PROJECT OVERVIEWarabic.mag-boulevard.com/MAG5-Phase3-Brochure.pdf · The project is destined to...

19
PROJECT OVERVIEW Feb. 2017

Transcript of PROJECT OVERVIEWarabic.mag-boulevard.com/MAG5-Phase3-Brochure.pdf · The project is destined to...

Page 1: PROJECT OVERVIEWarabic.mag-boulevard.com/MAG5-Phase3-Brochure.pdf · The project is destined to become a 24 hour living, walkable community spread over 800,000 sq. . of land. Phase

PROJECT OVERVIEWFeb. 2017

Page 2: PROJECT OVERVIEWarabic.mag-boulevard.com/MAG5-Phase3-Brochure.pdf · The project is destined to become a 24 hour living, walkable community spread over 800,000 sq. . of land. Phase

LocAtioN

MASterPLAN

KeY FeAtUreS

FLoor PLANS

PAYMeNt PLAN

mag5.ae

Page 3: PROJECT OVERVIEWarabic.mag-boulevard.com/MAG5-Phase3-Brochure.pdf · The project is destined to become a 24 hour living, walkable community spread over 800,000 sq. . of land. Phase

LocAtion

Landmark project in Dubai South

MAG 5 is a landmark community

that offers exceptional residential

living at affordable prices.

MAG 5 Boulevard is a walkable

development redefines quality

of life, functionality, simplicity of

design and efficient use. With the

Greenbelt Park at its centre – the

U.A.E.’s largest linear network of

parks - expansive green areas serve

as a focal point. These lands are

surrounded by a variety of facilities

for residents including running

and cycling tracks, playgrounds

for children, community and retail

centres.

Dubai South is

an emerging city

built to support

1 million residents

and create

500,000 jobs.

Page 4: PROJECT OVERVIEWarabic.mag-boulevard.com/MAG5-Phase3-Brochure.pdf · The project is destined to become a 24 hour living, walkable community spread over 800,000 sq. . of land. Phase

LocAtion

25

Dubai South Masterplan

Expo 2020

CommercialCity

Golf City

Residential

City

Al Maktoum Int. Airport

Aviation City

Logistic City

1

2

- An international airport designed to handle more than 200 million passengers and 12 million tonnes of cargo annually upon completion

- Passenger terminal now operational with capacity to serve seven million passengers per year

- Passenger operations commenced in october 2013

- A multimodal logistic platform dedicated to logistics and value added services including light manufacturing and assembly

- Caters to contract logistics, integrators, freight forwarders and agents

- Access to Al Maktoum International Airport for air cargo operations

Al Maktoum Int. Airport

Logistic City

Page 5: PROJECT OVERVIEWarabic.mag-boulevard.com/MAG5-Phase3-Brochure.pdf · The project is destined to become a 24 hour living, walkable community spread over 800,000 sq. . of land. Phase

1 2 3 4 5

6

7

8

9

10

11

12

13

LocAtion

Page 6: PROJECT OVERVIEWarabic.mag-boulevard.com/MAG5-Phase3-Brochure.pdf · The project is destined to become a 24 hour living, walkable community spread over 800,000 sq. . of land. Phase

MAStERPLAn

13 buildings1,422 residential unitsPrices range 310,000 AED and 1,480,000 AED.

The project is destined to become a

24 hour living, walkable community

spread over 800,000 sq. ft. of land.

Phase 1 & 2 handover for the

development is scheduled to commence

in Q4 2018 and Phase 3 will be handed

over by Q2 2019.

The 3 bed room units is with 580AED per

sq ft the best value in the UAE!

Page 7: PROJECT OVERVIEWarabic.mag-boulevard.com/MAG5-Phase3-Brochure.pdf · The project is destined to become a 24 hour living, walkable community spread over 800,000 sq. . of land. Phase

inVESt in DUBAi’S fUtUREinVESt in yoUR fUtURE

Page 8: PROJECT OVERVIEWarabic.mag-boulevard.com/MAG5-Phase3-Brochure.pdf · The project is destined to become a 24 hour living, walkable community spread over 800,000 sq. . of land. Phase

KEy fEAtURES

Close to Dubai Parks & ResortsAdjacent to EXPO 2020 Located next to the largest park in the UAE “The Green Belt”

Fully walkable community

Expected High rental demand

Minutes away from the proposed new metro stations

Balcony and parking spots for each unit

Elegantly designed landscaping

Swimming pool, jogging tracks and gardens

Convenience stores

Retail, dining and leisure outlets and activities

Page 9: PROJECT OVERVIEWarabic.mag-boulevard.com/MAG5-Phase3-Brochure.pdf · The project is destined to become a 24 hour living, walkable community spread over 800,000 sq. . of land. Phase

inVESt in DUBAi’S fUtUREinVESt in yoUR fUtURE

Page 10: PROJECT OVERVIEWarabic.mag-boulevard.com/MAG5-Phase3-Brochure.pdf · The project is destined to become a 24 hour living, walkable community spread over 800,000 sq. . of land. Phase

fLooR PLAnS

MAStERPLAn

13 buildings1,442 residential unitsPrices range 310,000 AED and 1,480,000 AED.

