry point to the development at early stages.
Illareen Road is currently an unsealed road. In the later stages of the development, this road will need to be
upgraded to a sealed road with a rural profile – unkerbed with roadside swales.
The intersection from Kojonup-Katanning Road to Illareen Road is currently sealed. However, the surfacing have
deteriorated. It is recommended for the intersection to be re-surfaced.
Some upgrades to existing roads might be requested by Shire during subdivision process that may include resealing
of the existing or construction of kerbs in the location of the intersections.
Engineering Servicing Report Revision: A
Page 7 of 19 Project Number:PC17193
Bulk Earthworks & Drainage
The TPS4 and LPS5 both require the retention of vegetation and rural landscape. Accordingly, it is recommended for bulk
earthworks to be limited to the construction of internal road reticulation and for drainage purposes.
Section 0 noted silty sand and gravel geology, which is not suited for in-situ stormwater disposal. Therefore existing drains
and dams will most likely pool with water. Smaller dams which are fully contained within a proposed lot may be left as is.
However, there are a number of dams and rural drain traversing across multiple future lots which needed to be graded out or
filled. This is to avoid having concentrated stormwater flows across private properties in the future.
It is anticipated that the proposed internal roads will be set slightly proud of the surrounding land to avoid having to box out
into the granite subgrade. Culverts may be required to allow flow across the road reserve. This is subject to site survey,
geotechnical report and detail design.
There will be a small increment of impervious areas due to the creation of houses. However, this increment is
inconsequential relative to the overall site area.
Section 0 noted areas subject to 100yr ARI flooding. In accordance to LPS5, development within the 100yr ARI floodway is
prohibited. At this stage, due to the lack of digital data, the lots within the influence of the floodwater cannot be accurately
defined. Upon finalisation of precal, survey and with the assistance of Shire of Katanning, the flood extent can be properly
mapped. A restrictive covenant may be used to constraint future owners from building within the floodway.
The seasonal water course are currently not protected by environmental regulations. The Shire of Katanning have noted
intent to establish protection areas around the water courses. The establishment of protection areas is outside of the control
of the developer. However, the restrictive covenant when imposed will provide similar effects and can be used as an interim
measure until a formal protection zone for the water course is established.
Water Supply
There are several viable options for water supply to the site as outlined in this section.
1.1.3 Groundwater
Correspondence with DWER noted that there is no known groundwater resources of significance within the area.
Section 0 noted that there is inadequate data to determine suitability of groundwater resources for water supply.
However, this does not automatically rule out the use of groundwater. This is because the DWER allow exemptions
from licensing if the groundwater is used exclusively for domestic, household purposes, watering stock, fire fighting,
and watering lawns less than 0.2ha, not from artesian sources. There appears to be a number of bores identified in
DWER database without licenses. Peritas is unable to confirm if any of these bores are utilised as production bores.
Desktop study will not yield any further data, if groundwater is considered to be adopted for water sources, site
drilling will need to be undertaken to determine yield and water quality.
1.1.4 Rainwater Tanks
LPS5 noted that if rainwater tanks are considered, a minimum of 135kl of storage on site is required.
The Bureau of Meteorology records indicated that Katanning experienced a mean rainfall of 440mm (from 1999-
2017). The lowest annual rainfall being 290mm, and this equates to 58kl of rainwater being collected over a 200m²
roof area. The Water Corporation statistics indicated that in 2015-16, the average water consumption (per person) in
Perth was 127kl – Averaging at 320l/day, this would include both potable and non-potable applications.
Therefore to generate 135kl of water, a roof area of 470m² is required (if 100% of rainwater in the year is captured –
based on min rainfall). This is perhaps not realistic unless the tank is supplemented by other sources such as bore
Engineering Servicing Report Revision: A
Page 8 of 19 Project Number:PC17193
water.
The wet winter and dry summer climate pattern also tend to render rainwater tanks inefficient. The tanks will be full
relatively quickly during winter periods and will run out of water during summer months.
The above would suggest:
Rainwater tank is better suited only as a supplementary water source for potable water application.
If rainwater tanks are to be considered as the primary source of water supply, potable and non-potable
water application needed to be separated. The cleaner rainwater from roof is better suited for potable
applications while dams can be used to collect water for non-potable applications such as grazing water,
irrigation, etc.
1.1.5 Scheme Water
Katanning township water supply is serviced by the Water Corporation from Harris Dam as part of the Great
Southern Towns Water Supply Scheme (GSTWSS). Water Corporation water mains are available around the Site
(Refer to Appendix G). However, the Water Corporation have advised that the proposed development is outside of
current water supply zone and that there is probably limited capacity in the existing network to supply the full
development.
Rural Residential lots east of Prosser Street are currently serviced via a DN100 water main (refer to Appendix C).
Prosser Street being the extent of the water supply zone. The Corporation have advised that the initial stages of the
subdivision along Prosser Street may potentially be supplied via the DN100 main along Prosser Street. Outside of
this, major Water Corporation infrastructure upgrades may be required to supply the entire development with
scheme water.
The Water Corporation have further advised that water resource planning in this region is due for a review within the
next 6 months. A formal Local Structure Plan or Western Australia Planning Commission (WAPC) subdivision
application will need to be lodged for the Water Corporation planning to consider this development in their review.
