Project StatusDocument Optimization

22 February 2007

Team members: Chris CatalanoChun-Yu ChangChris JosonDavid Matthes

Page 2: Project Status Document Optimization 22 February 2007 Team members: Chris Catalano Chun-Yu Chang Chris Joson David Matthes.

Project Milestones

Date Description15 Feb 07 Proposal and Presentation22 Feb 07 Status Report (10 Min)08 Mar 07 Progress Report (20 Min)22 Mar 07 Status Report (10 Min)05 Apr 07 Formal Progress Presentation (30 Min)26 Apr 07 Dry Run of Final Presentation11 May 07 Final Project Presentation

Final Report

Page 3: Project Status Document Optimization 22 February 2007 Team members: Chris Catalano Chun-Yu Chang Chris Joson David Matthes.

ID Task Name Duration Start Finish

1 EDD Project Plan 67 days? Thu 2/1/07 Thu 5/3/07

2 Prepare Proposal 11 days Thu 2/1/07 Thu 2/15/07

3 Develop Project Scope 11 days Thu 2/1/07 Thu 2/15/07

4 Identify Models 6 days Thu 2/8/07 Thu 2/15/07

5 Background Research and Learn SysML 17 days? Thu 2/8/07 Fri 3/2/07

6 Detail SysML Metrics & Measures 7 days Wed 2/14/07 Thu 2/22/07

7 Detail Huron Metrics & Performance 7 days Wed 2/14/07 Thu 2/22/07

8 Contact Aerospace 1 day? Thu 2/22/07 Thu 2/22/07

9 Determine a day to visit Huron 7 days Wed 2/14/07 Thu 2/22/07

10 Research Background Literature 11 days Thu 2/8/07 Thu 2/22/07

11 Research Autonomy 11 days Fri 2/16/07 Fri 3/2/07

12 Research Attenex 11 days Fri 2/16/07 Fri 3/2/07

23 Model Processes in SysML 42 days Fri 2/16/07 Fri 4/13/07

24 Implement Model of Current Process in SysML 21 days Fri 2/16/07 Thu 3/15/07

25 Implement Attenex Model in SysML 21 days Fri 3/2/07 Thu 3/29/07

26 Implement Autonomy Model in SysML 21 days Sat 3/3/07 Fri 3/30/07

27 Optimize Models and Perform Trade Analysis 21 days Fri 3/16/07 Fri 4/13/07

28 Track SysML Issues and Metrics 56 days Fri 2/9/07 Thu 4/26/07

29 Learn SysML 16 days Fri 2/9/07 Fri 3/2/07

30 Use SysML 51 days Fri 2/16/07 Thu 4/26/07

31 SysML Training 0 days Sat 3/3/07 Sat 3/3/07

13 Develop Final Presentation 17 days Wed 4/4/07 Thu 4/26/07

14 In Class Deliverables 56 days Thu 2/15/07 Thu 5/3/07

15 Proposal and Presentation 0 days Thu 2/15/07 Thu 2/15/07

16 Status Report 0 days Thu 2/22/07 Thu 2/22/07

17 Progress Report 0 days Thu 3/8/07 Thu 3/8/07

18 Status Report 0 days Thu 3/22/07 Thu 3/22/07

19 Formal Progress Presentation 0 days Thu 4/5/07 Thu 4/5/07

20 Dry Run of final Presentation 0 days Thu 4/26/07 Thu 4/26/07

21 Final Project Presenation 0 days Tue 5/1/07 Tue 5/1/07

22 Final Report 0 days Thu 5/3/07 Thu 5/3/07

3/3

2/15

2/22

3/8

3/22

4/5

4/26

5/1

5/3

1/28 2/4 2/11 2/18 2/25 3/4 3/11 3/18 3/25 4/1 4/8 4/15 4/22 4/29January February March April

Page 4: Project Status Document Optimization 22 February 2007 Team members: Chris Catalano Chun-Yu Chang Chris Joson David Matthes.

Activities

-Resolve or status SysML licensing issue (Chun, David)

in progress

-Install Rational System Developer (all)

complete

-Detail SysML Metrics/measures (Chun, Chris J)

in progress

-Detail Huron EDD Model Metrics/performance (Chris C)

in progress

-Contact Aerospace (Chris C)

in progress

-Visit Huron (all)

11am Sunday 2/25/2007

-post MS project file on webCT (David)

Complete

Page 5: Project Status Document Optimization 22 February 2007 Team members: Chris Catalano Chun-Yu Chang Chris Joson David Matthes.

SysML Performance Metrics/Ratings

• What is rated • User Interface - measures the effectiveness of the interface • Modeling Capability – measure the ability of SysML to models complex systems• Executable Performance – measures how fast the model executes• Flexibility – measure how the model and its parameters adapts to modifications• Learnability - measures the ease of use for first-time users

• How things are rated• 0 – Very Poor• 1 – Poor• 2 – Below Average• 3 – Average• 4 – Good• 5 – Very Good

• Performance Metrics• # of hours/diagram• Executable run time

Page 6: Project Status Document Optimization 22 February 2007 Team members: Chris Catalano Chun-Yu Chang Chris Joson David Matthes.

Interesting Note on Revenue and Job Speed• If we have a 50GB project, the price per GB is $2,250 so Revenue = $112,500• The revenue is now fixed! So if we can complete the project in 5 days we charge the same as if the project takes 10 days!• If each 50GB job took 5 days, we could do two 50GB jobs in 10 days! So in this example the opportunity cost of having a slower

system (50GB in 10 days,) is $112,500

So some of the important questions are: • How quickly can each of the 3 systems complete jobs of various sizes? • Where is the break even point for the increased speed to balance the investment in new capitol?• How might different scenarios impact our financial model?

Methodology:- First determine and decompose the parametric equations for the system- Then use system data to determine the distributions for the stochastic elements- Next run a Monte Carlo simulation to generate output - V&V the model and output- Finally, we’ll compare the three alternatives and do some sensitivity analysis

We can show the baseline systems’ output for the next update!

Hey Lets build a Model and Simulate Costs & Revenue!

Page 7: Project Status Document Optimization 22 February 2007 Team members: Chris Catalano Chun-Yu Chang Chris Joson David Matthes.

Parametric Cost Model

Page 8: Project Status Document Optimization 22 February 2007 Team members: Chris Catalano Chun-Yu Chang Chris Joson David Matthes.

Action Items• Obtain sample tool performance measures from Dr. Laskey (Chun)

• Interface with SysML• Make webpage for project group (Chun, Chris J)• Define Model assumptions (Chris C.)• Interaction slides with customer (Chris C.)• Update MS Project (David)

• Estimate project activities• Provide detail activities

• Activate Rational System Developer(All)• Produce Activity logs (Chris J.)• Get License from EmbeddedPlus (Chun)

• SysML Toolkit• Simulation Toolkit

• Run the SysML Hybrid SUV tutorial (All)• Learn JAVA? Compared to CORE?• Dr. Adlemen – empirical methods? (David)