The project is destined to become a

24-hour living, walkable community

spread over 800,000 sq. ft. of land.

Phase 1 & 2 handover for the

development is scheduled to commence

in Q4 2018 and Phase 3 will be handed

over by Q2 2019.

The 3 bed room units is with 580AED per

sq ft the best value in the UAE!

1 2 3 4 5 6

7

8

9

10

11

12

13

Page 11: PROJECT OVERVIEWarabic.mag-boulevard.com/MAG5-Phase3-Brochure.pdf · The project is destined to become a 24 hour living, walkable community spread over 800,000 sq. . of land. Phase

LIVING/DININGAREA

LIVING/DINING

AREA

LIVING/DININGAREA

STUDIO

STUDIO

LIVING/DINING

AREA

LIVING/DINING

AREA

LIVING/DININGAREA

LIVING/DININGAREA

STUDIO

STUDIO

LIVING/DININGAREA

STUDIO

STUDIO

LIVING/DININGAREA

STUDIO

STUDIO

LIVING/DININGAREA

LIVING/DININGAREA

LIVING/DINING

AREA

LIVING/DININGAREA

STUDIO STUDIO

6600

2A/201

BA/301

6600 3950

21100

3950

2A/201

BA/301

5800

12600

2150

0

3A/202

1A/200

AA/300

AA/300

4A/203

BA/301

4000

1450

6600

4400

6800

5800

12600

1645

0

6800

4400

A

1 2 3 54

B

C

D8

6

7

6'

7'

EF

G

H

I

E'F'

G'

H'

I'

2150

0

6750

1035

044

00

A

B

C

D8'55

° 55°

1450

6600

4000

4400

16450

6750

1035

0

\\aljabalserver\projects\1110-MAG DWC RESIDENCE\01-UPDATING\UPDATING\MAG5PD-200420155.jpg

A1Rev

Original Scale

Drawing Number

Date:

Drawn

Date:

Checked

Date:

Authorised Size

AuthorisedDescriptionRev CheckedDate

Project:

Client:

Consultant:

AuthorisedDateRevPurpose of issue

Drawing title:

GENERAL NOTES:1. THIS DRAWING IS THE COPYRIGHT OF AL JABAL ENGINEERING CONSULTANCY EST. (DUBAI) AND

MUST NOT BE RETAINED, COPIED OR USED WITHOUT THE ABOVE CONSULTANT'S AUTHORITY.

2. DO NOT SCALE FROM THE DRAWINGS.

3. ALL DIMENSIONS ARE IN MILLIMETRES AND LEVELS IN METRES UNLESS NOTED OTHERWISE. ALL DIMENSIONS TO BE VERIFIED ON SITE & APPROVED BY THE ENGINEER.

4. THIS DRAWING SHOULD BE READ IN CONJUNCTION WITH OTHER RELEVANT ARCHITECTURAL, STRUCTURAL, MECHANICAL AND ELECTRICAL DRAWINGS AND ALL RELEVANT SECTIONS OF THE SPECIFICATIONS.

MAG 5 BOULEVARD AT DUBAI SOUTH

\\aljabalserver\projects\1110-MAG DWC RESIDENCE\01-UPDATING\UPDATING\MAG € Blvd Launch (logos)grey.jpg

MAG 5PROPERTY DEVELOPMENT

1110-510/A/101

1ST TO 4TH FLOOR PLAN

2

1/100LEV/RAP

MAY 02, 2015

- -

PLOT NO. RE-41

N

1. PROVIDE MARBLE THRESHOLD FOR ENTRANCE, WET AREA,STAIRCASE, SERVICE ROOM , BALCONY DOORS AND WHERESHOWN ON THE DRAWINGS.

2. ALL REQUIRED PLASTER WORKS AND CONCRETE BLOCKWORK ACCESSORIES SHALL BE GALVANIZED FOR A/C AREAAND STAINLESS STEEL FOR EXTERNAL AND NON A/C AREA.