Providing scheme water will be the most reliable option for the development.
Wastewater
The Water Corporation do not have a gravity wastewater system in the vicinity of the site. The nearest gravity system
is located approximately 1.2km east of the Site.
Gravity systems is not efficient in rural lots due to large lot sizes with minimal inflow. As a general rule, the Corporation
is required to design a connection capable of serving the entire lot as they are not able to dictate position of facilities
requiring wastewater service. The low flow means that the sewer pipes needed to be graded steep to prevent
blockage. In context, a 200m long x 100m wide (2ha) lot would require a 5m deep property connection at the lot
frontage. A memorial on titles can be included to notify owners limits of wastewater serviceability. However, a far more
effective and simpler approach is by means of in-situ wastewater management.
LPS5 table 8, item 7 included provisions for in-situ wastewater management. The Department of Health listed a range
of approved wastewater management approach such as septic tanks, Aerobic Treatment Units (ATU) and Alternative
Treatment Systems (ATS).
Geotechnical investigation will be required to confirm suitable effluent disposal approach. If the ground is not
conductive to infiltration, dedicated spray fields may be required.
Engineering Servicing Report Revision: A
Page 9 of 19 Project Number:PC17193
Power
The proposed development is currently surrounded by overhead High Voltage (HV) infrastructure ranging from a 3
phase distribution line to a 66kV transmission line located north of Kojonup-Katanning Road. According to Western
Power’s Network Capacity Mapping Tool, there is currently 5 to 10MVA of spare capacity within the network (Appendix
H).
According to Western Power’s Design After Diversity Maximum Demand (DADMD) calculator, on average each
dwelling in Katanning utilise 6.2kVa of power and therefore the subdivision would require a demand of 477kVa. There
should be adequate capacity in the network for the development. An application needs to be lodged with WP at a later
stage to confirm the above.
It is anticipated that all lots within the proposed development will be served with underground power. The cost of this
work will need to be met in full by the developer. Western Power may also require existing infrastructure to be
grounded or relocated as several overhead lines cut across the Site.
Standard Western Power requirements will apply including cost for headworks upgrades and exclusions to serve the
site.
Several pad mount sites will be required throughout the development, however, due to the range of sizes of lots
proposed within the development, it is not envisaged that there will be a problem in providing the sites strategically
located to meet both Western Power design requirements and the requirements of the developer.
Telecommunication
It is anticipated that all lots within the proposed development will be served with Telecommunication services. Telstra
services are available all around the Site, refer to Appendix I.
The provider will install telecommunication facilities to the proposed subdivision, subject to the developer providing at
his cost, trenching for cable laying.
Alternatively, where cable routes match Western Power underground power supply routes, the communications
provider will wherever possible use the Western Power trenches in lieu of the developer providing additional trenching.
Headwork charges for Telecommunication services extensions are anticipated. Unfortunately, Telstra do not provide
feasibility assessment for developments in planning phase.
Gas Supply
Dial Before You Dig investigation did not respond with gas infrastructure. It is unlikely for underground Gas reticulation
to be available for the Site.
Future lot owners will have to procure gas bottles from Katanning.
Engineering Servicing Report Revision: A
Page 10 of 19 Project Number:PC17193
REFERENCES
Shire of Katanning 2013, ‘Town Planning Scheme No.4’
Shire of Katanning 2017, ‘Local Planning Scheme No.5’
Shire of Katanning 2017 ‘Local Planning Scheme No.5, District Scheme ’, sheet 9 of 12.
Government of Western Australia, Geoscience Australia 2011, 'National Elevation Data Audit 2011’, pp. 3.
Brakel A.T, J.S. Moncrieff, Muhling P.C. and Chin R.J. 1985, ‘Dumbleyung Western Australia. Sheet S1 50-07’.
Opus International 2014, ‘Katanning Flood Assessment’, pp 21& 23.