NOTE:

FHC : FIRE HOSE REEL CABINET

LA : ALUMINIUM LOUVERDT : TIMBER DOOR

DS : STEEL DOOR

DG : ALUMINIUM GLASS DOOR FFLSSLFL

TOCFCLFGL

TOP TOP OF PARAPET

FINISHED GROUND LEVELFALSE CEILING LEVELTOP OF CONCRETE

FINISHED LEVELSTRUCTURAL SLAB LEVELFINISHED FLOOR LEVEL

WA : ALUMINIUM WINDOW

LEGEND:

REVISED AS NEW DESIGN2 DEC. 12, 2016 - -

200 MM THICK SOLID CONC. BLOCKWORK WALL 200 MM THICK HOLLOW CONC. BLOCKWORK WALL

REINFORCED CONCRETE WALL OR COLUMN

100 MM THICK AUTOCLAVED AERATED WALL150 MM THICK AUTOCLAVED AERATED WALL100 MM THICK SOLID CONC. BLOCKWORK WALL

ISSUED FOR DWC -JULY 26, 20150

MAR. 03, 2016 - -

-1ISSUED FOR DUBAI SOUTH

REVISED AS CLOUDED1

OCT 26, 2016

REVISED

-ISSUED FOR DUBAI SOUTH JAN, 20172

fLooR PLAnS

StUDio

LIVING AREA

DINING AREA

KITCHEN AREA

ENTRANCE

BATHROOM

BEDROOM

TERRACE 38 sqm

5.3 sqm

TOTAL APARTMENT AREA

TERRACE

Page 12: PROJECT OVERVIEWarabic.mag-boulevard.com/MAG5-Phase3-Brochure.pdf · The project is destined to become a 24 hour living, walkable community spread over 800,000 sq. . of land. Phase

StUDio

mag5.ae

Page 13: PROJECT OVERVIEWarabic.mag-boulevard.com/MAG5-Phase3-Brochure.pdf · The project is destined to become a 24 hour living, walkable community spread over 800,000 sq. . of land. Phase

StUDio

mag5.ae

Page 14: PROJECT OVERVIEWarabic.mag-boulevard.com/MAG5-Phase3-Brochure.pdf · The project is destined to become a 24 hour living, walkable community spread over 800,000 sq. . of land. Phase

LIVING/DININGAREA

LIVING/DINING

AREA

LIVING/DININGAREA

STUDIO

STUDIO

LIVING/DINING

AREA

LIVING/DINING

AREA

LIVING/DININGAREA

LIVING/DININGAREA

STUDIO

STUDIO

LIVING/DININGAREA

STUDIO

STUDIO

LIVING/DININGAREA

STUDIO

STUDIO

LIVING/DININGAREA

LIVING/DININGAREA

LIVING/DINING

AREA

LIVING/DININGAREA

STUDIO STUDIO

6600

2A/201

BA/301

6600 3950

21100

3950

2A/201

BA/301

5800

12600

2150

0

3A/202

1A/200

AA/300

AA/300

4A/203

BA/301

4000

1450

6600

4400

6800

5800

12600

1645

0

6800

4400

A

1 2 3 54

B

C

D8

6

7

6'

7'

EF

G

H

I

E'F'

G'

H'

I'

2150

0

6750

1035

044

00

A

B

C

D8'55

° 55°

1450

6600

4000

4400

16450

6750

1035

0

\\aljabalserver\projects\1110-MAG DWC RESIDENCE\01-UPDATING\UPDATING\MAG5PD-200420155.jpg

A1Rev

Original Scale

Drawing Number

Date:

Drawn

Date:

Checked

Date:

Authorised Size

AuthorisedDescriptionRev CheckedDate

Project:

Client:

Consultant:

AuthorisedDateRevPurpose of issue

Drawing title:

GENERAL NOTES:1. THIS DRAWING IS THE COPYRIGHT OF AL JABAL ENGINEERING CONSULTANCY EST. (DUBAI) AND

MUST NOT BE RETAINED, COPIED OR USED WITHOUT THE ABOVE CONSULTANT'S AUTHORITY.

2. DO NOT SCALE FROM THE DRAWINGS.

3. ALL DIMENSIONS ARE IN MILLIMETRES AND LEVELS IN METRES UNLESS NOTED OTHERWISE. ALL DIMENSIONS TO BE VERIFIED ON SITE & APPROVED BY THE ENGINEER.

4. THIS DRAWING SHOULD BE READ IN CONJUNCTION WITH OTHER RELEVANT ARCHITECTURAL, STRUCTURAL, MECHANICAL AND ELECTRICAL DRAWINGS AND ALL RELEVANT SECTIONS OF THE SPECIFICATIONS.