Engineering Servicing Report Revision: A
Page 11 of 19 Project Number:PC17193
APPENDIX A – LOCALITY PLAN
PERTH OFFICE
P: +61 8 6336 9299
F: +61 8 6336 9288
74 GOODWOOD PARADE
BURSWOOD WA 6100
P.O. BOX 134
BURSWOOD WA 6100
Engineering Servicing Report Revision: A
Page 12 of 19 Project Number:PC17193
APPENDIX B – SUBDIVISION LAYOUT
Engineering Servicing Report Revision: A
Page 13 of 19 Project Number:PC17193
APPENDIX C – LPS5 ZONING
Engineering Servicing Report Revision: A
Page 14 of 19 Project Number:PC17193
APPENDIX D – TOPOGRAPHY
PERTH OFFICE
P: +61 8 6336 9299
F: +61 8 6336 9288
74 GOODWOOD PARADE
BURSWOOD WA 6100
P.O. BOX 134
BURSWOOD WA 6100
Engineering Servicing Report Revision: A
Page 15 of 19 Project Number:PC17193
APPENDIX E – GEOLOGY
PERTH OFFICE
P: +61 8 6336 9299
F: +61 8 6336 9288
74 GOODWOOD PARADE
BURSWOOD WA 6100
P.O. BOX 134
BURSWOOD WA 6100
Engineering Servicing Report Revision: A
Page 16 of 19 Project Number:PC17193
APPENDIX F – 1% AEP FLOOD
SITE
Engineering Servicing Report Revision: A
Page 17 of 19 Project Number:PC17193
APPENDIX G – WATER CORPORATION WATER MAINS
PERTH OFFICE
P: +61 8 6336 9299
F: +61 8 6336 9288
74 GOODWOOD PARADE
BURSWOOD WA 6100
P.O. BOX 134
BURSWOOD WA 6100
Engineering Servicing Report Revision: A
Page 18 of 19 Project Number:PC17193
APPENDIX H – WESTERN POWER NETWORK CAPACITY MAPPING
PERTH OFFICE
P: +61 8 6336 9299
F: +61 8 6336 9288
74 GOODWOOD PARADE
BURSWOOD WA 6100
P.O. BOX 134
BURSWOOD WA 6100
Engineering Servicing Report Revision: A
Page 19 of 19 Project Number:PC17193
APPENDIX I – TELSTRA TELECOMMUNICATION SERVICE
PERTH OFFICE
P: +61 8 6336 9299
F: +61 8 6336 9288
74 GOODWOOD PARADE
BURSWOOD WA 6100
P.O. BOX 134
BURSWOOD WA 6100
6 MBHJP19:O305-310
M
MM
M
M
MT
TM
M
MM
M
T
TM
M
EJ
EJ
EJ
EJ
EJ
EJ
EJ
EJ
EJ
EJ
EJ
EJ
EJ
EJEJ EJ
--
--
--
--
--
---
-
-
-
--
-
-
--
-
-
-
-
--
-
-
-
-
5DEADP19:O321-325
10
6F/- SMOF FNPEFRHJF KATX 1702:AC-AD/1-6
10/0.90P19:O311-320
20/0.90c744:Z01/J1-2
323.7
P19:O310
1DEAD
2 PEHJ
109.0
35 20.0U\RD
J314
20/0.90
8
2/1.27 PJ1.0
912.0
F KOJD 12F SMOF FNPEHJ/STDKTGW AA-AC/1-12
814.6
785.05DEAD
P19:O321-325
1010/0.90
216.7
10/0.90 MBHJP19:O311-320
53.0
332.1
15.0
10 PR
F KATX 1702:AC-AD/1-6
6F/- SMOF FNPEFRHJ
10
10/0.90705.8
556.0
J3198/88/P19:O312 P19:O314-320
1871.0
6139.6 m
591.0
10/0.90
213.6
10
P19:O322-325
6DEAD 10145.0
54.910 PR
P19:O322-3256DEAD
30.1
81.4J408
2/0.90
P19:O322-325
<CJ81:O6
RD
L376DP101811
180
202
L752DP102731
3469L804DP302900
M
M
EJEJ
EJ
EJ
EJ
EJ
EJ
EJ
EJ
EJ
EJ
6 PEHJCJ70:O7-84DEAD
10 MBHJ 5100.0
20.0
10 MBHJCJ70:O69DEADGUARDW
IRE 110.0
P35
80.0
T204CJ70:O6
CJ70:O11DEAD
163.5
2
10 PEHJCJ70:O1-1019.5P35CJ52:O1-10
10 PEHJ50.8
E70 1/4CJ52:O2CJ70
52.0
2
2J397J297
3
CJ70:O1-1010 PEHJ
P20
E52:C2 & 10CJ52:O31DEAD
CJ70:O111DEAD
CJ52:O5CJ52:O11
113.8519.5
284.0
CJ70:O6-83DEAD
6 PEHJ
110.0CJ70:O19DEAD5P5010 MBHJC
2 PEHJ 96.2
CJ70:O31DEADE70:C3
CJ70:O11DEAD
2/0.40 5 CJ70:O19DEADGW 110.010 MBHJC
CJ70
:O7
1DEA
DE7
0:C1
2
132.7
2
CJ70:O6-83DEAD6 PEHJ
P35
J398
CJ70:O89DEAD10
205.03
2
E70:C
2CJ
70:O
81D
EAD
T230CJ52:O19
10 M
BHJC
20 PEHJ154.0
119.0
CJ52:O13CJ52:O7CJ52:O197DEAD
10 PEHJ216.0
100.010 MBHJC
31.4P5010 MBHJC
5
22DEAD
CLPCJ52:O319DEADN2
T229CJ52:O12CLP
E52:C6CJ52:O231DEAD
20 PEHJO1-20P3532.06
51.0O1-2020 PEHJ
20 PEHJ83.0O1-20 E52 6/16O1O3O6O13-14O18
10 MBHJC
CJ52
149.0
CJ52:O21-3010
216.6
51.0O1-2020 PEHJ
J290
O1-20105.2
20
2
O151DEAD
2 PEHJ310.0
CJ52:O221DEAD
76.02
E52:C9
40.42/0.40J291P20
O201DEAD
2
CJ52:O199DEAD
CJ52:O79DEAD10 MBHJC
107.8
3 18.3P502 PR3
284.5
CJ52:O71DEAD
N/S I10491
EJEJ
EJ
905.5
120.0
2/0.40
10 PRP19:O341-350
24.0P35
P19:O3451DEAD
P19:O3481DEAD
104.0
10 PEHJ
2/0.40 PEHJJ311
373.0
270.0OC[ 9mm]
ST
ST
ST
ST
MILLS
GULLEY
ST
ST
WANKE
ST
MILLS
ST
ST
RDILLAREEN
58
L644DP222690
155L641DP222690
147
106
138
146
82
L633DP222690L628DP222690
100
L632DP222690
81
93 L1 D577
53
L2
LN4933
68
LN383
627L634DP22269079
103 50
L624DP222690
5653
L638DP22269052167
2
LN2979L439DP257395172
AAP100
AAP100
AAP100
M
EJ
EJEJ
EJ
--
P19:O303
1DEAD
2 PEHJ
95.0 35 20.0U\RD
J312
400.0
P19:O303
5DEAD
6 PEHJ
P19:O301-330 50 CPFUT (AA) 20DEAD 2xP35 SUBDUCTS (AA) F KATX 1702:AB-AC/1-6 6F/- SMOF FNPEHJ/STD (AA1)
----1.0 2/1.27 PEIQC PJC KATX 721:Z01/J1-2707.0
336.0
6
666.02/1.27 PEIQC PJc744:Z01/J1-2
Z02 P19:O301-330 50 CPFUT (AA) 20DEAD 2xP35 SUBDUCTS (AA) F KATX 1702:AB-AC/1-6 6F/- SMOF FNPEHJ/STD (AA1)F KOJD 1611:AC-AB/1-12 12F/- SMOF FNPEHJ <- (AA2)
50 MBP19:O301-32525DEAD
12F/- FNPEHJ/STDF KOJD 1611:KTGW AA-AC/1-12
13.020.5Vacant ACJ412
2 LEAD-IN ADDED FROMOFFICE RECORDS ONLY63.0
6.02/1.27 PJ
66
P5029/88/P19:O301-306 P19:O308-309 P19:O312 P19:O314-3203244m
P19:O3231DEAD
5DEADP19:O311-32530 6.1U/CRK
20 PEHJ88.0
P19:O3301DEAD
12F/UNKNOWN FNPEHJ/STDF KOJD:KTGW AA-AC/1-12828.1
20.0P50P50
237.0175.02/1.27 PEIQC PJC KATX 721:Z01/J1-2
2/1.27 PEIQC PJC KATX 721:Z01/J1-250 CPFUT MBHJP19:O301-32525DEAD
2/1.27 PEIQC PJ
c744:Z01/J1-2
914.0
2/1.27 PEIQC PJC KATX 721:Z01/J1-2
924.0
P19:O301-310
10DEAD
2/1.27 PEIQC PJ
FAIRFIELD
RD
RD
LN1729
L3095DP119523
L50D160319
L1
L381DP257380
L382DP102729
M
EJ
EJ
EJ
EJ
EJ
EJ
EJ
EJ
EJ
EJ EJ EJO261DEAD
140.12
5
18.5P50
J285
24.330 PRO1-30
P31893m
6
WARNING - ELECTRICALCABLES IN VICINITY
O31-6030 PEMBHJ
192.030
161.6
5J286P50
O31-322/0.40
115.05
O1-3030
P502J385 2x2
215.33x2565.0 P50
O21-3010 PEHJ
344.4
80.6
21.5
210 PEHJO21-30
10 PEHJO21-30P3520.0
10 PEHJO21-30P35
2/0.40
30 CPFUT PEMBHJO31-60
880.7
O1-3030
O301DEAD
402.3
O571DEAD
O401DEAD
2 PEHJ 60.0
175.9O51-60
30O1-30
10 MBHJ10 PEHJ2 PRO31-328DEADO41-50
P3519.7134.0
20 PRO21-302DEADO33-40
25J287
44.5
5P50
10 CPFUT MBHJ10 PEHJO41-50
34.0
156.2
P3510 PEMBHJO51-60
T213O31-32
10 MBHJ
10 MBHJO31-328DEADP5021.2
50.0
O21-302DEADO33-4020
O1-2020
239.6284.1
P35
O28-29
23.0J289
2x20 2O21-302DEADO33-40O1-20
3.320 PRO1-20
EJEJ
50 PEHJ50 121.0
CMC
1DEAD
173.050/0.40 MBHJO301-35050 PR50DEAD
C
282.0
50 PEHJ8 2108.8
O451DEAD
50 PEHJ
O1-50
O441DEAD
O39O46
105.7
2 PEH
J
50 PEHJO1-5031.8
MC
2.03
J400
AABAA100
A100AABA
F KOJD 1611:AB-BB/1-12 12F/- SMOF FNPEHJ/STD <- (AA) c744:Z01/J1-2 2/1.27 PEIQC PECSHJ (AA)
DIST (AA) 2xP35 SUBDUCTS (AA)