MAG 5 BOULEVARD AT DUBAI SOUTH

\\aljabalserver\projects\1110-MAG DWC RESIDENCE\01-UPDATING\UPDATING\MAG € Blvd Launch (logos)grey.jpg

MAG 5PROPERTY DEVELOPMENT

1110-510/A/101

1ST TO 4TH FLOOR PLAN

2

1/100LEV/RAP

MAY 02, 2015

- -

PLOT NO. RE-41

N

1. PROVIDE MARBLE THRESHOLD FOR ENTRANCE, WET AREA,STAIRCASE, SERVICE ROOM , BALCONY DOORS AND WHERESHOWN ON THE DRAWINGS.

2. ALL REQUIRED PLASTER WORKS AND CONCRETE BLOCKWORK ACCESSORIES SHALL BE GALVANIZED FOR A/C AREAAND STAINLESS STEEL FOR EXTERNAL AND NON A/C AREA.

NOTE:

FHC : FIRE HOSE REEL CABINET

LA : ALUMINIUM LOUVERDT : TIMBER DOOR

DS : STEEL DOOR

DG : ALUMINIUM GLASS DOOR FFLSSLFL

TOCFCLFGL

TOP TOP OF PARAPET

FINISHED GROUND LEVELFALSE CEILING LEVELTOP OF CONCRETE

FINISHED LEVELSTRUCTURAL SLAB LEVELFINISHED FLOOR LEVEL

WA : ALUMINIUM WINDOW

LEGEND:

REVISED AS NEW DESIGN2 DEC. 12, 2016 - -

200 MM THICK SOLID CONC. BLOCKWORK WALL 200 MM THICK HOLLOW CONC. BLOCKWORK WALL

REINFORCED CONCRETE WALL OR COLUMN

100 MM THICK AUTOCLAVED AERATED WALL150 MM THICK AUTOCLAVED AERATED WALL100 MM THICK SOLID CONC. BLOCKWORK WALL

ISSUED FOR DWC -JULY 26, 20150

MAR. 03, 2016 - -

-1ISSUED FOR DUBAI SOUTH

REVISED AS CLOUDED1

OCT 26, 2016

REVISED

-ISSUED FOR DUBAI SOUTH JAN, 20172

fLooR PLAnS

1 BEDRooM

LIVING AREA

TERRACE

KITCHEN AREA

ENTRANCE

BATHROOMBEDROOM

55 sqmTOTAL APARTMENT AREA

Page 15: PROJECT OVERVIEWarabic.mag-boulevard.com/MAG5-Phase3-Brochure.pdf · The project is destined to become a 24 hour living, walkable community spread over 800,000 sq. . of land. Phase

1 BEDRooM

Page 16: PROJECT OVERVIEWarabic.mag-boulevard.com/MAG5-Phase3-Brochure.pdf · The project is destined to become a 24 hour living, walkable community spread over 800,000 sq. . of land. Phase

1 BEDRooM

Page 17: PROJECT OVERVIEWarabic.mag-boulevard.com/MAG5-Phase3-Brochure.pdf · The project is destined to become a 24 hour living, walkable community spread over 800,000 sq. . of land. Phase

fLooR PLAnS

2 BEDRooM

LIVING ROOM

DINING AND KITCHEN AREA

ENTRANCE

BATHROOM

TERRACE 15,4 sqm

TERRACE 23,8 sqm

SINGLE BEDROOM 1

BEDROOM 2

LIVING/DININGAREA

LIVING/DINING

AREA

LIVING/DININGAREA

STUDIO

STUDIO

LIVING/DINING

AREA

LIVING/DINING

AREA

LIVING/DININGAREA

LIVING/DININGAREA

STUDIO

STUDIO

LIVING/DININGAREA

STUDIO

STUDIO

LIVING/DININGAREA

STUDIO

STUDIO

LIVING/DININGAREA

LIVING/DININGAREA

LIVING/DINING

AREA

LIVING/DININGAREA

STUDIO STUDIO

6600

2A/201

BA/301

6600 3950

21100

3950

2A/201

BA/301

5800

12600

2150

0

3A/202

1A/200

AA/300

AA/300

4A/203

BA/301

4000

1450

6600

4400

6800

5800

12600

1645

0

6800

4400

A

1 2 3 54

B

C

D8

6

7

6'

7'

EF

G

H

I

E'F'

G'

H'

I'

2150

0

6750

1035

044

00

A

B

C

D8'55

° 55°

1450

6600

4000

4400

16450

6750

1035

0

\\aljabalserver\projects\1110-MAG DWC RESIDENCE\01-UPDATING\UPDATING\MAG5PD-200420155.jpg

A1Rev

Original Scale

Drawing Number

Date:

Drawn

Date:

Checked

Date:

Authorised Size

AuthorisedDescriptionRev CheckedDate

Project:

Client:

Consultant:

AuthorisedDateRevPurpose of issue

Drawing title:

GENERAL NOTES:1. THIS DRAWING IS THE COPYRIGHT OF AL JABAL ENGINEERING CONSULTANCY EST. (DUBAI) AND

MUST NOT BE RETAINED, COPIED OR USED WITHOUT THE ABOVE CONSULTANT'S AUTHORITY.