F KATX 1702:YY-AB/1-6 6F/- SMOF FNPEFRHJ (AA1)2xP35 SUBDUCTS (BA)
3001:YY-AB/1-12 12F/- SMOF FNPEHJ/STD (BA1)
214.0
C KATX 721:Z01/J1-2 2/1.27 PEIQC PECSHJ 376.0
F KOJD 1611:AB-BB/1-12 12F/- SMOF FNPEHJ/STD <- (AA) c744:Z01/J1-2 2/1.27 PEIQC PECSHJ (AA)
DIST (AA) 2xP35 SUBDUCTS (AA)
F KATX 1702:YY-AB/1-6 6F/- SMOF FNPEFRHJ (AA1)2xP35 SUBDUCTS (BA)
c3001:YY-AB/1-12 12F/- SMOF FNPEHJ/STD (BA1)
0.5---1.5
173.0
8
E5101 1/30F KATX 1702:AB-KTTG/1
WARNING - ELECTRICITY
6
AB6
KTTG
POWER FEED(AA)
E5101:C1-30P19:O1-501893mDA3
P3 80/900 P32
POWER PEDESTALPROSSER ST
199.0
AAP100
AAP100
AAP100
ABP100
ABP100
AAP100
ABP100
AAP100
ABP100
AAP100
ABP100
AAP100
AAP100
AB
AAP100
M
M
M
M
EJ
EJ
EJ
P19:O301-350 50 (AA)c3001:AB-B11/1-12 12F/- SMOF FNPEHJ/STD (AA)
1xP35 SUBDUCTS (AA)
195.150 PR12F/- FNPEHJ/STDP19:O301-350c3001:AB-B11/1-12
0.6---1.2
MC
AB
597.0
2/1.27 PEIQC PJC KATX 721:Z01/J1-2
J4076
2/0.40
71.0
320.0
P20
MC 196.0
50 PR12F/- SMOF FNPEHJ/STD
P19:O301-350c3001:AB-B11/1-12
P100899.4
P19:O341
1DEAD
P19:O301-350 50 (AB)c3001:AB-B11/1-12 12F/- SMOF FNPEHJ/STD (AB)
6
2xP35 SUBDUCTS (AA) F KATX 1702:AB-AC/1-6 6F/- SMOF FNPEHJ/STD (AA1)F KOJD 1611:AC-AB/1-12 12F/- SMOF FNPEHJ <- (AA2)
P19:O301-350 50 (AB)c3001:AB-B11/1-12 12F/- SMOF FNPEHJ/STD (AB)
P19:O301-330 50 CPFUT (AA) 20DEAD
2xP35 SUBDUCTS (AA) F KATX 1702:AB-AC/1-6 6F/- SMOF FNPEHJ/STD (AA1)
2xP35 SUBDUCTS (AA) F KATX 1702:AB-AC/1-6 6F/- SMOF FNPEHJ/STD (AA1)F KOJD 1611:AC-AB/1-12 12F/- SMOF FNPEHJ <- (AA2)
194.029/88/P19:O301-306 P19:O308-309 P19:O312-320 P19:O322 P19:O325-327 P19:O329 7DEAD 1435.4m
2/1.27 PEIQC PJc744:Z01/J1-2
774.0
195.2
2/1.27 PEIQC PJC KATX 721:Z01/J1-2
1.0513.0
319.0
448.0
P19:O301-350 50 (AB)c3001:AB-B11/1-12 12F/- SMOF FNPEHJ/STD (AB)
P19:O301-350 50 (AB)c3001:AB-B11/1-12 12F/- SMOF FNPEHJ/STD (AB)
1DEAD 6 (AA) P19:O342 3DEAD P19:O346
c3001:AB-B11/1-12 12F/- SMOF FNPEHJ/STD (AA) P19:O331-340 30/0.40 (AA)
20DEAD
T167P19:O331-340
B113001:AB-B11/1-1212F/- FNPEHJ/STD
7.0P50
30/0.4012F/- FNPEHJ/STD
P35
430/0.40P507.0
50.0 307.0
6
169.7
18.5
2/1.27 PEIQC PJc744:Z01/J1-2
10 PRP19:O341-350
0.6---1.2
83.9 66
144.5
116.0
T166P19:O342P19:O346
P356
46.1 P50
3
----1.0
P19:O301-330 50 CPFUT (AB) 20DEAD
286.2
2/1.27 PEIQC PJc744:Z01/J1-2
1.0
601.0
10367.7
2/1.27 PEIQC PJC KATX 721:Z01/J1-2
6.010 PR
10
P19:O301-330 50 CPFUT (AA) 20DEAD
2xP35 SUBDUCTS (AA) F KATX 1702:AB-AC/1-6 6F/- SMOF FNPEHJ/STD (AA1)F KOJD 1611:AC-AB/1-12 12F/- SMOF FNPEHJ <- (AA2)
285.0
2DEAD
2/1.27 PEIQC PJc744:Z01/J1-2
600.0
6
351.5
----1.0 2.02/1.27 PEIQC PJc744:Z01/J1-2
JAMES
RAMSDEN
PROSSER
ST
ILLAREEN
KOJONUP-KATANNING
ST
SHIRLEY
STPROSSER
CURLEW
263858
3850
17
3842L1072DP102395
3802L51DP34416
3729
L50DP34416
133L52DP34416
L440DP257396
L27DP3271
L26DP3271
L25DP3271
8
L23DP327111
99
L607DP222690
8
135
37.510 PEHJ B
10 PEHJO61-7073.0
2 B2 PEHJ125.0
O68-69
10 MBHJC120.0
T225O61
O661DEADO47-48 EJ EJ
EJ
EJ
EJ
EJEJ
EJ
EJ
EJ
20/0.90 173.3
VAC
20/0.90 MBHJ
P50 21.0U/RD26.0
J180OC[ 8mm]OC[ 8mm]
112.020/0.90P5021.0
P35 12.0U/RLYP50 9.0U/RLY
20/0.
90
10/0.4028.05 P203.0 T140O115O11820/0.90
68.0
20/0.
90
J1775
94.1
OC[13mm]
OC[13mm]
OC[17mm]
OC[13mm]OC[17mm]OC[10mm]4xOC[ 4mm]
MC
26.8
OC[17mm]96.9
2
2P3546.1
5P20OC[10mm]
OC[11mm]P2021.8
20.0133.0
4xOC[ 8mm]
B
P35
2J179P20 P20
OC[13mm]
P35
OC[ 8mm]
OC[ 8mm]
115.8
115.8
P20
1P2010.4P20OC[ 8mm]
OC[12mm]
OC[13mm]
77.5
4xOC[ 6mm]29.13
76.5
2xOC[ 6mm]1
11.676.5
OC[13
mm]
OC[13
mm]
3OC[13mm]MC
75.0
OC[ 8mm]OC[ 8mm]
OC[ 8mm]1
4.8P203xOC[ 8mm]2OC[ 8mm]2 P20
9.9OC[ 8mm]
7.6
T139OCOC[ 8mm]
4xOC[ 8mm]
40.02
2 P20
OC[10
mm]
OC[13
mm]
WARNING-ELECTRICITY
OC[ 8mm]PTO130
107.05J181P3
5
OC[ 4mm]
44.0
OC[13
mm]
OC[13
mm]
OC[13
mm]
45.4
9.6OC[14mm]
OC[ 8mm]
3xOC[ 9mm]
77.3
OC[14mm]
5 26.0P35
B3
185.0
OC[ 8mm]
30.0OC[14mm]
B22.0OC[13mm]P35
144.7
OC[13mm]
P50
5
T246OC
94.0
OC[10mm]
P35
2
OC[ 9mm]72.0
OC[14mm]
OC[14
mm]
62.0 P5
0
5
14.0
OC[13
mm]
P35
104.0
OC[14
mm]
43.0 4
OC[14
mm]
P100
4
127.2
OC[14
mm]
P50OC[ 8mm]
OC[13
mm]
39.0
OC[13
mm]
P50
348
.8 98.0
O101
-120
20/0.
90
2xOC
[13mm
]P5
0
337.5
2xOC[13mm]
3P100
P50
123.4
2xOC[1
3mm]3
P50
2xOC[13mm]
350.3
2xOC[13mm]
P50
P50
3
98.8
67.0
OC[14
mm]
P20
20/0.90193.0
OC[10mm]
OC[13mm]
95.5
P50
3
P50OC[10mm]
J182
P20
OC[13mm]
46.0
T141OC
OC[10mm]
OC[13mm]
OC[10mm]
OC[13mm]
3
P50
82.5
OC[ 8mm]
P30 6.0OVER DRAIN41.03P2027.0
P20OC[ 8mm]206.0
90.0
EXTN
46.2OC[ 9mm] OC[ 4mm]
EJEJEJ
EJ
EJEJ
EJ
EJ
EJEJ
EJ
EJ
2
2
145.0
O51-60184.510 CPFUT PEMBHJ
P202
O51O59
2
2
50 40.5-SP-
2DEAD
5DEADO464DEAD
10 PEHJ5
213.6
O41-455DEAD
138.6
O601DEAD
O581DEAD
2 79.0P20
210 CPFUT PEMBHJ
O51-60
2 PEHJ62.1 5
22.1P50
145.5
130.0
30.410P50O41-482DEAD5
10 PEHJ
10 PRO41-482DEAD
2 PEHJ47.5P50
149.0 20 PEHJO41-602J2882/0.40
517.0
21.5P502/0.405 2/0.40P50 57.0
CJ52:O171DEAD
CJ52:O161DEADE52:C4
22/0.405J296O41-455DEADT243O41-45
P20 10 65.0 19.4P35
10DEAD10 PEHJ
10/0.
4045.02
P20
114.6
P20
96.610DEAD10 PEHJ
62.02
J29510 PEHJCJ52:O11-20
20.0P35
CJ52:O13CJ52:O18E52:C8
2/0.40
1DEAD1DEAD
24.02
O461DEAD
30.0
2
P10
2 PRP3520.2
2
10 PEHJCJ52:O11-20P3520.5
173.0
CJ52:O201DEAD
CJ52:O11-2010 PEHJ
73.0
P202
10 PEHJCJ52:O11-20P3520.0
CJ52:O1-1010 PEHJ
10 PEHJCJ52:O1-1021.7P35
10 PEHJCJ52:O1-10
20 PEHJCJ52:O1-20P35J294 26.6
110.6
109.6CJ52:O1-2020 PEHJ
5 P5020.02/0.405
2
110.6CJ52:O1-2020 PEHJ
80.05
P20
5 P50279.0
2
O581DEAD
O52O54
20 PEHJ
5
2/0.40
2174.2
O41-6020 PEHJ
2
P50 32 24.3133.0J3612
3
18.3P502 PR
O41-6020 PEHJ10/0.4010DEADP5018.1
20.0
O501DEAD
2DEAD
P20
O491DEAD
CJ52:O91DEAD
CJ52:O1-2020 PEHJ
CJ52:O31-40 211.2
280.0
3
20 PEHJCJ52:O1-2056.5
CJ52:O1-2010
3.520 MBHJCJ52:O1-20 CJ52:O1-2020 PEHJ
109.6J293
20 PEHJCJ52:O1-2026.6P35
O21-22
5/0.40
150.0
T205O24
O251DEAD
O55O53
64.3
2/0.90
PEH
J
55
99.5
CLPT216O54
82.0
10 M
BHJ
2x10 PEMBHJO51-60O41-5094.7
2x10 PEMBHJ
2
O41-50O51-60
120.0
10/0.