2. DO NOT SCALE FROM THE DRAWINGS.

3. ALL DIMENSIONS ARE IN MILLIMETRES AND LEVELS IN METRES UNLESS NOTED OTHERWISE. ALL DIMENSIONS TO BE VERIFIED ON SITE & APPROVED BY THE ENGINEER.

4. THIS DRAWING SHOULD BE READ IN CONJUNCTION WITH OTHER RELEVANT ARCHITECTURAL, STRUCTURAL, MECHANICAL AND ELECTRICAL DRAWINGS AND ALL RELEVANT SECTIONS OF THE SPECIFICATIONS.

MAG 5 BOULEVARD AT DUBAI SOUTH

\\aljabalserver\projects\1110-MAG DWC RESIDENCE\01-UPDATING\UPDATING\MAG € Blvd Launch (logos)grey.jpg

MAG 5PROPERTY DEVELOPMENT

1110-510/A/101

1ST TO 4TH FLOOR PLAN

2

1/100LEV/RAP

MAY 02, 2015

- -

PLOT NO. RE-41

N

1. PROVIDE MARBLE THRESHOLD FOR ENTRANCE, WET AREA,STAIRCASE, SERVICE ROOM , BALCONY DOORS AND WHERESHOWN ON THE DRAWINGS.

2. ALL REQUIRED PLASTER WORKS AND CONCRETE BLOCKWORK ACCESSORIES SHALL BE GALVANIZED FOR A/C AREAAND STAINLESS STEEL FOR EXTERNAL AND NON A/C AREA.

NOTE:

FHC : FIRE HOSE REEL CABINET

LA : ALUMINIUM LOUVERDT : TIMBER DOOR

DS : STEEL DOOR

DG : ALUMINIUM GLASS DOOR FFLSSLFL

TOCFCLFGL

TOP TOP OF PARAPET

FINISHED GROUND LEVELFALSE CEILING LEVELTOP OF CONCRETE

FINISHED LEVELSTRUCTURAL SLAB LEVELFINISHED FLOOR LEVEL

WA : ALUMINIUM WINDOW

LEGEND:

REVISED AS NEW DESIGN2 DEC. 12, 2016 - -

200 MM THICK SOLID CONC. BLOCKWORK WALL 200 MM THICK HOLLOW CONC. BLOCKWORK WALL

REINFORCED CONCRETE WALL OR COLUMN

100 MM THICK AUTOCLAVED AERATED WALL150 MM THICK AUTOCLAVED AERATED WALL100 MM THICK SOLID CONC. BLOCKWORK WALL

ISSUED FOR DWC -JULY 26, 20150

MAR. 03, 2016 - -

-1ISSUED FOR DUBAI SOUTH

REVISED AS CLOUDED1

OCT 26, 2016

REVISED

-ISSUED FOR DUBAI SOUTH JAN, 20172

64 sqm

9.2 sqm

TOTAL APARTMENT AREA

TERRACE

Page 18: PROJECT OVERVIEWarabic.mag-boulevard.com/MAG5-Phase3-Brochure.pdf · The project is destined to become a 24 hour living, walkable community spread over 800,000 sq. . of land. Phase

PAyMEnt PLAn

Solid Payment Plan 50% - 50%

We are offering a convenient payment plan,

which reduces the risk for our customers

and is attracting a more seasoned and

knowledgeable buyer to the MAG 5 project.

The 50% / 50% payment structure is

designed to offer comfortable payment

dates, with a year of no payments before

completion of the project.

Prices Starts from AED 310,000

10%10% 10% 10% 10% 50%

DO NOT MISS THIS OPPORTUNITY!

During Construction

SalesAgreement

April 17 July 17 Dec 17 April 18

On Handover

Page 19: PROJECT OVERVIEWarabic.mag-boulevard.com/MAG5-Phase3-Brochure.pdf · The project is destined to become a 24 hour living, walkable community spread over 800,000 sq. . of land. Phase

24/7 Sales Contact No.

+971 4553 8725

More Details are Available in

http://www.mag-boulevard.com

zeb
Stamp