4010
DEAD
P20
CJ52:O411DEAD
O561DEAD
20 PEHJO1-20
2
3J292
21.0P352 PEHJ10 PRCJ52:O31-40
3
OC[ 6mm] 24.9
OC[13
mm]
OC[10
mm]P50OC[ 6mm]
5 67.2
P50
OC[ 4mm]342
.4
T203OC14.
0
P50
OC[13
mm]
OC[10
mm]
OC[13mm]
P50
P203
AAP80
AAP80P100
AAP100
MM
M
M
MM
M
MM
MT
MT
- 4
--
1608.0
1615.0 5-
- 6-1752.0
12
1542.01543.0-
-----
1549.03
1908.0
1981.0
7--
9
--
-
10-2071.0
11
--
2230.0
1.2--7.9
c704:M1-28 28/0.64 PIQJ PJ
82.4
529.0
5
c704:M1-28 28/0.64 PIQJ PJ
84.0
1708:YY-AN/1-36 36F/- SMOF FNPEHJ (AA)7xOC (AA)
1708:YY-AN/1-36 36F/- SMOF FNPEHJ (AA)2xOC (AA)
77.53
76.5
3
3
26.4
3
1.2----13.774.0
6
125.0
6P5
0
BJ
897.0
C KATX 712:ZO1/J1-2 2/1.27 PEIQC PECSHJ
28LEFT IN SITU 28/0.64 PIQJ PJ
1708:YY-AN/1-36 36F/- SMOF FNPEHJ (AA)
c704:M1-28 30/0.64 CPFUT MBHJ <- (AA) 2DEAD
340.0
CAPR18C KATX 704
c704:M1-28 28/0.64 PIQJ PJ
c704:M1-28 30/0.64 CPFUT MBHJC 2DEAD GW 8.7
28LEFT IN SITU 28/0.64 PIQJ PJ
AN
9
1708:AN-INT4/1-36 36F/- SMOF FNPEHJ
c704:M1-28 28/0.64 PIQJ PJ
257.5
8.7
8.7
55
28LEFT IN SITU 28/0.64 PIQJ PJ
c1708:AN-INT4/1-36 2230m
c704:M1-28 30/0.64 CPFUT MBHJC 2DEAD GW 40.0
1.2----15.2
69.4
269.0
INT4
540.05
40.0
1.2----12.8
354.5
c704:M1-28 28/0.64 PIQJ PJ
C KATX 712:ZO1/J1-2 1m
6
C KATX 712:ZO1/J1-2 2/1.27 PEIQC PECSHJ
MT
MT
MT
M
M
EJEJ
EJ
2230.0
11-
-
--
11A
--
11B
2387.0
2417.0
2468.0
12
--
P16:O101-120
20/0.90
36F/UNKNOWN SMOF FNPEHJc1708:INT4:AM/1-36
c1708:AN-INT4/1-36 2230m
351.8
20/0.903.4
P35 18.7
D5
45.0P35
T178OC
OC[10mm]30.0P35
OC[10mm]10.0
P20
10.0
P35
22
35.7
OC[10mm]P35
C KATX 712:ZO1/J1-2 1m
2/1.27 PEIQC PECSHJC KATX 712:ZO1/J1-2
1.0
6 CA
MARTINS
CREEK
ST
ARNOLD
STST
LANGLE
Y
ST
ST
ST
BAY
BARCLAY
BAY
BOKA
RUP
ST
HWY
ST
GREAT SOUTHERN
ST
ST
CORN
WAL
L
CORNWALLST
HWY
MCLE
OD
ST
MCLEOD
GREAT SOUTHERN
ST
ANTONIOMCLEODST
CURLEW
TUCKER
STRICKLAND
ST GULLEYST
ST
STWANKE
ST
FLUGGE
TREE
L546
P1867
37
2L20
6L30
2
L9243
L1024
4
143L13 152
150
278L11
151L140
L983R31515
155
154L142
SITE2
2
SITE14
SITE21 46
SITE20 SITE23SITE19
SITE12 SITE13
68SITE24SITE25
SITE9 SITE
18
SITE16SITE17SITE8
SITE7
SITE164
SITE11
SITE3
SITE2
SITE15SITE10
SITE6
SITE5SITE4
L145DP222687
46L7
72
L146DP222687
L1039R45332
78
92L873
41
L964DP102394
L1010R31076
L994DP214737994
1322
26
3864
PUBLIC RESERVEL995R27092
L14DP3271
L603DP13501528497
2852
0
L605DP135015
L3
HSE1
81
109
78
86
L1D64302
L602R12424
L1D271
48
L4D563
25
L890DP141934L889DP141934
119
45
120
108
79613
120
L885DP141934
124
117
L639DP222690
L8DP3271L17DP3271
L18L7DP3271L6DP3271L19DP3271
L25D16035
6064
L16DP3271L9DP3271
L301DP300794
50L618DP222690
L612DP222690L617DP222690
L610DP22269047
1232
33402625
2118
24 2916L621DP222690
EJ
EJ
USED EXISTING 21.0 650x2U/RLYOC[16mm]
OC[16mm]
P100
66
OC[16mm]
21.0
P35
3
OC[10mm]OC[16mm]
44.6 J3943 P100
5
42.0
5 P50OC[16mm]
38.0
105.3
P20
2J15538.0 P35
OC[13mm]OC[12mm]
P352
OC[13mm]OC[12mm]
40.0
2OC[13mm]OC[12mm]55.3
T9OC
241.6 P35
OC[ 6mm]55.0
OC[14mm]2 57.7OC[14mm]
2xOC[10mm]P35P35 60.3OC[10mm]
P3527.1
60.36
P35
89.0OC[ 6mm]
2xOC[10mm]
OC[10mm]
T6OC
EXTN
P50OC[16mm]
5
36.2
T208OC
P20OC
[16mm
]OC[ 4
mm]
3
P20
67.73 P50
36.5
OC[10mm] J359
OC[13
mm]
76.0OC[13mm]OC[12mm]
P35
P50
T108OC
72.5OC[10mm]
OC[14mm]
597.8
J156
OC[ 9
mm]
236.0
OC[14mm]
529.0
OC[ 9mm]104.0
J157
OC[ 9mm] 70.0
BAGI50 MT
MT
MT
MT
MT
MT
TP
--
6.0-
-
4.0--
1731
7.0
4.0--
4.0--
1766
4.0
1750
0.0
17059.0 4.017000.0
2.0
4.0--
1783
4.0
32F/UNKN SMOF FNPEHJF MOJB 2003:AH-INT3/1-32
6
6
21.0
CA
C KATX 720:Z01/J1-2 2/1.27 PEIQC PJ (BA)ABANDONED TRUNK KATX 728 14/0.90 PIQC PJ(BA)
32F/UNKN SMOF FNPEHJF MOJB 2003:AH-INT3/1-32
F MOJB 2003:AH-INT3/1-32 17834m
838.0
C KATX 720:Z01/J1-2 2/1.27 PEIQC PJ ABANDONED TRUNK KATX 728 14/0.90 PIQC PJ
8C KATX 720:ZO1/J1-2
906.0
C KATX 720:Z01/J1-2 2/1.27 PEIQC PJ ABANDONED TRUNK KATX 728 14/0.90 PIQC PJ
AAP50
AAP50
M
M
MT
MT
MT
MT
M
M
MT
M
MT
EJ
EJ
EJ
EJ
EJ
17834.0
18
-
19-
--
17
--
3308
.0
3509
.0
2629.0
-
13
-
14--
2789.0
15A
-15
-
2948
.0
- -
3028
.0
3106
.0
16
--
3709
.0
3913
.0
20
--
22
--
4117
.0
23
--
4273
.0
4273.0--
F MOJB 2003:AH-INT3/1-32 17834m
20/0.90
P16:O101-120
910.0909.0
174.0
P16:O101-120
10/88/P16:O105-108 1DEAD P16:O114
P16:O116-118 P16:O111
600.0
P16:O101-12020/0.90 36F/- FNPEHJ
1708:INT4-AM/1-36
C KATX 712:ZO1/J1-2
181.8
2/1.27 PEIQC PECSHJ
28 PIQJ PJc704:M1-28
20/0.90
1.0
c1708:INT4-AM/1-36 36F/- SMOF FNPEHJ (AA)
C KATX 712:ZO1/J1-2
2/1.27 PEIQC PECSHJ
20/0.90
P16:O101-1201678.5 4.5
28 PIQJ PJ
536.0
9AM1AM
BJ7
CA
2/1.27 PEIQC PECSHJC KATX 712:ZO1/J1-2
c1708:AM-AL/1-36 36F/- SMOF FNPEHJ (AA)
4.5
374.0P16:O101-12020/0.90
908.0
C KATX 712:ZO1/J1-2
CREEK
36F/UNKNOWN SMOF FNPEHJc1708:AM-AL/1-36
C KATX 712:ZO1/J1-2
2/1.27 PEIQC PECSHJ
540.0
325.2
c704:M1-28
ST
POLICE POOLS
ST
CR
ST
DAPING
QUARRELL
POLICE POOLS
RD
GREAT SOUTHERN
HWY
30L27
L16DP1358416L7L6DP13368
1
L17DP13584
28L1017
L11P13368
22
5
L5
LN508
L508
L1D30714140
LN138
L32D93793
L31D93793
L255DP227407
L4
76L519DP257402
28694
LN4932
LN4931
L4937DP227775
L4934DP227775